424134.pdf
PDF 1 MB Posted
- Attached to
- School Breakfast Photo Props
- Solicitation number
- Jacket_424-134
- Issued by
-
Government Publishing Office
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications by DEE Jacket 424-134 Page 1 of 7 U.S. Department of Agriculture 3-01105 Reviewed by RM
BID OPENING: Bids shall be opened at 11:00 AM., prevailing Eastern Standard Time (EST), on January 12, 2023 by the U.S. Government Publishing Office, in Washington, DC 20401. Due to the COVID-19 pandemic, this will NOT be a public bid opening.
BID SUBMISSION: NOTE: Due to the COVID-19 pandemic, the physical office will NOT be open. Based on this, vendors MUST submit e-mail bids to bidsapsdc@gpo.gov for this solicitation. No other method of bid submission will be accepted at this time.
Note: The GPO 910 “BID” Form is no longer required; bidders are to fill out, sign/initial, as applicable, and return page 7.
The Jacket Number 424-134 and bid opening date must be specified in the subject line of the e-mailed bid submission. Bids received after 11:00 AM EST on the bid opening date specified above will not be considered for award.
For information regarding the solicitation requirements prior to award please email Dalton Everett at deeverett@gpo.gov. For contract administration after award, contact APS DC at 202-512-0078.
Additional e-mailed Bid Submission Provisions:
The Government will not be responsible for any failure attributable to the transmission or receipt of the e-mailed bid including, but not limited to, the following—
(1) Emails over 75 MB may not be received by GPO due to size limitations for receiving emails.
(2) The vendor’s email provider may have different size limitations for sending e-mail, however vendors are advised not to exceed GPO’s stated limit.
(3) Illegibility of bid.
(4) When the email bid is received by GPO it will remain unopened until the specified bid opening time.
Government personnel will not validate receipt of the e-mailed bid prior to bid opening. GPO will use the prevailing time (specified as the local time zone) and the exact time that the e-mail is received by GPO’s email server as the official time stamp for bid receipt at the specified location.
GPO CONTRACT TERMS: Any contract which results from this Invitation for Bid will be subject to the applicable provisions, clauses, and supplemental specifications of GPO Contract Terms (GPO Publication 310.2, effective December 1, 1987 (Rev. 01-18)) and GPO Contract Terms, Quality Assurance Through Attributes Program for Printing and Binding (GPO Publication 310.1, effective May 1979 (revised 9-19)).
GPO QATAP (GPO Publication 310.1) – https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/qatap-rev-09-19.pdf
SPECIFICATIONS WILL APPLY EQUALLY TO ALL ITEMS EXCEPT AS NOTED HEREIN.
PRODUCT: School Breakfast Photo Props FNS-3M.
TITLE: School Breakfast Photo Props
QUANTITY: 40,000 Sets of a 40 Photo Prop Set = 1,600,000 Total Props, 50 QARC’s Plus 1 Digital Deliverable.
PAGES: 40 Face Only Pages
TRIM SIZE: 8-1/2” x 11” and 11” x 8-1/2”
Page 2 of 7 Jacket 424-134
GOVERNMENT TO FURNISH:
One (1) Adobe Acrobat PDF file for each School Breakfast Photo Prop. NOTE: Two props share a page but should be printed individually. PAGE 33: “Milk Mustache” prop plus a Sign prop.
GPO Form 892 (R. 12/17) Proofs GPO Form 2678 (departmental random copies-blue label).
GPO Form 917 (Certificate of Selection).
GPO Form 915 (Business Reply Label).
GPO Form 2686 QARC Random copies sampling & shipping instructions.
Contractor to download the “Labeling and Marking Specifications” form (GPO Form 905, R. 7-15) from gpo.gov, fill in appropriate blanks, and attach to shipping containers.
DIGITAL DELIVERABLE: Upon completion, the contractor must furnish one CD-R with final production files converted to a single simple Acrobat PDF file "Optimized for Press" with proper color mode. CD-R disc must be ISO 9660 compliant.
CONTRACTOR TO FURNISH: All materials and operations, other than those listed under "Government to Furnish," necessary to produce the product(s) in accordance with these specifications.
ELECTRONIC PREPRESS: Prior to image processing, the contractor shall perform a basic check (preflight) of the furnished media and publishing files to assure correct output of the required reproduction image. Any errors, media damage, or data corruption that might interfere with proper file image processing must be reported to the contract administrator.
The contractor shall create or change any necessary trapping, set proper screen angles and screen frequency, and define file output selection for the imaging device being utilized. Furnished files must be imaged as necessary to meet the assigned quality level.
