Amendment 0002_Solicitation 47PA0724R0007- FY24 NY Competitive Electricity Supply.pdf
PDF 1 MB Posted
- Attached to
- R2 New York NYISO Competitive Electric Supply
- Solicitation number
- 47PA0724R0007
About this file
This document is Amendment 0002 to Solicitation 47PA0724R0007 for the General Services Administration's (GSA) competitive electricity supply procurement for federal facilities in the New York Independent System Operator (NYISO) region. Key details:
The solicitation is for the supply of all electricity commodity components up to the delivery point for federal facilities located in the NYISO Local Distribution Utility service territories in New York. The contract term is up to 41 monthly billing cycles, with a service start date based on the first utility meter read date for each account. The Government has organized the requirements into 10 pricing groups. Pricing must be provided through an internet-based transaction platform provided by Enel X North America, Inc. The solicitation includes requirements for renewable power and carbon pollution-free electricity. Offers must be received by 3:00 PM EST on August 1, 2024. The amendment incorporates updated questions and answers, contract clause changes, and updated pricing and account information attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 _Solicitation 47PA0724R0007 Exhibit 1.xlsx | XLSX spreadsheet | |
| Amendment 0001 _RFP Solicitation 47PA0724R0007.pdf | ||
| Amendment 0001 _Solicitation 47PA0724R0007 Exhibit 1 .xlsx | XLSX spreadsheet | |
| Solicitation 47PA0724R0007 Exhibit 1 - Final.xlsx | XLSX spreadsheet | |
| RFP Solicitation No. 47PA0724R0007 - FY24 NY Competitive Electricity Supply.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PMPB
Mark West, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002 hereby incorporates into the Solicitation the following: 1. Questions and Answers received as of 3:00 PM EST on July 17th, 2024; 2. Section B.4 GSAM Clauses Incorporated By Full Text, Clause 552.216-77 Economic Price Adjustment – Electric Supply (March 2020) is updated to add (4) NYPA Transmission Adjustment Charges (NTAC) costs. Any and all associated charges shall be with no markup to the Government; 3. Updated Attachment 3 Price Component Table; and 4. Updated Exhibit 1 - Excel File With Auction Schedule and Account Usage Information. All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
PMPB
Carbon Pollution-Free Electricity/ Clean Energy Division 1800 F Street, NW Washington, DC 20405 USA
Carbon Pollution-Free Electricity/ Clean Energy Division 1800 F Street, NW Washington, DC 20405 USA
EQPMPB-24-0013
47PA0724R0007
1 2
8/8/2024
6/28/2024
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
47PA0724R0007 GSA FY24 NY Compe��ve Electricity Supply Supplemental Ques�ons and Answers
NOTE: ALL CHANGES/UPDATES TO THE SOLICITATION ARE HIGHLIGHTED IN YELLOW IN THE
AMENDMENT 0002 VERSION OF THE SOLICITATION.
Q1: Q12 (in the original Q&As) Addressed the changing costs of NTAC and asked if the Government would allow for NTAC charges to be passed through or if annual price adjustments are allowed. The Government responded: “…(NTAC) to be fixed at currently known costs for the en�re contract.” NYPA posts an annual NTAC recovery cost with the NYISO, for the prompt 12 months, making charges unknown for the en�re contract. The latest pos�ng is here:
h�ps://www.nyiso.com/billing-rates under: NYPA Annual ATRR Updates à 2024 ATRR Update, and was posted on 6/28/2024, to be recovered by the NYISO from 7/1/2024 to 6/30/2025.
Assuming there are no: “future changes or implemented costs for future projects” being addressed under Regulatory Changes, if the cost are only known through 6/30/2025 (prior to the start of the RFP award), how would the Government prefer to handle the change in cost each year, as NYPA posts updated annual NTAC recovery amounts with the NYISO?
A1: See the Amendment 2 version of the solicita�on. Sec�on B of the solicita�on 552.216-77 Economic Price Adjustment has been updated to specify that NYPA Transmission Adjustment Charges (NTAC) shall be passed through with no markup to the Government each billing period.
