467189 Aberdeen Armory FACP Bid Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- 26IFB19927
- Issued by
- Brown County, South Dakota
About this file
This is a set of bid drawings for a fire alarm system replacement project issued by the South Dakota Department of the Military, Army National Guard, Construction & Facility Management Office, for the Aberdeen Armed Forces Readiness Center (CFMO# 467189). The project involves removing and replacing an existing broken and outdated fire alarm control panel (FACP), notification appliance circuits (NAC), addressable relays, smoke detectors, heat sensors, horn strobes, and other fire detection and notification devices throughout the facility. The contractor shall install a new FA/MNS combination system using Honeywell Fire-Lite ES-200X as the FACP basis and ECC-50/100(E) as the emergency command center, with all devices, wiring, conduit, and accessories necessary for a fully functioning fire detection and notification system. The project includes installation of manual pull stations, duct smoke detection, HVAC shut-down capability per NFPA 90A, and mass notification system (MNS) devices including scrolling LED message centers at points of egress and speaker/strobe combinations compatible with the new system. The drawings are dated July 2026 at 100% submittal phase and cover four armory sections (Southwest, Southeast, Northwest, and Northeast) plus site overview and single-line diagram sheets.
The project requires compliance with UFC 3-600-01, 4-021-01, 4-101-01, Army National Guard Design Guide 415, NFPA 70, NFPA 72, NFPA 90A, NFPA 101, and the 2024 IBC. The contractor must verify actual device locations, quantities, and types in the field and coordinate with the owner prior to installation to resolve any conflicts, with no additional compensation provided for conflicts discovered during rough-in. All fire alarm cables shall be installed in metal raceways independent of other cabling, with all equipment securely fastened and properly labeled. The contractor is responsible for completing touch-up painting, replacing damaged acoustic ceiling tiles, and obtaining a Certificate of Final Electrical Inspection. All new equipment shall be Honeywell Technologies Fire-Lite system unless approved otherwise by the owner, and no work shall be performed in the Army Reserve section of the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 467189 Aberdeen Fire Alarm Front Ends.pdf | ||
| 467189 TL Invitation to Builders Exchanges.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
CO
VE
R
SH
EE
T
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
OF
TH
E M
IL ITARY
S T A
T E
O F
S
U
T H
D
A K
O
TA
100%
8/2026
G-001
SCALE: NTS REVISIONS
ZONE LTR DATE APPROVED
SHEET INDEX
SOUTH DAKOTA
DEPARTMENT OF THE MILITARY
REPLACE FIRE SYSTEMS
CFMO# 467189
ABERDEEN ARMED FORCES READINESS CENTER
JULY 2026
STATE REFERENCE MAP
UNAUTHORIZED CHANGES
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR
LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL
CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE
PREPARER OF THESE PLANS. THE ENGINEER SIGNING THESE PLANS IS
RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF THE
DESIGN HERON.
NOTICE TO CONTRACTOR
THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH
GENERALLY ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE
REQUESTED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,
INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY
ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.
CITY MAP
DE
PA
RTM
ENT OF THE MIL ITARY
S T A T E O F S O U T H DA KOT A
G-001 COVER SHEET
G-101 GENERAL NOTES
F-101 SITE OVERVIEW
F-102 SOUTHWEST ARMORY
F-103 SOUTHEAST ARMORY
F-104 NORTHWEST ARMORY
F-105 NORTHEAST ARMORY
F-601 FACP SL DIAGRAM
TE
OF
SOUTH DAKOTAATS
R G
TA
E L
AES9881
U
REDN
DOG
EL
UR
ELP
OET PEH
AutoCAD SHX Text N
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
CO
DE
IN
FO
RM
AT
IO
N
A N
D G
EN
ER
AL
N
O
TE
S
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
G-101
DESCRIPTION OF WORK:
CONTRACTOR SHALL INSTALL AND FURNISH NEW FACP,
DEVICES, AND WIRING NECESSARY FOR A FULLY FUNCTIONING
FIRE DETECTION AND NOTIFICATION SYSTEM THAT MEETS ALL
CODES, REGULATIONS, AND STANDARDS. SYSTEM SHALL BE A
FA/MNS COMBINATION SYSTEM USING HONEYWELL FIRE-LITE
ES-200X AND ECC-50/100(E) AS A BASIS OF FACP AND ECC
RESPECTIVELY.
THIS PROJECT CONSISTS OF REMOVING THE EXISTING BROKEN
AND OUTDATED FACP, NAC, ADDRESSABLE RELAYS, SMOKE
DETECTORS, HEAT SENSORS, HORN STROBES, STROBES, AND
OTHER OUTDATED DEVICES AND REPLACING WITH NEW DEVICES
AS NEEDED. ADDITIONALLY, AN ECC WITH ACCESS TO TEXTUAL
SIGNAGE AND SPEAKER/STROBE SYSTEM WILL BE CONSTRUCTED.
PRIOR TO INSTALLATION, CONTRACTOR SHALL VERIFY DEVICE FIT,
COMPATIBILITY, AND COUNT.
GENERAL NOTES:
1. PROVIDE A NEW AUTOMATIC FIRE DETECTION AND NOTIFICATION
SYSTEM THROUGHOUT THE ENTIRE FACILITY COMPLYING WITH
UFC 3-600-01, 4-021-01, 4-101-01, AND ARMY NATIONAL GUARD
CRITERIA/GUIDELINES DG 415. SYSTEM INCLUDES MANUAL PULL
STATIONS, DUCT SMOKE DETECTION, HVAC SHUT-DOWN PER
NFPA 90A, NOTIFICATION DEVICES.
