4173 Preliminary Bid Tabulation.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Newport Data Logger
Solicitation number
S-63500-00004172
Issued by
Malheur County, Oregon

About this file

This is a Preliminary Bid Tabulation for Invitation to Bid (ITB) No. S-73000-00004173 issued by an unnamed city or county jurisdiction on September 14, 2022. The solicitation involves riprap installation work for the ESB I205 SB at Washington Street, with a bid closing date of September 14, 2022. The project scope includes mobilization, temporary work zone traffic control, grouted riprap (Class 700), and keyed riprap (Class 700). The estimated quantities are one lump sum for mobilization, one lump sum for traffic control, 380 square feet of grouted riprap, and 820 square feet of keyed riprap. One bidder, Keeping up with the Jones, LLC, submitted a bid for consideration during the bid period.

The single bid received from Keeping up with the Jones, LLC totaled $90,345.11, comprised of mobilization costs of $3,678.75, temporary traffic control costs of $14,928.76, grouted riprap at $58.36 per square foot totaling $22,176.80, and keyed riprap at $60.44 per square foot totaling $49,560.80. The document explicitly states that this bid tabulation is not an indicator of award and serves only as a preliminary compilation of submitted bids for consideration. No information regarding set-asides, incumbent contractors, funding sources, or contract terms is provided in this tabulation document.

View the file

Other files

File Type Posted
RBR Sole Source Letter 2020~1.pdf PDF
RBR duet datasheet.pdf PDF
Onset HOBO U26 Dissolved Oxygen Data Loggers.pdf PDF
RBR Sole Source Letter 2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:9/14/22
ITB No.S-73000-00004173BIDDER
NAME:Keeping up with the Jones, LLC
Bid Closing:September 14, 2022CITY/STATE:
Description:ESB I205 SB AT WASHINGTON ST RIP RAPCCB#:
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL

PRICE

1Mobilization1LS$ 3,678.75$ 3,678.75
2Temporary Work Zone Traffic Control, Complete1LS$ 14,928.76$ 14,928.76
3Grouted Riprap, Class 700380SQFT$ 58.36$ 22,176.80
4Keyed Riprap, Class 700820SQFT$ 60.44$ 49,560.80
TOTAL$ 90,345.11

File details come from the government source that posted it. Updated .