Q2: Q18 (in the original Q&As) addressed the bi-monthly meter reads for Acct#N01000006783039 which is included in pricing group 7 and asked if the Government would Can the Government confirm if the start month and end months for this account. The Government responded: “The awarded supplier should enroll the account with the closest available meter read to June 15 th whether that date is in May 2025 or July 2025” however NYSEG has not yet posted a meter reading schedule for 2025 but looking at the account history they were read on May 13 th 2024 and July 10 th 2024. Can the government confirm if this account is currently contracted through their May 2025 meter read date (es�mated to be May 13 th 2025) or their July 2025 meter read date (es�mated to be July 11 th 2025) and which month the awarded supplier should enroll the account (either May 2025 or July 2025)?
A2: The awarded supplier should enroll the account with its July 2025 u�lity meter read date.
Q3: Q19 (in the original Q&As) addressed the usage included in Exhibit 1 for Acct#N01000020813275 which is included in pricing group 7 and asked if the Government would the accuracy of the usage in Exhibit 1. The Government responded: “Confirmed” however there s�ll appears to be a discrepancy in the total monthly and annual usage in the latest version of Exhibit 1 vs the usage that NYSEG has provided to suppliers. Can the government review the a�ached comparison and advise if Exhibit 1 will be updated?
A3: Per the answer in the original Q&As, the volumes provided in Exhibit 1 will be the contract volumes for this account. The volumes match the u�lity volumes provided by the u�lity for the months included in the Exhibit 1 file and it will not be updated.
https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nyiso.com%2Fbilling-rates&data=05%7C02%7CJeffrey.Hills%40constellation.com%7C512c6cb7dfb34f8c795208dcb309752b%7Cd8fb9c07c19e4e8ca1cb717cd3cf8ffe%7C0%7C0%7C638582101112660466%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=L9urncGFJU3S9AaSmeCWRP0x2aKSUwN9C2keLzblzQI%3D&reserved=0
Q4: ConEd account 47463430000. Account hasn't been billed since December 2023. Coned has been billing with es�mated usage since the account became ac�ve. ConEd suggests the customer call 1-800-752-6633 to expedite billing for "Account(s) with no usage or haven't' billed in months.
A4: Noted.
Price Component Treatment Include in Bid Price?
Requires Individual Line Item Billing?
Energy Commodity Costs Fixed Yes N/A Fixed in per kWh Award Price Minimum of +/ 20% annual bandwidth based on aggregated use of pricing group Fixed Yes N/A Fixed in per kWh Award Price Capacity Fixed Yes N/A Fixed in per kWh Award Price Ancillary Services & Independent System Operator (ISO) costs, operating reserves and ISO administrative fees Fixed Yes
N/A Fixed in per kWh Award Price Balancing & Congestion Costs Fixed Yes N/A Fixed in per kWh Award Price Line Losses (including distribution losses to the end use meter) Fixed Yes N/A Fixed in per kWh Award Price Enel X Fee of $0.0007 per kWh addressed in Section A.17 of this solicitation Fixed Yes N/A Fixed in per kWh Award Price Renewable Energy Certificates(RECs) that comply with Section A.12 of this solicitation Fixed Yes N/A Fixed in per kWh Award Price Scheduling Fixed Yes N/A Fixed in per kWh Award Price Fuel Costs Fixed Yes N/A Fixed in per kWh Award Price Supplier Margin Fixed Yes N/A Fixed in per kWh Award Price New York Renewable Energy Standards (RES) compliance costs Economic Price Adjustment No No Clean Energy Standard Compliance Costs including Zero Emission Credits (ZECs) Economic Price Adjustment No No Public Policy Transmission (PPT) costs Economic Price Adjustment No No Transmission Owner Transmission Solutions (TOTS) Economic Price Adjustment No No NYPA Transmission Adjustment Charges (NTAC) Economic Price Adjustment No No Applicable taxes including NY Gross Receipts Taxes (GRT) Pass Through At Cost No Yes
Amendment 0002 _ATTACHMENT 3 PRICE COMPONENT CONFIRMATION TABLE Price Component Confirm Table
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
EQPMPB-24-0013 2
47PA0724R0007
Mark West 202-501-0465
PMPB
PMPB
Carbon Pollution-Free Electricity/ Clean Energy Division 1800 F Street, NW Washington, DC 20405 USA
Individual ordering agencies
See below for additional information
Mark West
221122
6/28/2024
8/1/2024
3:00 PM EST
Carbon Pollution-Free Electricity/ Clean Energy Division 1800 F Street, NW Washington, DC 20405 USA
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
Table of Contents
SECTION A: SCOPE OF WORK 5
A.1 GENERAL 5
A.2 DEFINITIONS 5
A.3 NOMINATING AND BALANCING RESPONSIBILITIES 6
A.4 CREDIT FOR DEFAULT SUPPLY SERVICE 6
A.5 RISK OF LOSS 6
A.6 PROTECTION OF CONTRACT INFORMATION 6
A.7 PAYMENT AND BILLING 6
A.8 REQUESTS FOR EXTENSION 7
A.9 RESERVED 8
A.10 ADDING AND DELETING FACILITIES TO THIS CONTRACT 8
A.11 CARBON POLLUTION-FREE ELECTRICITY IN THIS CONTRACT 8
A.12 RENEWABLE POWER / RENEWABLE ENERGY 8
A.13 LOAD CHANGES DURING THE TERM OF THE CONTRACT 9
A.14 ELECTRICITY REGULATORY CHANGES 10
A.15 CONTRACT ADMINISTRATION 10
A.16 AUCTION PROCESS FOR PRICING USING ENEL X 11
A.17 ENEL X FEE 11
A.18 DAMAGES FOR MISSING CONTRACT START DATE 11
SECTION B CONTRACT CLAUSES 11
B.1 CLAUSES INCORPORATED BY REFERENCE 11
B.2 CLAUSES INCORPORATED BY FULL TEXT 12
B.3 GSAM/R PROVISIONS INCORPORATED BY REFERENCE 34
B.4 GSAM CLAUSES INCORPORATED BY FULL TEXT 34
SECTION C SUBMISSION REQUIREMENTS 40
C.1 EVIDENCE OF TECHNICAL ACCEPTABILITY 40
C.2 PRICE PROPOSAL 41
C.3 SUBMISSION OF PROPOSALS 44
SECTION D EVALUATION FACTORS FOR AWARD 45
D.1 EVALUATION 45
D.2 BASIS FOR AWARD 45
D.3 POST AWARD REQUIREMENT FOR SERVICE START DATE REPORTING 45
SECTION E LIST OF ATTACHMENTS AND EXHIBITS 46
1. ATTACHMENT 1: TECHNICAL PROPOSAL CHECKLIST
2. ATTACHMENT 2: CONTRACTOR INFORMATION
3. ATTACHMENT 3: PRICE COMPONENT CONFIRMATION TABLE
4. ATTACHMENT 4: SAMPLE FEDERAL CONTRACTOR VETERANS’ EMPLOYMENT REPORT VETS-4212
FORM
5. ATTACHMENT 5: SUBCONTRACTING PLANS
6. ATTACHMENT 6: 52.212-3 OFFEROR REPRESENTATION AND CERTIFICATIONS - COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
7. ATTACHMENT 7: VERIFICATION FROM RENEWABLE POWER / RENEWABLE ENERGY
SUPPLIER
8. ATTACHMENT 8: RENEWABLE POWER / RENEWABLE ENERGY GENERATOR REGISTRATION FORM
9. ATTACHMENT 9: RENEWABLE POWER / RENEWABLE ENERGY VERIFICATION
10. ATTACHMENT 10: RENEWABLE POWER / RENEWABLE ENERGY CERTIFICATE NOTIFICATION
11. ATTACHMENT 11: RENEWABLE ENERGY / RENEWABLE ENERGY ELECTRICITY CALCULATIONS
12. ATTACHMENT 12: RESERVED
13. ATTACHMENT 13: RESERVED
14. ATTACHMENT 14: RESERVED
15. ATTACHMENT 15: RESERVED
16. ATTACHMENT 16: RESERVED
17. EXHIBIT 1: EXCEL FILE WITH AUCTION SCHEDULE AND ACCOUNT USAGE INFORMATION
NOTE: ALL QUESTIONS MUST BE SUBMITTED VIA
ELECTRONIC MAIL TO Mark2.West@gsa.gov , Ky.Nguyen@gsa.gov and Bonnie.Bueter@gsa.gov mailto:Mark2.West@gsa.gov mailto:Ky.Nguyen@gsa.gov mailto:Bonnie.Bueter@gsa.gov
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
SECTION A: SCOPE OF WORK
A.1 GENERAL
The U.S. General Services Administration (GSA or Government) is requesting proposals for the supply of all electricity supply commodity components up to the Delivery Point as specified in Attachment 3 of this solicitation for Federal facilities located in the Local Distribution Utility (LDU) service territories within the state of New York. The Delivery Point for such electricity shall be the independent system operator (ISO)/utility interconnect for the specific facilities identified in Exhibit 1 of this solicitation. The LDU will then distribute the electricity to the Government’s individual meters. Pricing is to the Delivery Point and shall include all cost components specified in Attachment 3 of this solicitation. The Contractor shall supply the full requirements of such electricity for a term of up to forty-one (41) full monthly billing cycles for accounts included in this contract. The Contractor shall bill in accordance with Attachment 3 of this solicitation. The Government has placed its requirements into ten (10) Pricing Groups, as indicated in Exhibit 1 . The service start date for all accounts shall begin with the first utility meter read date as specified by the utility for the month listed in Exhibit 1 for each account.