2. ALL ELECTRICAL WORK SHALL BE INSTALLED IN STRICT
ACCORDANCE WITH THE APPLICABLE EDITIONS OF NFPA 70,
NFPA 72, IBC, AND ANY OTHER LOCAL, STATE, OR FEDERAL
CODES, ORDINANCES, OR AUTHORITATIVE INTERPRETATIONS
THAT MAY APPLY. A CERTIFICATE OF FINAL ELECTRICAL
INSPECTION SHALL BE OBTAINED BY THE CONTRACTOR AT THE
COMPLETION OF THE WORK AND PRESENTED TO THE
CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND
SATISFACTORILY OPERATING SYSTEMS AS INDICATED ON THE
CONTRACT DOCUMENTS AND AS EVIDENTLY INTENDED. IT IS
NOTED THAT THE DRAWINGS ARE DIAGRAMMATIC IN NATURE
AND INDICATE GENERAL ARRANGEMENTS OF SYSTEMS AND
WORK. CONTRACTOR SHALL FURNISH AND INSTALL CONDUIT
AND WIRING AS REQUIRED ACCOMPLISHING THE FUNCTIONS
INDICATED. ADDITIONALLY, FIRE ALARM SYSTEM DEVICES HAVE
BEEN SHOWN AND THE CONTRACTOR SHALL FURNISH AND
INSTALL THE REQUIRED QUANTITIES AND TYPES OF CABLES,
CONDUCTORS, RACEWAYS, REMOTE POWER SUPPLIES AND
CONNECTIONS, SHIELDING REQUIREMENTS, ETC., AS REQUIRED
BY THE SYSTEM MANUFACTURER, THE SPECIFICATIONS, AND
ANY APPLICABLE CODES. ALL WIRING SHOWN ON RISER
DIAGRAMS SHALL ALSO BE FURNISHED AND INSTALLED
REGARDLESS OF WHETHER THESE ITEMS ARE SHOWN ON THE
FLOOR PLANS.
4. THE SMOKE DETECTOR PLACEMENT DETAILED ON DRAWINGS IS
BASED UPON SMOOTH CEILING DESIGN. THE ACTUAL
PLACEMENT OF SMOKE DETECTORS WILL BE DEPENDENT UPON
THE LOCATION AND ARRANGEMENT OF STRUCTURAL
COMPONENTS. THE CONTRACTOR’S DESIGN SHALL TAKE INTO
CONSIDERATION ALL STRUCTURAL MEMBERS AND SMOKE
DETECTORS SHALL BE PLACED ACCORDINGLY.
5. THE CONTRACTOR SHALL RESOLVE ALL INSTALLATION
CONFLICTS THROUGH THE CONTRACTING OFFICER PRIOR TO
ROUGH-IN. FAILURE TO PROVIDE SUCH COORDINATION PRIOR
TO WORK BEING INSTALLED SHALL NOT BE CAUSE FOR
ADDITIONAL COMPENSATION TO THE CONTRACTOR, AND MAY
RESULT IN REJECTION OF THE WORK.
6. ADDITIONAL DEVICES MAY BE REQUIRED. DO NOT USE THESE
DRAWINGS FOR DEVICE COUNTS.
7. ALL EQUIPMENT SHALL BE NEW, SHALL BE SUITABLE FOR THE
APPLICATION INTENDED, AND SHALL BEAR LABELS OR MARKINGS
INDICATING THIRD PARTY TESTING LABORATORY LISTINGS
ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION.
8. VERIFY LOCATIONS OF WIRING DEVICES IN FINISHED SPACES,
MILLWORK, AND CASEWORK PRIOR TO ROUGH-IN.
9. ALL FIRE ALARM CABLES SHALL BE INSTALLED IN METAL
RACEWAYS, INDEPENDENT OF OTHER CABLING.
10. ALL RACEWAY AND WIRING SHALL BE CONCEALED IN FINISHED
SPACES, AND MAY BE INSTALLED EXPOSED IN UNFINISHED
SPACES SUCH AS MECHANICAL AND ELECTRICAL ROOMS. ALL
RACEWAY AND WIRING, WHETHER CONCEALED OR EXPOSED,
SHALL BE RUN EITHER PERPENDICULAR OR PARALLEL TO THE
BUILDING'S STRUCTURAL COMPONENTS. CONDUITS THAT ARE
EXPOSED IN FINISHED AREAS SHALL BE BURIED WITHIN THE
WALL, OR SOFFIT TO BE PROVIDED TO CONCEAL IT.
11.PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET
CODE AND INSTALLATION REQUIREMENTS. PULL AND JUNCTION
BOXES SHALL BE CONCEALED IN FINISHED SPACES AND
LOCATIONS SHALL BE COORDINATED WITH THE WORK OF ALL
OTHER TRADES SO AS TO AVOID CONFLICTS.
