4665_Green_Tree_Dr_and_East_Pkwy_Improve_Bid_Special_Provisions_(2-sided).pdf

PDF 959 KB Posted

Attached to
Green Tree Dr and East Pkwy Improvements Project
Solicitation number
4665
Issued by
Sacramento County, San Francisco City, California

About this file

This document is a Special Provisions file for the Green Tree Drive and East Parkway Improvements Project issued by the County of Sacramento's Community Services Agency, Department of Transportation. The project involves road improvements along Franklin Boulevard, Green Tree Drive, and East Parkway, including clearing and grubbing, tree removal, roadway excavation, aggregate base, asphalt pavement, concrete curbs and sidewalks, street lighting, fencing, and roadside signs. The bid opening is scheduled for July 10, 2025, with a contract completion time of 40 working days. The project will require contractors to be licensed and registered, with specific insurance requirements including $3 million in general liability coverage.

The contract includes detailed specifications for environmental controls, water pollution management, site safety, traffic control, and materials testing. Contractors must submit a Water Pollution Control Plan and comply with various Best Management Practices (BMPs) for soil stabilization, sediment control, and waste management. The project emphasizes the use of recovered organic waste products and requires contractors to maintain detailed records of material procurement. Liquidated damages are set at $3,200 per day for delays beyond the specified working days. The contract incorporates the 2024 Sacramento County Standard Construction Specifications and California Department of Transportation Standard Specifications, with unit prices to be determined through a detailed Schedule of Values submitted by bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COUNTY OF SACRAMENTO

COMMUNITY SERVICES AGENCY

DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISIONS

FOR:

GREEN TREE DRIVE AND EAST PARKWAY

IMPROVEMENTS PROJECT

CONTRACT NO. 4665

NOTE: THE COUNTY OF SACRAMENTO 2024 STANDARD CONSTRUCTION SPECIFICATIONS, DATED

NOVEMBER 1, 2024 AND THE STATE OF CALIFORNIA DEPARTMENT ON TRANSPORTATION STANDARD SPECIFICATIONS DATED 2024 ARE HEREBY MADE PART OF THESE SPECIFICATIONS. A COPY OF THE

SACRAMENTO STANDARD CONSTRUCTION SPECIFICATIONS MAY BE DOWNLOADED FROM THE

COUNTY WEBSITE AT HTTPS://SACCOUNTYSPECS.SACCOUNTY.GOV

Bids Open: JULY 10, 2025

DAVE DEFANTI, CONTRACT NO. 4665

Deputy County Executive DATE: MAY 13, 2025

RON E. VICARI, Director Department of Transportation

COUNTY OF SACRAMENTO

COMMUNITY SERVICES AGENCY

DEPARTMENT OF TRANSPORTATION

GREEN TREE DRIVE AND EAST PARKWAY

IMPROVEMENTS PROJECT

EAST SIDE OF FRANKLIN BLVD, FLORIN RD TO

GREEN TREE DR

SOUTH SIDE OF GREEN TREE DR

WEST SIDE OF EAST PARKWAY, SOUTH OF FLORIN RD

COUNTY CONTRACT NO. 4665

SPECIAL PROVISIONS

GENERAL

TO BE SUPPLEMENTED WITH 2024 SACRAMENTO COUNTY STANDARD

CONSTRUCTION SPECIFICATIONS DATED NOVEMBER 1, 2024 AND THE STATE OF

CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS

DATED 2024.

CONTRACT NO. 4665 GREEN TREE DR AND EAST PKWY IMPROVEMENTS PROJECT

i

TABLE OF CONTENTS

SECTION 1 – TERMS AND DEFINITIONS .......................................................................................... - 1 -

1-1 GENERAL ............................................................................................................................... - 1 - 1-1.01 STATE STANDARD PLANS LIST ......................................................................................... - 1 -

SECTION 2 - BID REQUIREMENTS AND CONDITIONS ...................................................................... - 2 -

2-5 CONTRACTORS/SUBCONTRACTORS REQUIRED TO BE LICENSED AND REGISTERED .............. - 2 - 2-8 SUBCONTRACTORS ................................................................................................................ - 2 -

SECTION 3 - AWARD AND EXECUTION OF CONTRACT .................................................................... - 3 -

3-9 INSURANCE ........................................................................................................................... - 3 - 3-9.01 GENERAL LIABILITY .......................................................................................................... - 3 - 3-9.02 AUTOMOBILE LIABILITY ................................................................................................... - 3 - 3-9.03 WORKERS COMPENSATION ............................................................................................. - 3 -

SECTION 4 – SCOPE OF WORK ........................................................................................................ - 4 -

4-11 LANDS AND RIGHTS-OF-WAY ................................................................................................ - 4 - 4-13 DESCRIPTION OF WORK ........................................................................................................ - 4 -

SECTION 5 - CONTROL OF WORK AND MATERIALS ........................................................................ - 5 -

5-5 COOPERATION WITH OTHER ENTITIES .................................................................................. - 5 - 5-6 CONTRACTORS DISMISSAL OF UNSATISFACTORY EMPLOYEES .............................................. - 5 -

