43B-2026.pdf
PDF 426 KB Posted
- Solicitation number
- 43B-2026
- Issued by
- Whatcom County, Washington
About this file
This is a Scope of Work document for the City of Bellingham, Washington, detailing the Bellingham Central Library Renovation Phase 2 project (EF175). The project encompasses interior renovations and upgrades across the Ground Floor, Level 2, and portions of Level 1 of the library building. Work includes new interior layouts and finishes, installation of new mechanical equipment, plumbing and HVAC modifications, and replacement of electrical power and lighting systems. Power service improvements will be coordinated with the utility provider as part of the project scope. The document outlines the specific technical requirements, performance standards, and construction specifications that contractors must follow during execution of the renovation work.
The scope addresses hazardous materials abatement as required by project specifications and building codes. The document establishes detailed requirements for mechanical, plumbing, electrical, and finishing trades, ensuring all work meets applicable standards and integrates with existing building systems. Contractors must coordinate with city departments and utility providers to minimize service disruptions and ensure compliance with local regulations. The renovation is intended to modernize the facility's infrastructure and improve functionality while maintaining the building's operational status during construction phases.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .