4201349_CDRL1_REPORT.pdf
PDF 95 KB Posted
- Attached to
- CONTROL, ELECTRIC LI
- Solicitation number
- SPRTA1-25-R-0482
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Contract Data Requirements List (DD Form 1423-1) for a First Article Inspection Test Report related to an electronic component for the B-2 Control, Electric Li system. The contract number is FD20302600052, issued by the Air Force Life Cycle Management Center (AFLCMC/LZPED) at Tinker Air Force Base. The document specifies that a single test/inspection report must be submitted 180 days after contract award, with the purpose of providing objective evidence that all engineering, design, and specification requirements are correctly understood, verified, and recorded. The report must demonstrate that the first article unit(s) conform to the applicable contract technical requirements, with inspection results to include variable and attribute data, instrument readings, and any identified deviations or limitations. Deliverables shall be submitted on an ISO-10149 compliantCD-ROM in Adobe Acrobat PDF format, with distribution statement A (approved for public release, unlimited distribution).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4213877_TRNSPDATA_REPORT.pdf | ||
| SPRTA1-25-R-0482.pdf | ||
| 4204272_ATTACH.pdf | ||
| 4213876_PKGRQMT_REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-2 / Control, Electric Li
E. CONTRACT / PR NO.
FD20302600052
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
First Article Inspection Test Report
4. AUTHORITY
DI-NDTI-80809B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
AFLCMC/LZPED
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 XTIME
11. AS OF DATE
Test Day
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Hathaway, Anet MNAME: 18 JUN 2025DATE:
NSN: 6220012636601RK
P/N: 710410-3 Noun: Electronic Component System: B-2
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION UTILIZING WAWF. A
COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL BE SUBMITTED THROUGH WAWF IN
ORDER TO RECEIVE PAYMENT FOR DATA REPORTS.
BLOCK 8: GOVERNMENT WRITTEN NOTICE OF APPROVAL/DISAPPROVAL IS DUE 90 DAYS AFTER
RECEIPT OF CONTRACTOR'S REPORT.
BLOCK 9: Distribution Statement A: Approved for public release; distribution is unlimited.
BLOCK 12: 180 DAYS AFTER CONTRACT AWARD.
SEE ATTACHED DD FORM 1664, DATA ITEM DESCRIPTION.
BLOCK 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.
Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).
A. THE PURPOSE OF THE FIRST ARTICLE INSPECTION IS TO GIVE OBJECTIVE EVIDENCE THAT ALL
ENGINEERING, DESIGN AND SPECIFICATION REQUIREMENTS ARE CORRECTLY UNDERSTOOD,
ACCOUNTED FOR, VERIFIED AND RECORDED.
B. SHOW COMPLETION OF INSPECTION AND RESULTS OF INSPECTION PERFORMED TO
DEMONSTRATE THAT THE FIRST ARTICLE UNIT(S) CONFORM TO THE APPLICABLE CONTRACT
TECHNICAL REQUIREMENTS.
C. REPORT SHALL DELINEATE THE SPECIFIC RESULTS OBTAINED, THE WITNESSES, AND ANY
OTHER PERTINENT OBSERVATIONS.
D. INSPECTION RESULTS SHALL BE THE APPLICABLE VARIABLE & ATTRIBUTE DATA IN THE FORM
OF RECORDINGS, INSTRUMENT READINGS AND RELATED DATA.
E. AS APPLICABLE, THE FIRST ARTICLE INSPECTION TEST REPORT SHOULD IDENTIFY ANY
DEVIATIONS OR LIMITATIONS IN THE FIRST ARTICLE UNIT(S) INVOLVED.
DELETE PARAS: 10.2.4(a), 10.2.5, 10.2.6.2, 10.2.6.3, 10.2.6.4.2(b-d), 10.2.6.5, 10.2.6.6, 10.2.7.2 & 10.2.8
AS 9102 FORMAT OR EQUIVALENT IS ACCEPTABLE.
422 SCMS/GUEA
3001 Staff Drive Tinker Air Force Base, Oklahoma 73145
0 1 0
AFLCMC/LZPED
ATTN: FA Monitor DoDAAC
FA8111
3001 Staff Drive, Suite
1AB85A
Tinker AFB, OK 73145-3041
0 1 0
0 2 015. TOTAL
Page 1 of 2DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 22 Jul 2025
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
REMARK APPLICABLE TO HAZARDOUS ITEMS ONLY: THE TESTS REQUIRED ARE AS
SPECIFIED IN CHAPTER 9 OF THE UNITED NATIONS TRANSPORT OF DANGEROUS GOODS (ORANGE
BOOK) RECOMMENDATIONS.
COORDINATORS:
G. PREPARED BY
Dubler, Ashley M
422 SCMS / GUME
405-734-0255
H. DATE
15 JUL 2025
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Urchison, Kenneth L
422 SCMS / GUEA 405-582-5356 / 852-5356
J. DATE
15-JUL-25
Page 2 of 2DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 22 Jul 2025
PREVIOUS EDITION MAY BE USED.
File details come from the government source that posted it. Updated .