5-8.01.A SUBMITTALS – RECOVERED ORGANIC WASTE PRODUCTS ........................................... - 5 - 5-14 SUBSTITUTIONS ..................................................................................................................... - 6 - 5-16 MATERIALS SAMPLING AND TESTING ................................................................................... - 6 -

5-16.01 CONTROL OF MATERIALS .............................................................................................. - 6 -

SECTION 6 – LEGAL RELATIONS AND RESPONSIBILITIES ................................................................. - 7 -

6-11 EXISTING UTILITIES ................................................................................................................ - 7 -

SECTION 7 – PROSECUTION OF THE WORK .................................................................................... - 8 -

7-1.01 ORDER OF WORK ............................................................................................................. - 8 - 7-8.01 ALLOWABLE TIMES AND HOURS OF WORK ..................................................................... - 8 - 7-8.02 OFF-PERIOD WORK .......................................................................................................... - 8 -

7-12 DELAYS .................................................................................................................................. - 9 - 7-15 TIME OF COMPLETION .......................................................................................................... - 9 -

SECTION 8 – MEASUREMENT AND PAYMENT .............................................................................. - 10 -

8-10 LIQUIDATED DAMAGES FOR DELAY ..................................................................................... - 10 -

SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE .......................................................... - 11 -

10-4 EROSION SEDIMENT AND WATER POLLUTION CONTROL .................................................... - 11 -ii

10-4.06 WATER POLLUTION CONTROL PROGRAM (WPCP) ...................................................... - 11 - 10-4.09 PAYMENT .................................................................................................................... - 12 - 10-4.10 BMP SCHEDULE OF VALUES ........................................................................................ - 12 -

10-9 SANITARY REGULATIONS ..................................................................................................... - 14 -

SECTION 11 – PRECONSTRUCTION PHOTOGRAPHS AND RECORD DRAWINGS ............................. - 15 -

11-2 PRECONSTRUCTION PHOTOGRAPHS .................................................................................. - 15 -

SECTION 12 - SAFETY, PUBLIC CONVENIENCE, AND TRAFFIC CONTROL ........................................ - 16 -

12-1 SAFETY ................................................................................................................................. - 16 - 12-2.02 PEDESTRIAN AND BICYCLE ACCESS .............................................................................. - 16 - 12-2.03 WRITTEN NOTIFICATION TO RESIDENCES AND BUSINESSES ....................................... - 16 - 12-2.04 ACCESS TO DRIVEWAYS, HOUSES, AND BUILDINGS ..................................................... - 16 -

12-3 PUBLIC SAFETY AND TRAFFIC CONTROL .............................................................................. - 16 - 12-3.04 FURNISHING, INSTALLING, AND MAINTAINING TEMPORARY TRAFFIC CONTROLS ..... - 17 - 12-3.07 CONSTRUCTION SIGNS ................................................................................................ - 18 -

SECTION 13 – EXISTING FACILITIES ............................................................................................... - 20 -

13-2.15 REMOVE FENCE AND RESET FENCE POST .................................................................... - 20 - 13-3 MEASUREMENT AND PAYMENT .......................................................................................... - 20 -

SECTION 15 – CLEARING AND GRUBBING .................................................................................... - 21 -

15-1 GENERAL ............................................................................................................................. - 21 - 15-1.02 TREES, SHRUBS, GROUND COVER, AND LAWNS .......................................................... - 21 - 15-1.06 MISCELLANEOUS ......................................................................................................... - 21 -

SECTION 18 – EARTHWORK ......................................................................................................... - 23 -

18-2 ROADWAY EXCAVATION ...................................................................................................... - 23 -

SECTION 20 – LANDSCAPING ....................................................................................................... - 24 -

20-1 GENERAL ..................................................................................................................... - 24 - 20-1.01 LANDSCAPING SUBMITTALS ........................................................................................ - 24 - 20-2 MATERIALS .................................................................................................................. - 24 - 20-2.05 MULCH ........................................................................................................................ - 24 -

SECTION 23 – ASPHALT CONCRETE .............................................................................................. - 25 -

23-2.04 TEST METHODS ............................................................................................................ - 25 - 23-3.01.C GRADATIONS ............................................................................................................. - 25 - 23-5.04.B.2 GRADATIONS .......................................................................................................... - 25 - 23-10.06.C.2 AGGREGATE GRADATIONS ................................................................................... - 25 -

23-13 HOT MIX ASPHALT DRIVEWAY CONFORMS ......................................................................... - 26 -

SECTION 27 – CURBS, GUTTERS, SIDEWALKS, AND DRAINAGE STRUCTURES ................................ - 27 -

27-1 GENERAL ............................................................................................................................. - 27 - 27-5 SIDEWALKS .......................................................................................................................... - 27 -iii

27-13 DROP INLETS AND CATCH BASINS ....................................................................................... - 27 - 27-13.01 RECONSTRUCT STORM DRAINAGE INLET TOP ......................................................... - 27 -

27-16 PCC CURBS AND CURBS & GUTTER ..................................................................................... - 27 -

SECTION 49 - SIGNALS, LIGHTING AND ELECTRICAL SYSTEMS ...................................................... - 28 -

49-1 GENERAL ............................................................................................................................. - 28 - 49-1.06 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS .............................. - 28 - 49-6.03 LIGHT EMITTING DIODE (LED) LUMINAIRES ................................................................ - 28 -

