This is a Cost Proposal Worksheet for Hall County, Georgia, for the construction of a new softball field addition at Murrayville Park. The project encompasses multiple construction phases including mobilization, sitework, furnishings, utilities, and erosion control measures. Significant quantities of materials and labor are detailed across 54 line items, including rough grading (11,646 square yards), asphalt paving (194 tons combined), Tiftuf Bermuda sod installation (104,808 square feet), concrete work, electrical installations, and various site furnishings such as dugouts, bleachers, fencing, scoreboards, and irrigation systems. The worksheet also itemizes erosion control requirements including temporary sediment traps, silt fencing (2,942 linear feet), check dams, and water quality monitoring and inspection activities over a seven-month period.

The cost proposal worksheet requires contractors to enter unit costs in Column D for each line item, with quantities specified in the worksheet to calculate total costs. The document includes a construction subtotal followed by three deductive alternative options: Option 1 eliminates sod installation, Option 2 removes the irrigation system, and Option 3 excludes fencing, gates, and field-related items shown on project sheets 23 through 26. Final pricing scenarios are provided showing the construction total with various combinations of deductive alternatives applied. All costs are to be presented on a lump sum or unit cost basis as indicated in the worksheet, with no pricing information, project timeline, or contract terms specified in this cost proposal document.

View the file

Other files

File Type Posted
RFQP 47_016 New Baseball Field at Murrayville.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hall County Murrayville Pk Exhibit C - Cost Proposal Worksheet Murrayville Park - Softball Field Addition SOV

Company Name: _____________________________________________________

Please enter only unit costs in Column D.
ItemDescriptionUnitUnit CostQtyTotal
1Mobilization / De-mobilizationLS1.00$ -
2Bonds & InsuranceLS1.00$ -
3PermitsLS1.00$ -
Subtotal$ -
Sitework
4Rough grading sites, open, 10,000-20,000 graderSY11,646.00$ -
5Haul off excess fill dirtCY435.00$ -
6SidewalksSY344.00$ -
7Concrete stairsLS1.00$ -
6Regular excavation, cutCY2,841.00$ -
88-inch gradeded aggregate baseTN239.00$ -
92-inch asphalt binder (25mm superpave)TN97.00$ -
101.5-inch top course (9.5mm superpave)TN97.00$ -
11Demolish, remove pavement & curb, remove bituminous pavement, 4" to 6" thick, excludes hauling & disposal feesSY344.00$ -
12Tiftuf Bermuda SodSF104,808.00$ -
13Electrical Transformer Install, Jackson EMCEA1.00$ -
14Electrical Service Install, main panelsEA1.00$ -
15SignageEA1.00$ -
16Landscaping AllowanceEA$ -
17CurbstopsEA3.00$ -
18Handicap parking symbols/stripingEA3.00$ -
Subtotal$ -
Furnishings
195 FT High Black Vinyl FencingLF965.00$ -
2020 FT High Black Vinyl FencingLF195.00$ -
21Handrail, 2 inch round galvanizedLF75.00$ -
22Site Lighting (By Others)EA1.00$ -
23DugoutsEA2.00$ -
24BleachersEA2.00$ -
25Foul poles, inground mount, installedEA2.00$ -
26Scoreboard, including frame, electrical, conduit, etc. installed completeEA1.00$ -
27Irrigation SystemEA1.00$ -
2820 FT fabricated steel vehicle security gate, installedEA1.00$ -
29Field Building, 12 x 20SF240.00$ -
29ABullpensEA2.00$ -
Subtotal$ -
Utilities
30Waterline 2 IN PVCLF614.00$ -
312" MeterEA1.00$ -
32RPZEA2.00$ -
33HotboxEA2.00$ -
3412 IN HDPE Storm Drain Line, 1-10' CutLF240.00$ -
35Yard inlet manholes, precast concrete, 4 FT diameterEA.3.00$ -
Subtotal$ -
Erosion Control
36Construction ExitEA.1.00$ -
37Fertilizer Mixed GradeTN8.00$ -
38Maintenance of Check DamsEA15.00$ -
39Maintenance of Construction ExitEA1.00$ -
40Slope Stabilization MattingSY629.00$ -
41Cd-S Check Dam StoneEA3.00$ -
42Haybale Check DamsEA12.00$ -
43Diversion ChannelFT340.00$ -
44Sd-2F Inlet Sediment TrapEA4.00$ -
45Maintenance of Temporary Sediment TrapEA3.00$ -
46Maintenance of Type C Silt FenceLF629.00$ -
47MulchTN13.00$ -
48Permanent GrassingAC1.60$ -
49Prepare & Submit NOI and NOT to EPD GEOS as Responsible Official, Including Payment of EPD Land Disturbance FeesEA1.00$ -
50Temporary Sediment TrapEA3.00$ -
51Temporary Silt Fence, Type CLF2,942.00$ -
52Temporary GrassingAC5.29$ -
53Water Quality Inspection, Including Submittals to EPD GEOSEA6.00$ -
54Water Quality Monitoring and Sampling, Including Submittals to EPD GEOSMO7.00$ -
Subtotal$ -

Construction Subtotal $ - 0

CONSTRUCTION TOTAL $ - 0

Deductive Alternative Option 1 - Sod
Tiftuf Bermuda SodSF104,808.00$ -
Total$ -
Deductive Alternative Option 2 - Irrigation
Irrigation SystemEA1.00$ -
Total$ -
Deductive Alternative Option 3 - Fencing, Gates, and Field Related Items Shown on Sheets 23 thru 26 (except infield mix)
5 FT High Black Vinyl FencingLF965.00$ -
20 FT High Black Vinyl FencingLF195.00$ -
Handrail, 2 inch round galvanizedLF75.00$ -
DugoutsEA2.00$ -
BleachersEA2.00$ -
Foul poles, inground mount, installedEA2.00$ -
BullpensEA2.00$ -
Total$ -
Construction Total Less Deductive Alternative 1 (Sod)$ - 0
Construction Total Less Deductive Alternative 2 (Irrigation)$ - 0
Construction Total Less Deductive Alternative 3 (Fencing, Gates & Field Related Items on Sheets 23 - 26)$ - 0
Construction Total Less Deductive Alternative 1, 2 & 3$ - 0

Sheet2

Sheet1

File details come from the government source that posted it. Updated .