RFI 1 Responses 2020 03 11.pdf
PDF 68 KB Posted
- Solicitation number
- 47PB0220R0002
About this file
This document contains responses to requests for information (RFI) regarding a solicitation for exterior mortar and interior plaster repairs at the Portland Custom House. The General Services Administration issued Solicitation Number 47PB0220R0002 seeking to repair and replace exterior stonework and mortar, as well as interior plaster and lath. Through two RFI responses, the government clarified that referenced roof work is not required and should be removed from the scope of work. Additionally, repairs are needed for the keystone on Window #4, and detail G5 should be included in the area of work for the bottom two floors. Offerors were instructed to email proposals by March 18, 2020 to two GSA email addresses with the subject of the solicitation listed as Portland Custom House Exterior Mortar and Interior Plaster Repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 47PB0220R0002 AM0001 2020 03 11.pdf | ||
| PCH Envelope Sign-in Sheet 2020 03 04.pdf | ||
| Evaluation Factor Checklist.pdf | ||
| Solicitation.pdf | ||
| Reps & Certs.pdf | ||
| CRQ.pdf | ||
| 47PB0220R0002 SF1442.pdf | ||
| Agreement.pdf | ||
| Davis Bacon Wages 2020 02 21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
March 11, 2020
Project: Portland Custom House Exterior Mortar and Interior Plaster Repairs
Solicitation #47PB0220R0002
Amendment #1
Subject: RFI #1, Drawing AE-120 General Notes:
Question RFI #1: General note #4, describes the removal & replacement of roofing.
Actual General note #4: "Remove and Replace existing damaged tongue and groove wood roof decking, approximately 100 SF."
Gov’t Response to the RFI #1:
After review of this scope item, any referenced roof work is not required so delete any and all requirements on Sheet AE120, including any and all other references in the scope of work for replacement of tongue and groove decking as this work is not required and is not part of this contract. Deletions to include general notes #1, #2 & #4.
Additional comments during the site visit included the following:
A. Dwg. AE - 102: the windows should be numbered 1-5 running left to the right. Window #5 included the repair of the bottom section of the Keystone detailed as note P4. What about Window #4?
B. Dwg. AE - 202: Area of Work note is missing the G5 detail for the bottom two floors.
Gov’t Response:
A. Dwg. AE -102: Include the repair/replacement of the keystone on window #4.
B. Dwg. AE – 202: Include the detail G5 in the area of work for the bottom two floors