1228.15.00_-_VT-101_LOW-MID_RISE_ELEV-Layout1.pdf
PDF 465 KB Posted
- Attached to
- 290 Broadway Elevator Modernization Phase 2
- Solicitation number
- 47PC0318R0004(GS-02-P-18-DT-C-ELEV)
About this file
Revised Drawings 1228.15.00 - VT-101 LOW-MID RISE ELEV-Layout1
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C D
B
D
U P
25.20
[640.0]
32.36
[822.0]
5.24
[133.0]
13.39
[340.0]
1.77
[45.0]
42.68
[1084.0]
47.43
[1204.8]
LOW/MID RISER PASSENGER
ELEVATOR (EMR & SECTION)
XX
XX
VT-101.00
DESIGN ARCHITECT/MEP ENGINEERING
PROJECT
TITLE
K E
Y
P
L A
N C
E R
T I F
I C
A T
I O
N S
R E
V I S
I O
N
N
O T
E S
G R
A P
H I C
S
C A
L E
D R
A W
I N
G P
R O
J E
C T
B U
I L
D I N
G C
O N
T R
A C
T O
R S
PROJECT
DESCRIPTION
PROJECT NO.
GSA PM
SUBMISSION
SUB. DATE
DRAWING TITLE
FILE NAME
FLOOR NO.
DRAWN BY
CHECKED BY
DRAWING
NO.
FACILITY CODE
OTHER
BUILDING NO.s
BUILDING NO.
CITY/STATE/ZIP
STREET
NAME
CONSTR. CON.
SUB A/E
PRIME A/E
CONS. WORK
CONS. CONTR.
A/E TASK NO.
A/E CON NO.
DISCIPLINE SHEET TYPE SEQUENCE
DATE DRAFTED:
SHEET SIZE:
NY0331ZZ
24X36
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
CONSULTANT
- 05/26/17 ISSUED FOR DD
9/9/2011
VNY00058
TED WEISS ELEVATOR
MODERNIZATION
Ted Weiss Federal Building
New York, NY 10007
GSA
TED WEISS ELEVATOR
MODERNIZATION
GS-02P-15-PV-C0010
TED WEISS FEDERAL BUILDING
290 Broadway
NEW YORK, NEW YORK, 10007
N/A
DOMINIQUE FREEMAN
CONSTRUCTION DOCUMENTS
N/A
N/A
ELEVATOR MODERNIZATION
9/9/2011
MARK DATE DESCRIPTION
GC ENG & ASSOCIATES, P.C.
CONSULTING ENGINEERS
T
R
U
E
N
O
R
T
H
PROJECT
NORTH
T
R
U
E
N
O
R
T
H
PROJECT
NORTH
WORTH STREET
F
E
D
E
R
A
L
P
A
Z
A
L
A
F
A
Y
E
T
T
E
R
E
E
T
DUANE STREET
B R
O A
D W
A Y
C
E
N
T R
E
R
E
E
T
E
K
R
E E
T
E
K
R
E E
T
READE STREET
JENKINS & HUNTINGTON, INC.
VERTICAL TRANSPORTATION CONSULTANTS
08/15/17 ISSUED FOR 90% SUBMISSION
09/15/17 ISSUED FOR 100% SUBMISSION
CONSTRUCTION MANAGER
10/10/17 ISSUED FOR 100% PRE-BID
10/23/17 ISSUED FOR REVISION
File details come from the government source that posted it.