This scope of work document outlines requirements for a federal contract to remove and replace the port main diesel engine, repair damage to the dive platform, and conduct other maintenance on a 45-foot Coast Guard response boat. The contractor must haul out the vessel within 10 days of award, complete all work within 21 working days, and have the boat ready for use. The contractor will remove and install a government-furnished engine according to maintenance procedures. References and drawings are provided. The contractor must notify the contracting officer's representative of the intended start date and complete all work to standards while following federal, state, and local laws. Quotes are due by February 16, 2024 and must be emailed to the point of contact.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK (SOW)
FOR
Station San Francisco 1 Yerba Buena Rd.
San Francisco, CA. 94130 510-437-3454
1. SCOPE: Contractor shall provide general labor, equipment, and facilities to haul out US Coast Guard 45 FT Response Boat Medium (RBM) 45770, pressure wash hull, remove all interferences and renew Port Engine. Repair damage to dive platform and grab bar.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work within 10 days and work diligently to complete the entire project and have vessel ready for use by 21 working days from scheduled haul out after contract award.
3. INFORMATION AND REQUIREMENTS:
Physical Characteristics of Vessel
1. Hull Length 43’ 9”
2. Length Overall 44’ 9” (w/ rub rails)
3. Hull Beam 13’ 8” Beam Overall 14’ 8”
4. Highest Points: Fixed 13’ 1”, Unfixed 20’ 9”
5. Hoisting condition 36,700 LBS (boat, full fuel, outfit; no crew or cargo)
Drydocking
1. Haul vessel
2. Pressure wash hull
3. Securely block vessel.
4. Lauch vessel (Coast Guard representative shall ensure watertight integrity of vessel and test all propulsion machinery).
5. Documentation provided as attachments:
· 45-RB-M-084-002-Docking arrangement
· 45-RB-M_601_1_1_D_General Arrangement
Physical Characteristics of Engine
1. Engine Dimensions: Length 72.5”, Width 40.7”, and Height 45.7”
2. Weight: 3593 lbs.
3. Engine Dimensions W/Marine Gear: Length 80.3”, Width 40.7”, and Height 46.1”
4. Weight W/Marine Gear: 4279 lbs.
PORT Main Diesel Engine
1. Remove/Install government furnished engine IAW Maintenance Procedure A15004.D
2. Government furnished equipment: Engine Lift Tool and Hoisting Chain
3. References provided as attachments:
· 45-RB-M-201-1-1 Main Engine Arrangement
· 45-RB-M-84-5-1 Engine Mounting
· MPC A15004.D
AFT Swim platform/Transom Rail
1. Repair damaged swim platform IAW with industry standards and conduct Non-destructive testing.
2. References provided as attachments:
· Drawing 45-RB-M-110-090 DIVE PLATFORM
· 45 RBM Hot work diagram
· Pictures provided in enclosure (1)
4. CONDITIONS AFFECTING THE WORK: If additional work items are found, contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original scope.
5. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s representative of intended start date. The work shall be done in accordance with the specification.
6. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
7. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).
8. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
9. CLEAN UP: All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.
10. UPON COMPLETION OF WORK: Contact the COR to arrange for inspection/acceptance of work.
11. POINTS OF CONTACT:
Contracting Officer Representative Ryan Pizzi, USCG, MK1 Phone: 510-437-3454 Email: ryan.m.pizzi@uscg.mil
12. Enclosure (1):