All quantities required to be supplied to facilities included in this contract shall be considered firm requirements (“firm” means electric supply that will not be interrupted except as permitted under this contract) for delivery by the Contractor to the Delivery Point. The Contractor shall be liable for all costs assessed to facilities arising out of or relating to the non-delivery of firm requirements. The electricity provided under this contract shall conform to the tariff of the interstate/intrastate transmitting utility and the LDU at the Delivery Point. The Government has organized its requirements for this solicitation in Exhibit 1 , as described below.
Exhibit 1 includes: (1) LDU rate schedule, (2) LDU account number, (3) Agency/account holder, (4) General Service Location, (5) LDU, (6) Monthly consumption (kWh), (7) Registered monthly on-peak demand (KW) per LDU tariff definition, (8) Registered monthly maximum demand (KW) per LDU tariff definition, (9) Monthly on-peak KWH per LDU tariff definition, (10) Monthly interim KWH per LDU tariff definition, (11) Monthly off-peak KWH per LDU tariff definition, (12) Monthly billing days, (13) Monthly load factor, (14) Range of meter read dates throughout the year, and (15) Weather hourly interval data.
A.2 DEFINITIONS
For purposes of this contract, the following definitions apply to the contract and its attachments:
Balancing Authority: Also known as Control Area, is an electric power system or combination of electric power systems bounded by interconnection metering and telemetry to which a common generation control scheme is applied. For purposes of this solicitation, the Balancing Authority is the New York Independent System Operator (NYISO).
Carbon Pollution-Free Electricity (CFE): means electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets Environmental Protection Agency (EPA) requirements. ( See Sec. 603(d) of Executive Order (E.O.) 14057)
Energy Attribute Certificate (EAC): is any instrument that conveys information (attributes) about a unit of energy, including the resource used to create it and the emissions associated with its production and use. EACs provided under this contract must contain enough detail to satisfy the requirements of this contract.
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
Kilowatt Hour or kWh: means 1,000-watt hours and represents one kilowatt of power expended for one hour of time.
Megawatt or MW: means a unit for measuring power that is equivalent to one million watts (equivalent to one joule per second).
Renewable Energy Certificate or REC: means the technology and environmental (non-energy) attributes that represent proof that 1 megawatt-hour (MWh) of electricity was generated from an eligible renewable energy resource, and can be sold separately from the underlying generic electricity with which it is associated. (Sec. VII of M-22-06) These are unique certificates that represent all the environmental attributes or benefits of a specific quantity of renewable generation. RECs are created when a renewable energy facility generates electricity. A REC is a type of EAC and may fulfill the requirement to provide a CFE EAC where appropriate so long as all other contractual requirements are met.
For the purposes of this solicitation, Renewable Power shall have the same definition as Renewable Energy and are used interchangeably .
