462ATTACHMENTA.pdf
PDF 75 KB Posted
- Attached to
- F-16 AIS ANTENNA Federal contract opportunity
- Solicitation number
- FA821224Q0207
About this file
This document is an engineering data requirements attachment related to a federal contract opportunity for an F-16 AIS antenna. It provides specifications for the manufacture of an L1/L2 active or passive GPS antenna for the F-16 aircraft, including the part number, national stock number, and requirement to mark the antenna in accordance with MIL-STD-130. The engineering drawings and standards listed for the antenna cannot be substituted or deviated from without approval from the cognizant engineering activity.
The associated federal contract opportunity is a solicitation from the Air Force Sustainment Center within the Department of the Air Force Materiel Command seeking an F-16 AIS antenna. The solicitation number and additional details about the opportunity are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 14231CDRL.pdf | ||
| ITEMDESCRIPTION.pdf | ||
| 158PACKAGINGREQUIRMENTS.pdf | ||
| FA821224Q0207.pdf | ||
| ENGINEERINGDATALIST.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
L1/L2 ACTIVE, OR PASSIVE GPS ANTENNA F-16
2. PART NUMBER:
42G1215A-XT-1
3. NATIONAL STOCK NUMBER:
5985-01-608-4976WF
PREPARED BY:
ADRIAN GUSTAI
OFFICE SYMBOL:
416 SCMS /GUEAA
DATE:
20221115
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE
SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT
ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR
APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
7. MARKING PER MIL-STD-130.
File details come from the government source that posted it. Updated .