APPENDICES

APPENDIX A ........................................................................................................................................ A REVISED COUNTY STANDARD DRAWINGS ..................................................................................... A

APPENDIX B ........................................................................................................................................ B SCHEDULE OF VALUES AND RECOVERED ORGANIC WASTE PRODUCT .......................................... B

APPENDIX C ......................................................................................................................................... C PRICING PROPOSAL ........................................................................................................................ C

- 1 -

SECTION 1 – TERMS AND DEFINITIONS

The 2024 County of Sacramento, Community Services Agency Standard Construction Specifications, dated November 1, 2024 and these Special Provisions shall control all work to be done under this contract. In case of conflict between these Special Provisions and the Standard Construction Specifications, these Special Provisions shall take precedence over and be used in lieu of the conflicting portions.

Unless otherwise specified, the California Department of Transportation (State) Specifications, Revised Standard Specifications, and State Standard Plans, DATED 2024, shall be the version used when referenced in these Special Provisions.

The Standard Construction Specifications, which are incorporated by reference in the Contract Documents, may be downloaded from the County website at https://saccountyspecs.saccounty.gov

1-1 GENERAL

1-1.01 STATE STANDARD PLANS LIST

The State Standard Plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the appendix.

Title Plan

Number

Abbreviations, Lines, Symbols and Legend

Abbreviations (Sheet 1 of 3) A3A

Abbreviations (Sheet 2 of 3) A3B

Abbreviations (Sheet 3 of 3) A3C

Roadside Signs

Roadside Signs - Wood Post - Typical Installation Details No. 2 RS2

Roadside Signs - Typical Installation Details No. 4 RS4

- 2 -

SECTION 2 - BID REQUIREMENTS AND CONDITIONS

2-5 CONTRACTORS/SUBCONTRACTORS REQUIRED TO BE LICENSED AND

REGISTERED

The Contractor’s attention is directed to the provisions in Section 2-5, “Contractor/Subcontractors Required to be Licensed and Registered,” of the Standard Construction Specifications.

The Contractor must be properly licensed as a contractor from contract award through Contract acceptance

(23 CFR 635.110).

2-8 SUBCONTRACTORS

The following is added to the end of Section 2-8, “Subcontractors,” of the Standard Construction Specifications:

Before subcontracted work starts, the Contractor shall submit a Subcontracting Request form (CEM- 1201).

- 3 -

SECTION 3 - AWARD AND EXECUTION OF CONTRACT

3-9 INSURANCE

Contractor’s attention is directed to Section 3-9, “Insurance”, of the Standard Construction Specifications.

3-9.01 GENERAL LIABILITY

Subparagraph of the first paragraph of section 3-9.01, “General Liability” of the Standard Construction Specifications is amended to read as follows:

Each Occurrence Two Million Dollars ($3,000,000) Products and Completed Operations Aggregate Four Million Dollars ($3,000,000) Personal and Advertising Injury Two Million Dollars ($3,000,000) General Aggregate Four Million Dollars ($3,000,000) Fire Damage One Hundred Thousand Dollars ($100,000)

3-9.02 AUTOMOBILE LIABILITY

Subparagraph of the third paragraph of Section 3-9.02, “Automobile Liability” of the Standard Construction Specifications is amended to read as follows:

Bodily Injury and Property Damage Combined Single Limit Two Million Dollars ($2,000,000)

3-9.03 WORKERS COMPENSATION

Subparagraph of the first paragraph of Section 3-9.03, “Workers Compensation,” of the Standard Construction Specifications is amended to read as follows:

Contractor must comply with applicable sections of Title 8; CCR; Chapter 4-Division of

Industrial Safety.

- 4 -

SECTION 4 – SCOPE OF WORK

4-11 LANDS AND RIGHTS-OF-WAY

The Contractor’s attention is directed to Section 4-11, “Lands and Rights-of-Way,” of the Standard Construction Specifications and these Special Provisions.

The County rights-of-way shall be used only for purposes that are necessary to perform the required work.

The Contractor shall not occupy the rights-of-way, or allow others to occupy the rights-of-way, for purposes, which are not necessary to perform the required work. Determination of “necessary to perform work” will be made by the Engineer if necessary.

Use of the Contractor's work areas shall be at the Contractor's own risk, and the County shall not be held liable for any damage to or loss of materials or equipment located within such areas. Utilities, including but not limited to water or electricity, will not be provided and shall be the sole responsibility of the Contractor.

Residence trailers will not be allowed within the County rights-of-way.

No vehicles, construction equipment, mobile home/office, supplies, materials or facilities shall be driven, parked, stockpiled or located within the driplines of oak trees.

The Contractor shall remove all equipment, materials, and rubbish from the work areas, which the Contractor occupies; and shall leave the areas in a presentable condition.

Full compensation for complying with the requirements of this section shall be considered incidental to the project and no additional compensation will be allowed therefor.

4-13 DESCRIPTION OF WORK

The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for:

Project work includes clearing & grubbing, tree removal, roadway excavation, aggregate base, asphalt pavement, concrete curbs and sidewalks, street lighting, fencing, roadside signs, and doing all other work specified on the plans and in the specifications.

