0001 SF 30 Solicitation Amendment 2022 05 23 (2).pdf
PDF 749 KB Posted
- Attached to
- Alburg Springs Port Hardening
- Solicitation number
- 47PB0022R0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0002 SF 30 Solicitation Amendment 2022 05 26.pdf | ||
| Site-Visit Sign-In 2022 05 11.xlsx | XLSX spreadsheet | |
| Volume II Solicitation SAT LPTA 2022 03 29.pdf | ||
| Attachment B Past Performance Questionnaire 2022 03 24.docx | DOCX document | |
| SF 1442 2022 04 27.pdf | ||
| Wage Determination 2022 03 18.pdf | ||
| Reps 20222 03 24.pdf | ||
| 527-15e 2022 03 24.pdf | ||
| Volume I Agreement 2022 04 08.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Alburgh Springs
1. What is the flooring type and wall base in the command Room and the foyer/lobby? The flooring is typical residential wood.
2. Please provide information for the existing wall type/composition to verify that the push button can be flush mounted, and the conduits concealed within interior side of the exterior wall.
Regarding Keyed Note 2 on drawing C-1-02, “Provide flush mounted push button to the left of the interior border station entrance door. All conduit in finished space to be concealed”. The construction is typical 1930’s residential wood stud with plaster/sheetrock.
3. Are the Keyed Note 2 on drawing C-1-02 “FLUSH MOUNTED PUSH BUTTON” and the Keyed Note
2 on drawing ES-1-01 “GATE CONTROL PANEL” two different pieces of equipment or the same piece of equipment? They are both referenced in the same location on their respective drawing.
Yes, they are the same.
4. Please clarify : Spec section 010400-3, 1-4 Limitations For Use of Site, D. Parking
Facilities: ‘Except as noted or specified and within the project site, and except for one
Contractor vehicle, there will be no parking available at site during normal working hours. The
Contractor and his employees shall make their own arrangements for vehicle parking.”
Is onsite contractor vehicle parking allowed on site? If not, where will be park? Parking for contractor vehicles will be allowed along the side of the road.
1. What is the size of the existing camera cable conduit, which is to be reused for the new cameras? Assume ½ inch for bid purposes.
2. Can the Project Superintendent also be the SSHO in this project? Yes.
3. SPEC SECTION 013220 - PHOTOGRAPHIC DOCUMENTATION, Please clarify if the contractor is required to submit on and hire a Professional Construction Photographer/ 3RD Party photographer or can the Project Superintendent be the Construction Photographer for this project. The Project Superintendent or their designated alternate may take the relevant pictures.
4. Will the contractor be required to hire a testing agency for compaction testing and concrete testing? Certified testing is not required.
5. Please confirm: Spec section- EARTH MOVING 312000 – 8, 3.17, A. Special Inspections: Owner will engage a qualified special inspector to perform the following
Determine prior to placement of fill that site has been prepared in compliance with requirements.
Determine that fill material classification and maximum lift thickness comply with requirements.
Determine, during placement and compaction, that in-place density of compacted fill complies with requirements. The Project Superintendent can make these determinations based on experience, or consultation with others.
6. Please provide the most recent approved CAVSS list to assist with pricing. You can find the most recent approved CAVSS attached.
BSDP Approved Device List
Manufacturer Model Description Notes
4.0C-H5A-DO1, 4.0C-H5A-DO1-IR Requires Vicon License
4.0C-H5A-DO2 Requires Vicon License
5.0C-H5A-DO2 Requires Vicon License
6.0C-H5A-DO1, 6.0C-H5A-DO1-IR Requires Vicon License
8.0C-H5A-DO1. 8.0C-H5A-DO1-IR Requires Vicon License
4.0C-H5A-DP1, 4.0C-H5A-DP1-IR Requires Vicon License
4.0C-H5A-DP2 Requires Vicon License
5.0C-H5A-DP2 Requires Vicon License
6.0C-H5A-DP1, 6.0C-H5A-DP1-IR Requires Vicon License
8.0C-H5A-DP1, 8.0C-H5A-DP1-IR Requires Vicon License
4.0C-H5A-BO1-IR, 4.0C-H5A-BO2-IR Requires Vicon License
5.0C-H5A-BO2-IR Requires Vicon License
6.0C-H5A-BO1-IR Requires Vicon License
8.0C-H5A-BO1-IR Requires Vicon License
4.0C-H5A-B2, 4.0C-H5A-B3 Requires Vicon License
6.0C-H5A-B2 Requires Vicon License
8.0C-H5A-B2 Requires Vicon License
AV12176DN-08
AV20175DN-08
AV20175DN-NL
AV20175DN-28
M1134 Requires Vicon License
M1135, M1135-E Requires Vicon License
M1137, M1137-E Requires Vicon License
M1145-L Requires Vicon License
Axis Communications M2026-LE Mk II AXIS M20 Series Fixed Cameras Requires Vicon License
P1375 , P1375-E, Requires Vicon License
P1377, P1377-E Requires Vicon License
P1378, P1378-E Requires Vicon License
P1435-LE, P1445-LE-3, P1455-LE Requires Vicon License
P1447-LE Requires Vicon License
P1448-LE Requires Vicon License
Axis Communications Q1659 AXIS Q16 Series Fixed Cameras Requires Vicon License
Axis Communications Q1785-LE AXIS Q17 Series Fixed Cameras Requires Vicon License
Axis Communications Q1786-LE AXIS Q17 Series Fixed Cameras Requires Vicon License
Axis Communications Q1941-E, Q1941-E PT MOUNT, Q1942-E, Q1942-E PT MOUNT AXIS Q19 Series Thermal Cameras Requires Vicon License
P1214, P1214-E, P1224-E Requires Vicon License
P1244, P1245, P1254, P1264, P1265, P1275 Requires Vicon License
P1280-E, P1290-E Requires Vicon License
M3037-PVE, M3057-PLVE, M3058-PLVE , M3067-P, M3068-P AXIS M30 Series 360°/270°/180° Panoramic Requires Vicon License
P3719-PLE, P3727-PLE AXIS P37 Series Fixed 360 Multi-directional Cameras Requires Vicon License
M3015,,M3045-WV, M3065-V Requires Vicon License
M3016 Requires Vicon License
M3066-V Requires Vicon License
M3075-V, with Audio Requires Vicon License
M3205-LVE Requires Vicon License
M3206-LVE Requires Vicon License
M3115-LVE Requires Vicon License
M3116-LVE Requires Vicon License
Avigilon H5A Bullet Cameras
Avigilon H5A Box Camera
Avigilon H5A Outdoor Fixed Dome
Avigilon H5A Outdoor Dome Pendant
BSDP Approved Device List IP Cameras
Omni-Directional day/night indoor/outdoor dome IP camera AVCostar
Arecont Requires Vicon License
Axis M30 Series Fixed Dome
The CAVSS Approved Device List is accurate for the month identified. The list is subject to change and is updated monthly as new devices are scanned for approval or removed. Devices are to be on the CAVSS Approved Device
List as well as the Office of Information and Technology (OIT) Technical Reference Model (TRM) at the time of purchase. Purchases should be made within 6-9 months of project completion. Devices with known cyber security vulnerabilities at project completion, may require replacement or risk acceptance, before being transitioned to the CAVSS on the CBP Network. An updated list can be obtained by contacting BSDPTechnologySupport@cbp.dhs.gov.
Axis Communications
AXIS P13 Series Fixed Box Cameras
Axis Communications AXIS M11 Series Fixed Cameras
AXIS flat-faced domes with IR
Axis Communications
AXIS P14 Series Fixed Bullet CamerasAxis Communications
Axis Communications
Axis Communications
Axis Communications
AXIS P12 Series Fixed PINHOLE Cameras
Axis Communications
AXIS M32 Series Wide Angle w/IR
DATE ISSUED 4/26/2022 Page 1 of 3
Manufacturer Model Description Notes
P3227-LV, P3227-LVE Requires Vicon License
P3228-LV, P3228-LVE, Requires Vicon License
P3245-LV, P3245-LVE, P3245-V, P3245-VE Requires Vicon License
P3247-LV, P3247-LVE Requires Vicon License
P3248-LV, P3248-LVE Requires Vicon License
P3255-LVE Requires Vicon License
Q3515-LV, Q3515-LVE Requires Vicon License
Q3517-LV, Q3517-LVE, Q3517-SLVE, Q3527-LVE Requires Vicon License
Q3518-LVE Requires Vicon License
Q3615-VE
Q3617-VE
Q6055-C Requires Vicon License
Q6074, Q6074-E Requires Vicon License
Q6075, Q6075-E, Q6075-S Requires Vicon License
