472-24052.JGH - Statewide Perimeter Repair-Replacement - Newberry CF - Addendum #1.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ-171-250000000171-2
- Issued by
- Livingston County, Michigan
About this file
This is Addendum No. 1 issued by Matrix Consulting Engineers for the State of Michigan's Newberry Correctional Facility Statewide Perimeter Repair/Replacement project (File Number 472/24052.JGH, Matrix Project Number 24233.00). The addendum includes a sign-in sheet from a meeting held on February 4, 2025, at 1:00 pm in the Admin Building of the facility, located at 13747 E. County Road 428, Newberry, MI 49868. The meeting was attended by representatives from Century Fence, Maverick Fence, NCF PPS, DTMB-DCD, Matrix, and Nationwide.
The addendum provides minimal modifications to the original contract documents, with its primary purpose being to distribute the meeting attendance record to all bidders. Bidders are required to acknowledge receipt of this addendum on their Proposal Form. The meeting attendance record (Form DTMB-0441) shows contact information for approximately 10 attendees representing various companies interested in the perimeter repair/replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1601 E. CÉSAR E. CHÁVEZ AVENUE, LANSING, MI 48906
PHONE: (517) 487-2511
FAX: (517) 487-2544
ADDENDUM NO. 1
Newberry Correctional Facility – Statewide Perimeter Repair/Replacement
Date: 2/10/2025 File Number: 472/24052.JGH
Matrix Project Number: 24233.00
OWNER: ENGINEER:
State of Michigan Matrix Consulting Engineers 13747 E. County Road 428 1601 E. Cesar E. Chavez Ave.
Newberry, MI 49868 Lansing, MI 48906
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.
Addendum Items:
1. Sign-In Sheet (Issued):
a. The sign-in sheet is attached to this addendum or all bidders to review.
End of Addendum No. 1
File details come from the government source that posted it. Updated .