Other items or details not mentioned above that are required by these Special Provisions shall be performed, placed, constructed, or installed in accordance with the Standard Construction Specifications and these Special Provisions. The construction, materials, and workmanship for items of work on the plans, but not specifically mentioned in these Special Provisions are referred to the Standard Construction Specifications for conformance.

- 5 -

SECTION 5 - CONTROL OF WORK AND MATERIALS

5-5 COOPERATION WITH OTHER ENTITIES

The Contractor’s attention is directed to Section 5-5, “Cooperation with Other Entities,” of the Standard Construction Specifications and Section titled “Existing Utilities,” of these Special Provisions.

Contractor shall fully cooperate and coordinate with all entities/utilities, including, but not limited to:

Communication: AT&T, Comcast, ZAYO Group

Drainage: Sacramento County Water Resources

Electric: Sacramento Municipal Utilities District (SMUD)

Fire: Sacramento Metropolitan Fire District (SMFD)

Gas: Pacific Gas & Electric (PG&E)

Water: California American Water Company (CAWC)

Sewer: Sacramento Area Sewer District (SASD)

The points of contact for the utility companies are listed on the Cover Sheet of the Contract Plans.

5-6 CONTRACTORS DISMISSAL OF UNSATISFACTORY EMPLOYEES

The following is to be added to Section 5-6:

The Contractor shall be polite to citizens encountered during the course of work. Loud music, foul language, and cursing are not permitted.

5-8.01.A SUBMITTALS – RECOVERED ORGANIC WASTE PRODUCTS

Contractor’s attention is directed to Section 5-8.01, “Submittals-General” of the Standard Construction Specifications and these Special Provisions.

The Contractor is responsible for maintaining accurate records including invoices or proof of recovered organic waste product (ROWP) procurement, either through purchase or acquisition. See the Special Provisions appendix for a sample ROWP reporting form. The Contractor shall submit an electronic copy of the completed reporting form to the Engineering prior to Field Acceptance.

Records shall include:

1. General description of how and where the product was used and applied.

2. Source of product; including name, physical location and contact information for each entity, and operation or facility from whom ROWP’s were procured.

3. Type of product.

4. Quantity of each product.

5. Invoice or other records demonstrating purchase or procurement including date of purchase/procurement.

Contractor’s attention is also directed to Section 20-2.05 and Section 20-4.02 of these Special Provisions regarding recovered organic waste products. Forward a copy of the completed reporting form to sb1383reports@saccounty.gov.

- 6 -

5-14 SUBSTITUTIONS

Should the Contractor seek approval of a product other than the brand or brands named in these specifications, it shall furnish written evidence that such product conforms in all respects to the specified requirements, and that it has been used successfully elsewhere under similar conditions. Where the specified requirements involve conformance to recognized codes or standards, the Contractor shall furnish evidence of such conformance in the form of test or inspection reports, prepared by a recognized agency, and baring an authorized signature.

Manufacturer’s standard data and catalog cut sheets will not be considered sufficient in themselves, and the Engineer will not be responsible for seeking further data from the manufacturer, or for otherwise researching the project. Failure to provide complete data will be cause for rejection of the proposal.

5-16 MATERIALS SAMPLING AND TESTING

When a reference is made in the specifications to the “Laboratory” or “Transportation Laboratory,” the reference shall mean the Sacramento County Materials Test Lab or other laboratories authorized by the Engineer to test materials and work involved in the contract. This laboratory is located at 9665 Agriculture Lane, Sacramento, CA 95827, telephone (916) 875-5330.

The County uses a Quality Assurance Program (QAP) that uses samples and tests to ensure a material is produced to comply with the Contract. The County may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP sampling and testing.

5-16.01 CONTROL OF MATERIALS

The Contractor’s attention is directed to Section 5-13, “Quality of Materials and Workmanship,” Section 5-16, “Materials Sampling and Testing,” and Section 5-17, “Approval of Materials,” of the Standard Construction Specifications.

All materials required to complete the Work under this Contract shall be produced or furnished, delivered, and installed by the Contractor unless otherwise specified in these Project Special Provisions. The Contractor shall be responsible for controlling the quality of materials entering the work and for the quality of the work performed. The Contractor shall perform and provide, at their sole expense, any necessary quality control testing to ensure the quality of materials and the quality of the Work performed. Any Work using non-compliant or unsatisfactory materials or any Work showing unsatisfactory workmanship shall be removed and replaced at the sole cost of the Contractor.

Certificates of Compliance, conforming to the provisions, “Certificates of Compliance,” of the State Specifications shall be furnished for all manufactured products unless otherwise waived by the Engineer.

- 7 -

SECTION 6 – LEGAL RELATIONS AND RESPONSIBILITIES

6-11 EXISTING UTILITIES

The Contractor’s attention is directed to Section 6-11.01 of the Standard Construction Specifications. After potholing for all utility lines within the proposed limits of excavation, the Contractor shall provide a pothole log to the engineer within 7 days of potholing showing the location of the utility pothole with reference to the centerline stationing and offset, elevation of the utility and existing surface, and size and type of utility.

All water valves, boxes and manhole covers encountered in the area to be paved with asphalt concrete shall be carefully referenced by the Contractor and locations of the valves and covers painted on the surface immediately after paving.