Renewable Energy: means marine energy (as defined in 42 U.S.C. 17211), or electric energy produced from solar, wind, biomass, landfill gas, geothermal, municipal solid waste, or new hydroelectric generation capacity achieved from increased efficiency or additions of new capacity at an existing hydroelectric project. Renewable Energy and biomass shall have the definitions as specified by the Energy Policy Act of 2005, currently codified at 42 U.S.C. 15852(b)(2).
A.3 NOMINATING AND BALANCING RESPONSIBILITIES
It is the Contractor’s responsibility to conduct all required nominations on behalf of the facilities specified in Exhibit 1 . The Contractor shall be fully familiar with the imbalance, transmission grid loss and line loss policies of both the LDU and the interstate/intrastate transmission companies. The Contractor shall be liable for all costs arising out of or relating to these items.
A.4 CREDIT FOR DEFAULT SUPPLY SERVICE
If at any time, unless as a result of an Excusable Delay (see FAR 52.212-4(f)), an account covered by this contract is forced to switch to the LDU solely as a result of action/inaction by the Contractor, the Contractor shall be responsible for payment of any additional costs incurred.
A.5 RISK OF LOSS
Risk of loss of electricity supplied under this contract shall remain with the Contractor prior to the Delivery Point and shall pass to the Government at and after the Delivery Point specified for each facility.
A.6 PROTECTION OF CONTRACT INFORMATION
The Government will take the necessary and usual steps to maintain the confidentiality of information submitted by offerors prior to award of the contract. The Contractor is advised that the Government will make all contract prices publicly available for the full contract period.
A.7 PAYMENT AND BILLING
The Contractor expressly agrees and acknowledges that each Government facility to which supplies or services are provided pursuant to this contract will be separately responsible for and liable to pay for any such supplies or services. For the avoidance of doubt, GSA will be the responsible party for purposes of making payments for the accounts only where GSA is listed as the Agency on Exhibit 1 .
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
The Contractor will submit a monthly invoice to the Government facility for supplies and services rendered the previous month. The invoice should include the amount of kWhs measured at each meter and must be consistent with the rules of the New York Public Service Commission (NYPSC) regarding issuance and format of bills. The Contractor shall use the LDU's meters, meter readings, and billing cycles for the computation of bills. The Contractor must establish a unique supplier account number for each end-use Government account and provide the corresponding LDU account number on each monthly bill. The Contractor also expressly agrees and acknowledges they will be required to submit invoices in accordance with each end use agency’s billing requirements and systems which can include requirements for invoices to be submitted through online systems.
It shall be the Contractor’s responsibility to know and understand the specific details and requirements for monthly billing, reporting, and coordination with the LDUs. Payment shall be in accordance with FAR 32.9 (Prompt Payment). If payment is to be made by electronic funds transfer, the provisions of FAR 32.11 (ELECTRONIC FUNDS TRANSFER), including the clause at 52.232-33 shall apply. Contractor invoices must match the company’s name and payment information for the Contractor in relation to invoices rendered must match the SAM.gov Unique Entity ID, Tax Identification Number and Cage Code specified in Attachment 2 .
A.8 REQUESTS FOR EXTENSION
The Government may request extension of performance, one or more times, in accordance with the existing contract terms and conditions, so long as the total additional performance period does not exceed twelve (12) months.
Pricing for the extension term will be in accordance with market movement comparing market prices on the day of contract award with settle prices for the previous trading day to the day the Government requests a contract extension.
For purposes of this solicitation, the comparison will be based on applicable pricing zones’ Around the Clock (ATC) settle prices and term awarded for each pricing group on the day of the auction and settle prices for the previous trading day to the day an extension price is requested by the Government for the same pricing group or groups. The applicable pricing zone for each included account will be included in the Exhibit 1 file.
The auction day settle prices will be load weighted with the applicable pricing zones monthly contract volumes included in the Exhibit 1 for each pricing group the Government requests an extension for. The Government will provide a copy of the ATC settle prices and monthly volumes for each pricing group in the fully executed contract.
The settle prices will be load weighted with the applicable pricing zones extension volumes provided by the Government for each pricing group at the time of extension request.