12. ALL CONDUCTORS SHALL BE IDENTIFIED AT EACH JUNCTION BOX,
OUTLET BOX, CABINET, PULL BOX, ETC., WITH VINYL
SELF-ADHESIVE TAGS INDICATING PANEL AND CIRCUIT NUMBER,
CONTROL WIRE IDENTIFICATION NUMBER, OR OTHER
APPROPRIATE INFORMATION. ALL PULL AND JUNCTION BOXES
SHALL BE LABELED AS TO FUNCTION. SEE THE UFC FOR
CONDUCTOR TYPES AND SIZES ALLOWED. FIRE ALARM/MNS
CONDUCTORS SHALL BE POWER-LIMITED CIRCUITS AS DEFINED
BY NFPA 70 UNLESS OTHERWISE INDICATED.
13. ALL EQUIPMENT SHALL BE SECURELY FASTENED BY MEANS OF
ANCHORS, RODS, HANGERS, SUPPORTS, GUIDES, SWAY BRACES,
ETC., TO MAINTAIN ALIGNMENT AND PREVENT EQUIPMENT
MOVEMENT. ALL EQUIPMENT LOCATED IN SEISMIC ZONES SHALL
BE SECURED WITH MEANS APPROVED FOR THE SEISMIC
CLASSIFICATION ENCOUNTERED.
14. ALL PENETRATIONS OF FIRE OR SMOKE RATED CONSTRUCTION
SHALL BE SEALED WITH FIRESTOPPING MATERIALS APPROVED
AND LISTED FOR THE RATING OF THE CONSTRUCTION TO BE
PENETRATED. PROVIDE DOCUMENTATION ON ALL SUCH
PENETRATION SEALING SYSTEMS FOR VERIFICATION OF PROPER
INSTALLATION. DOCUMENT ON AS-BUILT DRAWINGS THE
LOCATION OF ALL FIRE AND SMOKE RATED BARRIER
PENETRATIONS. PLACE IDENTIFYING PLACARD OR LABEL AT
EACH PENETRATION LOCATION DETAILING DATE, CONTRACTOR,
AND CONTRACT NUMBER AND SEQUENTIAL SERIAL NUMBER (I.E.
B145-XXX). A DETAILED INVENTORY OF EACH PENETRATION
SHALL BE MAINTAINED. THE INVENTORY SHALL INCLUDE
BUILDING NO, LOCATION DATA (ROOM NUMBER, ETC.), TYPE OF
BARRIER, AND METHOD OF SEALANT (I.E. FIRE CAULK, MORTAR,
PILLOW, ETC.).
15.WHERE EMPTY RACEWAYS ARE INSTALLED, THEY SHALL BE
LABELED AT BOTH ENDS AND FITTED WITH NYLON PULLSTRINGS
FOR FUTURE USE.
CODE INFORMATION
APPLICABLE CODES AND REGULATIONS:
2024 IBC
NFPA 101
NFPA 70
NFPA 72
NFPA 90A
UNIFIED FACILITY CRITERIA 3-600-01
UNIFIED FACILITY CRITERIA 4-021-01
UNIFIED FACILITY CRITERIA 4-101-01
NG DESIGN GUIDE 415
16. ELECTRICAL WORK SHALL BE PERFORMED ON DE-ENERGIZED SYSTEMS ONLY
TO PREVENT PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE WORK
ON EXISTING SYSTEMS WILL REQUIRE INTERRUPTION OF ELECTRICAL SERVICE,
THEN TEMPORARY PROVISIONS ACCEPTABLE TO THE OWNER FOR TEMPORARY
POWER SHALL BE UTILIZED UNTIL THE WORK IS COMPLETE.
17. FIRE ALARM SYSTEM SHALL COMPLY WITH ALL RELATED NFPA AND BUILDING
CODES, AND LOCAL FIRE DEPARTMENT REGULATIONS.
18. WALL MOUNTED FIRE ALARM PULL STATIONS ARE TO BE LOCATED 44" A.F.F.
TO THE OPERATING MECHANISM OF THE STATION AND WITHIN 5' OF THE NEAREST
ADJACENT EXIT DOOR FROM THE FLOOR OR BUILDING.
BUILDING IS SPRINKLERED AND HAS A PIV THAT IS TO BE MONITORED BY THE FIRE
ALARM SYSTEM.
19. WALL MOUNTED FIRE ALARM/MNS NOTIFICATION APPLIANCES, EITHER VISUAL,
OR COMBINATION AUDIO/VISUAL, SHALL BE LOCATED SUCH THAT THE ENTIRE LENS
OF THE VISUAL PORTION IS BETWEEN 82" AND 96" A.F.F. AUDIO ONLY APPLIANCES
SHALL BE LOCATED, NOT LESS THAN, 90" A.F.F. TO TOP OF APPLIANCE, OR 6" BELOW
CEILING.
20. CONTRACTOR SHALL COMPLETE ANY NECESSARY TOUCH-UP PAINTING
REQUIRED AS THE RESULT OF CONSTRUCTION ACTIVITIES.
21. CONTRACTOR SHALL REPLACE ANY ACCOUSTICAL CEILING TILES (ACT) THAT
ARE DAMAGED AS THE RESULT OF CONSTRUCTION OR WHERE NEW DEVICES DO
NOT FIT PROPERLY IN THE PREVIOUSLY CUT OR DRILLED ACT.
22. MASS NOTIFICATION SIGNS SHALL BE SCROLLING SIGNS WITH CAPABILITY OF
CUSTOM MESSAGES AND CONNECTION TO MULTIPLE BUILDINGS.
LOCAL OPERATORS CONSOLE
ADDRESSABLE INPUT MODULE
ADDRESSABLE OUTPUT MODULE
ADDRESSABLE HEAT DETECTOR
END OF LINE SUPERVISION DEVICE
FLOW DETECTOR/SWITCH
NON-ADDRESSABLE OUTPUT RELAY
PRESSURE DETECTOR/SWITCH
SURGE SUPPRESSOR
VALVE SUPERVISORY SWITCH
LOW TEMPERATURE SUPERVISORY SWITCH, 40°F LOW LIMIT
MANUAL STATION, FIRE ALARM
ADDRESSABLE SMOKE DETECTOR, PHOTOELECTRIC
ADDRESSABLE DUCT MOUNTED SMOKE DETECTOR
NAC EXTENDER BOOSTER POWER SUPPLY
DOOR HOLDER
TAMPER SWITCH
STROBE ONLY, WALL MOUNT
ADDRESSABLE DUAL INPUT MODULE
SPEAKER/STROBE COMBO, WALL MOUNT, CLEAR LENS
STROBE ONLY, CEILING MOUNT
SPEAKER ONLY, CEILING MOUNT
2 DUAL
40°F 40 DEGREES FAHRENHEIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AS ASPIRATING SMOKE TYPE
C CEILING MOUNT
CA CLEAN AGENT
CO CARBON MONOXIDE
CO2 NITROGEN DIOXIDE
EX EXISTING
FO FOAM
FT FIXED TEMPERATURE
G GONG
GSO GAS SHUTOFF
H HIGH AUDIBLE SETTING
HEF HIGH EXPANSION FOAM
HPS HIGH POWERED SPEAKER
IR INFRA-RED
L LOW AUDIBLE SETTING
LVHV LOW VELOCITY / HIGH VOLUME FAN
M MASS NOTIFICATION DEVICE
MEZZ UNDER MEZZANINE MOUNT
MNS MASS NOTIFICATION SYSTEM
MRC MARINE RESERVE CENTER
NH4 METHANE
NO2 NITROGEN DIOXIDE
OWS OIL-WATER SEPARATOR
P PENDANT
PRE PREACTION
RF RADIO FREQUENCY
RI REMOTE INDICATOR
ROOF ROOF CEILING MOUNT
RTS REMOTE TEST STATION
RTU ROOF TOP UNIT
SB SOUNDER BASE
SF SUB-FLOOR MOUNTED
SOV SOLENOID OUTPUT VALVE
TOS TOP OF SHAFT
TYP TYPICAL
U or UF UNDER-FLOOR MOUNTED
UV ULTRA VIOLET
V VIBRATING
VFD VARIABLE FREQUENCY DRIVE
VMF VEHICLE MAINTENANCE FACILITY
W WALL
nW WATTAGE SETTING (n=SPEAKER TAP)
WP WEATHERPROOF
WG WIRE GUARD
XCVR TRANSCEIVER
XP EXPLOSION PROOF
SPEAKER ONLY, WALL MOUNT
SPEAKER/STROBE COMBO, CEILING MOUNT, CLEAR LENS
SPEAKER ONLY, EXTERIOR WEATHERPROOF
KNOX BOX
POST INDICATOR VALVE
FIRE ALARM ANNUNCIATOR PANEL
NOTE: NOT ALL SYMBOLS MAY BE USED
ET MNS TEXTURAL SIGN
MASS NOTIFICATION SYSTEM CONTROL UNIT
FIRE ALARM TERMINAL CABINET
NOTE: NOT ALL ABBREVIATIONS MAY BE USED
HD
C
C
K
FIRE ALARM/MASS NOTIFICATION SYSTEM AMPLIFIER
WPHPS
FIRE ALARM SYMBOLS LEGEND
- PANELS CABINETS AND CONTROLLERS -
- DEVICE SUBSCRIPTS & PROJECT ABBREVIATIONS -
- MANUAL STATIONS -
- DETECTION -
- ADDRESSABLE MODULES -
- NOTIFICATION APPLIANCES -
- PERIPHERAL DEVICES -
HORN/STROBE COMBO WALL, CLEAR LENS
AOM
REMOTE TEST/STATUS STATION
FIRE ALARM / MASS NOTIFICATION SYSTEM CONTROL UNIT
AIM
WF
R
PS
SS
VS
TSS40°F
P
DH
FMCP
2AIM
P
LOC
NAC
FAA
MNS
FATC
P
EOL
PIV
AMP
S
S
ASSEMBLY HALL
MECH.
ROOM
ADMIN
ADMIN OFFICE
ADMIN OFFICE
CLASSROOM
OFFICEOFFICE
MEN
VEST.
SUPPLY
AHU #1
AHU #2
AIR
HANDLER
OFFICE
CLASSROOM
KITCHEN
FOOD
STG.
MECH.
ROOM
VAULT
STG.
AHU #3
LOCKER ROOM
AIR
HANDLER
AIM
NAC
JAN.
SUPPLY
HALL
DISTRIBUTION
ROOM
ADMIN OFFICE
P
P P P P
PPP
P P P
PPP
P
P
P
P
P
P
P
P
P
P P
DH
HD
HD
HD
HD
HD
HD
HD
P
P
P
HD
HD
HD
HD
HD
HD HD
HD
P
P
P
P
P
P
R
R
R
R
R
R
R
F
F
F
ET
WP
FAA
ET
P
P
ENTRY
02 03
TOILET
ADMIN OFFICE
ADMIN OFFICE
WOMEN
STG.