E-MAIL PROOFS (indicate margins): CONTRACTOR MUST NOT PRINT PRIOR TO RECEIVING AN "OK TO PRINT". One set of E-Mailed Electronic Page Proofs. Contractor to submit one "Press Quality" PDF "soft" proof (for content only) using the same Raster Image Processor (RIP) that will be used to produce the final printed product. PDF proof will be evaluated for text flow, image position, and color breaks. Proof will not be used for color match. E-Mailed proofs (marked with Jacket/Req. Number plus return name and E-Mail address) directly to the Agency at gionne.johnsonjones@usda.gov. Contractor must call GPO Contract Compliance Section at (202) 512-0520 or email compliance@gpo.gov immediately upon E-Mailing proofs and immediately upon receiving the returned proofs (or OK E-Mail) back from the Department. Proofs will be withheld not more than (2) workdays from receipt at the Department to receipt in the contractor's plant. AFTER EMAIL PROOF APPROVAL
AFTER EMAIL PROOF APPROVAL
Two (2) sets of inkjet proofs that are G7 profiled and use pigment-based inks. A proofing RIP that provides an option for high quality color matching (such as Device Links Technology and/or ICC Profiles Technology), and meets or exceeds industry tolerance to ISO 12647-7 Standard for Graphic Technology (as of 3/19/09, and future amendments) must be utilized plus GRACoL 2006 Coated #1 specifications (CGATS TR006) must be achieved.
Output must be a minimum of 720 x 720 dpi on a GRACoL or SWOP certified proofing media.
Proofs must contain color control bars (such as Brunner, GATF, GRETAG, or RIT) for each color of ink on the sheet. Control bars must be placed parallel to the press’s ink rollers and must show areas consisting of minimum 1/8 x 1/8” solid color patches; tint patches of 25, 50 and 75%; dot gain scale; and gray balance patches for process color (if applicable). These areas must be repeated consecutively across the sheet.
The make and model number of the proofing system utilized shall be furnished with the proofs. These proofs must contain all elements, be in press configuration, and indicate margins. Proofs will be used for color match on press.
Direct to plate must be used to produce the final product with a minimum of 2400 x 2400 dpi.
Page 3 of 7 Jacket 424-134
Send proofs together with the furnished media (copy, electronic files) directly to: Gionne Jones, Upper Marlboro, MD 20772 (Complete address to be provided after award). Contractor must call GPO Contract Compliance Section at 202512-0520, or e-mail information to compliance@gpo.gov immediately upon sending/delivering proofs and immediately upon notification that the proofs are available for pickup at the department. Proofs will be withheld not more than (3) workdays from receipt in the department to when they are made available for pickup at the department. CONTRACTOR MUST NOT PRINT PRIOR TO RECEIVING AN "OK TO PRINT". Contractor to provide return shipping label if one proof needs to be returned.
PRIOR TOP RODUCTIONSAMPLES Prior to the commencement of production of the contract production quantity, the contractor shall submit Three sets of (3) samples to: One sample, proof approval sheet, and return label to: Gionne Jones ((240) 486-3737), Upper Marlboro, MD 20772, One sample to: Sandy Davila ((787) 949- 8131), Clarksville, TN 37042 and One sample to: Evelyn Garcia ((703) 593-2190), Leesburg, VA 20176. (complete *residential addresses to be provided after award).
Samples will be tested for conformance of materials and for construction. Each sample must be constructed as specified using the form, materials, equipment, and methods of production, which will be used in producing the final product. All samples shall be manufactured at the facilities in which the contract production quantities are to be manufactured.
Samples will be inspected and tested and must comply with the specifications in all respects. The container and accompanying documentation shall be marked PREPRODUCTION SAMPLES and shall include the GPO jacket, and purchase order. The samples must be submitted in sufficient time to allow Government testing of the samples and production and shipment in accordance with the shipping schedule.
The Government will approve, conditionally approve, or disapprove the samples within (5) workdays of the receipt thereof. Approval or conditional approval shall not relieve the contractor from complying with the specifications and all other terms and conditions of the contract. A conditional approval shall state any further action required by the contractor. A notice of disapproval shall state the reasons therefor.
If the samples are disapproved by the Government, the Government, at its option, may require the contractor to submit additional samples for inspection and test, in the time and under the terms and conditions specified in the notice of rejection. Such additional samples shall be furnished, and necessary changes made, at no additional cost to the Government and with no extension in the shipping schedule. The Government will require the time specified above to inspect and test any additional samples required.
In the event the additional samples are disapproved by the Government, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause in which event this contract shall be subject to termination for default, provided however, that the failure of the Government to terminate the contract for default in such event shall not relieve the contractor of the responsibility to deliver the contract quantities in accordance with the shipping schedule.
In the event the Government fails to approve, conditionally approve, or disapprove the samples within the time specified, the Contracting Officer shall automatically extend the shipping schedule in accordance with Contract Clause 12, "Notice of Compliance With Schedules," of GPO Contract Terms (GPO Publication 310.2, effective December 1, 1987 (Rev. 01-18)).