Pricing for the extension term shall be determined by calculating the percentage difference between the load weighted auction day and previous trading day settle prices and applying that percentage difference to the original auction price under this Contract.
If the Contractor declines to extend, the contract will expire with the current performance period for the associated pricing group(s).
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
Notice of request for extension will be furnished to the Contractor not later than thirty (30) days prior to the expiration of the contract or any extension thereof. However, nothing precludes the Contractor from agreeing to an extension of the contract if the Government fails to issue the notice prior to the thirty (30) days.
Notice of request for extension of this contract shall be considered to have been accomplished at the time the Government sends notice via email to the Contractor.
A.9 RESERVED
A.10 ADDING AND DELETING FACILITIES TO THIS CONTRACT
It is possible that additional accounts not included in Exhibit 1 may be added to the resultant contract(s). In that event, the Government will provide the Contractor with the facility’s estimated electric requirement (if available) and the two parties shall enter into good faith negotiations to determine a price. A bilateral modification will be executed adding the line item on the Standard Form 30, Amendment of Solicitation/Modification of Award.
If the Government removes any facilities listed in Exhibit 1 , the Government shall provide the Contractor with a written notice 45 business days before any such removal. The Government may unilaterally remove any facilities at its discretion. If accounts are removed, the methodology provided in the Tailored Addendum to FAR 52.212-4
(l) - Termination for the Government’s Convenience shall be used to calculate the early termination charges, if any. The provisions of this paragraph shall not apply to accounts with early end dates noted in Exhibit 1 at the time of contract award.
A.11 CARBON POLLUTION-FREE ELECTRICITY IN THIS CONTRACT
Section 203 of Executive Order (E.O.) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability , December 8, 2021) set a goal for the Federal Government to achieve 100% carbon pollution-free electricity (CFE) on a net annual basis by 2030, including 50% 24/7. If during the term of the contract, CFE becomes available in the NYISO grid region, the Government may be interested in a future bilateral modification(s) to require up to 100% CFE. The Contractor must be willing to discuss such delivery.
To count toward the Federal Government’s goal of achieving 100% CFE by 2030, the CFE EACs must be sourced from generation resources that:
● Produce CFE (based on the above definition);
● Were placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and
● Deliver CFE to the NYISO Balancing Authority.
A.12 RENEWABLE POWER / RENEWABLE ENERGY
The Contractor shall deliver wind or solar RECs equal to eight (8.0%) of total usage required for all accounts included in Pricing Groups two (2), four (4) and eight (8) as specified in Section C.2 and Exhibit 1. The Renewable Power requirement is load following and the number of RECs delivered will be based on actual usage for each account. The REC content requirements are in addition to any RenewablePower required to comply with the State of New York’s Renewable Energy Standards (RES) requirements, if any, during the term of any resultant contract(s). The Renewable Power that the Contractor provides must come from renewable resources that have been placed in service within 10 years prior to the start of the Government’s fiscal year for each year of the contract. For example, for the contract’s first year, resources will need to have been placed in service on or after October 1, 2014.
Annual Renewable Report https://www.whitehouse.gov/briefing-room/presidential-actions/2021/12/08/executive-order-on-catalyzing-clean-energy-industries-and-jobs-through-federal-sustainability/ https://www.whitehouse.gov/briefing-room/presidential-actions/2021/12/08/executive-order-on-catalyzing-clean-energy-industries-and-jobs-through-federal-sustainability/
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
The Contractor shall provide an annual report. The annual reporting period shall be October 1 through September
30. The annual report shall contain the following elements:
(a) Verification of the product content for the annual reporting period that:
(1) Indicates the source of new Renewable Power, zip code of the source and the EGRID subregion for the new source; and
(b) Verification that:
(1) The Contractor has not sold the Renewable Power more than once (as either a Renewable Power product or as a REC product), and in the case of a reseller that purchases a wholesale product for retail sale, reasonable measures are taken to ensure that suppliers also do not sell Renewable Power more than once;
(2) All environmental attributes, including any attendant emission credits which are specifically owned by or to which the Renewable Power generator is otherwise entitled convey to the purchaser (i.e., Government);
(3) The Contractor has not sold any emission allowances/credits, or other environmental attributes which are specifically owned by or to which the Renewable Power generator is otherwise entitled to convey associated withRenewable Power; and
(4) The Renewable Power that is used to fulfill the requirements of this solicitation is also not being used to meet any federal, state, or local renewable energy requirement, renewable energy procurement, renewable portfolio standard, or other renewable energy mandate.
