460-125.pdf
PDF 213 KB Posted
- Attached to
- USMC 4" CHROME DECALS
- Solicitation number
- 460-125
- Issued by
-
Government Publishing Office
About this file
This is a Request for Proposal (RFP) from the U.S. Government Publishing Office (GPO) Midatlantic Region for the procurement of 450,000 USMC 4" Chrome Decals for the U.S. Army/Army Materiel Command. The decals will be 4-1/4" x 4-1/4" finished size, kiss-die cut to 4" diameter with a scalloped edge, printed in white, black, PMS 186 (red), and metallic gold on 4 Mil Chrome Metalized Polyethylene Terephthalate (Mylar). Key production requirements include embossing, laminating with .003 thick clear polyester, and creating a permanent adhesive with a siliconized backing sheet.
The bid opens virtually on January 20, 2026, at 11:00 AM Eastern Time, with bids to be submitted electronically to bids@gpo.gov. Bidders must provide pre-production samples for testing, and the final product must be delivered by April 30, 2026, to Staci Americas in Suwanee, GA. The solicitation includes detailed quality assurance standards, requiring Level II inspection for printing and finishing attributes. Contractors must be able to produce the entire production run in-house, as subcontracting the primary printing function will result in being declared non-responsible.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
460-125 (6-60125)
Specifications by TN Reviewed by WL Page 1 of 7
U.S. Government Publishing Office (GPO)
Midatlantic Region General Terms, Conditions, and Specifications
For the procurement of
USMC 4" CHROME DECALS
As requested from U.S. Government Publishing Office (GPO) by the US Army / Army Materiel Command
BID OPENING: Bids shall be opened virtually at 11:00 AM, Eastern Time (ET), on January 20, 2026, at the U.S. Government Publishing Office. All parties interested in attending the bid opening shall email bids@gpo.gov one (1) hour prior to the bid opening date and time to request a Microsoft Teams live stream link. This must be a separate email from the bid submission. The link will be emailed prior to the bid opening.
For information regarding the solicitation requirements prior to award, please contact Theresa Nagel 757-490- 7940 Ext. 3 or tnagel@gpo.gov.
BID SUBMISSION: Bidders must email bids to bids@gpo.gov for this solicitation. No other method of bid submission will be accepted at this time. The Jacket Number and bid opening date must be specified in the subject line of the emailed bid submission. Bids received after the bid opening date and time specified above will not be considered for award.
Bidders are to fill out, sign/initial, as applicable, Page 7.
ADDITIONAL EMAILED BID SUBMISSION PROVISIONS: The Government will not be responsible for any failure attributable to the transmission or receipt of the emailed bid including, but not limited to, the following:
1) Illegibility of bid.
2) Emails over 75 MB may not be received by GPO due to size limitations for receiving emails.
3) The bidder’s email provider may have different size limitations for sending email; however, bidders are advised not to exceed GPO’s stated limit.
4) When the email bid is received by GPO, it will remain unopened until the specified bid opening time.
Government personnel will not validate receipt of the emailed bid prior to bid opening. GPO will use the prevailing time (specified as the local time zone) and the exact time that the email is received by GPO’s email server as the official time stamp for bid receipt at the specified location.
BIDDER’S NAME AND SIGNATURE: Unless specific written exception is taken, the bidder, by signing and submitting a bid, agrees with and accepts responsibility for all certifications and representations as required by the solicitation and GPO Contract Terms – Publication 310.2. When responding by email, fill out and return one completed copy of all applicable pages (pgs. 9) that include the Jacket Number, Bid Price, Additional Rate, Discounts, Amendments, Bid Acceptance Period, and Bidder’s Name and Signature, including signing where indicated. Valid electronic signatures will be accepted in accordance with the Uniform Electronic Transactions Act, § 2. Electronic signatures must be verifiable of the person authorized by the company to sign bids.
Reviewed by WL Page 2 of 7
GPO CONTRACT TERMS: Any contract which results from this Invitation for Bid will be subject to the applicable provisions, clauses, and supplemental specifications of GPO Contract Terms (GPO Publication 310.2, effective December 1, 1987 (Rev. 01-18)) and GPO Contract Terms, Quality Assurance Through Attributes Program for Printing and Binding (GPO Publication 310.1, effective May 1979 (revised 9-19)).
