This is a Cost Proposal Worksheet for Hall County, Georgia, for the construction of a new softball field addition at Murrayville Park. The project encompasses multiple construction phases including mobilization, sitework, furnishings, utilities, and erosion control measures. Significant quantities of materials and labor are detailed across 54 line items, including rough grading (11,646 square yards), asphalt paving (194 tons combined), Tiftuf Bermuda sod installation (104,808 square feet), concrete work, electrical installations, and various site furnishings such as dugouts, bleachers, fencing, scoreboards, and irrigation systems. The worksheet also itemizes erosion control requirements including temporary sediment traps, silt fencing (2,942 linear feet), check dams, and water quality monitoring and inspection activities over a seven-month period.
The cost proposal worksheet requires contractors to enter unit costs in Column D for each line item, with quantities specified in the worksheet to calculate total costs. The document includes a construction subtotal followed by three deductive alternative options: Option 1 eliminates sod installation, Option 2 removes the irrigation system, and Option 3 excludes fencing, gates, and field-related items shown on project sheets 23 through 26. Final pricing scenarios are provided showing the construction total with various combinations of deductive alternatives applied. All costs are to be presented on a lump sum or unit cost basis as indicated in the worksheet, with no pricing information, project timeline, or contract terms specified in this cost proposal document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQP 47_016 New Baseball Field at Murrayville.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hall County Murrayville Pk Exhibit C - Cost Proposal Worksheet Murrayville Park - Softball Field Addition SOV
Company Name: _____________________________________________________
| Please enter only unit costs in Column D. | |||||
| Item | Description | Unit | Unit Cost | Qty | Total |
| 1 | Mobilization / De-mobilization | LS | 1.00 | $ - |
| 2 | Bonds & Insurance | LS | 1.00 | $ - |
| 3 | Permits | LS | 1.00 | $ - |
| Subtotal | $ - | |||
| Sitework | ||||
| 4 | Rough grading sites, open, 10,000-20,000 grader | SY | 11,646.00 | $ - |
| 5 | Haul off excess fill dirt | CY | 435.00 | $ - |
| 6 | Sidewalks | SY | 344.00 | $ - |
| 7 | Concrete stairs | LS | 1.00 | $ - |
| 6 | Regular excavation, cut | CY | 2,841.00 | $ - |
| 8 | 8-inch gradeded aggregate base | TN | 239.00 | $ - |
| 9 | 2-inch asphalt binder (25mm superpave) | TN | 97.00 | $ - |
| 10 | 1.5-inch top course (9.5mm superpave) | TN | 97.00 | $ - |
| 11 | Demolish, remove pavement & curb, remove bituminous pavement, 4" to 6" thick, excludes hauling & disposal fees | SY | 344.00 | $ - |
| 12 | Tiftuf Bermuda Sod | SF | 104,808.00 | $ - |
| 13 | Electrical Transformer Install, Jackson EMC | EA | 1.00 | $ - |
| 14 | Electrical Service Install, main panels | EA | 1.00 | $ - |
| 15 | Signage | EA | 1.00 | $ - |
| 16 | Landscaping Allowance | EA | $ - | |
| 17 | Curbstops | EA | 3.00 | $ - |
| 18 | Handicap parking symbols/striping | EA | 3.00 | $ - |
| Subtotal | $ - | |||
| Furnishings | ||||
| 19 | 5 FT High Black Vinyl Fencing | LF | 965.00 | $ - |
| 20 | 20 FT High Black Vinyl Fencing | LF | 195.00 | $ - |
| 21 | Handrail, 2 inch round galvanized | LF | 75.00 | $ - |
| 22 | Site Lighting (By Others) | EA | 1.00 | $ - |
| 23 | Dugouts | EA | 2.00 | $ - |
| 24 | Bleachers | EA | 2.00 | $ - |
| 25 | Foul poles, inground mount, installed | EA | 2.00 | $ - |
| 26 | Scoreboard, including frame, electrical, conduit, etc. installed complete | EA | 1.00 | $ - |
| 27 | Irrigation System | EA | 1.00 | $ - |
| 28 | 20 FT fabricated steel vehicle security gate, installed | EA | 1.00 | $ - |
| 29 | Field Building, 12 x 20 | SF | 240.00 | $ - |
| 29A | Bullpens | EA | 2.00 | $ - |
| Subtotal | $ - | |||
| Utilities | ||||
| 30 | Waterline 2 IN PVC | LF | 614.00 | $ - |
| 31 | 2" Meter | EA | 1.00 | $ - |
| 32 | RPZ | EA | 2.00 | $ - |
| 33 | Hotbox | EA | 2.00 | $ - |
| 34 | 12 IN HDPE Storm Drain Line, 1-10' Cut | LF | 240.00 | $ - |
| 35 | Yard inlet manholes, precast concrete, 4 FT diameter | EA. | 3.00 | $ - |
| Subtotal | $ - | |||
| Erosion Control | ||||
| 36 | Construction Exit | EA. | 1.00 | $ - |
| 37 | Fertilizer Mixed Grade | TN | 8.00 | $ - |
| 38 | Maintenance of Check Dams | EA | 15.00 | $ - |
| 39 | Maintenance of Construction Exit | EA | 1.00 | $ - |
| 40 | Slope Stabilization Matting | SY | 629.00 | $ - |
| 41 | Cd-S Check Dam Stone | EA | 3.00 | $ - |
| 42 | Haybale Check Dams | EA | 12.00 | $ - |
| 43 | Diversion Channel | FT | 340.00 | $ - |
| 44 | Sd-2F Inlet Sediment Trap | EA | 4.00 | $ - |
| 45 | Maintenance of Temporary Sediment Trap | EA | 3.00 | $ - |
| 46 | Maintenance of Type C Silt Fence | LF | 629.00 | $ - |
| 47 | Mulch | TN | 13.00 | $ - |
| 48 | Permanent Grassing | AC | 1.60 | $ - |
| 49 | Prepare & Submit NOI and NOT to EPD GEOS as Responsible Official, Including Payment of EPD Land Disturbance Fees | EA | 1.00 | $ - |
| 50 | Temporary Sediment Trap | EA | 3.00 | $ - |
| 51 | Temporary Silt Fence, Type C | LF | 2,942.00 | $ - |
| 52 | Temporary Grassing | AC | 5.29 | $ - |
| 53 | Water Quality Inspection, Including Submittals to EPD GEOS | EA | 6.00 | $ - |
| 54 | Water Quality Monitoring and Sampling, Including Submittals to EPD GEOS | MO | 7.00 | $ - |
| Subtotal | $ - |
Construction Subtotal $ - 0
CONSTRUCTION TOTAL $ - 0
| Deductive Alternative Option 1 - Sod | |||
| Tiftuf Bermuda Sod | SF | 104,808.00 | $ - |
| Total | $ - |
| Deductive Alternative Option 2 - Irrigation | |||
| Irrigation System | EA | 1.00 | $ - |
| Total | $ - |
| Deductive Alternative Option 3 - Fencing, Gates, and Field Related Items Shown on Sheets 23 thru 26 (except infield mix) | |||
| 5 FT High Black Vinyl Fencing | LF | 965.00 | $ - |
| 20 FT High Black Vinyl Fencing | LF | 195.00 | $ - |
| Handrail, 2 inch round galvanized | LF | 75.00 | $ - |
| Dugouts | EA | 2.00 | $ - |
| Bleachers | EA | 2.00 | $ - |
| Foul poles, inground mount, installed | EA | 2.00 | $ - |
| Bullpens | EA | 2.00 | $ - |
| Total | $ - | ||
| Construction Total Less Deductive Alternative 1 (Sod) | $ - 0 | ||
| Construction Total Less Deductive Alternative 2 (Irrigation) | $ - 0 | ||
| Construction Total Less Deductive Alternative 3 (Fencing, Gates & Field Related Items on Sheets 23 - 26) | $ - 0 | ||
| Construction Total Less Deductive Alternative 1, 2 & 3 | $ - 0 |