The Annual Report shall be submitted to both the CO and CS at the addresses specified in Section A.15 no later October 31 each year and shall contain Attachments seven (7) through eleven (11). While the annual report is due to GSA no later than October 31st each year; if needed, the Contractor may update the report no later than December 1st each year. Contractor must state in the email where they submit their report as to whether the report is final or if an updated report will be provided to GSA.
Renewable Power Vintage: To qualify as an eligible REC under this contract, the Renewable Power must be generated during the Government’s applicable fiscal year calendar (October 1 through September 30) for each year of the contract,or the six (6) months immediately preceding or the three (3) months immediately following that time period (e.g., April 1, 2024 through December 31, 2025 for fiscal year 2025).
A.13 LOAD CHANGES DURING THE TERM OF THE CONTRACT
As indicated in Section A.1, this contract is for the full requirements of each account at the Delivery Point. The full requirements are expressed as estimates on Exhibit 1 of the solicitation. The Government does not estimate that its aggregate load will change in a significant manner throughout the term of this contract unless noted on Exhibit 1 . The Government considers an annual change in the aggregate kWh consumption of each pricing group in excess of twenty percent (20%) each contract year to be significant. The historical volumes are given in Exhibit 1 and these volumes will be used in determining annual changes. In the event of a significant change in contract load, the Government agrees, if requested by the Contractor, to negotiate in good faith with the Contractor to equitably adjust the contract price to account for the incremental costs, if any, associated with such load change beyond the twenty percent (20%) measurement threshold. Any proposed adjustments to contract pricing must compare the contract price with the market price at the time of usage deviation to arrive at an adjustment to
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024 contract pricing. The Government will notify the Contractor of any significant anticipated load changes as soon as it becomes aware of such anticipated changes.
A.14 ELECTRICITY REGULATORY CHANGES
(a) The contract price includes all applicable Federal, State, and local regulations including ISO/RTO charges expected to be in effect and applicable to this contract at the time of contract award. This includes all Price Components listed in Attachment 3.
(b) After-Imposed Charges Due to a Change of Federal, State, or Local Regulation, means any new or modified Federal , State, and/or local regulation including ISO/RTO charges on the transactions covered by this contract that result in new or increased charges that the Contractor is required to pay or bear as the result of legislative, judicial, regulatory or administrative action taking effect after the contract award date.
(b)(1) The contract price shall be increased by the amount of any after-imposed charges due to a change of Federal, State, or local regulation, provided the Contractor warrants in writing that no amount for such newly imposed Federal, State, and local regulation or rate increase was included in the contract price, as a contingency reserve or otherwise, and that the Contractor provides sufficient documentation to support the increase.
(c) After-Relieved Charges Due to a Change of Federal, State, or Local Regulation, means any Federal, State, and/or local regulation including ISO/RTO charges on the transactions covered by this contract that the Contractor is no longer required to pay or bear, or for which the Contractor obtains a refund or reduction, as the result of legislative, judicial, regulatory or administrative action taking effect after the contract award date.
(c)(1) The contract price shall be decreased by the amount of any after-relieved charges due to a change of Federal, State, or local regulation.
(d) Any increases or decreases in the contract price shall be accomplished by a bilateral contract modification. In the event that the Government and the Contractor cannot agree to an acceptable contract adjustment, the Government will unilaterally adjust the contract price via modification subject to the Disputes provisions of FAR 52.212-4(d) incorporated in the contract.
(e)The ceiling price for after-imposed regulatory costs is limited to 50% of the contract price.
(e)(1) The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth has been increased, any costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the costs had been incurred after the increase in the ceiling price.
A.15 CONTRACT ADMINISTRATION
After award, this contract shall be administered by the GSA Clean Energy Division. The CO and CS for the administration of this contract is:
Mark West, Contracting Officer Ky Nguyen-Zubroski, Contract Specialist Carbon Pollution-Free Electricity/ Carbon Pollution-Free Electricity/ Clean Energy Division Clean Energy Division 1800 F Street, NW, Washington, D.C. 20405 1800 F Street, NW, Washington, D.C. 20405
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
202-710-4642 cell, 202-501-0465 office 682-216-5334 cell, 817-850-8479 office Mark2.West@gsa.gov Ky.Nguyen@gsa.gov
A.16 AUCTION PROCESS FOR PRICING USING ENEL X
The Government shall use an internet-based transaction platform provided by Enel X North America, Inc. (Enel X), the Government’s third-party contractor, to obtain pricing for this procurement. The Contractor shall submit pricing to GSA using the Enel X platform in accordance with the instructions in Section C and the Enel X website. All prices submitted to the Enel X transaction platform shall be in accordance with the provisions of the solicitation. It shall be the responsibility of the offeror to understand both the rules and the mechanics of the Enel X transaction platform.
A.17 ENEL X FEE
The Contractor hereby agrees to pay a fee in the amount of $0.00070 per kWh for all usage billed under this contract. The Contractor shall pay the fee directly to Enel X in accordance with the agreement, if any, executed between the Contractor and Enel X. The Contractor expressly recognizes and understands that the Government is not responsible for paying the fee to Enel X. To the extent a dispute occurs between the Contractor and Enel X regarding the fee, any such dispute shall be handled in accordance with the agreement executed between the Contractor and Enel X.
A.18 DAMAGES FOR MISSING CONTRACT START DATE
In the event that the start date for electric supply is missed due solely to the fault of the Contractor and an account(s) is required to switch to the LDU, then the Contractor shall be liable for the difference, if any, between the contract rate and the rates billed by the LDU. Subject to the approval of the Contracting Officer, the Contractor will issue an equivalent credit to the Government on a future invoice. This credit must be issued within sixty (60) days of the date the Contractor begins serving the account.
SECTION B CONTRACT CLAUSES
In the event of any inconsistencies between non-mandatory FAR and GSAM clauses incorporated by reference herein or elsewhere and any clauses set forth in full text in this Contract, the full text clauses shall control.
B.1 CLAUSES INCORPORATED BY REFERENCE
FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
http://www.acquisition.gov/content/regulations
(End of Clause) mailto:Mark2.West@gsa.gov http://www.acquisition.gov/content/regulations
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024
The following FAR clauses are incorporated by reference:
FAR Clause Title IAW Date
52.204-7 System for Award Management FAR 4.1105(a)(1) Oct 2018
52.204-13 System for Award Management Maintenance FAR 4.1105(b) Oct 2018
52.204-17 Ownership or Control of Offeror FAR 4.1804(b) Aug 2020
52.204-19 Incorporation by Reference of Representations and Certifications FAR 4.1202(b) Dec 2014
52.204-22 Alternative Line Item Proposal FAR 4.1008 Jan 2017
52.225-25 Prohibition on Contracting With Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications
FAR 25.1103(e) Jun 2020
52.227-14 Rights in Data-General FAR 27.409 May 2014
52.232-18 Availability of Funds FAR 32.706-1(a) Apr 1984
52.232-40 Providing Accelerated Payments to Small Business Subcontractors FAR 32.009-2 Mar 2023
52.242-13 Bankruptcy FAR 42.903 Jul 1995
B.2 CLAUSES INCORPORATED BY FULL TEXT
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has * represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26 , Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3 , Offeror Representations and Certifications-Commercial Products or Commercial Services.
The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26 , or in paragraph (v)(2)(ii) of the provision at 52.212-3 .
(a) Definitions. As used in this provision— Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25 , Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition .
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25
RFP 47PA0724R0007 GENERAL SERVICES ADMINISTRATION
R2 - NEW YORK - NYISO FY24 COMPETITIVE ELECTRICITY SUPPLY
AMENDMENT 0002 - August 8, 2024 or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements;
or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements;
or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM ) ( https://www.sam.gov ) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
(d) Representation. The Offeror represents that—
(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .