4614D_SupplementalSpecificaitons_5.25.21.docx
DOCX document 75 KB Posted
- Solicitation number
- 1240LU21Q0015
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend1_pg 5 sol.docx | DOCX document | |
| SF30_Amend1_1240LU21Q0015.pdf | ||
| WageDetermMT20210079.pdf | ||
| 4614D_PlansDrawings.pdf | ||
| SF18_1240LU21Q0015.pdf | ||
| RFQ_1240LU21Q0015.docx | DOCX document | |
| KNF food storage order.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
| Preface | 3 |
| 101 - Terms¸ Format¸ and Definitions | 4 |
| 101.01 Meaning of Terms. | 4 |
| 101.03 Abbreviations. | 4 |
| 101.04 Definitions. | 5 |
| 102 - Bid¸ Award¸ and Execution of Contract | 9 |
| Delete Section 102. | 9 |
| 103 - Scope of Work | 10 |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. | 10 |
| 104 - Control of Work | 11 |
| Delete Subsections 104.01, 104.02, 104.04. | 11 |
| 104.06 Use of Roads by Contractor. | 11 |
| 105 - Control of Material | 12 |
| 105.05 Use of Material Found in the Work. | 12 |
| 106 - Acceptance of Work | 13 |
| 106.01 Conformity with Contract Requirements. | 13 |
| 106.02 Visual Inspection. | 15 |
| 107 - Legal Relations and Responsibility to the Public | 16 |
| Delete Subsection 107.05. | 16 |
| 108 - Prosecution and Progress | 17 |
| Delete Section 108. | 17 |
| 109 - Measurement and Payment | 18 |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. | 18 |
| 109.01 Measurement of Work. | 18 |
| 109.02 Measurement Terms and Definitions. | 19 |
| 151 - Mobilization | 20 |
| 151 Mobilization | 20 |
| 155 - Schedules for Construction Contracts | 21 |
| Delete Section 155. | 21 |
| 157 - Soil Erosion and Sediment Control | 22 |
| 157.04 General. | 22 |
| 201 - Clearing and Grubbing | 23 |
| 201 - Clearing and Grubbing | 23 |
| 203 - Removal of Structures and Obstructions | 24 |
| 209 - Structure Excavation and Backfill | 25 |
| Section 209 – structure excavation and backfill | 25 |
| 211 - Roadway Obliteration | 27 |
| 211 – ROADWAY OBLITERATION | 27 |
| Construction Requirements | 28 |
| 211.02 | 28 |
| 622 - Rental Equipment | 29 |
| 622.01 Description | 29 |
Preface Preface_wo_05_28_2021
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_9_15_2016 Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_4_7_2015 Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSAR — Forest Service Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
| MP | — | milepost | location | ||
| ppm | — | parts per million | volume | ||
| STA | station | location |
101.04_National_9_5_2018 Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_9_15_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_9_15_2016 Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_9_15_2016 Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_9_16_2016 Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.05_National_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106 - Acceptance of Work 106.01_National_7_18_2017 Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
Sampling method;
Number of samples;
Sample transport;
Test procedures;
Testing laboratories;
Reporting;
Estimated time and costs; and Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
1. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_10_23_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017 Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_9_16_2016 Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_9_16_2016 Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019 Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1 Decimal Accuracy of Quantities for Final Payment
| Pay Item |
| Level of Precision |
| Linear Foot |
| 1 |
| Exception--Timber, Steel, and concrete Piles |
| 0.1 |
| Station |
| 0.1 |
| Mile |
| 0.01 |
| Square Foot |
| 0.1 |
| Square Yard |
| 0.1 |
| Each |
| 1 |
| Acre |
| 0.01 |
| Gallon |
| 1 |
| M-Gals. |
| 0.1 |
| Cubic Yard | |
| 1 |
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
| Exception--Concrete; Masonry |
| 0.01 |
| Pound |
| 1 |
| Ton |
| 0.1 |
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials 0.01
| Hour |
| 0.1 |
| MFBM |
| 0.01 |
| Station Yard |
| 1 |
| Cubic Yard Mile |
| 1 |
| Ton Mile |
| 1 |
109.02_National_9_16_2016 Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
151 - Mobilization 151.01_Forest_4_9_2020 151 Mobilization
151.01 ‐ Description
Add the following at the end of the last sentence:
Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Construction equipment includes all construction heavy equipment, service vehicles, all highway‐legal trucks (including dump trucks, cement trucks, water trucks, etc.), and trailers (including lowboys), except cars. Unless otherwise agreed, the Contractor shall give the Forest Service at least 24 hours’ notice when equipment is ready for inspection. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move‐ins of equipment the same as the initial move‐in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.
155 - Schedules for Construction Contracts 155.00_National_9_14_2016 Delete Section 155 in its entirety.
Delete Section 155.
157 - Soil Erosion and Sediment Control 157.04_National_4_3_2020 Delete Subsection 157.04 and replace with the following:
157.04 General.
Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.
When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.
