PROJECT SPECIFICATIONS

DMVA PROJECT NO. 42160083

For

FTIG-CONSTRUCT BUILDING FOR RANGE MAINTENANCE

AREA-24, FORT INDIANTOWN GAP

ANNVILLE, LEBANON COUNTY, PENNSYLVANIA 17003

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF MILITARY AND VETERANS’ AFFAIRS

HARRISBURG, PENNSYLVANIA

Josh Shapiro, GOVERNOR Major General John R. Pippy, THE ADJUTANT GENERAL

Date: 30 MAY 2025

DESIGN PROFESSIONALS

Office of Facilities and Engineering

Bureau of Design and Project Management Bldg. 0-10, Chapel Road, Ft. Indiantown Gap

Annville, Lebanon County, Pa. 17003 Phone: (717) 861-9748 Fax: (717) 861-8583

DMVA Project#: 42160083 0000002 - 1 FTIG-Construct Building for Range Maintenance

0000002 - DRAWING INDEX

The drawings which form a part of this project are indicated in the following list.

NUMBER DRAWING TITLE

G.1.0 COVER SHEET

G.1.1 ABBREVIATIONS, SYMBOLS AND NOTES

C.1.0 EXISTING SITE PLAN

C.2.0 NEW FACILITY SITE/E&S PLAN

C.2.1 NOTES & DETAILS

A.1.1 PROPOSED FLOOR PLAN

A.1.2 DIMENSIONED FLOOR PLAN

A.1.3 REFLECTED CEILING PLAN

A.2.1 EXTERIOR ELEVATIONS

A.3.1 ENLARGED PLANS & DETAILS

A.4.1 SCHEDULES, NOTES & DETAILS

S.1.1 FOUNDATION PLAN

S.2.1 ROOF PLAN & DETAILS

S.3.1 SECTIONS & DETAILS

S.4.1 NOTES & DETAILS

H.1.1 HVAC FLOOR PLAN

H.2.1 HVAC SCHEDULES

H.3.1 HVAC SCHEDULES & DETAILS

P.1.1 PLUMBING PLANS AND DETAILS

p.1.2 PLUMBING PLANS AND DETAILS

E.1.1 ELECTRICAL SITE PLAN

E.2.1 ELECTRICAL PLANS

E.3.1 SCHEDULES AND DETAILS

E.4.1 RISER DIAGRAM

E.5.1 PANEL SCHEDULES

The above is an exact list of the drawings included under DMVA Project No. 42160083 and shall be considered a part thereof.

As the work progresses, the Bureau of Design and Project Management may furnish supplemental drawings that may be required for further illustrating details of the work. However, these supplemental drawings will not include the shop drawings, all of which are to be prepared by the Contractor and submitted as hereinafter specified for approval before the work is started.

DMVA Project#: 42160083 0000003 1

TABLE OF CONTENTS

SECTION TITLE

DIVISION 01 GENERAL REQUIREMENTS

Section 010100 Summary of Work Section 010400 Coordination and Control Section 013100 Sequence of Construction & Milestones Section 013300 Submittals Section 017700 Closeout Procedures Section 017823 Operation and Maintenance Data Section 017839 Project Record Documents

GENERAL CONSTRUCTION (.1)

DIVISION 03 CONCRETE

Section 033000 Cast-In-Place Concrete

DIVISION 04 MASONRY

Section 042000 Concrete Unit Masonry

DIVISION 05 METALS

Section 054000 Load Bearing Metal Framing Section 055119 Metal Stairs Section 055213 Pipe and Tube Railings

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

Section 061053 Miscellaneous Rough Carpentry Section 061600 Sheathing

DIVISION 07 THERMAL AND MOISTURE PROTECTION

Section 072100 Thermal Insulation Section 074113 Metal Roof Panels Section 076200 Sheet Metal Flashing and Trim Section 077100 Gutters and Downspouts Section 079200 Joint Sealants

DIVISION 08 OPENINGS

Section 081113 Metal Doors and Frames Section 083323 Overhead Coiling Doors Section 085113 Aluminum Windows Section 087111 Door Hardware Section 088000 Glazing

DIVISION 09 FINISHES

Section 092216 Non-Structural Metal Framing Section 092900 Gypsum Board Section 095123 Acoustical Tile Ceilings

DMVA Project#: 42160083 0000003 2

Section 097200 Fiberglass Reinforcement Panels Section 099113 Exterior Painting Section 099123 Interior Painting Section 099600 Epoxy Floor Coatings

DIVISION 10 SPECIALTIES

Section 101400 Signage Section 102113 Toilet Compartments Section 102800 Toilet Room Accessories Section 104413 Fire Extinguisher Cabinets Section 104416 Fire Extinguishers

DIVISION 11 EQUIPMENT

Section 111313 Dock Bumpers

DIVISION 12 FURNISHINGS

Section 123530 Casework Section 123623.13 Laminate Countertops

DIVISION 13 SPECIAL CONSTRUCTION

Section 133419 Pre-Engineered Metal Buildings (PEMB)

DIVISION 31 EARTHWORK

Section 311000 Site Clearing Section 312000 Earth Moving

DIVISION 32 EXTERIOR IMPROVEMENTS

Section 321216 Asphatl Paving Section 323113 Chain-Link Fences and Gates Section 329200 Turf and Grasses

HVAC CONSTRUCTION (.2)

DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING

Section 230500 Common Work Results for HVAC Section 230510 HVAC Electrical Equipment and Wiring Requirements Section 230515 HVAC Piping, Materials, Equipment Section 230520 HVAC Specialties Section 230553 Mechanical Identification Section 230590 Testing, Adjusting and Balancing for HVAC Section 230713 HVAC Duct Insulation Section 233110 Ductwork, Accessories, and Sheetmetal Section 233423 HVAC POWER VENTILATORS Section 233710 Air Inlets and Outlets Section 235400 Furnaces Section 238126 Split-System Air-Conditioners

DMVA Project#: 42160083 0000003 3

PLUMBING CONSTRUCTION (.3)

DIVISION 22 PLUMBING

Section 220500 Common Work Results for Plumbing Section 221110 Plumbing Piping Section 221310 Plumbing Specialties Section 221316 Sanitary Waste and Vent Piping Section 223300 Electric Point of Use Water Heaters Section 224000 Plumbing Fixtures

ELECTRICAL CONSTRUCTION (.4)

DIVISION 26 ELECTRICAL

Section 260500 Common Work Results for Electrical Section 260510 Electrical Equipment Wiring Section 260519 Low-Voltage Electrical Power Conductors & Cables Section 260526 Grounding & Bonding for Electrical Systems Section 260529 Hangers & Supports for Electrical Systems Section 260533 Raceways & Boxes for Electrical Systems Section 260553 Identification for Electrical Systems Section 260573 Overcurrent Protective Device Coordination Study Section 260923 Lighting Control Devices Section 262416 Panelboards Section 262713 Electricity Metering Section 262726 Wiring Devices Section 262813 Fuses Section 262816 Enclosed Switches and Circuit Breakers Section 265119 LED Interior Lighting

DIVISION 27 COMMUNICATIONS

Section 270500 Common Work Results for Communications Section 271300 Communications Backbone Cabling Section 271500 Communications Horizontal Cabling

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

Section 283111 Digital, Addressable Fire-Alarm System

DMVA Project#: 42160083 010100 - 1

Ed SECTION 010100

SUMMARY OF WORK

PART 1 – GENERAL

1.1 STIPULATIONS

A. The specifications “General Conditions of the Construction Contract”, “Special Conditions” and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.3 SCOPE OF WORK, GENERAL

A. The work under this Contract shall generally consist of, but not necessarily be limited to, providing all labor, material, devices, tools and equipment required for the complete new construction of an 8,000 SQFT Pre-engineered Metal Building (PEMB) for Range Maintenance located in area 24 and shall be in total accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents.

1.4 PERFORMANCE PERIOD

A. Three Hundred and Sixty-Five (365) calendar days from Government granted Notice to Proceed.

1.5 WAGE SCALES

A. Wage Scales ARE REQUIRED to be paid on this Project.

1.6 QUESTIONS DURING BID PROCESS.

A. Direct all questions pertaining to the project as shown and described in the contract documents to both persons listed below.

Josh Kahl DMVA, Bureau of Military Construction & Engineering Bldg. 0-10, Fort Indiantown Gap Annville, PA 17003 Email: jkahl@pa.gov Ph.: 610-698-6511 Fax: 717.861.8683

DMVA Project#: 42160083 010100 - 2

Tina Rebuck Department of Military and Veterans Affairs State Contracting Office Building 0-47, Fort Indiantown Gap Annville, PA 17003 Email: trebuck@pa.gov Ph.: 717. 861.8794

B. Should the contractor submit an RFI via email, the subject line shall appear as follows:

1. DMVA Project#: 42160083_ FTIG-Construct Building for Range Maintenance

2. Additional information can be included thereafter.

1.7 SUBMITTALS

A. See individual Sections and “SCHEDULE OF MATERIAL SUBMITTALS (AF FORM 66)” included within the project Design Documents

B. Submittals shall be forwarded to Department of Military & Veteran’s Affairs; Division of Engineering and Architecture, Building 0-10, Fort Indiantown Gap, Annville, Pa 17003

C. Each submittal shall include the following:

1. Project number

2. Contract number

3. Related specification section

4. Contractor’s approval stamp

5. Contractors initials and date

6. Area for DMVA-BMCE review stamp

D. All submittals must be approved by the discipline responsible, DMVA-BMCE Design Professional prior to incorporation into the project.

1.8 REQUIRED WARRANTIES

A. Contractor shall provide all required warranties as outlined within the Project Design Specifications and on all included Government AF Form 66’s.

PART 2 – OUTLINE OF REQUIRED WORK

2.1 The work of this project consists of but is not necessarily limited to the following. Detailed requirements of the work are described on the pertinent specification sections and/or shown on the drawings.

A. (GENERAL – POINT 1)

1. Prepare and submit all necessary pre-construction documentation as outlined within the project Design Documents.

2. Outline individual construction tasks/milestones.

3. Excavate/prepare site.

4. Construct/Install all foundation aspects.

DMVA Project#: 42160083 010100 - 3

5. Erect pre-fabricated metal building and all associated items.

6. Install all exterior facility features, to include but not limited to, fencing, pavement, concrete aprons and sidewalks, etc. as depicted within the Project Design Documents.

7. Install all interior facility features, to include but not limited to, stud walls, doors, windows, flooring, ceilings, etc. as depicted within the Project Design Documents.