Manufacture of the final product prior to approval of the sample submitted is at the contractor's risk. Samples will not be returned to the contractor. All costs, including the costs of all samples shall be included in the contract price for the production quantity.
All samples shall be manufactured at the facilities in which the contract production quantities are to be manufactured
STOCK/PAPER: The specifications of all paper furnished must be in accordance with those listed herein or listed for the corresponding JCP Code numbers in the “Government Paper Specification Standards No. 13” dated September 2019. https://www.gpo.gov/docs/default-source/forms-standards-pdf-files/vol_13..PDF.
Page 4 of 7 Jacket 424-134
JCP Code* L50, White Matte-Coated Cover, Basis Size 20 X 26" 100 lbs.
NOTE: All stock used must be uniform in shade.
PRINTING: DIGITAL PRINTING IS NOT ACCEPTABLE.
Props print face only with type/rule matter, solids, tints, and illustrations, in 4-color process with some type reversing out to appear white.
INK: 4-Color Process
MARGINS: Follow electronic files/Inadequate Gripper
BINDING: Trim four sides. Die-cut each prop to irregular shape per file setup. See Attachment for visual of random die-cutting requirements.
COLLATING: Collate in order, 40 different Breakfast Photo Props Per Set.
PACKING: Package each set of photo props into appropriately sized envelope with chipboard inserted to keep envelope flat. (Do not shrink wrap photo props). Place Label/Sticker (provided by printer) to outside of each envelope. Print on Label/Sticker: School Breakfast Photo Props FNS 936 ** DO NOT BEND**
Pack packages in cartons suitable to prevent shifting of or damage to materials. Do not shrink wrap contents.
Label and identify shipping containers with GPO Jacket, name of publication, FNS number (FNS 936), approximate number of packages per box.
Pallets must be in good condition and 48" x 40" with opening for fork lift on the 48" side. Pallets to be stacked no more than 42-56" high, not to exceed 2,000 lbs. and must include corrugated cardboard corner protectors.
LABELING AND MARKING (package and/or container label): Reproduce shipping container label from furnished repro, fill in appropriate blanks and attach to shipping containers.
REQUISITION: 3-01105
JACKET NO.: 424-134
QUANTITY: __________
NUMBER OF BOXES: EX. Box 1 of 4, Box 2 of 4...
Cartons must be labeled correctly. Mislabeled cartons will be returned for correction at the contractor’s expense.
QUALITY ASSURANCE LEVELS AND STANDARDS: The following levels and standards shall apply to these specifications:
Product Quality Levels:
(a) Printing Attributes -- Level II.
(b) Finishing Attributes -- Level II.
Inspection Levels (from ANSI/ASQC Z1.4):
(a) Non-destructive Tests -- General Inspection Level I.
(b) Destructive Tests -- Special Inspection Level S-2.
Specified Standards: The specified standards for the attributes requiring them shall be:
Attribute Specified Standard P-7. Type Quality and Uniformity Approved Proofs/Electronic File P-10. Process Color Match Approved Proofs/ Furnished Electronic File
QUALITY ASSURANCE RANDOM COPIES: In addition to the Departmental Random Copies (Blue Label), the contractor may be required to submit quality assurance random copies to test for compliance against
Page 5 of 7 Jacket 424-134 specifications. The purchase order/specifications will indicate the number required, if any. When ordered, the contractor must divide the entire order into equal sublots and select a copy from a different general area of each sublot.
The contractor will be required to execute a statement furnished by GPO certifying that copies were selected as directed. Copies will be paid for at the running rate offered in the contractor's bid and their cost will not be a consideration for award. A copy of the purchase order/specifications must be included.
Business Reply Mail labels will be furnished for mailing the quality assurance random copies. The copies are to be mailed at the same time as the first scheduled shipment. A U.S. Postal Service approved Certificate of Mailing, identified by Jacket and Purchase Order numbers, must be furnished with billing as evidence of mailing.
DISTRIBUTION: Deliver F.O.B. Destination.
Contractor must notify the ordering agency on the same day that the product ships/delivers via e-mail sent to karen.lewis@usda.gov. The subject line of this message shall be Distribution Notice for Jacket 424-134, Req. No.
3-01105. The notice must provide all applicable tracking numbers, shipping method, and Title. Contractor must be able to provide copies of all delivery, mailing, and shipping receipts upon agency request.
Deliver one (1) digital deliverable and 40,000 Sets of a 40 Photo Prop Set = 1,600,000 Total Props (Includes 200 Departmental Random Blue Label Copies of each die-cut photo props) to: US Government Publishing Office, Laurel Publications Distribution Center, TEAM NUTRITION C/O RECEIVING – USDA FNS-936, 8660 Cherry Lane, Ste #32, Laurel, MD 20707 Phone: 202-512-1401, Email: laurelpdc2@gpo.gov. NOTE: TEAM
NUTRITION MUST BE IN BOLD AND CAPS.