The overhead utility lines within the project limits will need to be protected in place unless otherwise shown on the plans.

Full compensation for conformance with all requirements of this section shall be considered incidental and included in the various bid items and no additional compensation will be allowed therefor.

- 8 -

SECTION 7 – PROSECUTION OF THE WORK

7-1.01 ORDER OF WORK

When required by these Special Provisions or Plans, the Contractor shall follow the sequence of operations as set forth therein.

Liquidated damages, as set forth elsewhere in these special provisions, shall be assessed if the working days are exceeded. No work may take place prior to receipt of the executed Contract and review of the prescribed bonds and insurance.

Contractor's attention is directed to Section 12, “Safety, Public Convenience, and Traffic Control,” of the Standard Construction Specifications and these Special Provisions. Any Special Signs (S1) that are required for detour or maintaining traffic shall be placed a minimum of 10 days in advance of the project start.

The first order of work shall be the following:

Prepare and submit a Water Pollution Control Plan as required in Section 10.

Prepare and submit Baseline Schedule

Prepare and submit Traffic Control Plans

Ordering street light poles, and equipment that is not furnished by the County. The Engineer shall be furnished a statement from the vendor that the orders for equipment/materials have been received and accepted by the vendor.

Pothole to verify street light foundation clearances.

The Contractor’s attention is directed to Section 6-11, “Existing Utilities,” of these Special Provisions.

The uppermost layer of new pavement shall not be placed until all underlying conduits have been installed.

At the end of each work day, all debris, branches, roots, removed fence, rubbish, and other debris in the work area shall be collected and placed in a suitable disposal bin or pile. Materials to be used later in construction shall be neatly stockpiled. All parts of the work shall be left in a neat and presentable condition at the end of the work shift.

Full compensation for Order of Work, as specified herein, shall be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor.

7-8.01 ALLOWABLE TIMES AND HOURS OF WORK

No lane or road closures will be permitted outside of the allowable hours of work. All traffic lanes shall be open, each day, by the end of shift.

7-8.02 OFF-PERIOD WORK

Under no circumstances shall any night time work be performed prior to and without the written permission of the Engineer. In the event of permitted night work, the Contractor shall maintain a minimum of one ten-foot (10’) minimum clear lane(s) in each direction between the hours of 7:00 pm and 6:00 am.

- 9 -

7-12 DELAYS

Contractor’s attention is directed to Section 7-12.02, “Unavoidable Delays,” of the Standard Construction Specifications.

No extension of time will be granted for a delay caused by a shortage of materials unless the Contractor furnishes to the Engineer documentary proof that he has made every effort to obtain such materials from all known sources, within reasonable reach of the work in a diligent and timely manner. The documentary proof shall indicate that the inability to obtain such materials, when originally planned, did in fact cause a delay in final completion of the entire work which could not be compensated for by revising the sequence of the Contractor's operations. The term "Shortage of Materials" as used in this section, shall not apply to materials, articles, parts, or equipment which are processed, made, constructed, fabricated, or manufactured to meet the specific requirements of the contract. Only the physical shortage of material will be considered under these provisions as a cause for extension of time. Delays in obtaining materials due to priority in filling orders will not constitute a shortage of materials.

No extension of time will be allowed for delay in delivery of traffic signal poles, luminaires, or traffic signal equipment.

7-15 TIME OF COMPLETION

As set forth in Section 7-15, "Time of Completion", of the Standard Construction Specifications, the time for completion of this contract shall be Forty (40) working days.

No roadway excavation or soil disturbance may occur before the counting of working days.

- 10 -

SECTION 8 – MEASUREMENT AND PAYMENT

8-10 LIQUIDATED DAMAGES FOR DELAY

The Contractor shall pay liquidated damages for this contract to the County of Sacramento the sum of THREE THOUSAND TWO HUNDRED DOLLARS ($3,200.00) per day for failure to complete all contract items, for each and every calendar day's delay in finishing the work in excess of the number of working days prescribed elsewhere in these Special Provisions.

- 11 -

SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE

The Contractor’s attention is directed to Section 7-1.01, "Order of Work," in these Special Provisions.

Area Plan for Emergency Response to Hazardous Materials Incidents in Sacramento County is on file with the Sacramento County Department of Transportation for Contractor’s reference:

http://www.emd.saccounty.net/EC/CUPA/Documents/AreaPlan_Final2016.pdf

10-4 EROSION SEDIMENT AND WATER POLLUTION CONTROL

At reasonable times and upon presentation of credentials and other documents as may be required by law, the Contractor shall allow authorized agents of the Central Valley Regional Water Quality Control Board, State Water Resources Control Board, Department of Fish and Wildlife, United States Environmental Protection Agency and the local storm water management agency to:

A. Enter upon the construction site and the Contractor’s facilities pertinent to the work;

B. Have access to and copy records that must be kept as specified in a permit;

C. Inspect the construction site and related soil stabilization practices and sediment control measures; and D. Sample or monitor for the purpose of ensuring compliance with the Permit.

The Contractor shall notify the Engineer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor or otherwise access the project site or the Contractor’s records.