9. Complete Punch Lists and Final Cleaning.

10. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

B. (HVAC – POINT 2)

1. Prepare and submit all necessary pre-construction documentation as outlined within the project Design Documents.

2. Outline individual construction tasks/milestones.

3. Provide HVAC system including ductwork, diffusers and grilles, gas fired split system DX equipment for office area.

4. Provide gas fired unit heaters in wood shop and machine shop and gas fired radiant tube heaters in assembly area.

5. Provide articulating weld exhaust arms, fan, and filter in small projects area.

6. Provide compressed air distribution throughout building.

7. Provide mini split air conditioning in IT closet and mezzanine tool storage area.

8. Provide dust collection systems for wood shop.

9. Complete Punch Lists and Final Cleaning.

10. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

C. (PLUMBING – POINT 3)

1. Prepare and submit all necessary pre-construction documentation as outlined within the project Design Documents.

2. Outline individual construction tasks/milestones.

3. Install all required under-slab sanitary piping to 5ft outside of facility.

4. Install all required under-slab domestic water piping to 5ft outside of facility.

5. Provide all plumbing rough-in piping.

6. Install all plumbing fixtures and equipment per project design documents.

7. Connect all fixtures and equipment to associated water, waste and vent piping.

8. Flush/clean water distribution system.

9. Complete Punch Lists and Final Cleaning.

10. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

D. (ELECTRICAL – POINT 4)

1. Prepare and submit all necessary pre-construction documentation as outlined within the project Design Documents.

2. Outline individual construction tasks/milestones.

DMVA Project#: 42160083 010100 - 4

3. Provide all conduit rough-ins, to include power lighting, data, fire alarm system, and equipment (all over head).

4. Provide panel rough-ins (all over head).

5. Provide all conductors and pull wiring.

6. Provide all lighting and controls.

7. Provide all outlets, receptacles, disconnect switches, contactors, and controls.

8. Provide all terminations, testing, and associated reports.

9. Provide all grounding and bonding, to include ground rods and underground cabling.

10. Provide all panelboards and circuit breakers as depicted, to include all terminations.

11. Provide all equipment connections, to include electrical, plumbing, HVAC, and special equipment.

12. Provide all trenching and exterior conduit placement, to include backfilling, etc.

13. Provide all data equipment, CAT6 cables, fiber, terminations, testing, racks, patch panels, and all associated equipment and reports.

14. Provide all fire alarm system components, wire, test, and program.

15. Complete Punch Lists and Final Cleaning.

16. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

END OF SECTION 010100

DMVA Project#: 42160083 011200 - 1

SECTION 011200

COORDINATION AND CONTROL

PART 1 - GENERAL

1.1 STIPULATIONS

A. The General Conditions, drawings and all other attached documents form a part of this Section and all other Sections by reference thereto and have the same force and effect as if printed herewith in full. The Contractor shall be strictly accountable for the cognizance of carrying out the provisions thereof.

1.2 SUMMARY

A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls that govern the performance of the work to complete this project.

B. Specific requirements for work of each contract are also indicated in individual Specification Sections and on Drawings.

1.3 PRIME CONTRACTS FOR CONSTRUCTION

A. Point 1 – General Contractor

1.4 WORK HOURS

A. Regular work hours will be Monday through Friday, 7:00 am to 4:30 pm.

B. Holidays: No work will be allowed on holidays observed by the State and Federal Government.

C. Weekends: No work will be allowed on weekends.

D. Exceptions: If deemed necessary, exceptions to the above can be made. Prime Contractors must submit, in writing, justification for such an exception and approval from the Department must be obtained prior to commencement of any work.

1. Fort Indiantown Gap: Any and all work that takes place outside of the working hours as listed herein, shall be coordinated with the DMVA-FTIG Construction Manager. Contractor(s) performing work on approved dates shall submit, in writing, a list of all employees that will be on site for the days approved. This list of employees will be submitted to the Fort Indiantown Gap Police Dept. by the DMVA-FTIG Construction Manager.

1.5 COORDINATION

A. The General Contractor shall be responsible for coordination between all contracts.

1. Construction operations shall be coordinated to ensure efficient and orderly installation of each part of the work.

DMVA Project#: 42160083 011200 - 2

2. Coordinate installation of different components with other Contractors to ensure accessibility for required construction operations.

3. Make necessary provisions to accommodate items scheduled for later installation.

PART 2 - TEMPORARY FACILITIES AND EQUIPMENT

2.1 GENERAL

A. It shall be the responsibility of the Contractor to provide, maintain, and remove all facilities and equipment necessary for construction operations for individual Contracts. All restoration required due to contract operations, shall be the responsibility of each individual Contractor for his location/area of operation, at no expense to the Department. Where there is conflict with responsibility, the General Contractor shall be responsible for restoration, at no cost to the Department.

1. These items include, but are not limited to:

a. Costs and use charges associated with the facility.

b. Plug-in cords, power cords, and extension cords, power tools.

c. Task lighting and special lighting necessary for construction operations.

d. Storage and fabrication structures/areas.

e. Temporary enclosures for construction activities.

f. Hoisting equipment for construction activities.

g. Waste disposal facilities, including collection and legal disposal of its own waste materials.

h. Daily cleaning of work area.

i. Secure lockup of tools, materials, and equipment.

j. Construction aids, services, and facilities necessary for individual construction activities.