NOTE: ** Notify Sandy Davila, sandy.davila@usda.gov at FNS and GPO Warehouse, laurelpdc2@gpo.gov (5) business days prior to delivery date.
Deliver die cut molds to: (*Residential address), Leesburg, VA 20176, Attention: Evelyn Garcia ((703) 593- 2190). *Complete address to be provided after award.
Note: For the "Blue Label" Copies -- A copy of the Government furnished certificate (GPO Form 917) must accompany the voucher sent to GPO, Financial Management Service, for payment. Failure to furnish the certificate may result in delay in processing the voucher. NOTE: Form is also available at https://www.gpo.gov/pdfs/vendors/sfas/Form917.pdf
All expenses incidental to returning materials, submitting proofs, and furnishing sample copies must be borne by the contractor.
SCHEDULE: The purchase order and GFM will be available via e-mail, GPO File Sharing, or contractor's FTP site on January 19, 2023. Deliver complete by February 20, 2023.
Unscheduled material such as shipping documents, receipts or instructions, delivery lists, labels, etc., will be furnished with the order or shortly thereafter. In the event such information is not received in due time, the contractor will not be relieved of any responsibility in meeting the shipping schedule because of failure to request such information. Submit proofs as soon as the contractor deems necessary in order to comply with the shipping schedule.
OFFERS: Offers must include the cost of all materials and operations for the total quantity ordered in accordance with these specifications. A price must be submitted for each additional 1,000 assembled sets. The price for additional quantities must be based on a continuing run, exclusive of all basic or preliminary charges and will not be a factor for determination of award.
PREAWARD SURVEY: In order to determine the responsibility of the prime contractor or any subcontractor, the Government reserves the right to conduct an on-site pre-award survey at the contractor's/subcontractor's facility or to require other evidence of technical, production, managerial, financial, and similar abilities to perform, prior to the award of a contract. As part of the financial determination, the contractor in line for award may be required to provide one or more of the following financial documents:
Page 6 of 7 Jacket 424-134
1) Most recent profit and loss statement
2) Most recent balance sheet
3) Statement of cash flows
4) Current official bank statement
5) Current lines of credit (with amounts available)
6) Letter of commitment from paper supplier(s)
7) Letter of commitment from any subcontractor
The documents will be reviewed to validate that adequate financial resources are available to perform the contract requirements. Documents submitted will be kept confidential, and used only for the determination of responsibility by the Government. Failure to provide the requested information in the time specified by the Government may result in the Contracting Officer not having adequate information to reach an affirmative determination of responsibility.
PAYMENT: Submitting invoices for payment via the GPO fax gateway (if no samples are required) utilizing the GPO barcode coversheet program application is the most efficient method of invoicing.
Instruction for using this method can be found at the following web address:
http://winapps.access.gpo.gov/fms/vouchers/barcode/instructions.html
Invoices may also be mailed to: U.S. Government Publishing Office, Office of Financial Management, Attn:
Comptroller, Stop: FMCE, Washington, DC 20401.
For more information about the billing process refer to the General Information of the Office of Finance web page located at https://www.gpo.gov/how-to-work-with-us/vendors/how-to-get-paid
Page 7 of 7 Jacket 424-134
JACKET NUMBER BID PRICE: ADDITIONAL/M
Jacket 424-134 $________________ $________________
DISCOUNTS: Discounts are offered for payment as follows: ____________ Percent, ___________calendar days.
See Article 12 “Discounts” of Solicitation Provisions in GPO Contract Terms (Publication 310.2).
AMENDMENT(S): Bidder hereby acknowledges amendment(s) number(ed) ______________
BID ACCEPTANCE PERIOD: In compliance with the above, the undersigned agree, if this bid is accepted within____________ calendar days (60 calendar days unless a different period is inserted by the bidder) from the date for receipt of bids, to furnish the specified items at the price set opposite each item, delivered at the designated points(s), in exact accordance with specifications.
NOTE: Failure to provide a 60-day bid acceptance period may result in expiration of the bid prior to award.
BIDDER’S NAME AND SIGNATURE: Unless specific written exception is taken, the bidder, by signing and submitting a bid, agrees with and accepts responsibility for all certifications and representations as required by the solicitation and GPO Contract Terms - Publication 310.2. When responding by fax or mail, fill out and return one copy.
Bidder
(Contractor Name) (GPO Contractor’s Code)
(Street Address)
(City – State – Zip Code)
By (Printed Name, and Title of Person Authorized to Sign this Bid)
(Signature) (Date)
(Telephone Number) (Email Address)
Contracting Officer Review: __________Date: __________ Certifier: __________Date:________ (Initials) (Initials)
File details come from the government source that posted it. Updated .