472-25257-ABG Kinross Fire Alarm - Project Statement.pdf

PDF 470 KB Posted

Attached to
472/25257. ABG; Kinross CF - Fire Alarm System Upgrades
Solicitation number
RFP-171-250000002555-3
Issued by
Chippewa County, Michigan

About this file

This is a Project Statement from the Michigan Department of Technology, Management and Budget (DTMB) for the Kinross Correctional Facility Fire Alarm System Upgrades project. The project involves replacing the entire existing fire alarm system at the Kinross Correctional Facility and a remote warehouse location, as the current Potter System is no longer supported and replacement parts are unavailable. The project requires a Professional Services Contractor (PSC) to provide design and construction administration services, including field investigation of the existing system, developing plans and specifications, and overseeing the complete replacement of the fire alarm system. A mandatory walk-through inspection is scheduled for Monday, June 30, 2025, at 11:00 am, with proposals due on Thursday, July 17, 2025. The desired project timeline includes investigation and design completion in Summer 2025, bidding in Fall 2025, and construction in Winter 2025/2026.

The project requires comprehensive fire alarm system upgrades meeting current codes, including new head end units, strobes, alarms, duct detectors, tamper switches, hood suppression system reviews, and connections to air handling units. The PSC must provide detailed documentation, 50% and 100% construction cost estimates, design and construction scheduling, and submit contract documents for review. The proposal must be submitted through SIGMA VSS, with technical and cost proposals combined into a single attachment. The project will comply with various federal and state agency codes and regulations, including those from EPA, OSHA, DOT, DCH, EGLE, DNR, and MIOSHA. Contractors must complete a LEIN check and submit required documentation prior to the pre-bid walk-through meeting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0427 (R 10/22)

PROJECT STATEMENT

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design and Construction Division 3111 West St. Joseph

Street Lansing, Michigan 48909

FILE NUMBER

472/25257.ABG

PROPOSAL DUE DATE

Thursday, July 17, 2025

CLIENT AGENCY

Michigan Department of Corrections

PROJECT NAME AND LOCATION

Kinross Correctional Facility – Fire Alarm System Upgrades PROJECT ADDRESS (if applicable) 4533 W Industrial Park Dr, Kincheloe, MI 49788

CLIENT AGENCY CONTACT

Richard White, whiter12@michigan.gov

TELEPHONE NUMBER

517-242-3599

DTMB - DCD PROJECT DIRECTOR

Alan Goschka, goschkaa@michigan.gov

TELEPHONE NUMBER

517-388-3489

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:

Monday, June 30, 2025 at 11:00am at the Kinross Correctional Facility, 4533 W Industrial Park Dr, Kincheloe, MI 49788. Meeting at the main entrance at the Administration Building.

MANDATORY (Check box if Mandatory)

LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

PROJECT DESCRIPTION/SERVICES REQUESTED:

The Kinross Correctional Facility is replacing the existing Fire Alarm system throughout the entire facility.

The existing Potter System is no longer supported and replacement parts are no longer available. The new Fire Alarm system shall include a complete system meeting all current codes including, but not limited to:

head end units, strobes, alarms, duct detectors, tamper switches on shut off valves, review and upgrades to the hood suppression systems, connection to AHUs over 2,000cfm, new cabling and conduit, trouble and alarms to report back to the Star Net II security system at central control, etc. The existing fire alarm system is to remain functioning until the new system is completely installed, tested and functioning properly. The removal of the existing system shall include all existing equipment, conduit, cabling and existing direct buried lines to be properly terminated and abandoned in place (all removed equipment to be salvaged and returned to DOC).

There is a warehouse at a remote location (see attached aerial maps) that will also be included in the project requiring the design and installation of a fire alarm system (there is fiber connectivity between the Kinross Campus and the warehouse facility).

The Professional Services Contractor (PSC) is to provide a proposal for Phase 500 Final Design and Phase 600/700 Construction Administration services to field investigate and document the existing system in its entirety (there is limited documentation of the existing system), including existing head end unit locations, all speaker/strobe locations, conduits and cabling, duct detectors, etc so that all equipment to be removed is depicted in the design documents. Develop plans/specifications to replace the entire fire alarm system (all new equipment to be depicted on the design documents), submission for plan review, pre-bid walkthrough and evaluation recommendation along with construction administration services.

The PSC Proposal (Technical and Cost) for all required Professional Architectural and Engineering Services shall be in compliance with the State of Michigan, Department of Technology Management and Budget DTMB Project Statement Form (DMB427), DTMB ISID Billable Rate Professional Services Contract and the DTMB 430 RFP Billable Rate Form (DMB 430) and DTMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. A proposed schedule for design, bidding and construction must be included.

The cost portion shall be submitted in DTMB410 format.

THE PSC PROPOSAL SHALL INCLUDE:

1. All required LARA plan review, permit application preparation, permitting fees, reimbursements, and approvals.

2. Contract Documents utilizing the current State of Michigan, DTMB, Facilities and Business Services Administration, Design and Construction Division and the Master Spec format.

3. Clear documentation of the number of meetings proposed during the design and construction administration phases and indicate whether the meetings are proposed to be on-site, face to face, by telephone, or in specific electronic format.

4. Providing 50% and Final (100%) estimates of construction costs for development plans.

5. Design and construction scheduling. Provide a proposed PSC design schedule. The Agency desires to have the design completed as soon as possible.

6. Submittal of 50% and 90% contract documents for owner review, posting on SIGMA-VSS, Best

Value Bid Evaluation, PSC recommendation of Contract Award, and Contract Administration.

7. Under the Cost Proposal, Section III-2-B Fee with Anticipated Hours and Billing Rate – PSC to breakdown and provide a table for each design phase – Phase 500, Phase 600 and Phase 700.

The PSC shall provide a biweekly progress summary email to the project team, briefly documenting the prior 2-week’s progress by the PSC and display the initial project schedule and current schedule status.

The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders, and telephone communication logs. The project files shall be maintained in an electronic file format and delivered to the DTMB Design and Construction Division with the PSC’s final Payment Request.

Reference Documents

Attachment A – Site Maps

Please NOTE:

Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.

Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.

Please remember that attachments can be no larger than 30mb.

Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.

SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.

If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

Responses should not be emailed to the Project Director.

NIGP CODES

90607, 90630, 90692, 92533, 92539, 92584

DESIRED SCHEDULE OF WORK

Investigation services and design completed Summer 2025, bidding Fall 2025, with construction Winter 2025/2026

ACCEPTING RFP QUESTIONS UNTIL:

Please do not submit online questions via VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov address no later than 2:00 p.m., Eastern on Wednesday, July 9, 2025.

REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.

This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) goschkaa Text Box File 472/25257.ABG Kinross Correctional Facility Fire Alarm System Upgrades goschkaa Callout Main Kinross Correctional Campus goschkaa Callout Kinross Correctional Warehouse Facility goschkaa

Attachment A

Attachment A goschkaa Text Box File 472/25257.ABG Kinross Correctional Facility Fire Alarm System Upgrades goschkaa Callout Kinross Correctional Facility Campus

File 472/25257.ABG Kinross Correctional Facility Fire Alarm System Upgrades goschkaa Callout Kinross Correctional Warehouse Facility goschkaa

Attachment A

File details come from the government source that posted it. Updated .