2.2 FIELD OFFICES

A. CONTRACTOR TRAILERS/OFFICES

1. The Prime Contractor(s) shall provide and maintain, at their cost, a suitable office on the premises.

Trailer/offices shall be located based on the either the staging area depicted on the Project Design Documents and/or the location determined during the Pre-Construction Coordination Meeting.

The Contractor shall provide and maintain all necessary services and utilities for their respective offices and/or trailers, to include, but not limited to; electrical services, sanitary and water services, heating and cooling, telephone/fax and internet services.

B. SANITARY FACILITIES

1. Portable Toilets (Porta Johns) – Contractor, at their costs, shall be responsible for providing and maintaining any and all temporary toilet facilities. Toilets are to be utilized by all persons (Contractors, Sub-Contractors, DMVA Personnel, etc.) associated with the project.

a. Cleaning, Pumping and Maintenance of the portable toilets shall be the responsibility of the General Contractor.

DMVA Project#: 42160083 011200 - 3

PART 3 - TEMPORARY SERVICES/UTILITIES DURING CONSTRUCTION

3.1 CONTRACTOR RESPONSIBILTIES

A. The Contractor shall be responsible for all temporary heating, cooling, ventilation, power, lighting and water/sewer. This shall include, unless otherwise indicated, utility-use charges, temporary meters, and temporary connections, necessary during construction operations.

B. The Contractor shall install, operate, protect and maintain the respective temporary services as specified herein during the duration of the entire project.

C. Temporary connections to new and/or existing permanent service lines shall be made at locations as directed by the Department, and when the temporary service lines are no longer required, they shall be removed by the Contractor. Any part or parts of the permanent service lines, grounds and building, disturbed and damaged by the installation and/or removal of the temporary service lines, shall be restored to their original condition by the Contractor responsible for the temporary installation.

D. If the Contractor fails to carry out its responsibility in supplying temporary services as set forth in this contract it is responsible for such failure and the Department may take such action as it deems proper for the protection and conduct of the work and shall deduct the cost involved from the amount due the Contractor. Only those temporary utilities required for construction need to be extended to the work area(s).

3.2 INTERRUPTION OF SERVICES

A. Contractor shall have all needed equipment and material to complete planned work at the site prior to shutting down any system.

B. No additional compensation or time will be given to the Contractor if work must be performed on State or National Holidays or on weekends or on overtime. See Paragraph 1.4 on ‘Working Hours’.

3.3 WELDING

A. Any Contractor using electrical power for welding on the site shall use self-contained engine generating units.

3.4 FIRE EXTINGUISHERS

A. Contractor shall provide UL listed, NFPA approved fire extinguishers (ten (10) lb. minimum) at the construction site during operations, suitable for all types of fires in accordance with OSHA.

END OF SECTION 011200

DMVA Project#: 42160083 013100 - 1

SECTION 013100

SEQUENCE OF CONSTRUCTION AND MILESTONES

Part 1 GENERAL

A. The specifications sections "General Conditions of Contract" and "General Requirements" form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 GENERAL REQUIREMENTS

A. Before beginning work, the Contractor will be required to prepare a schedule in consultation with the Department. The work must be carried out in full accordance with the schedule. The Contractor shall arrange without any unnecessary interference with the Institution’s operation.

1.3 CRITICAL MATERIALS AND EQUIPMENT

A. The Contractor is cautioned that all necessary and required critical materials and equipment shall be ordered as quickly as possible, in order that the shipping will not delay the progress of the work or completion of the project.

1.4 CRITICAL ITEMS TO BE NOTED AS MILESTONES

A. Refer to the General Conditions regarding construction progress Milestones to be established by the Lead Contractor.

B. Contractor shall submit a construction schedule, for the total project, including all prime contractors critical path work items. The schedule shall be submitted at the pre-construction meeting. The schedule will be reviewed and approved by the designer and the using agency to confirm compliance with construction sequencing and Using Agency training schedule.

1. GENERAL CONTRACTOR

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Site Clearing and E&S Measures

4) Excavation – Foundation

5) Excavation – Footer and Rainwater Drainage

6) Concrete – Foundation (Footers, Frostwalls, Piers, etc.)

7) Concrete - Floor Slab

8) P.E. Building Steel Erection

9) P.E. Building Roof Installation

10) P.E. Building Panel and Insulation Install

11) Gutters and Downspouts

12) Underground Electrical Rough-Ins to include trenching

13) 15KV Cable, Terminations and Testing

14) Transformer and Vault installation

15) Trench backfill, tamping up to rough-grade.

16) 15KV class work

17) Panel Rough-Ins

18) Branch Circuit Rough-Ins

DMVA Project#: 42160083 013100 - 2

19) Branch Circuit Wiring

20) Installation of Lighting

21) Installation of devices and outlets

22) Testing and Adjusting

23) Final Connections

24) Final Grading, Seeding

25) Final Cleaning, Puch List Items, Close-Out Documents

2. HVAC CONTRACTOR

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Outline individual construction tasks/milestones.

4) Install all required Office HVAC System including equipment, ductwork, diffusers, and grilles.

5) Install mini split systems in IT closet and tool room.

6) Install toilet room exhaust.

7) Install Wood Shop Dust Collectors.

8) Install wood shop dust collection duct systems.

9) Install shop unit heaters and radiant tube heaters.

10) Install assembly area circulation fans.

11) Install weld hood assemblies and fan & filter

12) Install HVAC control systems supplied by Johnson Controls.

13) Complete Punch Lists and Final Cleaning.

14) Provide all required closeout documentation and training per the Project Design

Documents prior to deeming/granting the project complete.

3. PLUMBING CONTRACTOR

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Outline individual construction tasks/milestones.

4) Install all required under-slab sanitary piping to 5ft outside of facility.

5) Install all required under-slab domestic water piping to 5ft outside of facility.

6) Provide all plumbing rough-in piping.

7) Install all plumbing fixtures and equipment per project design documents.

8) Connect all fixtures and equipment to associated water, waste and vent piping.

9) Flush/clean water distribution system.

10) Complete Punch Lists and Final Cleaning.

11) Provide all required closeout documentation and training per the Project Design

Documents prior to deeming/granting the project complete.

4. ELECTRICAL CONTRACTOR

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Grounding of footers and rebar

4) Grounding of building steel.

5) Exterior service entrance ground counterpoise.

6) Underground Electrical Rough-Ins (only exterior of the bldg allowed to be underground)

7) Trench backfill, tamping up to rough-grade.

DMVA Project#: 42160083 013100 - 3

8) Pole installation.

9) Panel Rough-Ins

10) Branch Circuit Rough-Ins

11) Branch Circuit and feeder wiring

12) Installation of Lighting

13) Installation of devices and outlets

14) Equipment connections

15) Data installation and testing

16) Fire alarm system wiring, testing, and programming

17) Testing and Adjusting

18) Final Connections

19) Final Cleaning, Puch List Items, Close-Out Documents

END OF SECTION 013100

DMVA Project#: 42160083 013000 - 1

SECTION 013000

SUBMITTALS

Part 1 GENERAL

A. The specifications sections "General Conditions of Contract" and "General Requirements" form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 SECTION INCLUDES/CONTENT

A. Included in this section of the specifications is a list of approvals required for all materials incorporated into the project. The Department reserves the right to require additional approvals if necessary. No material, equipment or supplies listed herein shall be incorporated into the work until the Contractor has obtained prior approval from the Department.

B. Submittals required by each prime contract are indicated within AF Form 66 “Schedule of Material Submittals” attached to the end of Section 01300.

1.3 SUBMITTAL PROCEDURES

A. Refer to ‘Submittals’ of the General Conditions.

B. Comply with the following or resubmission will be required:

1. Indicate contract number, specification section and building number (as shown on the drawings) on each item submitted.

2. Signify approval by stamp, initialing and dating each item prior to submission to the Professional.

C. Items requiring testing shall be forwarded directly to the approved laboratory. The Contractor shall pay all costs associated with testing.

D. Expedite critical materials, equipment and shop drawings, and other required submissions.

E. Incomplete submissions will be returned for resubmission.

F. Use of substitutions for materials or details shown on the contract drawings or called for in these specifications require written approval from the Department. See General Conditions.

1.4 PRODUCT DATA

A. Manufacturer's printed directions and manufacturer's standard specifications showing all dimensions, cuts, finishes, etc., as well as catalog cuts and ratings of all material will be required and shall be submitted in advance prior to application and/or installation.

1.5 TESTS

A. Refer to ‘Tests’ of the General Conditions.

B. Submit required reports listing items tested, tests conducted and results obtained as specified.

DMVA Project#: 42160083 013000 - 2

1.6 CERTIFICATIONS

A. Submit required certifications in written form identifying authorized representative, manufacturer, systems designer and other required data as specified.

1.7 WARRANTIES

A. Refer to Specifications for required warranties. Copies of proposed warranties specified for products shall accompany the designated submittal of that product.

1.8 OPERATION AND MAINTENANCE MANUALS

A. Manual Format (Use 3-ring binder):

1. Title page with the following information for each system covered:

a. Project Title and DMVA Contract Number (in capital letters)

b. Name of Company

c. Name of the individual to be called

d. Normal telephone numbers

e. Contractor's account number for project

2. Index listing all sections of the Manual.

3. Warranties for equipment furnished in contract. (Index tabbed)

4. Complete system circuit diagrams, block diagrams, copies of all approved shop drawings, which shall clearly illustrate how all the components relate and how they are interconnected and a point wiring diagram.

5. Reports, testing analysis.

6. Operating instructions and maintenance instructions for all equipment and finish materials furnished.

1.9 SUBMITTALS LIST

A. See attached AF FORM 66 “Schedule of Material Submittals” organized by prime contract.

END OF SECTION 013000

AF FORM 66, OCT 89 (COMPUTER GENERATED) PREVIOUS EDITION WILL BE USED

SCHEDULE OF MATERIAL SUBMITTALS

General (.1) - Civil Submittals

PROJECT NUMBER

42160083

PROJECT TITLE

FIG-Construct Building for Range Maintenance

TO BE COMPLETED BY PROJECT ENGINEER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

EQ

U

IR

ED

S

U B

M

IS

SI

O

N

D A

TE

TE

R

EC

EI

V

ED

IN

C

N

TR

A

CT

G

TE

T

O C

IV

IL

EN

IN

EE

R

ET

U R

N S

U

SP

EN

SE

D

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V

L

REMARKS

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

CE

SH

P D

R A

W

IN

G S

SA

M

PL

ES

LO

R

S

EL

EC

TI

M

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TY

TA

LO

G D

TA

PE

R A

TI

ST

R U

C

TI

O N

S

R ep or ts at ch S lip s

St ee l C er tif ic at io ns

APPROVED

DIS-

1 312000 Aggregate PENNDOT Certificates

1 1 1 IJC

+10

A,B

2 312000 Laboratory & Placed Compaction results of utility trenches, select fill & aggregate