Axis Communications Q6128-E, Q6135-LE, Q6154-E, Q6155-E AXIS Q61 Series PTZ Cameras Requires Vicon License
Axis Communications Q6215-LE Axis Q62 Series PTZ Cameras Requires Vicon License
Axis Communications P5624-E MKII, P5654-E, P5655-E Axis P56 Series PTZ Cameras Requires Vicon License
Axis Communications Q8641-E, Q8642-E, Q8685-E, Q8685-LE Axis Q86 PT Thermal Cameras Requires Vicon License
Axis Communications Q8752-E Axis Q87 bispectral Thermal PTZ Camera Requires Vicon License
Axis Communications M5525-E PTZ Axis Indoor/Outdoor PTZ Requires Vicon License
Axis Communications P3807-PVE Axis P38 Panoramic Cameras Requires Vicon License
Axis Communications Q9216-SLV AXIS Impact Resistant Network Camera Requires Vicon License
V2002D-W313MIR
V2005D-W313MIR
V2008D-W310MIR
V2002B-W313MIR
V2005B-W313MIR
V2008B-W310MIR
V2002D-W28IR
V2005D-W28IR
Vicon V2008-W-NL V2008 Box Camera
Requires Separate Lens
V2102D-W313MI
V2105D-W313MIR
V2102B-W313MIR
V2105B-W313MIR
V2102B-W28IR
V2105B-W28I
Vicon V2002D-PTZ Roughneck Pro PTZ
Roughneck Pro Series Micro Dome
Roughneck Series Dome
Vicon
The CAVSS Approved Device List is accurate for the month identified. The list is subject to change and is updated monthly as new devices are scanned for approval or removed. Devices are to be on the CAVSS Approved Device
List as well as the Office of Information and Technology (OIT) Technical Reference Model (TRM) at the time of purchase. Purchases should be made within 6-9 months of project completion. Devices with known cyber security vulnerabilities at project completion, may require replacement or risk acceptance, before being transitioned to the CAVSS on the CBP Network. An updated list can be obtained by contacting BSDPTechnologySupport@cbp.dhs.gov.
AXIS Q36 Series Fixed Cameras
IP Cameras
AXIS P32 Series Fixed CamerasAxis Communications
Roughneck Series Fixed Mini Bullet
Roughneck Series Bullet
Vicon
Roughneck Pro Series BulletVicon
AXIS Q35 Series Fixed CamerasAxis Communications
AXIS Q60 Series PTZ CamerasAxis Communications
Axis Communications
Vicon
Roughneck Pro Series Dome
DISCONTINUED
Vicon
Vicon
DATE ISSUED 4/26/2022 Page 2 of 3
Manufacturer Model Description Notes
Vicon VN-CAM-LIC Non Viconnet Camera Connection License
PART NUMBER FOR
REQUIRED VICON LICENSE
VPK11TBV8-R5-1 NVR - Rackmount - 11TB Storage 1 Rack Unit
VPK17TBV8-R5-1 NVR - Rackmount - 17TB Storage 1 Rack Unit
VPK-34TBV8-R5 NVR - Rackmount - 34TB Storage
VPK-62TBV8-R5 NVR - Rackmount - 62TB Storage
VPK-83TBV8-R5 NVR - Rackmount - 83TB Storage
VPK-125TBV8-R5 NVR - Rackmount - 125TB Storage
VPK-174TBV8-R5 NVR - Rackmount - 125TB Storage
Vicon
VMDC-2V8-A, VMDC-4V8-A, VMDC-2V8-B-RK, VMDC-4V8-B-RK, VMDC-6V8-B-RK, VMDC-
6V8-B Virtual Matrix Display Controller (2CH, 4CH, 6CH)
Vicon VWS-SWV8 Viconnet Workstation Software To be used with approved DMG desktop computer.
Vicon VNUC-PCV8-B-RK Vicon - Nucleus Enterprise Management System
Veracity Longspan Long range Ethernet and PoE
Comnet CNFE100X Series Media Converters 10/100 Mbps Ethernet Electrical To Optical Media Converter
(Includes POE+ Models)
Comnet CNFE200X Series Media Converters 2 Channel Ethernet electrical to optical media converter
10/100 mbps
Comnet CNMC2 Series Media Converters 2 Channel Ethernet electrical to optical media converter
Comnet CNMCSFP Series Media Converters 1, 2 and 4 Channel Ethernet electrical to optical media converter
Comnet CNGE2MCPOEM Media Converter + PoE 10/100/1000 Mbps Ethernet 2 Port Media Converter + PoE
Comnet CNGE2MC Series Media Converters 10/100/1000 Mbps Ethernet Media Converters
Comnet CWGE2SFP Series Media Converter One-channel Ethernet electrical to optical media converter
Month Issued 4/26/2022
The CAVSS Approved Device List is accurate for the month identified. The list is subject to change and is updated monthly as new devices are scanned for approval or removed. Devices are to be on the CAVSS Approved Device
List as well as the Office of Information and Technology (OIT) Technical Reference Model (TRM) at the time of purchase. Purchases should be made within 6-9 months of project completion. Devices with known cyber security vulnerabilities at project completion, may require replacement or risk acceptance, before being transitioned to the CAVSS on the CBP Network. An updated list can be obtained by contacting BSDPTechnologySupport@cbp.dhs.gov.