GPO Contract Terms (GPO Publication 310.2) – https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/contractterms2018.pdf
GPO QATAP (GPO Publication 310.1) – https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/qatap-rev-09-19.pdf
PREAWARD SURVEY: In order to determine the responsibility of the prime contractor, the Government reserves the right to conduct an on-site pre-award survey at the contractor's/subcontractor's facility or to require other evidence of technical, production, managerial, financial, and similar abilities to perform, prior to the award of a contract. As part of the financial determination, the contractor in line for award may be required to provide one or more of the following financial documents:
1) Most recent profit and loss statement
2) Most recent balance sheet
3) Statement of cash flows
4) Current official bank statement
5) Current lines of credit (with amounts available)
6) Letter of commitment from paper supplier(s)
The documents will be reviewed to validate that adequate financial resources are available to perform the contract requirements. Documents submitted will be kept confidential and used only for the determination of responsibility by the Government. Failure to provide the requested information in the time specified by the Government may result in the Contracting Officer not having adequate information to reach an affirmative determination of responsibility.
NOTE: Prior to award the apparent low vendor must be able to show ability to produce the product in question and may be asked to supply samples of similar items.
PAYMENT: Submitting invoices for payment via the GPO fax gateway (if no samples are required) utilizing the GPO barcode coversheet program application is the most efficient method of invoicing. Instruction for using this method can be found at the following web address:
http://winapps.access.gpo.gov/fms/vouchers/barcode/instructions.html
Invoices may also be mailed to: U.S. Government Publishing Office, Office of Financial Management, Attn: Comptroller, Stop: FMCE, Washington, DC 20401.
For more information about the billing process refer to the General Information of the Office of Finance web page located at https://www.gpo.gov/how-to-work-with-us/vendors/how-to-get-paid
Vendors are expected to submit invoices within 15 days of job shipping/delivery.
MODS: If any additional costs are incurred during the production of this job due to Government action (i.e.
AAs), contractor is REQUIRED to submit written request to the Printing Specialist for written approval BEFORE proceeding.
https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/contractterms2018.pdf https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/contractterms2018.pdf https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/qatap-rev-09-19.pdf https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/qatap-rev-09-19.pdf http://winapps.access.gpo.gov/fms/vouchers/barcode/instructions.html https://www.gpo.gov/how-to-work-with-us/vendors/how-to-get-paid
Reviewed by WL Page 3 of 7
Only a warranted GPO Contracting Officer acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the GPO Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the GPO Contracting Officer. Proceeding with any work not authorized by the GPO Contracting Officer will be at the Contractor’s own risk.
SUBCONTRACTING: The predominant production function is printing. Bidders who must subcontract this operation will be declared non-responsible.
PRODUCT: USMC 4" CHROME DECALS
QUANTITY: 450,000
PAGES: Face Only
TRIM: 4-1/4" X 4-1/4" finished size, kiss-die cut to 4" diameter (scalloped edge).
DESCRIPTION:
Prints White, Black, PMS 186 (red) and metallic gold.
All images butt and trap to each other.
ADHESIVE AND PROTECTIVE LINER: The adhesive must be a permanent type. Protect the adhesive entirely with an easy release, siliconized backing sheet.
EMBOSSING: Create embossing plate.
LAMINATION: After printing and embossing, laminate over the entire face side with a .003 thick, clear polyethylene terephthalate.
DIE CUTTING: Kiss die cut 4" diameter stickers, scalloped style on outer edge of Rope border to match supplied sample.
***Contractor to create dies***
STOCK: The specifications of all paper furnished must be in accordance with those listed herein or listed for the corresponding JCP Code numbers in the Government Paper Specification Standards, No. 13, dated September 2019.
4 Mil. Chrome Metalized Polyethylene Terephthalate (Mylar)
INK: White, Black, PMS 186 (red) and metallic gold.