1 1 IJC

+10

WC

+3

A,B

3 329200 – Seed mix, Fertilizer, straw or matting

1 1 Com

4 Exterior Waterline Pipe, fittings, valves, etc…

1 1 1 IJC

+10

WC

+3

A, B

5 Sanitary Manhole, Manhole cover, pipe, fittings, etc…

1 1 1 1 IJC

+10

WC

AF FORM 66, OCT 89 (COMPUTER GENERATED) PREVIOUS EDITION WILL BE USED

General (.1) - Civil Submittals

PROJECT NUMBER

42160083

PROJECT TITLE

FIG-Construct Building for Range Maintenance

N

E N

U M

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O C

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O N

S

R ep or ts at ch S lip s

St ee l C er tif ic at io ns

A. No deviations, substitutions or changes of materials, to be incorporated into this project, shall be made after approval by the Department, except for written direction by and the approval of the manufacturer of a specific item and re-approval by the Department.

B. The Department retains the right to require additional items not specifically denoted to be submitted for approval and/or additional clarification.

AF FORM 66, OCT 89 (COMPUTER GENERATED) PREVIOUS EDITION WILL BE USED 1 of 3

(POINT 1 - GENERAL)

PROJECT NUMBER

42160083

PROJECT TITLE

FTIG-Construct Building for Range Maintenance

N

E N

U M

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

(DWG’s.) SPEC SECTION

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O C

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

S-

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

LS

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

033000 Stone Base

X

NTP

+30

033000 Rebar & WWF

Concrete/Mix Designs

Vapor Barrier

042000 Unit Masonry

+45

055000 Metal Fabrications

X X X

+90

061053 Misc. Rough Carpentry

061600 Sheathing

072100 Thermal Insulation

074113 Mtl. Roof Panels

X X X X X X X

074219 Mtl. Wall Panels

X X X X X X X

075423 Rigid Insulation

X X

X X X X X

075423 Mtl. Flashing & Trim

X X X X X X X X X

AF FORM 66, OCT 89 (COMPUTER GENERATED) PREVIOUS EDITION WILL BE USED 2 of 3

(POINT 1 - GENERAL)

PROJECT NUMBER

42160083

PROJECT TITLE

N

E N

U M

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O C

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

078446 Fire Resistive Joint Systems

X X X X

079200 Joint Sealants

081113 Mtl Door & Frames

X X

X X X X X

083323 OH Coiling Door

X X X

X X X X X

087111 Door Hardware

+90

085113 Aluminum Windows

X

NTP

+90

088000 Glazing

X X X X X X

NTP

+90

092216 N.S. Mtl. Framing

X X

X X X

092900 Gypsum Board

+90

095123 Ceiling Grid System

+90

095123 Ac. Ceiling Tile

+90

096519 Vinyl Wall Base

+90

097200 Wall Coverings

AF FORM 66, OCT 89 (COMPUTER GENERATED) PREVIOUS EDITION WILL BE USED 3 of 3

(POINT 1 - GENERAL)

PROJECT NUMBER

42160083

PROJECT TITLE

N

E N

U M

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O C

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

099113 Exterior Primer & Paint

X X X X X X NTP

+90

099123 Interior Primer & Paint

X X X X X X NTP

+90

101400 Interior Signage

X X X X X X X X NTP

+90

102113 Toilet Compartments

X X X X X X X X NTP

+90

102800 Toilet Accessories - All

X X X X X X NTP

+90

104413 Fire Extinguisher Cabinets

X X X X X X

33 104416 Fire Extinguishers

X X X X X NTP

+90

111313 Dock Bumpers

X X X X X X

123530 Casework X X X X X X X X X

123633 Laminate Countertops X X X X X X X X

133419 Metal Building System X X X X X X X X NTP

+90

As-Built dwgs, CAD & printed (1 Set) X

DMVA Project#: 42160083 AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS

HVAC (.2)

FED. PROJECT #

DMVA/BMCE-

42160083

PROJECT TITLE

FTIG – Construct Building for Range Maintenance

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O

EP

O

TS

EL

EG

A

TE

D

D

ES

IG

1 230515-General Duty Valves 5 5 NTP +10 A,B

230515-Hangers and Supports for HVAC Equip.

& Piping

5 5 NTP

+10 A,B

3 230590-Testing, Adjusting and Balancing 5 A,B

4 230710-Duct Insulation 5 5 NTP +10 A,B

5 233110- Metal Ducts 5 5 NTP +10 A,B

6 233110-Air Duct Accessories 5 5 5 NTP

+10 A,B

7 233423 – HVAC Power Ventilators 5 5 5 5 NTP

+10 A,B

8 233710-Diffusers and Grilles 5 5 NTP +10 A,B

9 235400-FURNACES 5 5 NTP

+10 A,B

10 238126 - Split-System Air- Conditioners 5 5 NTP

+10 A,B

11 Various – Equipment Training, O&M Manuals 3 3 A,B

12 017839 – Hard Copy of As- Built Drawings 3 A,B

13 017839 – CDRom of As- Built Drawings in AutoCAD 3 A,B

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS

HVAC (.2)

FED. PROJECT #

DMVA/BMCE-

42160083

PROJECT TITLE

FTIG – Construct Building for Range Maintenance

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O

O

EG

A

TE

D

D

ES

A. No deviations, substitutions or changes of materials, to be incorporated into this project, shall be made after approval by the Department, except for written direction by and the approval of the manufacturer of a specific item and re-approval by the Department.

B. The Department retains the right to require additional items not specifically denoted to be submitted for approval and/or additional clarification.

DMVA Project#: 4225003 AF Form 66 FTIG Bldg. 0-48 Renovation

SCHEDULE OF MATERIAL SUBMITTALS

PLUMBING (.3)

FED. PROJECT #

DMVA/BMCE-

42160083

PROJECT TITLE

FTIG-New Range Maint.

Building

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O

O

EG

A

TE

D

D

ES

1 221110 – Plumbing Insulation X NTP

+30 A,B

2 221110 – Domestic Water Piping X NTP

+30 A,B

221110 – Domestic Water Piping Valves and Specialties (balancing, check, ball, arresters)

X NTP

+30 A,B

4 221110 – Sanitary Waste and Vent Piping X NTP

+30 A,B

221310 – Sanitary Waste Piping Specialties (floor drains, cleanouts)

X NTP

+30 A,B

6 223300 – Electric POU Water Heaters X X X X NTP

+30 A,B

224000 – Plumbing Fixtures (water closets, flush valves, toilet seats, etc.)

X X X NTP

+30 A,B

224000 – Plumbing Fixtures (urinals, flush valves, supports, etc.)

X X X NTP

+30 A,B

224000 – Plumbing Fixtures (lavatories, faucets, supports, shielding guards, etc.)

X X X NTP

+30 A,B

10 224000 – Plumbing Fixtures (lavatory, faucets, etc.) X X X NTP

+30 A,B

11 224000 – Plumbing Fixtures (kitch. sink, faucet, etc.) X X X NTP

+30 A,B

12 Various – O&M Manuals 2 A,B

DMVA Project#: 4225003 AF Form 66 FTIG Bldg. 0-48 Renovation

SCHEDULE OF MATERIAL SUBMITTALS

PLUMBING (.3)

FED. PROJECT #

DMVA/BMCE-

42160083

PROJECT TITLE

FTIG-New Range Maint.

Building

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O

O

EG

A

TE

D

D

ES

017839 – Hard Copy of As- Built Drawings

X A,B

017839 – CDRom of As- Built Drawings in AutoCAD format

X A,B

A. No deviations, substitutions or changes of materials, to be incorporated into this project, shall be made after approval by the Department, except for written direction by and the approval of the manufacturer of a specific item and re-approval by the Department.

B. The Department retains the right to require additional items not specifically denoted to be submitted for approval and/or additional clarification.

DMVA FORM 66, OCT 08 (EF) PREVIOUS EDITION IS OBSOLETE Page 1 of 2

Electrical Submittals *

PROJECT NUMBER

DMVA 42160083

PROJECT TITLE

FTIG-Construct Building for Range Maintenance

IT

EM

N U

M

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T O

E N

G

IN

EE

R

D

A R

C H

IT

EC

TU

R

E D

A

TE

T O

C O

N

TR

A C

TI

FR

M E

NOTIFIED

RESUBMITTAL

REMARKS

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

RE

R

S

W A

R R

A

TA

LO

G D

R A

TI

N

G

IN

ST

R

U

CT

IO

N

S

R

EP

O

TC

H

S

PS

EE

L C

ER

TI

FI

C

A

TI

O N

S

D A

TE

O

F R

ES

U

BM

IT

TA

TO

N

TR

A

CT

TE

O F

R

ES

U

BM

IT

TA

E&

TE

O

F R

ES

U

BM

IT

TA

LT

N

TR

A

CT

IN

G

F R

O M

E

TE

O

F

FI

N A

L A

PP

R

O V

A L

A C

C

EP

C

EP

TE

D

A S

N O

EV

IS

E

U

BM

IT

T A

C C

EP

260500 – Common Work Results for Electrical, Vibration Isolators

X X NTP

+10

260500 – Common Work Results for Electrical, Access Panels

X X NTP

+10

260500 – Common Work Results for Electrical, Concrete

X NTP

+10

260519 – Low-Voltage Electrical Power Conductors & Cables, Conductors and Cables, and Connectors & Splices

X NTP

+10

260526 – Grounding & Bonding for Electrical Systems, Grounding Conductors, Connectors, Grounding Electrodes, & Conduit Ground Bushings

X NTP

+10

260529 – Hangers & Supports for Electrical Systems, Support, Anchorage & Attachment Components

X X NTP

+10

260533 – Raceway and Boxes for Electrical Systems, Metal Conduit and Tubing

X X NTP

+10

260533 – Raceway and Boxes for Electrical Systems, Boxes, Enclosures, Cabinets, and Sleeves for Raceway

X X NTP

+10

260553 – Identification for Electrical Systems, Identification Materials

X NTP

+10

10 260573 – Overcurrent Protective Device Coordination Study X NTP

+30 Submit after coordination with all distribution equipment.

