437-22-108 Construction SOW.doc
DOC document 60 KB Posted
- Solicitation number
- 36C26324B0001
About this file
This document is a Scope of Work (SOW) for a construction project (Project Number: 437-22-108) to place chilled water pumps on emergency power for the Fargo VA Health Care System. The work includes demolition, new construction, new conduits, electrical power wiring, BAS control system wiring and programming, and other items required per the contract documents. Specific pumps to be placed on emergency power are identified by location. The construction work must meet current Infection Control Risk Assessment/Pre-Construction Risk Assessment (ICRA/PCRA) requirements, interim life safety measures (ILSM), and all other applicable VA guides, manuals, and requirements. Phasing plans are required to ensure continuous chilled water service during the 216 calendar day project duration.
The related federal contract opportunity is a pre-solicitation notice (Solicitation Number: 36C26324B0001) for a competitive Invitation for Bid to satisfy this requirement. The procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The NAICS code is 238220 with a $19 Million size standard. All solicitation documents will be available on SAM.gov upon issuance of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26324B0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work - Construction Fargo VA Health Care System
Project Number: 437-22-108 Project Title: Place Chilled Water Pumps on Emergency Power Description of Work:
Construction work shall include, but shall not be limited to providing all labor, materials, tools, equipment, etc. necessary to complete the project 437-22-108, Place Chilled Water Pumps on Emergency Power for the Fargo VA Health Care System in accordance with contract documents and this Scope of Work (SOW). All work shall follow federal, state, and local codes and requirements. If there are conflicts between the codes, contact the VA CO and the VA COR for resolution.
Work shall include, but shall not be limited to, requirements in the contract drawings, specifications and the items included in the description of work to construct a complete and operating system to switch the chilled water pumps automatically to emergency back-up power.
The project shall include, but shall not be limited to: demolition, new construction, new conduits, electrical power wiring, BAS Control system wiring, and BAS Control system programming, and other items as required per the contract documents.
This project will place the follow CW pumps are on emergency back-up power system, ensure all Building Automation Systems (BAS) Controls for the pumps are on emergency back-up power and test/verify that the CW pumps and BAS Controls are able to be switched automatically to Emergency power when called to.
A. CHWP#1 - #5: These pumps are located in Room BE-27 B. Pumps #8/#9: These pumps are located in Room BA-01
C. Pumps #12/#13: These pumps are located in Room BA-65A
D. Pumps #14/#15: These pumps are also located in Room BA-65A
E. Pumps #16/#17: These pumps are located in Room 3E-08
F. Pumps #18/#19: These pumps are located in Room BD-70 The construction work must meet with current Infection Control Risk Assessment/Pre-Construction Risk Assessment (ICRA/PCRA) requirements, interim life safety measures (ILSM) and all other applicable VA guides, manuals and requirements. Contractor shall follow Fargo VA Pre-Construction Risk Assessment requirements (sample PCRA and the associated requirements are located in the project specifications). Prior to beginning work, the Superintendent shall contact the VA COR about obtaining a PCRA for the work area(s). Once the PCRA is completed by VA staff, a copy will be provided to the General Contractor to follow. PCRA infection control and safety items shall be installed prior to the beginning of construction work by the general contractor or any subcontractors.
Phasing plans shall be required to ensure continuous operation of chilled water service to all HVAC units during the duration of this project. Phasing shall ensure that at least 50% or more of the redundant pumps are operational and downtimes are kept to a minimum. All work must be coordinated with the VA COR prior to disabling any CW pumps or controls.
Duration: 216 calendar days after the Notice to Proceed (NTP) is issued.
- - - END - - -
File details come from the government source that posted it. Updated .