43113070 cdrl 9.pdf
PDF 449 KB Posted
- Attached to
- WASTEWATER STORAGE TANKS Federal contract opportunity
- Solicitation number
- SPMYM225Q0734
About this file
This is a Contract Data Requirements List (DD Form 1423-1) for a Preliminary Installation Plan (PIP) with Drawings related to wastewater storage tanks. The document specifies requirements for a certification/data report under contract line item 0002AJ.
Key details include: The data item requires a one-time submission with distribution limited to DoD and DoD contractors only (Distribution Statement D) until November 8, 2024. The contractor must submit documentation through the Wide Area Workflow (WAWF) e-Business Suite and send email notifications to PSNS.WAWFQACertifications.FCM@navy.mil. The requirements are tailored to specific sections (10.1, 10.2, 10.2.4, 10.3, 10.3.1, and 10.5) and must ensure certifications are traceable to materials via unique markings. The requiring office is listed as "PURCHASING ACTIVITY" and the document number is 4311-3070. No draft copies are required, but one final reproducible copy must be provided to addressee N4523A.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDED SOLICITATION SPMYM225Q0734.pdf | ||
| 43113070 cdrl 1.pdf | ||
| 43113070 cdrl 5.pdf | ||
| 43113070 cdrl 7.pdf | ||
| 43113070 cdrl 8.pdf | ||
| 43113070 cdrl 4.pdf | ||
| 43113070 cdrl 6.pdf | ||
| 43113070 cdrl 2.pdf | ||
| SOLICITATION SPMYM225Q0734.pdf | ||
| 43113070 tech data.pdf | ||
| 43113070 cdrl 3.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
MISC
D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
CERTIFICATION/DATA REPORT Preliminary Installation Plan (PIP) with Drawings
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80678 PER CONTRACT PURCHASING ACTIVITY
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD ONE/R SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS N4523A 0 1 0
Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.4, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only.
Administration and operations only, effective 11/8/2024. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.
Upon submission in WAWF send email notifications to:
PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.
Document No.: 4311-3070 15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ Truung Luu C/900F.34 11/8/2024 /s/ R. Balter C/900F.32 11/8/2024
DD FORM 1423-1, JUN 90 (EG) Page 1 of 2 Pages
0002AJ J
J001
TANKS
File details come from the government source that posted it. Updated .