PROOF: Contractor to submit one Press Quality PDF soft proof (for content only) using the same Raster Image Processor (RIP) that will be used to produce the final printed product. PDF proof will be evaluated for text flow, image position, and color breaks. Proof will not be used for color match. Include REMINDER that agency can keep proof Two (2) workdays. Date of receipt is NOT considered first workday.
Contractor must call Buffy Torres at 404-790-6266 to confirm receipt.
Email PDF to: buffy.torres@wundermanthompson.com; dink.byers@marines.usmc.mil and tnagel@gpo.gov.
After PDF is approved:
Reviewed by WL Page 4 of 7
Contractor must supply a proof sign-off sheet and return airbill. Also please include a reminder that the agency can only keep Samples 2 days.
The Prior to Production Samples must be produced as specified using the format, ink, stock, equipment, and methods of production that will be used in producing the final product. Do not print the entire quantity until receipt of the OK from the Government.
Prior to the commencement of production of the contract production quantity, the contractor shall submit samples to:
Buffy Torres 6105 Lakeaires Drive, Cumming GA 30040 404-790-6266
Samples will be tested for conformance of material(s). (10) Samples will be tested for usage on the specified equipment and/or for construction. The container and accompanying documentation shall be marked PREPRODUCTION SAMPLE and shall include the GPO jacket, purchase order, and program numbers. The samples must be submitted in sufficient time to allow Government testing of the samples and production and shipment in accordance with the shipping schedule. The Government will approve, conditionally approve, or disapprove the samples within 2 workdays of the receipt thereof. Approval or conditional approval shall not relieve the contractor from complying with the specifications and all other terms and conditions of the contract. A conditional approval shall state any further action required by the contractor. A notice of disapproval shall state the reasons therefor.
If the samples are disapproved by the Government, the Government, at its option, may require the contractor to submit additional samples for inspection and test, in the time and under the terms and conditions specified in the notice of rejection. Such additional samples shall be furnished, and necessary changes made, at no additional cost to the Government and with no extension in the shipping schedule. The Government will require the time specified above to inspect and test any additional samples required.
In the event the additional samples are disapproved by the Government, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause in which event this contract shall be subject to termination for default, provided however, that the failure of the Government to terminate the contract for default in such event shall not relieve the contractor of the responsibility to deliver the contract quantities in accordance with the shipping schedule.
In the event the Government fails to approve, conditionally approve, or disapprove the samples within the time specified, the Contracting Officer shall automatically extend the shipping schedule in accordance with Contract Clause 12, "Notice of Compliance With Schedules," of GPO Contract Terms (GPO Publication 310.2, effective December 1, 1987 (Rev. 01-18)).
Manufacture of the final product prior to approval of the sample submitted is at the contractor’s risk. Samples will not be returned to the contractor. All costs, including the costs of all samples shall be included in the contract price for the production quantity.
All samples shall be manufactured at the facilities in which the contract production quantities are to be manufactured.
Reviewed by WL Page 5 of 7
PACKING/PALLETIZING: Shrink-wrap in sets of 50. Pack in uniform quantities in shipping containers with a minimum bursting strength of 275 psi. Boxes must be filled to capacity without air. Each shipping container must not exceed 45 pounds when fully packed.
All shipments which fill less than a shipping container must be packaged with materials of sufficient strength and durability and in such a manner which will guarantee that the product will not be damaged and the package will not open nor split during delivery process.
Pack to ensure no damage occurs to product during transit prior to receipt by agency. Pack to ensure no shifting of product in transit, using spacers if necessary. Product should arrive with no abrasions, dog-ears, etc.
Packing to be in accordance with GPO Contract Terms (GPO Pub. 310.2). Noncompliance with the packing instructions will be cause for the Government to take corrective action in accordance with GPO Pub. 310.2.
Palletizing: Pallets must be in accordance with GPO Contract Terms (GPO Pub. 310.2).
DISTRIBUTION: Deliver f.o.b. destination. Ship by traceable means. All expenses incidental to picking up and returning materials and samples must be borne by the contractor.
Inside deliver order to:
Staci Americas 195 Sawmill Drive Suwanee, GA 30024 Attn: Raidis Luis & Victoria Perkins
To schedule delivery appointment email: buffy.torres@wundermanthompson.com and dink.byers@marines.usmc.mil.
• Appointments must be secured and confirmed to accept delivery of material.
• Appointments must be secured a minimum of three (3) business days in advance of the requested date.
• Agency will provide confirmation or alternate delivery dates within one (1) business day of the request.
NOTIFICATION OF SHIPMENT: Contractor must notify the ordering agency on the same day that the product ships/delivers via e-mail sent to buffy.torres@wundermanthompson.com, dink.byers@marines.usmc.mil and tnagel@gpo.gov. The subject line of this message shall be Distribution Notice for Jacket 460-125. The notice must provide all applicable tracking numbers, shipping method, and Title. Contractor must be able to provide copies of all delivery, mailing, and shipping receipts upon agency request.
SCHEDULE: Adherence to this schedule must be maintained. See "Notice of Compliance with Schedules”, in GPO Pub. 310.2.
Purchase Order and furnished material will be emailed no later than January 22, 2026.
Deliver complete (to arrive at destination) by April 30, 2026. F.O.B. destination.
QUALITY ASSURANCE LEVELS AND STANDARDS: The following levels and standards shall apply to these specifications:
Product Quality Levels:
(a) Printing Attributes -- Level II
(b) Finishing Attributes -- Level II
(c) Exceptions: None
Inspection Levels (from ANSI/ASQC Z1.4):
mailto:buffy.torres@wundermanthompson.com mailto:dink.byers@marines.usmc.mil
Reviewed by WL Page 6 of 7
(a) Non-destructive Tests - General Inspection Level 1.
(b) Destructive Tests - Special Inspection Level S-2.
Specified Standards: The specified standards for the attributes requiring them shall be:
ATTRIBUTE SPECIFIED STANDARD
P-7. Type Quality and Uniformity *Approved Preproduction Sample P-10. Process Color Match * Approved Preproduction Sample
Reviewed by WL Page 7 of 7
Bidders must fill out this page and return it.
BID PRICE: $ __________________ ____ ADDITIONAL RATE: $ _________PER: 1,000.
DISCOUNTS: Discounts are offered for payment as follows: __________ Percent, _________calendar days.
See Article 12 “Discounts” of Solicitation Provisions in GPO Contract Terms (Publication 310.2).
AMENDMENT(S): Bidder hereby acknowledges amendment(s) number(ed) ____________________________
BID ACCEPTANCE PERIOD: In compliance with the above, the undersigned agree, if this bid is accepted within____________ calendar days (60 calendar days unless a different period is inserted by the bidder) from the date for receipt of bids, to furnish the specified items at the price set opposite each item, delivered at the designated points(s), in exact accordance with specifications.
NOTE: Failure to provide a 60-day bid acceptance period may result in expiration of the bid prior to award.
BIDDER’S NAME AND SIGNATURE: Unless specific written exception is taken, the bidder, by signing and submitting a bid, agrees with and accepts responsibility for all certifications and representations as required by the solicitation and GPO Contract Terms – Publication 310.2. When responding by email, fill out and return one completed copy of all applicable pages that include the Jacket Number, Bid Price, Additional Rate, Discounts, Amendments, Bid Acceptance Period, and Bidder’s Name and Signature, including signing where indicated.
Valid electronic signatures will be accepted in accordance with the Uniform Electronic Transactions Act, § 2.
Electronic signatures must be verifiable of the person authorized by the company to sign bids.
Failure to sign the signature block below may result in the bid being declared non-responsive
Bidder _____________________________________________________________________________________ (Contractor Name) (GPO Contractor’s Code)
(Street Address)
(City – State – Zip Code)
By _________________________________________________________________________________________ (Printed Name, Signature, and Title of Person Authorized to Sign this Bid) (Date)
(Person to be Contacted) (Telephone Number) (Email)
THIS SECTION FOR GPO USE ONLY
Certified by: __________ Date: __________ Contracting Officer: __________ Date: __________ (Initials) (Initials)
File details come from the government source that posted it. Updated .