This document appears to be a set of drawings related to a federal contract opportunity to install a new natural gas line at the Sioux Falls VA Medical Center in South Dakota. The drawings show the existing gas line and the proposed new gas line, including the location of the connection point, valves, pressure regulation valve, and pressure relief valve.

The related federal contract opportunity is a solicitation (Solicitation Number: 36C26324B0002) for a project to install the new laundry natural gas line at the Sioux Falls VA Medical Center. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with a NAICS code of 237120 (Oil and Gas Pipeline and Related Structures Construction) and a size standard of $45 million. The magnitude of construction is between $500,000 and $1,000,000, and the period of performance is 60 calendar days. The solicitation is planned to be issued on or about July 9, 2024, with an award date within 60 calendar days from the bid opening date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING GAS LINE

NEW GAS LINE DRAWING

• Proposed connection point is displayed by the red star. Connection point is to be agreed upon between the COR and the contractor prior to project start.

• Add T – branch pipe to existing 4” line o Add 2nd valve as shown, so line can be closed if needed

An accessible plastic covering/access port must be added over both valves shown in the drawing for identification and ease of access

• Add pressure regulation valve on the outside of the laundry building as shown. The pressure going into the building will be identified by the COR

• The piping will run alongside the outer wall of the laundry building and will enter the building either via the roof or high point along the wall. The contractor will identify the access point with the COR prior to any demolition of the roof/wall of the building.

• Add pressure relief valve to the new piping in the interior of the laundry building before adding a cap to the end of the piping.