Unless arrangements for disturbance of areas outside the project limits are made by the Department and made part of the contract, it is expressly agreed that the Department assumes no responsibility whatsoever to the Contractor or property owner with respect to any arrangements made between the Contractor and property owner to allow disturbance of areas outside the project limits.

10-4.06 WATER POLLUTION CONTROL PROGRAM (WPCP)

The Contractor shall be required to prepare a Water Pollution Control Plan (WPCP) per Section 10-4.06 “Water Pollution Control Plan (WPCP)” of the Standard Construction Specifications. The WPCP shall be submitted to the Engineer and subject to review and comment by the County Department of Water Resources. Water Pollution Control shall conform to the requirements of the current edition of the County of Sacramento Improvement Standards.

Throughout the project, the active, soil-disturbed area of the project site shall be not more than 1 acre. The Engineer may approve, on a case-by-case basis, expansions of the active, soil-disturbed area limit.

The Contractor shall amend the WPCP, graphically and in narrative form, whenever there is a change in construction activities or operations which may affect the discharge of significant quantities of pollutants to surface waters, ground waters, municipal storm drain systems or when deemed necessary by the Engineer. The WPCP shall be amended if the WPCP is in violation of any permit condition, or has not effectively achieved the objective of reducing pollutants in storm water discharges. Amendments shall show additional control measures or revised operations, including those in areas not shown in the initially approved WPCP, which are required on the project to control water pollution effectively. Amendments to the WPCP shall be submitted to the Engineer for review and approval in the same manner specified for the

- 12 -initially approved WPCP. Approved amendments shall be dated and logged in the WPCP. Upon approval of the amendment, the Contractor shall implement the additional control measures or revised operations.

10-4.09 PAYMENT

The contract ALLOWANCE for preparation of the Water Pollution Control Plan shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for doing all the work involved in developing, preparing, obtaining approval of, revising and amending the Plan as specified in the Standard Construction Specifications, these Special Provisions, and as directed by the Engineer, and no additional compensation will be allowed therefor.

10-4.10 BMP SCHEDULE OF VALUES

An electronic submittal, CD, DVD, flash drive, or hard copies of the Best Management Practices (BMP) Schedules of Values included in the Appendices of these Special Provisions are to be submitted to the Engineer when the WPCP is submitted.

On the BMP Schedule of Values, the Contractor shall provide a unit prices for all BMP’s except those listed as “PROCEDURAL”. Payment for these procedural BMP’s is included in the prices paid for the various other items of work and no additional compensation will be paid.

Erosion and sediment control BMPs shall be placed, monitored for effectiveness, and maintained throughout the construction process. The following precautions shall be implemented regardless of the season:

1. A stabilized construction site access shall be constructed at any construction staging and/or stockpile site as determined appropriate by the Engineer.

2. Temporary stockpiling of construction materials, including vehicles and portable equipment, supplies, fuels and chemicals, will be restricted to designated construction staging areas within the project area.

3. Any wet season requirement shall be implemented if conditions exist which may cause erosion and sedimentation.

4. The contractor shall not be limited to the requirements listed above, but shall be responsible for implementing whatever measures are necessary to prevent erosion and sedimentation.

The Contractor shall demonstrate the ability and preparedness to fully implement soil stabilization practices and sediment control measures to protect soil-disturbed areas on the project site before the onset of precipitation. A quantity of soil stabilization and sediment control materials shall be maintained on site equal to 100 percent of that sufficient to protect unprotected, soil-disturbed areas on the project site. A detailed plan for the mobilization of sufficient labor and equipment shall be maintained to fully deploy control measures required for the protection of soil-disturbed areas on the project site prior to the onset of precipitation. A current inventory of control measure materials and the detailed mobilization plan shall be included as part of the WPCP.

The wet season is hereby defined as the period between October 1st and April 30th. Erosion control (i.e.

soil stabilization) BMPs shall be applied during the wet season. All other BMPs included in the approved WPCP shall be installed/implemented and maintained year round.

- 13 -

Throughout the wet season:

1. Soil-disturbed areas of the project site shall be considered to be non-active whenever soil disturbance activities are to be discontinued for a period of 20 or more days and the areas are fully protected. Areas that will become non-active during the wet season shall be fully protected with soil stabilization practices and sediment control measures within 10 days of the discontinuance of soil disturbing activities or prior to the onset of precipitation, whichever is first to occur.

2. Active soil-disturbed areas of the project site shall be fully protected at the end of each day with soil stabilization practices and sediment control measures unless fair weather is predicted through the following workday. The Contractor shall monitor the weather forecast on a daily basis. The National Weather Service forecast shall be used. An alternative weather forecast proposed by the Contractor may be used if approved by the Engineer. If precipitation is predicted prior to the end of the following workday, construction scheduling shall be modified, as required and functioning control measures shall be deployed prior to the onset of the precipitation.

3. Inspections of the construction site shall be conducted by the Contractor to identify deficient measures, as follows:

A. Prior to a forecast storm;

B. After any precipitation which causes runoff capable of carrying sediment from the construction site;

C. At 24 hour intervals during extended precipitation events; and D. Routinely, a minimum of once every 2 weeks.

If the Contractor or the Engineer identifies a deficiency in the implementation or functioning of an identified control measure, the deficiency shall be corrected immediately. The deficiency may be corrected at a later date and time if requested by the Contractor and approved by the Engineer in writing, but not later than the onset of subsequent precipitation. The correction of deficiencies shall be at no additional cost to the County.

The Contractor shall implement, year-round and throughout the duration of the project, control measures included in the WPCP for sediment tracking, wind erosion, non-storm water management and waste management and disposal.

The schedule of values shall reflect the items of work and costs for the control measures required for the WPCP, except for critical temporary controls and permanent control measures which are shown on the project Plans and for which there is a contract item of work. Any items required by the WPCP that are not included in the BMP Schedule of Values shall be amended to the BMP Schedule of Values and re-submitted to the County within 4 business days after the approval of the WPCP.

If approved in writing by the Engineer, the BMP schedule of values will be used to determine payments from the ALLOWANCE for Water Pollution Control Implementation during the progress of the work. If unit costs provided by the Contractor in the BMP Schedule of Values are not within allowable industry standards, the Department of Transportation would have the right to have devices installed on a Force Account Basis in accordance with Section 9-8.03 of the Standard Construction Specifications. The BMP schedule of values will also be used as the basis for calculating any adjustment in compensation for the contract item for water pollution control due to changes in control measures required by an approved amendment to the WPCP.

The contract ALLOWANCE for Water Pollution Control Implementation shall include full compensation

- 14 -for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing, constructing, maintaining, removing, and disposing of control measures (except those shown on the Plans and for which there is a contract item of work), as shown in the Plans, as specified in the Standard Construction Specifications, these Special Provisions, and as directed by the Engineer. The total amount to be paid for the work included in the ALLOWANCE for Water Pollution Control Implementation shall be the amount of the allowance actually utilized in the course of completing the work and no additional compensation will be allowed therefor.

10-9 SANITARY REGULATIONS

The Contractor’s attention is directed to Section 10-9 “Sanitary Regulations,” of the Standard Construction Specifications and to these Special Provisions.

CONTRACTOR shall be solely responsible for implementing the applicable COVID-19 guidelines from the California Department of Industrial Relations, Division of Occupational Safety and Health, and the applicable COVID-19 guidance from the Centers for Disease Control and Prevention for the protection of workers, including regulations concerning education, training, routine cleaning, on-site washing facilities, and the use of Personal Protective Equipment (PPE) at the workplace (collectively, "Guidelines").

Full compensation for implementing the Guidelines shall be considered as included in the prices paid for the various items of Work involved as specified in Section 8-3, "Work to be Done Without Direct Payment," of the Standard Construction Specifications and no additional compensation will be allowed therefor.”

- 15 -

SECTION 11 – PRECONSTRUCTION PHOTOGRAPHS AND RECORD

DRAWINGS

11-2 PRECONSTRUCTION PHOTOGRAPHS

Preconstruction photographs shall be required and shall conform to Section 11-2 of the Standard Construction Specifications.

Full compensation for preconstruction photographs is included in the prices paid for the various items of work and no additional compensation will be allowed therefor.

- 16 -

SECTION 12 - SAFETY, PUBLIC CONVENIENCE, AND TRAFFIC CONTROL

12-1 SAFETY

The local Fire Department, Sheriff/Police Department, and California Highway Patrol shall be notified 24 hours in advance of construction work.

12-2.02 PEDESTRIAN AND BICYCLE ACCESS

The Contractor’s attention is directed to Section 12-2.02, “Pedestrian and Bicycle Access,” of the Standard Construction Specifications and to these Special Provisions.

Pedestrian traffic mitigation shall be in full compliance with the Sacramento County Standard Construction Specifications Section 12-2.02 and Sacramento County Department of Transportation (SacDOT) Traffic Control Templates (revised in February 2014) limiting pedestrian detour distance to 500 ft. The 2014 SacDOT Traffic Control Templates (TC-45 and TC-45.1) can help to provide information involving pedestrian traffic mitigation.

During working hours, at least one worker shall be assigned the responsibility to escort elderly, disabled or any other pedestrians in need of assistance through and/or around the construction work zone. The worker assigned this responsibility may also participate in other construction activities; however, the assigned worker shall be aware of their primary responsibilities for providing this assistance.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor.

12-2.03 WRITTEN NOTIFICATION TO RESIDENCES AND BUSINESSES

The Contractor shall follow notification procedures as stated in Section 12-2.03 of the Standard Construction Specifications unless otherwise modified in these Special Provisions for specific properties and/or businesses.

12-2.04 ACCESS TO DRIVEWAYS, HOUSES, AND BUILDINGS

The Contractor’s attention is directed to Section 12-2.04, “Access to Driveways, Houses, and Buildings,” of the Standard Construction Specifications.

On properties that have a single driveway access, and unless otherwise agreed to by the resident, the Contractor shall be permitted to close no more than one-half of the driveway access at any one time, leaving a minimum of 8 feet of the driveway access at all times. For properties with two driveways, the Contractor shall keep at least one of the driveways available at all times. A means of ingress to and egress from all properties shall be provided at all times. This includes access for USPS mail delivery and County garbage, recycling, and green waste pickup.

12-3 PUBLIC SAFETY AND TRAFFIC CONTROL

The Contractor’s attention is directed to Section 12-3, “Public Safety and Traffic Control,” of the Standard Construction Specifications.

- 17 -

The Contractor shall be responsible for public safety and traffic control within the project limits and on the approaches to the project. Provisions for public convenience and safety, construction area traffic control, and hours of work shall be in accordance with the County of Sacramento Standard Construction Specifications, Sections 7-8 and 12, and these Special Provisions.

All traffic control devices including: signs, barricades, vertical panels, drums, warning lights, arrow boards, changeable message signs, cones and tubular markers that meet the requirements of American Traffic Safety Services Association (ATSSA), “Quality Standard for Work Zone Traffic Control Devices – 1992” shall be used on this project/this work.

Existing "No Parking" and/or "No Stopping" controls shall remain in effect as applicable. Work crews may park personal vehicles where no restrictions exist. Material delivery vehicles may stop along the roadway as commensurate with work requirements. No equipment or materials shall be parked or stored within any traffic lanes or within the public rights-of-way at any time, day or night, including holidays and weekends, without an approved lane or road closure.

Reduced speed zones may be considered in order to limit the risk of an accident to workers and the traveling public. Refer to CVC Section 21367 and CVC Section 22362.

For any work that can affect the operation of traffic signals, the Contractor shall contact and coordinate with the Construction Management and Inspection Division (CMID).

Public Safety and Traffic Control shall be considered incidental to and included in the various items of work and no additional compensation will be allowed therefor. Such incidental work shall include, but not be limited to preparation of traffic control plans, furnishing, placing, removing, storing, maintaining, relocating, replacing and disposing of the components of the temporary traffic control system as required to maintain traffic as specified in the Standard Construction Specifications and as directed by the Engineer.

12-3.04 FURNISHING, INSTALLING, AND MAINTAINING TEMPORARY TRAFFIC

CONTROLS

The Contractor’s attention is directed to Section 12-3.04, “Furnishing, Installing, and Maintaining Temporary Traffic Controls,” of the Standard Construction Specifications.

Contractor shall maintain one lane in each direction on Franklin Boulevard, Green Tree Drive, and East Parkway at all times, unless prior approval has been granted by the Engineer. For lane closures on [street name(s)], the Contractor’s attention is directed to Sections 7-8.01, “Allowable Times and Hours of Work,” and 7-8.02, “Off-Period Work,” of these Special Provisions.

The Contractor shall not place traffic control devices on private property without the permission of the property owner(s).

Each vehicle used to place, maintain, and remove components of a traffic control system on multilane highways shall be equipped with a type II flashing arrow sign which shall be in operation when the vehicle is being used for placing, maintaining, or removing said components. The sign shall be controllable by the operator of the vehicle while the vehicle is in motion. The flashing arrow sign shall not be used on the

- 18 -vehicles that are doing the placing, maintaining, and removing, of components of a traffic control system, and shall be in place before a lane closure requiring its use is completed.

If any component in the traffic control system is displaced, or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.

When lane closures are made for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way shall be removed from the traveled way and shoulder. No equipment or materials shall be parked or stored within any traffic lanes or within the public right-of-way at any time of day or night, including holidays and weekends, without an approved lane or road closure.

12-3.07 CONSTRUCTION SIGNS

Construction area and/or detour signs for temporary traffic control shall be furnished, installed, maintained, and removed when no longer required in conformance with the provisions in Section 12-3.07, “Construction Signs,” and Section 34-3, “Roadside Signs,” of the Standard Construction Specifications and these Special Provisions.

The Contractor shall not erect any signs on private property without prior written approval from the private property owner. The Contractor shall erect the construction area signs at the locations shown on the traffic control plans or as designated by the Engineer.

Construction area and detour signs associated with pedestrians shall conform to Section 12-3.04, “Furnishing, Installing, and Maintaining Temporary Traffic Controls,” of these Special Provisions.

The Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least 2 working days, but not more than 14 calendar days, prior to commencing excavation for construction area sign posts. The regional notification centers include but are not limited to:

Notification Center Telephone Number Underground Service Alert-Northern California (USA)

1-800-642-2444 1-800-227-2600

Excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes.

The Contractor may be required to cover certain signs during the progress of the work. Signs that are no longer required or that convey inaccurate information to the public shall be immediately covered or removed or the information shall be corrected. Covers for construction area signs shall be of sufficient size and density to completely block out the complete face of the signs. The retro-reflective face of the covered signs shall not be visible either during the day or at night. Covers shall be fastened securely so that the signs remain covered during inclement weather. Covers shall be replaced when they no longer cover the signs properly.

- 19 -

Full compensation for Construction Area Signs as specified herein, shall be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor.

- 20 -

SECTION 13 – EXISTING FACILITIES

13-2.15 REMOVE FENCE AND RESET FENCE POST

Removal of fence and resetting of fence posts shall be implemented as indicated on the Contract Plans or as directed by the Engineer. The existing sign(s) posted on the fence shall be relocated to the existing fence that remains.

Use Class ‘B’ concrete for the footing. Ensure positive drainage at top of footing.

Set post vertical and true.

The price paid per Linear Foot for Remove Fence and Reset Fence Post shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in removing post and foundation, removing rails and pickets, reinstalling fence post, reattaching rails and…

This is the start of the file's text. The full file is on GovTribe.