VAULT
FA
CP
MNS
7 12
NO WORK TO BE DONE IN ARMY RESERVE
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
SI
TE
O
VE
RV
IE
W
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K O
TA
100%
8/2026
F-101
KEY NOTES:
CONTRACTOR TO REMOVE/REPLACE
CEILING-MOUNTED SMOKE
DETECTORS. TYP
CONTRACTOR TO REMOVE EXISTING
HORN/STROBE OR STROBE AND REPLACE
WITH NEW SPEAKER/STROBE COMPATIBLE
WITH ECC-50/100 MNS. MODEL
TO BE DISCUSSED WITH OWNER PRIOR
TO INSTALLATION. TYP.
CONTRACTOR TO REMOVE/REPLACE
MANUAL PULL BOXES. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE RELAYS. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HRS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
REMOTE FIRE ALARM ANNUNCIATOR
PANEL. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HFS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
EXISTING FACP FOR NEW FLUSH-MOUNTED
FIRE-LITE ES-200X WITH LCD ANNUNCIATOR.
CONTRACTOR TO INSTALL NEW MNS LED
MESSAGE CENTERS AT POINTS OF EGRESS.
MODEL TO BE DISCUSSED WITH
OWNER PRIOR TO INSTALLATION. TYP
CONTRACTOR TO REMOVE WEATHER-PROOF
HORN/STROBE AND REPLACE WITH
WEATHERPROOF SPEAKER STROBE. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE INPUT MODULE FOR
KITCHEN EQUIPMENT. TYP
CONTRACTOR TO INSTALL FIRE-LITE
ECC-50/100(E) EMERGENCY COMMAND
CENTER AND CONNECT TO
SPEAKER/STROBE CIRCUITS
CONTRACTOR TO REMOVE NAC
BOOSTER PANELS AND REPLACE AS
NEEDED FOR A FUNCTIONING SYSTEM
CONTRACTOR TO REMOVE/REPLACE
STROBE. TYP14
GENERAL NOTES:
1. EXISTING DEVICES ARE SHOWN TO BEST OF ABILITIES. CONTRACTOR SHALL VERIFY
ACTUAL NUMBER OF EXISTING DEVICES.
2. EXISTING DEVICES ARE SHOWN IN APPROXIMATE LOCATIONS. CONTRACTOR TO
VERIFY ACTUAL FIELD LOCATIONS.
3. ALL EXISTING PANELS, CONTROLLERS, STATIONS, DETECTORS, ADDRESSABLE
MODULES, NOTIFICATION APPLIANCES, AND PERIPHERAL DEVICES NOT COMPATIBLE
WITH NEW FACP SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY REPAIRS AND TOUCH UP PAINTING
RESULTING FROM REMOVED EQUIPMENT.
5. CONTRACTOR SHALL PROVIDE NEW FACP AND MNS COMPATIBLE DEVICES AND
HARDWARE FOR A FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL VERIFY DEVICE LOCATIONS, QUANTITIES, AND TYPE MEET ALL
CURRENT CODES AND REGULATIONS.
7. CONTRACTOR SHALL VERIFY FIT WITH OWNER PRIOR TO INSTALLATION OF NEW
PANELS, DEVICES, ETC.
8. CONTRACTOR SHALL PAINT ALL NEW CONDUIT TO MATCH ROOM SURROUNDINGS.
9. CONTRACTOR SHALL REUSE EXISTING FIRE SYSTEM CONDUIT AND WIRING WHERE
POSSIBLE UNLESS CODE DICTATES OTHERWISE.
10. ALL EQUIPMENT SHOULD BE OF HONEYWELL TECHNOLOGIES FIRE-LITE SYSTEM
UNLESS APPROVED BY OWNER PRIOR TO INSTALLATION.
SITE OVERVIEW
SCALE: NTS
CLASSROOM
OFFICEOFFICE
MEN
VEST.
AHU #1
AHU #2
OFFICE
KITCHEN
FOOD
STG.
AIM
NAC
JAN.
HALL
DISTRIBUTION
ROOM
ADMIN OFFICE
P
P
P
P
P
P
P
P
P
P
P
P P
HD
HD
HD
HD
HD
P
P
P
HD
HD HD
P
P
P
R
R
R
6F
F
ET
WP
FAA
P
ENTRY
02 03
TOILET
ADMIN OFFICE
ADMIN OFFICE
WOMEN
FA
CP
MNS
7 12
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
SO
U
TH
W
ES
T
AR
M
O
RY
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
OF
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
F-102
KEY NOTES:
CONTRACTOR TO REMOVE/REPLACE
CEILING-MOUNTED SMOKE
DETECTORS. TYP
CONTRACTOR TO REMOVE EXISTING
HORN/STROBE OR STROBE AND REPLACE
WITH NEW SPEAKER/STROBE COMPATIBLE
WITH ECC-50/100 MNS. MODEL
TO BE DISCUSSED WITH OWNER PRIOR
TO INSTALLATION. TYP.
CONTRACTOR TO REMOVE/REPLACE
MANUAL PULL BOXES. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE RELAYS. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HRS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
REMOTE FIRE ALARM ANNUNCIATOR
PANEL. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HFS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
EXISTING FACP FOR NEW FLUSH-MOUNTED
FIRE-LITE ES-200X WITH LCD ANNUNCIATOR.
CONTRACTOR TO INSTALL NEW MNS LED
MESSAGE CENTERS AT POINTS OF EGRESS.
