4163165_CDRL1_REPORT.pdf

PDF 94 KB Posted

Attached to
NSN2840-01-687-3807PR_Case&Vane_F110_PN2215M15G05_FD2030-25-01523
Solicitation number
SPRTA1-26-R-0168
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying reporting obligations for the F110/129 Engine Case and Vane Assembly under contract FD20302501523. The contractor must provide Comprehensive Engine Management System (CEMS) Reporting for all engines and parts identified as CEMS serially tracked items. The data item (A001) is governed by authority DI-MGMT-81324C and is required for the AFLCMC/LPZC CEMS PMO at Tinker Air Force Base, Oklahoma.

The contractor's primary responsibilities include obtaining AF Portal and CEMS access through the New Contractor CEMS Access Process, completing CEMS reporting no later than Close of Business the next business day following any occurrence, and updating all serially tracked assets (whether repaired or new production) into the CEMS system. For foreign military sales, the contractor may submit an AF Form 1534 (CEMS CDB Report) or spreadsheet to CEMS.PMO.Helpdesk@us.af.mil or fax to 405-734-3807. The prime contractor is responsible for processing security investigation packages for subcontractor personnel. Technical guidance is provided in T.O. 00-25-254-1 and T.O. 00-25-254-2. Distribution Statement A applies, and the document was prepared by Jesse M Reust (421 SCMS/GUMCB) and approved by John E Heaton (AFLCMC/LPSBN) on 12 May 2025.

View the file

Other files

File Type Posted
DI-MGMT-81324C.pdf PDF
IUID Checklist.pdf PDF
4162152_PKGRQMT_REPORT.pdf PDF
SPI.pdf PDF
SPRTA1-26-R-0168 GE Letter RFP.pdf PDF
4162149_TRNSPDATA_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F110/129 ENGINE/ CASE AND VANE ASSEMBLY

E. CONTRACT / PR NO.

FD20302501523

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Wyckoff, Shianne SNAME: 06 MAY 2025DATE:

NSN:2840016873807PR

P/N:2215M15G05

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 421st SCMS/GUEA, Tinker Air Force Base, Oklahoma.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS webpage: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

COORDINATORS:

AFLCMC/LPSBN CEMS

Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Reust, Jesse M

421 SCMS / GUMCB

405-736-4481

H. DATE

12 MAY 2025

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Heaton, John E

AFLCMC / LPSBN 405-736-2544 / 336-2544

J. DATE

12-MAY-25

Page 1 of 1DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2025

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .