472-25140-ABG Kinross PPD System - Addendum 4.pdf
PDF 86 KB Posted
- Attached to
- 472/25140. ABG; Kinross CF - PPD System Upgrade
- Solicitation number
- RFP 171 250000001702 5
- Issued by
- Cass County, Kincheloe CDP, Michigan
About this file
This is an Addendum No. 4 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget (DTMB) for the Kinross Correctional Facility Personal Protection Device (PPD) Upgrades project. The proposal seeks professional design services for upgrading personal protection device systems at the correctional facility. The project director is Alan Goschka, with a proposal due date of Thursday, May 22, 2025. The addendum, issued on May 14, 2025, clarifies scope expectations and addresses six key questions from proposers regarding project deliverables and responsibilities.
The addendum clarifies that proposers must conduct a comprehensive field investigation and documentation of the existing PPD system, including head-end unit locations and emergency power availability, to properly inform demolition and removal scopes. An installation plan with preliminary construction phasing must be developed to coordinate concurrent installation of the new system with the existing system during a minimum 30-day trial period before switchover. The proposer (PSC) is responsible for 50% and 90% design review cost estimates to inform the Department of Corrections of projected project costs. Plan review submissions for electrical work required for additional emergency circuits fall under the proposer's responsibility, while contractor and subcontractor permit applications remain the contractor's responsibility. This is a delegated design project where typical plan review and permit application preparation by the proposer are not applicable except where electrical modifications necessitate formal review submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 4
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
05-14-2025
PROJECT NAME
Kinross Correctional Facility – Personal Protection Device (PPD) Upgrades
FILE NUMBER
472/25140.ABG
PROJECT DIRECTOR
Alan Goschka
PROPOSAL DUE DATE:
Thursday, May 22, 2025
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Questions:
1. "Field investigate and document the existing system in its entirety, including existing head-end unit locations and existing emergency power availability". - This request is not typical and has not been requested/completed in previous projects.
The intent is to properly document the existing system so that it can be properly depicted on the demolition plans so that the contractor understands exactly what their removal scope of work includes – do not want to leave it up to the contractor to determine what needs to be removed and what should remain.
2. "Develop an installation plan" - This is a coordination item for the general contractor. We will note in the drawings and specs that the new system needs to be installed concurrently with the existing system, and switchover will happen only after the trial period (30 days minimum). – acceptable?
A preliminary construction Phasing plan must be provided in the design documents so the contractor has an understanding of the project. There will certainly be coordination with the contractor once they are engaged with the project.
3. "Submission for plan review" - This is a delegated design, and the PSC is unable to submit the plans for plan review. Have PPD plans been submitted in the past? If electrical work is required for additional emergency circuit – that needs to be submitted for plan review.
The PSC will be responsible for submitting required documents for plan review.
4. "LARA plan review" - Not applicable to the PSC on this scope. Again, any electrical changes need to be submitted.
The PSC will be responsible for submitting required documents for plan review.
5. "Permit application preparation" - Not applicable to the PSC on this scope. If plan review required for electrical work, then PSC needs to include.
The PSC will be responsible for submitting required documents for plan review. The contractor and subs will be responsible for submitting their respective permit applications.
6. "Provide 50% and final (100%) estimates for construction costs" - Not typical for PPD projects since this is a delegated design. – Have cost estimates been provided on other PPD projects?
PSC will be responsible for 50% and 90% design review and associated cost estimates for DOC to have an idea on the cost of the proposed project.
APPROVED BY:
Alan Goschka
PROJECT DIRECTOR DATE 05-14-2025