11 262416 – Panelboards X X X NTP +30

Submit after coordination with Overcurrent Protective Device Coordination Study

12 262726 – Wiring Devices X NTP +10

DMVA FORM 66, OCT 08 (EF) PREVIOUS EDITION IS OBSOLETE Page 2 of 2

Electrical Submittals *

PROJECT NUMBER

DMVA 42160083

PROJECT TITLE

FTIG-Construct Building for Range Maintenance

IT

EM

N U

M

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T O

E N

G

IN

EE

R

D

A R

C H

IT

EC

TU

R

E D

A

TE

T O

C O

N

TR

A C

TI

FR

M E

NOTIFIED

RESUBMITTAL

REMARKS

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

RE

R

S

W A

R R

A

TA

LO

G D

R A

TI

N

G

IN

ST

R

U

CT

IO

N

S

R

EP

O

TC

H

S

PS

EE

L C

ER

TI

FI

C

A

TI

O N

S

D A

TE

O

F R

ES

U

BM

IT

TA

N

TR

A

CT

TE

O F

R

ES

U

BM

IT

TA

E&

TE

O

F R

ES

U

BM

IT

TA

LT

N

TR

A

CT

IN

G

F R

O M

E

TE

O

F

FI

N A

L A

PP

R

O V

A L

A C

C

EP

C

EP

TE

D

A S

N O

EV

IS

E

U

BM

IT

T A

C C

EP

13 262813 – Fuses X X NTP

Submit after coordination with Overcurrent Protective Device Coordination Study

14 262913 – Enclosed Controllers X X X X NTP +30

Submit after coordination with Overcurrent Protective Device Coordination Study

15 265100 – Interior Lighting X X X NTP +10

270500 – Common Work for Communications, Sleeves and Sleeve Seals

X X NTP

+10

271300 – Communications Equipment Room Fittings, Equipment Frames and Grounding, Cable, Connectors, etc.

X X X NTP

+10

18 283111 – Digital, Addressable Fire Alarm System X X X NTP

+10

* NOTE: This form is provided for contract compliance and does not alleviate any requirements stated in the specifications. “NTP” – Notice to Proceed. Combine submittals where appropriate, line items are shown for control only.

014000 - 1

SECTION 014000

QUALITY CONTROL REQUIREMENTS

PART 1 - GENERAL

1.1 STIPULATIONS

A. The specifications sections “General Conditions of the Construction Contract”, “Special Conditions”, and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

B. The Contractor shall be strictly accountable for the cognizance of carrying out the provisions thereof.

Contractor shall note that reference to “Project Design Documents” refers to any and all documentation included within the Project Bid and/or Award Package. This includes, but is not limited to drawings, specifications, Government forms, contractual literature, etc.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.3 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-assurance and -control services required by the Department of Military and Veterans’ Affairs or authorities having jurisdiction are not limited by provisions of this Section.

4. Specific test and inspection requirements are not specified in this Section.

1.4 DEFINITIONS

A. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Government Design Professionals. All Quality Control Services shall be at the Contractor's cost, which shall be included proportionally in all items of payment or contained in any Base Bid or Unit Price on the Proposal.

B. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance with specified criteria.

014000 - 2

C. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

D. Source Quality-Control Testing: Tests and inspections that are performed at the source, e.g., plant, mill, factory, or shop.

E. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

F. Testing Agency: An entity engaged by the contractor to perform specific tests, inspections, or both.

Testing laboratory shall mean the same as testing agency.

G. Government Required Inspections: All inspections deemed necessary per the DMVA Inspection Form, will require oversight and verification by DMVA-Bureau of Design and Project Management personnel.

H. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade(s).

I. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.5 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to the Government Design Professional(s) for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to the Government Design Professional(s) for a decision before proceeding.

1.6 TESTING SUBMITTALS

A. Schedule of Tests: Testing submittals shall include the following:

1. Specification Section number and title.

2. Entity responsible for performing tests and inspections.

3. Description of test and inspection.

4. Identification of applicable standards.

5. Identification of test and inspection methods.

6. Number of tests and inspections required.

7. Time schedule or time span for tests and inspections.

8. Requirements for obtaining samples.

014000 - 3

9. Unique characteristics of each quality-control service.

1.7 CONTRACTOR'S QUALITY-CONTROL PLAN

A. Quality-Control Plan, General: Submit quality-control plan within ten (10) days of Notice to Proceed, and not less than five (5) days prior to preconstruction conference. Submit in format acceptable to Government Design Professional. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities.

Coordinate with Contractor's construction schedule.

B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project.

1. Project quality-control manager may also serve as Project superintendent.

C. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection, including the following:

1. Contractor-performed tests including subcontractor-performed tests. Include required tests and inspections and Contractor-elected tests and inspections.

D. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified.

Indicate types of corrective actions to be required to bring work into compliance with standards of workmanship established by Contract requirements and approved mockups.

E. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include work Government Design Professional and/or Project Manager has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming work into compliance with requirements. Comply with requirements of authorities having jurisdiction.

1.8 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections.

Include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the

Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and re-inspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:

014000 - 4

1. Name, address, and telephone number of technical representatives making report.

2. Statement on condition of substrates and their acceptability for installation of product.

3. Statement that products at Project site comply with requirements.

4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

5. Results of operational and other tests and a statement of whether observed performance complies with requirements.

6. Statement whether conditions, products, and installation will affect warranty.

7. Other required items indicated in individual Specification Sections.

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, and…