MODEL TO BE DISCUSSED WITH
OWNER PRIOR TO INSTALLATION. TYP
CONTRACTOR TO REMOVE WEATHER-PROOF
HORN/STROBE AND REPLACE WITH
WEATHERPROOF SPEAKER STROBE. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE INPUT MODULE FOR
KITCHEN EQUIPMENT. TYP
CONTRACTOR TO INSTALL FIRE-LITE
ECC-50/100(E) EMERGENCY COMMAND
CENTER AND CONNECT TO
SPEAKER/STROBE CIRCUITS
CONTRACTOR TO REMOVE NAC
BOOSTER PANELS AND REPLACE AS
NEEDED FOR A FUNCTIONING SYSTEM
CONTRACTOR TO REMOVE/REPLACE
STROBE. TYP14
GENERAL NOTES:
1. EXISTING DEVICES ARE SHOWN TO BEST OF ABILITIES. CONTRACTOR SHALL VERIFY
ACTUAL NUMBER OF EXISTING DEVICES.
2. EXISTING DEVICES ARE SHOWN IN APPROXIMATE LOCATIONS. CONTRACTOR TO
VERIFY ACTUAL FIELD LOCATIONS.
3. ALL EXISTING PANELS, CONTROLLERS, STATIONS, DETECTORS, ADDRESSABLE
MODULES, NOTIFICATION APPLIANCES, AND PERIPHERAL DEVICES NOT COMPATIBLE
WITH NEW FACP SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY REPAIRS AND TOUCH UP PAINTING
RESULTING FROM REMOVED EQUIPMENT.
5. CONTRACTOR SHALL PROVIDE NEW FACP AND MNS COMPATIBLE DEVICES AND
HARDWARE FOR A FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL VERIFY DEVICE LOCATIONS, QUANTITIES, AND TYPE MEET ALL
CURRENT CODES AND REGULATIONS.
7. CONTRACTOR SHALL VERIFY FIT WITH OWNER PRIOR TO INSTALLATION OF NEW
PANELS, DEVICES, ETC.
8. CONTRACTOR SHALL PAINT ALL NEW CONDUIT TO MATCH ROOM SURROUNDINGS.
9. CONTRACTOR SHALL REUSE EXISTING FIRE SYSTEM CONDUIT AND WIRING WHERE
POSSIBLE UNLESS CODE DICTATES OTHERWISE.
10. ALL EQUIPMENT SHOULD BE OF HONEYWELL TECHNOLOGIES FIRE-LITE SYSTEM
UNLESS APPROVED BY OWNER PRIOR TO INSTALLATION.
SOUTHWEST ARMORY
SCALE: NTS
MEN
CLASSROOM
KITCHEN
FOOD
STG.
MECH.
ROOM
VAULT
LOCKER ROOM
AIR
HANDLER
AIM
JAN.
SUPPLY
HALL
DISTRIBUTION
ROOM
ADMIN OFFICE
PPP
P P P
PPP
P
P
P
P
P
P
P
DH
HD
HD
HD
HD
P
P
HD
HD HD
HD
P
P
P
R
R
R
F
F
F
ET
P
P
ENTRY
TOILET
ADMIN OFFICE
ADMIN OFFICE
WOMEN
FA
CP
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
SO
U
TH
EA
ST
A
RM
O
RY
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
F-103
SOUTHEAST ARMORY
SCALE: NTS
KEY NOTES:
CONTRACTOR TO REMOVE/REPLACE
CEILING-MOUNTED SMOKE
DETECTORS. TYP
CONTRACTOR TO REMOVE EXISTING
HORN/STROBE OR STROBE AND REPLACE
WITH NEW SPEAKER/STROBE COMPATIBLE
WITH ECC-50/100 MNS. MODEL
TO BE DISCUSSED WITH OWNER PRIOR
TO INSTALLATION. TYP.
CONTRACTOR TO REMOVE/REPLACE
MANUAL PULL BOXES. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE RELAYS. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HRS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
REMOTE FIRE ALARM ANNUNCIATOR
PANEL. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HFS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
EXISTING FACP FOR NEW FLUSH-MOUNTED
FIRE-LITE ES-200X WITH LCD ANNUNCIATOR.
CONTRACTOR TO INSTALL NEW MNS LED
MESSAGE CENTERS AT POINTS OF EGRESS.
MODEL TO BE DISCUSSED WITH
OWNER PRIOR TO INSTALLATION. TYP
CONTRACTOR TO REMOVE WEATHER-PROOF
HORN/STROBE AND REPLACE WITH
WEATHERPROOF SPEAKER STROBE. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE INPUT MODULE FOR
KITCHEN EQUIPMENT. TYP
CONTRACTOR TO INSTALL FIRE-LITE
ECC-50/100(E) EMERGENCY COMMAND
CENTER AND CONNECT TO
SPEAKER/STROBE CIRCUITS
CONTRACTOR TO REMOVE NAC
BOOSTER PANELS AND REPLACE AS
NEEDED FOR A FUNCTIONING SYSTEM
CONTRACTOR TO REMOVE/REPLACE
STROBE. TYP14
GENERAL NOTES:
1. EXISTING DEVICES ARE SHOWN TO BEST OF ABILITIES. CONTRACTOR SHALL VERIFY
ACTUAL NUMBER OF EXISTING DEVICES.
2. EXISTING DEVICES ARE SHOWN IN APPROXIMATE LOCATIONS. CONTRACTOR TO
VERIFY ACTUAL FIELD LOCATIONS.
3. ALL EXISTING PANELS, CONTROLLERS, STATIONS, DETECTORS, ADDRESSABLE
MODULES, NOTIFICATION APPLIANCES, AND PERIPHERAL DEVICES NOT COMPATIBLE
WITH NEW FACP SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY REPAIRS AND TOUCH UP PAINTING
RESULTING FROM REMOVED EQUIPMENT.
5. CONTRACTOR SHALL PROVIDE NEW FACP AND MNS COMPATIBLE DEVICES AND
HARDWARE FOR A FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL VERIFY DEVICE LOCATIONS, QUANTITIES, AND TYPE MEET ALL
CURRENT CODES AND REGULATIONS.
7. CONTRACTOR SHALL VERIFY FIT WITH OWNER PRIOR TO INSTALLATION OF NEW
PANELS, DEVICES, ETC.
8. CONTRACTOR SHALL PAINT ALL NEW CONDUIT TO MATCH ROOM SURROUNDINGS.
9. CONTRACTOR SHALL REUSE EXISTING FIRE SYSTEM CONDUIT AND WIRING WHERE
POSSIBLE UNLESS CODE DICTATES OTHERWISE.
10. ALL EQUIPMENT SHOULD BE OF HONEYWELL TECHNOLOGIES FIRE-LITE SYSTEM
UNLESS APPROVED BY OWNER PRIOR TO INSTALLATION.
MEN
SUPPLY
AIR
HANDLER
VAULT
STG.
NAC
JAN.
SUPPLY
P P
PPP
P P P
DH
HD
HD
HD
HD
HD
HD
HD
HD
HD
HD
P
R
R
TOILET
WOMEN
STG.
VAULT
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
N O
RT
HW
ES
T
AR
M
O
RY
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
F-104
NORTHWEST ARMORY
KEY NOTES:
CONTRACTOR TO REMOVE/REPLACE
CEILING-MOUNTED SMOKE
DETECTORS. TYP
CONTRACTOR TO REMOVE EXISTING
HORN/STROBE OR STROBE AND REPLACE
WITH NEW SPEAKER/STROBE COMPATIBLE
WITH ECC-50/100 MNS. MODEL
TO BE DISCUSSED WITH OWNER PRIOR
TO INSTALLATION. TYP.
CONTRACTOR TO REMOVE/REPLACE
MANUAL PULL BOXES. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE RELAYS. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HRS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
REMOTE FIRE ALARM ANNUNCIATOR
PANEL. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HFS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
EXISTING FACP FOR NEW FLUSH-MOUNTED
FIRE-LITE ES-200X WITH LCD ANNUNCIATOR.
CONTRACTOR TO INSTALL NEW MNS LED
MESSAGE CENTERS AT POINTS OF EGRESS.
MODEL TO BE DISCUSSED WITH
OWNER PRIOR TO INSTALLATION. TYP
CONTRACTOR TO REMOVE WEATHER-PROOF
HORN/STROBE AND REPLACE WITH
WEATHERPROOF SPEAKER STROBE. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE INPUT MODULE FOR
KITCHEN EQUIPMENT. TYP
CONTRACTOR TO INSTALL FIRE-LITE
ECC-50/100(E) EMERGENCY COMMAND
CENTER AND CONNECT TO
SPEAKER/STROBE CIRCUITS
CONTRACTOR TO REMOVE NAC
BOOSTER PANELS AND REPLACE AS
NEEDED FOR A FUNCTIONING SYSTEM
CONTRACTOR TO REMOVE/REPLACE
STROBE. TYP14
GENERAL NOTES:
1. EXISTING DEVICES ARE SHOWN TO BEST OF ABILITIES. CONTRACTOR SHALL VERIFY
ACTUAL NUMBER OF EXISTING DEVICES.
2. EXISTING DEVICES ARE SHOWN IN APPROXIMATE LOCATIONS. CONTRACTOR TO
VERIFY ACTUAL FIELD LOCATIONS.
3. ALL EXISTING PANELS, CONTROLLERS, STATIONS, DETECTORS, ADDRESSABLE
MODULES, NOTIFICATION APPLIANCES, AND PERIPHERAL DEVICES NOT COMPATIBLE
WITH NEW FACP SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY REPAIRS AND TOUCH UP PAINTING
RESULTING FROM REMOVED EQUIPMENT.
5. CONTRACTOR SHALL PROVIDE NEW FACP AND MNS COMPATIBLE DEVICES AND
HARDWARE FOR A FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL VERIFY DEVICE LOCATIONS, QUANTITIES, AND TYPE MEET ALL
CURRENT CODES AND REGULATIONS.
7. CONTRACTOR SHALL VERIFY FIT WITH OWNER PRIOR TO INSTALLATION OF NEW
PANELS, DEVICES, ETC.
8. CONTRACTOR SHALL PAINT ALL NEW CONDUIT TO MATCH ROOM SURROUNDINGS.
9. CONTRACTOR SHALL REUSE EXISTING FIRE SYSTEM CONDUIT AND WIRING WHERE
POSSIBLE UNLESS CODE DICTATES OTHERWISE.
10. ALL EQUIPMENT SHOULD BE OF HONEYWELL TECHNOLOGIES FIRE-LITE SYSTEM
UNLESS APPROVED BY OWNER PRIOR TO INSTALLATION.
SCALE: NTS
AIR
HANDLER
AHU #3
LOCKER ROOM
P P P
P
DH
P
R
R
R
P
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
N O
RT
HE
AS
T
AR
M
O
RY
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
F-105
SCALE: NTS
KEY NOTES:
CONTRACTOR TO REMOVE/REPLACE
CEILING-MOUNTED SMOKE
DETECTORS. TYP
CONTRACTOR TO REMOVE EXISTING
HORN/STROBE OR STROBE AND REPLACE
WITH NEW SPEAKER/STROBE COMPATIBLE
WITH ECC-50/100 MNS. MODEL
TO BE DISCUSSED WITH OWNER PRIOR
TO INSTALLATION. TYP.
CONTRACTOR TO REMOVE/REPLACE
MANUAL PULL BOXES. TYP
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE RELAYS. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HRS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
REMOTE FIRE ALARM ANNUNCIATOR
PANEL. TYP
CONTRACTOR TO REMOVE/REPLACE
SIGA-HFS HEAT DETECTORS. TYP
CONTRACTOR TO REMOVE/REPLACE
EXISTING FACP FOR NEW FLUSH-MOUNTED
FIRE-LITE ES-200X WITH LCD ANNUNCIATOR.
CONTRACTOR TO INSTALL NEW MNS LED
MESSAGE CENTERS AT POINTS OF EGRESS.
MODEL TO BE DISCUSSED WITH
OWNER PRIOR TO INSTALLATION. TYP
CONTRACTOR TO REMOVE WEATHER-PROOF
HORN/STROBE AND REPLACE WITH
WEATHERPROOF SPEAKER STROBE. TYP
CONTRACTOR TO INSTALL FIRE-LITE
ECC-50/100(E) EMERGENCY COMMAND
CENTER AND CONNECT TO
SPEAKER/STROBE CIRCUITS
CONTRACTOR TO REMOVE NAC
BOOSTER PANELS AND REPLACE AS
NEEDED FOR A FUNCTIONING SYSTEM
CONTRACTOR TO REMOVE/REPLACE
STROBE. TYP14
CONTRACTOR TO REMOVE/REPLACE
ADDRESSABLE INPUT MODULE FOR
KITCHEN EQUIPMENT. TYP
GENERAL NOTES:
1. EXISTING DEVICES ARE SHOWN TO BEST OF ABILITIES. CONTRACTOR SHALL VERIFY
ACTUAL NUMBER OF EXISTING DEVICES.
2. EXISTING DEVICES ARE SHOWN IN APPROXIMATE LOCATIONS. CONTRACTOR TO
VERIFY ACTUAL FIELD LOCATIONS.
3. ALL EXISTING PANELS, CONTROLLERS, STATIONS, DETECTORS, ADDRESSABLE
MODULES, NOTIFICATION APPLIANCES, AND PERIPHERAL DEVICES NOT COMPATIBLE
WITH NEW FACP SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR.
4. CONTRACTOR SHALL COMPLETE ALL NECESSARY REPAIRS AND TOUCH UP PAINTING
RESULTING FROM REMOVED EQUIPMENT.
5. CONTRACTOR SHALL PROVIDE NEW FACP AND MNS COMPATIBLE DEVICES AND
HARDWARE FOR A FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL VERIFY DEVICE LOCATIONS, QUANTITIES, AND TYPE MEET ALL
CURRENT CODES AND REGULATIONS.
7. CONTRACTOR SHALL VERIFY FIT WITH OWNER PRIOR TO INSTALLATION OF NEW
PANELS, DEVICES, ETC.
8. CONTRACTOR SHALL PAINT ALL NEW CONDUIT TO MATCH ROOM SURROUNDINGS.
9. CONTRACTOR SHALL REUSE EXISTING FIRE SYSTEM CONDUIT AND WIRING WHERE
POSSIBLE UNLESS CODE DICTATES OTHERWISE.
10. ALL EQUIPMENT SHOULD BE OF HONEYWELL TECHNOLOGIES FIRE-LITE SYSTEM
UNLESS APPROVED BY OWNER PRIOR TO INSTALLATION.
NORTHEAST ARMORY
FMCP
FIRE-LITE
ES-200X
WITH
ECC-50/100
COMBO
FA/MNS
DH
RRR
WP
ET
P P P
HD AIMHD
F
DACT
BATTERY
BACKUP
MASS NOTIFICATION
TEXTUAL SIGNAGE
STROBES (WHITE/CLEAR)
AND SPEAKERS
AHU DOOR HOLDER FIRE/SMOKE DAMPERS
FIRE & MASS NOTIFICATION SYSTEM SLD
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
FA
CP
S
IN
G
LE
L
IN
E
DI
AG
RA
M
R
EP
LA
C
E
FI
R E
SY
ST
EM
S
A B
ER
D
EE
N
A R
M
ED
F O
R C
ES
R
EA
D
IN
ES
S C
EN
TE
R C
FM
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
U
K
O
TA
100%
8/2026
F-601
SCALE: NTS
| Sheets and Views |
| Aberdeen Armory FACP 100%-G-001 |
| Aberdeen Armory FACP 100%-G-101 |
| Aberdeen Armory FACP 100%-F-101 |
| Aberdeen Armory FACP 100%-F-102 |
| Aberdeen Armory FACP 100%-F-103 |
| Aberdeen Armory FACP 100%-F-104 |
| Aberdeen Armory FACP 100%-F-105 |
| Aberdeen Armory FACP 100%-F-601 |
File details come from the government source that posted it. Updated .