Vicon
Other Approved Devices
DATE ISSUED 4/26/2022 Page 3 of 3
5/23/22, 10:01 AM SAM.gov https://sam.gov/wage-determination/VT20220027/3 1/5
"General Decision Number: VT20220027 05/13/2022
Superseded General Decision Number: VT20210027
State: Vermont
Construction Type: Building
County: Grand Isle County in Vermont.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/25/2022 https://sam.gov/wage-determination/VT20220027/3 2/5
2 03/18/2022 3 05/13/2022
CARP0118-007 04/01/2013
Rates Fringes
CARPENTER, Excludes Drywall Hanging..........................$ 20.69 17.39
ELEC0300-001 07/04/2021
Rates Fringes
ELECTRICIAN......................$ 26.10 9.25%+7.70
ELEC0300-002 07/04/2021
Rates Fringes
ELECTRICIAN (Low Voltage Wiring)..........................$ 26.10 9.25%+7.70
IRON0007-024 03/16/2022
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 29.02 24.29
* PLUM0693-003 05/01/2022
Rates Fringes
PLUMBER..........................$ 30.50 17.67
SHEE0063-005 01/01/2016
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 31.57 28.12
* SUVT2011-012 02/10/2011
Rates Fringes
BRICKLAYER.......................$ 25.89 0.78
CARPENTER (Drywall Hanging Only)............................$ 17.15 1.63
LABORER: Common or General......$ 11.00 ** 0.00
LABORER: Mason Tender - Brick...$ 15.78 0.48
LABORER: Mason Tender - Cement/Concrete..................$ 16.50 0.00
OPERATOR: Bulldozer.............$ 19.00 0.00
OPERATOR: Excavator.............$ 16.40 0.00
PAINTER: Brush Only.............$ 17.91 0.00
PAINTER: Roller.................$ 17.91 0.00 https://sam.gov/wage-determination/VT20220027/3 3/5
ROOFER...........................$ 18.98 4.40
SPRINKLER FITTER (Fire Sprinklers)......................$ 19.43 2.30
TRUCK DRIVER: Dump Truck........$ 14.00 ** 0.81
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 https://sam.gov/wage-determination/VT20220027/3 4/5 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour https://sam.gov/wage-determination/VT20220027/3 5/5
National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
| topmostSubform[0]: |
| Page1[0]: |
| Code[0]: 1PQB |
| Copies[0]: 1 |
| CheckBox9[0]: 1 |
| Code[2]: 1PQB |
| NameandTitleOfficer[0]: Sebastian Asaro, Contracting Officer |
| Is[0]: 1 |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 11 |
| AmendmentNo[0]: 0001 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS |
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
| FacilityCode[0]: | |
| CheckBox13B[0]: Off | |
| CheckBox13D[0]: Off | |
| ReqNumber[0]: EQ1PSKM-22-0072 | |
| Dated9B[0]: 4/27/2022 | |
| 2022-05-23T15:38:57-0400 | |
| SEBASTIAN ASARO | |
| I am the author of this document |
| C13[0]: |
| Description[0]: The purpose of this amendment is to: |
1. Incorporate Government's Responses to Industry's Questions dated 05/20/2022.
2. Incorporate the updated approved CAVSS list into the solicitation.
3. Incorporate the updated wage determination into the solicitation.
4. All other terms and conditions remain unchanged.
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PB0022R0035 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: 1 |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 5/23/2022 |
| A13[0]: |
| ProjectNo[0]: N2022947 |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: Acquisition Management Division (1PQ) Contract Operations Branch (1PQB) GSA/PBS |
10 CAUSEWAY ST., RM 1100
BOSTON, MA 02222-1077 USA
NameandTitleSigner[0]:
| Page2[0]: |
| TextField1[5]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[0]: |
File details come from the government source that posted it. Updated .