201 - Clearing and Grubbing 201.06_Forest_4_9_2020 201 - Clearing and Grubbing
201.06 Disposal. Delete this subsection and substitute the following:
Dispose of construction slash by placing on finished embankment slopes to reduce soil erosion. When placing slash on embankment slopes start at the toe of the fill and place as flat as practicable on the completed slope.
If trees are removed from within a Riparian Habitat Conservation Area during project work, trees are to remain on-site and will be placed as directed by the CO.
If trees are removed from outside of a Riparian Habitat Conservation Area during project work, trees could be merchantable timber. In this instance, merchantable timber is the Government’s property. Limb and deck merchantable timber on site as directed by the CO.
Measurement
201.08. Delete this subsection and replace with the following:
Do not measure clearing and grubbing for payment.
203 - Removal of Structures and Obstructions 203.05_Forest_4_9_2020 203 - Removal of Structures and Obstructions
203.05 Disposing of Material.
Modify this subsection as follows:
(a) Remove from project. Add the following:
All materials designated for removal become the property of the Contractor and are to be disposed of by removing off of Forest Service Lands in accordance with all local, state and federal requirements.
(b) Burn. Delete this section.
(c) Bury. Delete this section.
Add the following:
(e) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes or scatter as directed by the CO to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.
Add the following Section:
209 - Structure Excavation and Backfill 209.06_Forest_4_9_2020 Section 209 – structure excavation and backfill
209.06 Dewatering
Delete the subsection and add the following:
Submit a Dewatering Plan 5 days prior to beginning excavation.
Construct diversion prior to performing any excavation. Construct diversions using water tight, non-eroding methods. Employ settling basins or other methods so that muddy water is not returned to stream. Install, operate, and remove diversions in a manner that minimizes erosion and sedimentation.
209.07 Foundation Preparation
Delete second and third paragraph and replace with the following:
Backfill according to Section 209.09. Compact according to Section 209.10
209.09 Backfill.
(a) General.
Add the following:0 Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:
1. Embankment height greater than 6 feet at subgrade centerline.
1. Installation in a protected streamcourse.
1. Round pipe with a diameter of 48 inches or greater.
1. Pipe arches with a span of 50 inches or greater.
1. Any box culvert of structure other than pipe culverts.
(b) Pipe Culverts.
(1) Pipe culverts with compacted backfill.
Add the following:
On each side of the pipe, excavate an area at least as wide as the diameter of the pipe. Backfill without damaging or displacing the pipe. Complete backfilling of the trench with suitable material.
209.10 Compacting.
Delete the subsection and add the following:
Compact backfill using designated compaction method A, B, C, or D:
Method A. Ensure that backfill density exceeds the density of the surrounding embankment.
Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer 6 inch layer with a minimum of three complete passes or until visual displacement ceases using a mechanical tamper, (wacker-packer type or approved equal). For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.
Method C. Compact each layer of backfill with a minimum of two passes with mechanical tamper, (wacker-packer type, or approved equal).
Method D. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
209.11 Acceptance.
Sampling and Testing Requirements Add the following:
Compaction methods (A),(B), and (C) do not require AASHTO T-99 or T-310 test methods for foundation fill.
211 - Roadway Obliteration 211.01_Forest_4_9_2020
211 – ROADWAY OBLITERATION
Description
211.01 Delete this subsection and replace with the following:
This work consists of the reclamation of roadways by the removal of culverts; construction of waterbars and leadoff ditches; restoration of stream channels; and seeding, fertilizing, and mulching of all disturbed areas. This work may include necessary diverting of live streams, pumping, bailing, draining, sheeting, bracing, and miscellaneous items required for execution of the work. Additionally, survey stakes depicting work locations may need to be re-established using original survey notes and/or plans.
Roadway reclamation methods are designated as follows:
(c) Method 3. Loosen the roadbed by scarifying to the depth of 12 inches. Construct waterbars as shown on the plans. Scatter any available slash on obliterated roadway. Eliminate all ruts and low spots that could hold water.
(e) Method 5. Treat the roadway as shown on the plans.
Construction Requirements
211.02 Delete this subsection and replace with the following:
Remove all culverts and bridges designated to be removed from National Forest lands and dispose of them in any legal manner. All removed culverts may be salvaged by the Contractor for personal use. Excavate and finish to the lines shown on the plans. Slope all areas to drain and return water to natural watercourses. After removing pipes and bridges, obtain approval from CO before continuing work. Remove all fill material to the natural channel. Treat slash and clearing debris according to Subsection 203.05.
211.03 Waterbars and Barriers.
Delete this subsection and replace with the following:
Construct rock barriers to prevent vehicle access and waterbars as shown on the plans. Place weed free straw mulch on all areas of recontour and culvert or bridge removal.
622 - Rental Equipment 622.01_Regional_5_28_2021 Add the following to Subsection 622.01
622.01 Description
Work is to correct minor site discrepancies not noted in the contract documents that occurred between award of contract and implementation of work needed to result in a complete project. Examples of work may include:
a. Excavating and placing embankment,
b. Slide removal,
c. Drainage and roadway repair,
d. Haul and placement of material such as rocks, logs, or debris, or
e. Sign or gate installation image1.png