This Invitation for Bids (IFB) document is issued by the Maryland State Highway Administration (MDOT SHA) for the installation and removal of contrast pavement marking tape on the northbound lanes of Interstate 95 at Patapsco Avenue in Baltimore County. The project involves the removal of existing pavement marking lines via hydroblasting and installation of new 5-inch white and yellow contrast pavement marking tape. Estimated quantities include 1,450 linear feet of white contrast tape, 820 linear feet of yellow contrast tape, and 2,270 linear feet of existing marking removal. The work must be performed during night hours only, from 9 PM to 5 AM, Sunday through Thursday, excluding state holidays, over approximately six months or until project completion. A pre-bid conference and scheduled site visit are not applicable. Questions from prospective bidders must be submitted by 5 days prior to bid opening by 12:00 PM EST. Bids are due on April 27, 2026, at 10:00 AM local time and must be submitted through the eMMA (eMaryland Marketplace Advantage) electronic procurement system. No public bid opening date, time, or location is specified. The contract is awarded on a single award basis to the responsive and responsible bidder with the lowest total bid price.
This procurement is designated as a Small Business Reserve (SBR) procurement, limiting award eligibility to certified small business vendors meeting statutory requirements under Maryland State Finance and Procurement Article sections 14-501 through 14-505. There are no MBE or VSBE subcontracting goals established for this solicitation (0% for all categories). No federal funding is involved. The contractor must provide all equipment, materials, and labor necessary for performance and is responsible for obtaining materials approval from the MDOT SHA Engineer prior to installation. Required insurance includes Commercial General Liability ($1,000,000 combined single limit/$3,000,000 aggregate), Worker's Compensation ($1,000,000 per occurrence), and Automobile Insurance as required by state law. The contract specifies liquidated damages of $500 per working day for failure to report on the Notice to Proceed date and $500 per work stoppage day for discontinuous night work. Bidders must comply with Maryland Living Wage requirements and submit financial capability documentation, references from the past five years, current and prior state contracts listing, and a legal action summary with their bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT1-CONTRACT_BID_FORM.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALLATION AND REMOVAL OF CONTRAST TAPE
ON THE BRDIGE LOCATED AT I-95 NB AT PATAPSCO
Solicitation #: 479DCON95ASB
IFB Document
IFB for 479DCON95ASB Page 1 of 34
STATE OF MARYLAND
MARYLAND STATE HIGHWAY ADMINISTRATION
MDOT
INVITATION FOR BIDS (IFB)
INSTALLATION AND REMOVAL OF CONTRAST TAPE ON
THE BRDIGE LOCATED AT I-95 NB AT PATAPSCO
IFB NUMBER 479DCON95ASB
ISSUE DATE: APRIL 14, 2026
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace Advantage (eMMA) https://procurement.maryland.gov should register on eMMA https://emma.maryland.gov/
NOTICE TO BIDDERS
SMALL BUSINESS RESERVE PROCUREMENT
This is a Small Business Reserve Procurement for which the award will be limited to certified small business vendors. Only businesses that meet the statutory requirements set forth in State Finance and Procurement Article, §§14-501—14-505, Annotated Code of Maryland, and that are certified by the Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) Small Business Reserve Program are eligible for award of a contract. Before awarding a contract under a procurement designated as a small business reserve procurement, the Procurement Officer shall verify that the apparent awardee is certified by the GOSBA as a small business through eMMA. However, if small businesses do not show interest in this solicitation, the Procurement Officer has the right to remove the SBR designation via an Amendment on eMMA.
https://procurement.maryland.gov/ https://emma.maryland.gov/ https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx
Solicitation #: 479DCON95ASB
IFB Document
IFB for 479DCON95ASB Page 2 of 34
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS
SOLICITATION.
KEY INFORMATION SUMMARY SHEET (KISS)
Invitation for Bids INSTALLATION AND REMOVAL OF CONTRAST TAPE ON THE
BRDIGE LOCATED AT I-95 NB AT PATAPSCO
Solicitation Number:
479DCON95ASB
IFB Issue Date: APRIL 14, 2026
IFB Issuing Office:
District 4 Maintenance
Procurement Officer:
DIANE EVANS
320 West Warren Road Hunt Valley MD 21030
Email:
Phone Number:
DEVANS@mdot.maryland.gov
410-229-2363
Bids are to be sent to:
Submit on emma.maryland.gov under Solicitation Number
479DCON95ASB
To submit a bid, bidders must first register on emma.maryland.gov. We recommend registering in advance to become acquainted with the site.
No Bid Notice Feedback Form
If you are not submitting a bid for this solicitation, submit Attachment 1 with your reasons why.
Pre-Bid Conference:
N/A
Scheduled Site Visit
N/A
Questions Due Date and Time:
5 DAYS PRIOR TO BID OPENING BY 12:00 EST
Solicitation #: 479DCON95ASB
IFB Document
IFB for 479DCON95ASB Page 3 of 34
Bid Due (Closing) Date and Time:
APRIL 27, 2026 @ 10:00 AM Local Time Bidders are reminded that a completed Feedback Form is requested if a no-bid decision is made (see Attachment 1 - No Bid Notice/Vendor Feedback Form).
Public Bid Opening Date, Time, and Location
N/A ALL BIDS MUST BE SUBMITTED THROUGH eMMA
MBE [[OR]] DBE
Subcontracting Goal:
An overall Minority Business Enterprise (MBE) or Disadvantaged Business Enterprise (DBE) subcontract participation goal of __0___ percent of the total contract dollar amount, including all renewal option terms, if any, has been established for this procurement. The overall MBE or DBE subcontract participation goal includes the following subgoals, which have been established for this procurement:
__0___% for African-American MBEs;
__0___% for Asian-American MBEs;
__0___% for Hispanic-American MBEs; and
___0__% for Woman-Owned MBEs.
N/A
VSBE
Subcontracting Goal:
This solicitation includes a VSBE participation Goal of __0___% N/A
Procurement Method:
A Contract will be awarded in accordance with the Competitive Sealed Bidding method under COMAR 21.05.02.
Multiple or Alternate Bids:
Multiple or alternate Bids will not be accepted.
Contract Type: Insert contract Type: established line items for installation of contrast tape and an item for tape removal
Contract Duration:
The contract shall last for approximately 6 months or until the job is completed.
Primary Place of Performance:
Insert Primary Place of Performance
Solicitation #: 479DCON95ASB
IFB Document
IFB for 479DCON95ASB Page 4 of 34
State Highway of Maryland State
320 West Warren Road
Hunt Valley Md 21030
SBR Designation: yes
Federal Funding: no
IFB for 479DCON95ASB Page 5 of 34
Table of Contents - IFB
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.2 Background and Purpose
2.2.1 Project Goals
2.2.2 State Staff and Roles
2.2.3 Other State Responsibilities
2.3 Contractor Responsibilities and Tasks
2.4 Supplemental Category of Work Requirements and Responsibilities
3 Standard Terms and Conditions
3.1 Contract Initiation Requirements
3.2 End of Contract Transition
3.3 Invoicing
3.3.1 Invoice Submission Schedule
3.3.2 Deliverable Invoicing
3.3.3 Labor Hour/Time and Materials Invoicing
3.3.4 Travel Reimbursement
3.4 Liquidated Damages
3.4.1 MBE Liquidated Damages
3.4.2 Liquidated Damages other than MBE
3.4.3 Problem Escalation Procedure
3.5 Work Orders
3.6 Payments by Electronic Funds Transfer
3.7 Prompt Payment Policy
3.8 Federal Funding Acknowledgement
3.9 Conflict of Interest Affidavit and Disclosure
3.10 Non-Disclosure Agreement
3.10.1 Non-Disclosure Agreement (Bidder/Offeror)
3.10.2 Non-Disclosure Agreement (Contractor)
3.11 Maryland Healthy Working Families Act Requirements
3.12 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and
Services (EPPs)
3.13 Insurance Requirements
4 Bid Submission Information and Instructions
IFB for 479DCON95ASB Page 6 of 34
4.1 eMaryland Marketplace Advantage (eMMA)
4.2 Electronic Means
4.3 Pre-Bid Conference
4.4 Questions
4.5 Bid Due (Closing) Date and Time
4.6 Receipt, Opening and Recording of Bids
4.7 Duration of Bids
4.8 Revisions to the IFB
4.9 Cancellations
4.10 Incurred Expenses
4.11 Protest/Disputes
4.12 Bidder Responsibilities
4.13 Acceptance of Terms and Conditions
4.14 Compliance with Laws/Arrearages
4.15 Verification of Registration and Tax Payment
4.16 False Statements
4.17 Confidentiality of Bids / Public Information Act Notice
4.18 Use of Bidder’s Form Not Binding on State
4.19 Attachments and Documents Required with the Bid (Table A)
4.20 Bid Delivery Instructions
4.21 Bid Evaluation Criteria and Award Basis
4.22 Tie Bids
4.23 Reciprocal Preference
4.24 Documents Required upon Notice of Recommendation for Contract Award (Table B)
5 IFB Appendices and Exhibits
5.1 Appendices (Table C)
5.2 Exhibits (Table D)
IFB for 479DCON95ASB Page 7 of 34
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
The Bidder must document in its Bid that it satisfies the following Minimum Qualifications:
SEE EQUIPMENT AND EXPERIENCE STATEMENT PAPERWORK ATTACHEMENT 2
A. The Bidder shall have . . . [[e.g., three (3) years of experience providing…]]. Required Documentation: The Bidder shall provide with its Bid . . . [[e.g., one or more references from the past five years that collectively are able to attest to the Bidder’s required years of experience in providing.]].
B. The Bidder shall be certified . . .[[e.g., by the Maryland Insurance Administration as a …. ]].
Required Documentation: The Bidder shall provide with its Bid . . .[[e.g., a current certificate issued by the Maryland Insurance Administration evidencing the Bidder’s certification as a . . .]].
C. The Bidder shall provide with its Bid "Attachment L Reference Checks" with one or more references filled out.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
IFB for 479DCON95ASB Page 8 of 34
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
This Invitation for Bids (IFB) is issued to procure the goods or services, as specified in this Section 2, from a contract between the successful bidder(s) and the State of Maryland (“State”):
This open ended, on call, Contract consists of the removal and installation of contrast pavement marking tape on the Northbound lanes of I-95 @ Patapsco Ave. These will be typical markings indicated in the Manual of uniform Traffic Controls Devices. The Contractor shall provide all equipment, material and labor necessary to install these markings at the above location.
This is a non-exclusive Contract. It does not include all work expected to be performed in the designated areas. Therefore, at times, other Contractors may be performing similar work that is not associated with this Contract.
2.1.1
It is the State’s intention to obtain goods and services, as specified in this IFB, from a contract between the selected Bidder and the State.
2.1.2 This is 479DCON95ASB IFB [[Tailor according to the IFB. Replace single award with “up to X awards” if there is the possibility for multiple awards, with “X” being the maximum number of awards. If more than one award is possible based on different Service Categories/Functional Areas or Regions/Counties, state so here.]] See IFB Section 4.21 Bid Evaluation Criteria and Award Basis for more Contract award information.
A Contract award does not ensure a Contractor will receive all or any State business under the Contract.
2.2 Background and Purpose
REMOVAL AND INSTALLATION OF CONTRAST TAPE ON I-95 Northbound @ Patapsco Ave
2.2.1 Project Goals
2.2.2 State Staff and Roles
To upgrade the pavement marking on this brisge
The Owings Mills Shop will provide all of the maintenance of traffic for this contract.
In addition to the Procurement Officer and Contract Monitor, the State …………
State Project Manager
A. The State Project Manager is responsible for scheduling work with the contractor and the shop.
The State Project Manager will provide the following: lane closure permits and Maryland State Police for traffic control.
B. Other State Furnished Roles
2.2.3 Other State Responsibilities
IFB for 479DCON95ASB Page 9 of 34
N/A
A. The State will provide normal office working facilities and equipment reasonably necessary for Contractor performance under the Contract. N/A
2.3 Contractor Responsibilities and Tasks
A. Payment Information (reference to Standard Terms) B. Work Orders (reference to Standard Terms) C. Security Requirements (reference to Standard Terms) D. Insurance Requirement E. Heading for agency requirements F. Heading for agency requirements G. Heading for agency requirements
2.4 Supplemental Category of Work Requirements and Responsibilities The 2024 MDOT SHA Standard and Specifications for Construction and Materials will apply on this Contract. This information can be found on the Administration’s Internet Site at www.roads.maryland.gov.
2.5 Variations in Estimated Quantities
All items and quantities in these Special Provisions are provided for use when and as directed by the Engineer. The quantities for these items are established for the purpose of obtaining a bid price. The quantities for these items may be increased, decreased, or deleted entirely from the Contract by the Engineer.
2.6 Work Scheduling
The Contractor shall furnish the names and telephone numbers of two individuals who may be contacted at any time by the Engineer. O n c e t h e C o n t r a c t i s a w a r d e d , t he Engineer and Contractor will meet and agree to an NTP date, within 2 weeks of that meeting dependent on the weather.
If the Contractor fails to report to the designated starting point on the NTP date, the sum of $500.00 per each working day beyond the NTP date will be deducted from any money due to the Contractor. A l s o , i f t h e C o n t r a c t o r d o e s n o t w o r k o n c o n t i n u o u s n i g h t , t he sum of $500.00 per each work stoppage day will be deducted from any money due to the Contractor, not as a penalty but as liquidated damages.
2.7 Work Hours
Work for this Contract will be restricted to night work from 9PM to 5AM, Sunday through Thursday, with the exception of State Holidays.
2.8 Materials
All materials used for this Contract and furnished by the Contractor will be approved by the Engineer prior to the incorporation of the material into any repair work. Please check the current MDOT SHA Qualified Product List (QPL) at www.roads.maryland.gov to check the existing approved material list for contrast pavement http://www.roads.maryland.gov/
IFB for 479DCON95ASB Page 10 of 34 marking tape. Prior to beginning work, the Contractor shall submit a Source of Supply for materials to the Office of Materials Technology, using the Materials Management System (MMS). Training on the submittal of sources using the MMS will be provided when requested.
2.9 Sequence of Construction
This work will be scheduled for consecutive nights in order to allow for surface dry time caused by the hydro blasting of the existing contrast tape. All traffic control will be supplied by the SHA Golden Ring Maintenance facility.
Schedule will be determined prior to beginning of work.
IFB for 479DCON95ASB Page 11 of 34
3 Standard Terms and Conditions
3.1 Contract Initiation Requirements
Once all approvals have been obtained and the Contract is fully executed, the Procurement Officer may schedule a kickoff meeting to be held prior to commencement of Contract performance.
3.2 End of Contract Transition
The Contractor shall cooperate in the orderly transition of services from it to a subsequent contractor at the end of the contract term or upon receipt of a Notice of Termination from the State. Transition shall be provided in a prompt and timely manner and shall proceed in accordance with the schedule provided to the Contractor by the State in the Notice of Transition. Additional instructions regarding transition services may be provided in the event of a Notice of Termination issued by the State.
3.3 Invoicing
Submission of an invoice constitutes the Contractor’s verification that the information in the invoice is accurate as of the time of submission.
An invoice not satisfying the requirements of a Proper Invoice (as defined in COMAR 21.06.09) will not be processed for payment. To be considered a Proper Invoice, invoices must include the following information, without error:
A. Contractor name and address;
B. Remittance address;
C. Federal taxpayer identification (FEIN) number, social security number, as appropriate;
D. Invoice period (i.e. time period during which services covered by invoice were performed);
E. Invoice date;
F. Invoice number;
G. State assigned Contract number;
H. State assigned (Blanket) Purchase Order number(s);
I. Goods or services provided;
J. Amount due; and
K. Any additional documentation required by regulation or the Contract.
Invoices that contain both fixed price and labor hour or time and material items shall clearly identify each item as either fixed price, and labor hour, or time and material billing.
The State reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide all required deliverables within the time frame specified in the Contract or otherwise breaches the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.
IFB for 479DCON95ASB Page 12 of 34
The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes and transportation taxes. The Contractor, however, is not exempt from such sales and use taxes and may be liable for the same.
Invoices for final payment shall be clearly marked as “FINAL” and submitted when all work requirements have been completed and no further charges are to be incurred under the Contract. In no event shall any invoice be submitted later than 60 calendar days from the Contract termination date.
3.3.1 Invoice Submission Schedule
When the job is completed.
The Contractor shall submit invoices in accordance with the following schedule:
A. For items of work for which there is one-time pricing (see Attachment B –The Price Form), those items shall be billed in the month following the acceptance of the work by the State.
B. For Items of work for which there is annual pricing (see Attachment B–The Price Form), those items shall be billed when the job is completed.
C. Invoices for work performed on a labor hour or time and materials basis shall be submitted on or before the ___ business day of the month following the end of the invoice period.
D. Invoices for deliverables shall be submitted upon completion and acceptance of the deliverables as defined in Section 2 of the IFB.
3.3.2 Deliverable Invoicing
Electronic invoices will be submitted when job is completed.
3.3.3 Labor Hour/Time and Materials Invoicing
N/A
1. Timesheet Reporting
N/A
Within three (3) Business Days after the 15th and last day of the month, the Contractor shall submit a semi-monthly timesheet for the preceding half month providing data for all Contractor Personnel / employees / resources working under the Contract.
At a minimum, each semi-monthly timesheet shall show:
1) Title: “Time Sheet for <<xxxxx>>”;
2) Issuing company name, address, and telephone number;
3) For each Contractor employee /resource:
a) Contractor employee / resource name, and
b) For each period ending date, e.g., “Period Ending: mm/dd/yyyy” (Periods run 1st through 15th, and 16th through last day of the month.):
i) Tasks completed that week and the associated deliverable names and ID#s;
IFB for 479DCON95ASB Page 13 of 34
ii) Number of hours worked each day;
iii) Total number of hours worked that Period;
iv) Period variance above or below 40 hours;
v) Annual number of hours planned under the Task Order;
vi) Annual number of hours worked to date; and
vii) Balance of hours remaining;
4) Annual variance to date (Sum of periodic variances); and
5) Signature and date lines for the Contract Monitor.
Time sheets shall be submitted to the Contract Monitor prior to invoicing. The Contract Monitor shall sign the timesheet to indicate authorization to invoice.
2. Materials Reporting N/A
Submit evidence to support the cost of materials and that billing on the invoice is consistent with the requirements stated in Section 2 of the IFB.
A. For the purposes of the Contract an amount will not be deemed due and payable if:
B. The amount invoiced is inconsistent with the Contract;
C. The proper invoice has not been received by the party or office specified in the
Contract;
D. The invoice or performance is in dispute or the Contractor has failed to otherwise comply with the provisions of the Contract;
E. The item or services have not been accepted;
F. The quantity of items delivered is less than the quantity ordered;
G. The items or services do not meet the quality requirements of the Contract;
H. If the Contract provides for progress payments, the proper invoice for the progress payment has not been submitted pursuant to the schedule;
I. If the Contract provides for withholding a retainage and the invoice is for the retainage, all stipulated conditions for release of the retainage have not been met; or J. The Contractor has not submitted satisfactory documentation or other evidence reasonably required by the Procurement Officer or by the Contract concerning performance under the Contract and compliance with its provisions.
3.3.4 Travel Reimbursement
Travel will not be reimbursed under this IFB.
A. There shall be no reimbursement for Routine Travel. Contractor shall not be reimbursed for Non-Routine Travel without prior Contract Monitor approval.
B. Routine Travel is defined as travel within a 50-mile radius of the <<typeofAgency>>’s base location, as identified herein the IFB, or the Contractor’s facility, whichever is closer to the consulting or work site. There will be no payment for labor hours for travel time or reimbursement for any travel expenses for work performed within these radiuses or at the Contractor’s facility.
C. Non-routine Travel is defined as travel beyond the 50-mile radius of <<typeofAgency>>’s base location, as identified herein the IFB, or the Contractor’s facility, whichever is closer to the consulting or work site. Non-routine travel will be
IFB for 479DCON95ASB Page 14 of 34 reimbursed according to the State’s travel regulations and reimbursement rates, which can be found at: www.DBM.maryland.gov - search: Fleet Management. If Non-Routine travel is conducted by automobile, the first 50 miles of such travel will be treated as Routine Travel and will not be reimbursed. The Contractor may bill for labor hours expended in non-routine traveling beyond the identified 50-mile radius, only if so specified in the IFB or Work Order.
3.4 Liquidated Damages
3.4.1 MBE Liquidated Damages
N/A
Inapplicable because there is no MBE goal for this IFB.
3.4.2 Liquidated Damages other than MBE
This section is inapplicable to this IFB.
3.4.3 Problem Escalation Procedure
No later than ten (10) Business Days after notice of recommended award or after the date of the Notice to Proceed, whichever is earlier, the Contractor must provide, and thereafter, maintain a Problem Escalation Procedure (PEP) for both routine and emergency situations. The PEP must state how the Contractor will address problem situations as they occur during the performance of the Contract, especially problems that are not resolved to the satisfaction of the State within appropriate timeframes and must include:
A. Contact information B. The process for establishing the existence of a problem;
C. Names, titles, and contact information for progressively higher levels of personnel in the Contractor’s organization who would become involved in resolving a problem;
D. For each individual listed in the Contractor’s PEP, the maximum amount of time a problem will remain unresolved with that individual before the problem escalates to the next contact person listed in the Contractor’s PEP;
E. Expedited escalation procedures and any circumstances that would trigger expediting them;
F. The method of providing feedback on resolution progress, including the frequency of feedback to be provided to the State;
G. Contact information for persons responsible for resolving issues after normal business hours (e.g., evenings, weekends, holidays) and on an emergency basis; and
H. A process for updating and notifying the Contract Monitor of any changes to the PEP.
I. The PEP must be updated within ten (10) Business Days after any change in circumstance which changes the PEP but not less than annually within ten (10) Business Days after the start of each Contract year .
Nothing in this section shall be construed to limit any rights of the Contract Monitor or the State which may be allowed by the Contract or applicable law.
3.5 Work Orders
TASK ORDER WILL BE ASSIGN PRIOR TO START OF WORK
THIS SECTION IS INAPPLICABLE TO THIS IFB.
IFB for 479DCON95ASB Page 15 of 34
A. Additional <<PICK both or just one: services and resources>> will be provided via a Work Order process. Work shall not begin in advance of a fully executed Work Order. A Work Order may be issued for <<pick any that apply: either fixed price or labor hour contract or time and material contract (T&M)>>. T&M Work Orders will be issued in accordance with pre-approved Labor Categories with the fully loaded rates on the Attachment B – The Price Form. [[Remove last sentence if no T&M.]]
B. Work Order Requests (See sample at http://doit.maryland.gov/contracts/Documents/_procurementForms/WorkOrderSample.pd
f) for the provision of services or resources that are within the scope of this IFB will be issued to the Contractor. The Work Order Request will include:
1) Technical requirements and description of the service or resources needed;
2) Performance objectives and/or deliverables, as applicable;
3) Due date and time for submitting a response to the request; and
4) Required place(s) where work must be performed.
C. The Contractor shall e-mail a response to the Contract Monitor within the specified time and include at a minimum:
1. A response that details the Contractor’s understanding of the work;
2. A price to complete the Work Order Request using the format provided (see online sample).
3. A description of proposed resources required to perform the requested tasks, with labor categories listed in accordance with Appendix 3.
4. An explanation of how tasks shall be completed. This description shall include proposed subcontractors and related tasks.
5. Contractor’s expectations for State-furnished information, work site, and/or access to equipment, facilities, or personnel
6. The proposed personnel resources, including any subcontractor personnel, to complete the task.
D. For a T&M Work Order, the Contract Monitor will review the response and will confirm the proposed labor rates are consistent with this IFB. For a fixed price Work Order, the Contract Monitor will review the response and will confirm the proposed prices are acceptable.
E. The Contract Monitor may contact the Contractor to obtain additional information, clarification or revision to the Work Order, and will provide the Work Order to the Procurement Officer for a determination of compliance with the Contract and a determination whether a change order is appropriate. Written Procurement Officer approval is required before Work Order execution by the State.
F. Proposed personnel on any type of Work Order shall be subject to the State’s prior approval. The Contractor shall furnish resumes of proposed personnel specifying the labor category(ies) proposed. The Contract Monitor shall have the option to interview the proposed personnel and, in the event of an interview or not, shall notify the Contractor of acceptance or denial of the personnel.
http://doit.maryland.gov/contracts/Documents/_procurementForms/WorkOrderSample.pdf http://doit.maryland.gov/contracts/Documents/_procurementForms/WorkOrderSample.pdf
IFB for 479DCON95ASB Page 16 of 34
G. Performance of services under a Work Order shall commence consistent with an NTP issued by the Contract Monitor for such Work Order.
The Blanket Purchase Order (BPO) issued as a result of this solicitation, and any subsequent amendments, modifications or options issued relevant to this solicitation or BPO, complies with all the terms, conditions and specifications issued with this solicitation and is incorporated in and made part of the Contract – see Exhibit 2 - Sample Contract.
3.6 Payments by Electronic Funds Transfer
By submitting a Bid in response to this solicitation, the Bidder, if selected for award:
Agrees to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s Office grants an exemption. Payment by EFT is mandatory for contracts exceeding $200,000. The successful Bidder shall register using the COT/GAD X-10 Vendor Electronic Funds (EFT) Registration Request Form.
Any request for exemption must be submitted to the State Comptroller’s Office for approval at the address specified on the COT/GAD X-10 form, must include the business identification information as stated on the form, and must include the reason for the exemption. The COT/GAD X-10 form may be downloaded from the Comptroller’s website at:
http://comptroller.marylandtaxes.com/Vendor_Services/Accounting_Information/Static_Files/GA DX10Form20150615.pdf.
3.7 Prompt Payment Policy
This procurement and the Contract(s) to be awarded pursuant to this solicitation are subject to the Prompt Payment Policy Directive issued by the Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) and dated August 1, 2008. Promulgated pursuant to Md. Code Ann., State Finance and Procurement Article, §§ 11-201, 13-205(a), and Title 14, Subtitle 3, and COMAR 21.01.01.03 and 21.11.03.01, the Directive seeks to ensure the prompt payment of all subcontractors on non-construction procurement contracts. The Contractor shall comply with the prompt payment requirements outlined in the Contract, Section 31 “Prompt Pay Requirements” (see Exhibit 2 - Sample Contract). Additional information is available on GOSBA’s website at:
http://www.gomdsmallbiz.maryland.gov/documents/legislation/promptpaymentfaqs.pdf.
3.8 Federal Funding Acknowledgement
This Contract does not contain federal funds.
3.9 Conflict of Interest Affidavit and Disclosure
The Bidder shall complete and sign the Conflict-of-Interest Affidavit and Disclosure (Attachment I) and submit it with its Bid.
By submitting a Conflict-of-Interest Affidavit and Disclosure, the Contractor shall be construed as certifying all Contractor Personnel and subcontractors are also without a conflict of interest as defined in COMAR 21.05.08.08A.
Additionally, a Contractor has an ongoing obligation to ensure that all Contractor Personnel are without conflicts of interest prior to providing services under the Contract. For policies and procedures applying specifically to Conflict of Interests, the Contract is governed by COMAR 21.05.08.08.
IFB for 479DCON95ASB Page 17 of 34
Participation in Drafting of Specifications: Disqualifying Event: Bidders are advised that Md. Code Ann. State Finance and Procurement Article §13-212.1(a) provides generally that “an individual who assists an executive unit in the drafting of specifications, an invitation for bids, a request for proposals for a procurement, or the selection or award made in response to an invitation for bids or a request for proposals, or a person that employs the individual, may not: (1) submit a bid or proposal for that procurement; or (2) assist or represent another person, directly or indirectly, who is submitting a bid or proposal for that procurement.” Any Bidder submitting a Bid in violation of this provision shall be classified as “not responsible.”
3.10 Non-Disclosure Agreement
3.10.1 Non-Disclosure Agreement (Bidder/Offeror)
A Non-Disclosure Agreement (Bidder/Offeror) is not required for this procurement.
3.10.2 Non-Disclosure Agreement (Contractor)
A Non-Disclosure Agreement (Contractor) is not required for this procurement.
3.11 Maryland Healthy Working Families Act Requirements
On February 11, 2018, the Maryland Healthy Working Families Act went into effect. All Bidders should be aware of how this Act could affect your potential contract award with the State of Maryland. See the Department of Labor, Licensing and Regulations website for Maryland Healthy Working Families Act Information: https://dllr.state.md.us/paidleave/.
3.12 The State of Maryland’s Commitment to Purchasing Environmentally Preferred Products and Services (EPPs)
Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.” Accordingly, Bidders are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
3.13 Insurance Requirements
The Contractor shall maintain, at a minimum, the insurance coverages outlined below, or any minimum requirements established by law if higher, for the duration of the Contract, including option periods, if exercised:
3.13.1 The following type(s) of insurance and minimum amount(s) of coverage are required:
A. Commercial General Liability - One million dollars ($1,000,000) combined single limit per occurrence for bodily injury, property damage, and personal and advertising injury and three million dollars ($3,000,000) annual aggregate. The minimum limits required herein may be satisfied through any combination of primary and umbrella/excess liability policies.
B. Errors and Omissions/Professional Liability - One million dollars ($1,000,000) per combined single limit per claim and three million dollars ($3,000,000) annual aggregate.
N/A https://dllr.state.md.us/paidleave/ https://trackbill.com/bill/maryland-house-bill-629-environmentally-preferable-procurement-maryland-green-purchasing-committee/647077/
IFB for 479DCON95ASB Page 18 of 34
C. Crime Insurance/Employee Theft Insurance - to cover employee theft with a minimum single loss limit of one million dollars ($1,000,000) per loss, and a minimum single loss retention not to exceed ten thousand dollars ($10,000), with the State of Maryland listed as a “loss payee.”
N/A
D. Cyber Security / Data Breach Insurance – Five million dollars ($5,000,000) per occurrence. The coverage must be valid at all locations where work is performed or data or other information concerning the State’s claimants or employers is processed or stored.
N/A
E. Worker’s Compensation - The Contractor shall maintain such insurance as necessary or as required under Workers’ Compensation Acts, the Longshore and Harbor Workers’ Compensation Act, and the Federal Employers’ Liability Act, to not be less than. one million dollars ($1,000,000) per occurrence (unless a state’s law requires a greater amount of coverage). Coverage must be valid in all states where work is performed.
F. Automobile or Commercial Truck Insurance - The Contractor shall maintain Automobile or Commercial Truck Insurance (including owned, leased, hired, and non-owned vehicles) as appropriate with Liability, Collision, and PIP limits no less than those required by the State where the vehicle(s) is registered, but in no case less than those required by the State of Maryland.
N/A
G. The State shall be listed as an additional insured on the faces of the certificates associated with the coverages listed above, including umbrella policies, excluding Workers’ Compensation Insurance and professional liability.
3.13.2 All insurance policies shall be endorsed to include a clause requiring the insurance carrier to provide the Procurement Officer, by certified mail, not less than 30 days’ advance notice of any non-renewal, cancellation, or expiration. The Contractor shall notify the Procurement Officer in writing, if policies are canceled or not renewed within five (5) days of learning of such cancellation or nonrenewal. The Contractor shall provide evidence of replacement insurance coverage to the Procurement Officer at least 15 days prior to the expiration of the insurance policy then in effect.
3.13.3 Any insurance furnished as a condition of the Contract shall be issued by a company authorized to do business in the State.
3.13.4 The recommended awardee must provide current certificate(s) of insurance with the prescribed coverages, limits and requirements set forth in this section within five (5) Business Days from notice of recommended award. During the period of performance for multi-year contracts, the Contractor shall provide certificates of insurance annually, or as otherwise directed by the Contract Monitor.
3.13.5 Subcontractor Insurance
The Contractor shall require any subcontractors to obtain and maintain comparable levels of coverage and shall provide the Contract Monitor with the same documentation as is required of the Contractor.
IFB for 479DCON95ASB Page 19 of 34
4 Bid Submission Information and Instructions
4.1 eMaryland Marketplace Advantage (eMMA) eMMA is the electronic commerce system for the State of Maryland. The IFB, Pre-Bid Conference (Conference)summary and attendance sheet, Bidders’ questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be made available via eMMA.
To receive a contract award, a vendor must be registered on eMMA. Registration is free. Go to emma.maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.
4.2 Electronic Means
The following transactions related to this procurement and any Contract awarded pursuant to it are not authorized to be conducted by electronic means:
A. Submission of Bond documents determined by the State to require original signatures; or
B. Any transaction, submission, or communication where the Procurement Officer has specifically directed that a response from the Contractor or Offeror be provided in writing or hard copy.
Any e-mail transmission is only authorized to the email addresses for the identified person as provided in the solicitation, the Contract, or in the direction from the Procurement Officer or Contract Monitor.
“Electronic means” refers to exchanges or communications using electronic, digital, magnetic, wireless, optical, electromagnetic, or other means of electronically conducting transactions.
Electronic means includes e-mail, internet-based communications, electronic funds transfer, specific electronic bidding platforms (e.g., https://procurement.maryland.gov), and electronic data interchange.
4.3 Pre-Bid Conference
If a Conference will be held, the date, time, and location is indicated on the Key Information Summary Sheet. Attendance at the Conference is not mandatory, but all interested parties are encouraged to attend in order to facilitate better preparation of their Bids. If the solicitation includes an MBE participating goal, failure to attend the Conference will be taken into consideration as part of the evaluation of a bidder’s good faith efforts if there is a waiver request.
It is highly recommended that all Prime Contractors bring their intended subcontractors to the Conference/Site Visit to ensure that all parties understand the IFB requirements and the socio-economic goals for this solicitation.
MBE subcontractors are encouraged to attend the Conference to market their participation to potential prime contractors.
In order to assure adequate accommodations at the Conference, please email the completed Attachment 2 for those expected to attend the Conference to the Procurement Officer no later than the time and date indicated on the Key Information Summary Sheet. In addition, if there is a need for sign language interpretation or other special accommodations due to a disability, please notify the https://emma.maryland.gov/page.aspx/en/usr/login?ReturnUrl=%2fpage.aspx%2fen%2fbuy%2fhomepage https://procurement.maryland.gov/
IFB for 479DCON95ASB Page 20 of 34
Procurement Officer at least five (5) Business Days prior to the Conference date. Reasonable effort will be made to provide such special accommodation.
If the Conference is in person, attendees should bring a copy of the solicitation and a business card to help facilitate the sign-in process.
4.4 Questions
All questions, including concerns regarding any applicable MBE or VSBE participation goals, shall identify in the subject line the Solicitation Number and Title for this IFB and must be submitted in writing via e-mail or eMMA to the Procurement Officer no later than the date and time specified in the Key Information Summary Sheet. The Procurement Officer, based on the availability of time to research and communicate an answer, shall decide whether an answer can be given before the Bid due date.
4.4.1 Answers to all questions that are not clearly specific only to the requestor will be distributed via the same mechanism as for IFB amendments and posted on eMMA.
4.4.2 The statements and interpretations contained in responses to any questions, whether responded to verbally or in writing, are not binding on the State unless it issues an amendment to the solicitation in writing.
4.5 Bid Due (Closing) Date and Time
Bids must be received by the Procurement Officer no later than the Bid due date and time indicated on the Key Information Summary Sheet to be considered. Except as provided in COMAR
21.05.02.10. Bids received after that date will not be considered. Requests for an extension of this date or time shall not be granted.
For Bids accepted via email, the time stamp to indicate receipt of the Bid by the State, is the posted date and time in the Procurement Officer’s email inbox.
Bids may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Bids.
Potential Bidders not responding to this solicitation are requested to submit the “No Bid/Proposal Notice/Vendor Feedback” form Attachment 1, which includes company information and the reason for not responding (e.g., too busy, cannot meet mandatory requirements).
4.6 Receipt, Opening and Recording of Bids
Upon receipt, each Bid and any timely modification(s) to a Bid shall be stored in a secure place until the time and date set for Bid opening. Before Bid opening, the State may not disclose the identity of any Bidder.
Bids shall be opened publicly at the time, date and place designated in the Key Information Summary Sheet.
The name of each Bidder, the Total Bid Price, and such other information as is deemed appropriate shall be read aloud or otherwise made available and recorded at the time of Bid opening.
IFB for 479DCON95ASB Page 21 of 34
4.7 Duration of Bids
Bids submitted in response to this IFB are irrevocable for the latest of the following: 90 days following the Bid due date and time or the date any protest concerning this IFB is finally resolved.
This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
4.8 Revisions to the IFB
4.8.1 All revisions to the IFB before the due date for Bids will be published in an addendum to the IFB and posted on eMMA and reasonable effort will be made to provide such addenda to all prospective Bidders that were sent this IFB or are otherwise known by the Procurement Officer to have obtained this IFB. It is the responsibility of all prospective Bidders to check eMMA for any addenda issued prior to the submission of Bids.
4.8.2 Bidders shall acknowledge in the Bid the receipt of all addenda to this IFB issued before the Bid due date.
4.8.3 Failure to acknowledge receipt of an addendum does not relieve the Bidder from complying with the terms, additions, deletions, or corrections set forth in the addendum, and may cause the Bid to be deemed not responsive.
4.9 Cancellations
4.9.1 This IFB may be cancelled as provided in COMAR 21.06.02.02
4.9.2 The State reserves the right to cancel this IFB, accept or reject any and all Bids, in whole or in part, received in response to this IFB and to waive or permit the cure of minor irregularities.
4.9.3 In the event a government entity proposes and receives the recommendation for award, this procurement may be canceled, and the award processed in accordance with COMAR 21.01.03.01.A(4).
4.9.4 If the services that are the subject of the IFB are currently being provided under an interagency agreement with a public institution of higher education and the State determines that the services can be provided more cost effectively by the public institution of higher education, then the IFB may be canceled in accordance with Md.
Code Ann., State Finance and Procurement Art., § 3-207(b)(2).
4.10 Incurred Expenses
The State will not be responsible for any costs incurred by any Bidder in preparing and submitting a Bid or performing any other activities related to submitting a Bid in response to this solicitation.
4.11 Protest/Disputes
Any protest or claim related to this IFB or the Contract award hereunder shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
4.12 Bidder Responsibilities
4.12.1 A Bidder, either directly or through its subcontractor(s), must be able to provide all goods and services and meet all of the requirements requested in this solicitation and the
IFB for 479DCON95ASB Page 22 of 34 successful Bidder (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work.
4.12.2 If applicable, subcontractors utilized in meeting the established MBE or VSBE participation goal(s) for this solicitation shall be identified using Attachment D or Attachment E as appropriate. Guidance for completing the Attachments is provided in the appropriate Appendix or Appendices to this IFB (see “Appendix 4 - MBE Participation Goal” and “Appendix 5 - VSBE Participation Goal”).
4.12.3 If the Bidder is the subsidiary of another entity, all information submitted by the Bidder, including but not limited to references, financial reports, or experience and documentation (e.g., insurance policies, bonds, letters of credit) used to meet minimum qualifications, if any, shall pertain exclusively to the Bidder, unless the parent organization will guarantee the performance of the subsidiary. If applicable, the Bidder’s Bid shall contain an explicit statement, signed by an authorized representative of the parent organization, stating that the parent organization will guarantee the performance of the subsidiary.
4.12.4 A parental guarantee of the performance of the Bidder under this section will not automatically result in crediting the Bidder with the experience or qualifications of the parent under any evaluation criteria pertaining to the actual Bidder’s experience and qualifications. Instead, the Bidder’s responsibility will be assessed to the extent to which the State determines that the experience and qualifications of the parent are applicable to and shared with the Bidder, any stated intent by the parent to be directly involved in the performance of the Contract, and the value of the parent’s participation as determined by the State.
4.13 Acceptance of Terms and Conditions
By submitting a Bid in response to this IFB, the Bidder, if selected for award, is deemed to have accepted the terms and conditions of this IFB and the Contract, attached hereto as Exhibit 2 – Sample Contract. Any questions or exceptions to this IFB or the Contract must be submitted by the “Questions Due Date and Time” prior to Bid submission. Changes to the solicitation, including the Bid Form or Contract, made by the Bidder may result in Bid rejection.
4.14 Compliance with Laws/Arrearages
By submitting a Bid in response to this IFB, the Bidder, if selected for award, agrees that it will comply with all federal, State, and local laws applicable to its activities and obligations under the Contract.
By submitting a response to this solicitation, each Bidder represents that it is not in arrears in the payment of any obligations due and owing the State, including the payment of taxes and employee benefits, and shall not become so in arrears during the term of the Contract if selected for Contract award.
4.15 Verification of Registration and Tax Payment
Before a business entity can do business in the State, it must be registered with the State Department of Assessments and Taxation (SDAT). SDAT is located at State Office Building, Room 803, 301 West Preston Street, Baltimore, Maryland 21201. For registration information, visit https://egov.maryland.gov/BusinessExpress/.
https://egov.maryland.gov/BusinessExpress/
IFB for 479DCON95ASB Page 23 of 34
It is strongly recommended that any potential Bidder complete registration prior to the Bid due date and time. The Bidder’s failure to complete registration with SDAT may disqualify an otherwise responsive successful Bidder from final consideration and recommendation for Contract award.
4.16 False Statements
Bidders are advised that Md. Code Ann., State Finance and Procurement Article, § 11-205.1 provides as follows:
In connection with a procurement contract a person may not willfully:
A. Falsify, conceal, or suppress a material fact by any scheme or device;
B. Make a false or fraudulent statement or representation of a material fact;or C. Use a false writing or document that contains a false or fraudulent statement or entry of a material fact.
A person may not aid or conspire with another person to commit an act under this section.
A person who violates any provision of this section is guilty of a felony and on conviction is subject to a fine not exceeding $20,000 or imprisonment not exceeding five (5) years or both.
4.17 Confidentiality of Bids / Public Information Act Notice
The Bidder should give specific attention to the clear identification of those portions of its Bid that it considers to contain confidential and/or proprietary commercial information or trade secrets, and provide justification why such materials, upon request, should not be disclosed by the State under the Public Information Act, Md. Code Ann., General Provisions Article, Title 4. This information should be identified by page number and placed in the Transmittal Letter with the Bid.
The Bids shall be tabulated or a Bid abstract made. The opened Bids shall be available for public inspection at a reasonable time after Bid opening, but in any case before contract award, except to the extent the Bidder designates trade secrets or other proprietary data to be confidential as set forth in this solicitation. Material so designated as confidential shall accompany the Bid and shall be readily separable from the Bid to facilitate public inspection of the non-confidential portion of the Bid, including the Total Bid Price.
For requests for information made under the PIA, the Procurement Officer shall examine the Bids to determine the validity of any requests for nondisclosure. Nondisclosure is permissible only if approved by the Office of the Attorney General.
4.18 Use of Bidder’s Form Not Binding on State
The Bidder may not substitute, modify, or provide any other document in lieu of the documents provided with this Bid. Only those forms and documents provided with this solicitation and by the Procurement Officer will be considered acceptable as bid submission.
4.19 Attachments and Documents Required with the Bid (Table A) A Bidder shall include the following Attachments with its Bid as a single Bid Package:
Attachments A through E = Bid will be rejected if the required Attachment is not submitted or is incomplete.
IFB for 479DCON95ASB Page 24 of 34
Attachments F through R = Bid may be rejected if the required Attachment is not submitted or is incomplete.
<<*Procurement Officer should delete the Attachment Name and replace it with “Not Applicable” if the Attachment is not required for this solicitation.>>
TABLE A - Attachments and Documents Required with the Bid
Attachment Attachment Name
A
Bid/Proposal Affidavit A Bid submitted by the Bidder must be accompanied by a completed Bid/Proposal
Affidavit.
https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf
B
The Price Form (as specified within eMMA) Do not alter this Price Form or the Bid may be determined to be not responsive.
The Price Form must be signed and dated, where requested, by an individual who is authorized to bind the Bidder to the prices…