4022.9 Painting Contractors GC Bid Document.pdf

PDF 746 KB Posted

Attached to
BID 4022.9 On Call Painting Services
Solicitation number
BPM059657
Issued by
Montgomery County, Maryland

About this file

BID 4022.9 On-Call Painting Services

This is an Invitation for Bid (IFB) document issued by Montgomery County Public Schools (MCPS) in Maryland for on-call painting services. MCPS seeks to pre-qualify a maximum of six painting contractors to perform full or partial painting projects throughout the school system on an as-needed basis. The scope of work includes all labor, materials, services, supervision, and equipment necessary to complete painting projects, encompassing surface preparation tasks such as cleaning, patching, scraping, sanding, re-glazing, re-caulking, and application of primer and top coatings to interior and exterior surfaces including wood, fiberboard, concrete, plaster, masonry, and metal. Contractors must attend a mandatory pre-bid meeting and site visits scheduled for November 12, 2026, beginning at 8:00 a.m. at four specified locations: Rockville High School, Kensington Parkwood Elementary School, Fields Road Elementary School, and Clarksburg High School. Contractors are required to submit proposals for mock-up painting projects at these four sites as part of their bid response. The contract term is for one year beginning one day after Board of Education approval, with MCPS retaining the right to extend the contract for up to four additional one-year terms, with written notice of extension intent provided 90 days prior to contract expiration.

Pricing shall be calculated using hourly labor rates provided by the contractor on the quotation form, plus material costs for each project. Contractors must submit the Pre-Qualification Questionnaire, evidence of a current Maryland Construction Business License or Maryland Home Improvement Commission License, EPA Lead-Safe Firm certification (or a commitment letter to obtain certification within 90 days of award), copies of any applicable trade licenses, and surety statement evidence of bonding capacity. A 10% Minority Business Enterprise (MBE) participation goal is established for this solicitation, with contractors required to submit completed MBE utilization and fair solicitation affidavit forms. For projects exceeding $100,000, contractors must furnish Performance and Payment Bonds each equal to 100% of the project award amount. All workmanship and materials are guaranteed for two years from final payment approval, with warranty covering defective materials and installation issues such as peeling, blistering, and excessive fading. MCPS does not commit to award any contract or specific quantity of work; project assignments depend on current MCPS requirements and budgetary availability. Contractors must comply with asbestos-free material requirements, criminal background check procedures for employees with unsupervised access to children, and all applicable federal, state, and local regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Financial Management

Department of Procurement

MONTGOMERY COUNTY PUBLIC SCHOOLS

45 West Gude Drive, Suite 3100

Rockville, Maryland

Invitation For Bid #4022.9

ON-CALL PAINTING SERVICES

GENERAL CONDITIONS AND SPECIFICATIONS

GENERAL CONDITIONS

A. SCOPE OF WORK

The work includes providing all labor, materials, services, supervision, and equipment to perform full or partial painting projects as requested by Montgomery County Public Schools (MCPS). The work includes, but is not limited to cleaning, patching, scraping, sanding, re-glazing, re-caulking, and all required preparation tasks of surfaces to be painted including all necessary primer and top coatings. The scope includes exterior and/or interior painting and all related tasks and materials to make a project complete in all details. This includes painting and refinishing wood, fiberboard, concrete, plaster, masonry and metal surfaces. All work shall be performed in compliance with

MCPS specifications herein and the manufacturer’s preparation/application instructions. The pre-qualified Contractor(s) will be required to visit various facilities throughout MCPS to take measurements and develop proposals.

B. INTENT

1. The intent of this Invitation For Bid (IFB) is to pre-qualify bona-fide painting contractors to perform services described. Complete the pre-qualification questionnaire that is included under

APPENDIX G, prices for a mock-up painting project identified herein, and hourly rates as requested on the Quotation Form herein under APPENDIX I.

2. Only Contractors who are full-service painting contractors regularly engaged in this trade will be considered. Successful Contractors will be required to submit the Asbestos Free

Verification form as applicable and required herein. APPENDIX H.

3. After MCPS evaluation, a maximum of six painting contractors will be selected based on their submissions and will be pre-qualified to participate in providing proposals for future painting services adhering to all conditions and detailed specifications herein.

4. Proposals offered for future projects by the authorized Contractors shall be all inclusive, including but not limited to labor, equipment and miscellaneous materials to satisfy all specification requirements. All costs shall be included in the proposals submitted. All

GENERAL CONDITIONS 2 RFP #4022.9

work shall be performed in accordance with the latest applicable laws, codes, and regulations of the various regulatory bodies of the State of Maryland, Federal/Local Governments, and all other boards or departments having jurisdiction. These regulations and standards will be further considered a part of these specifications and conditions. The Contractor will furnish and install any additional items required by the same, whether or not particularly shown or specified. Any items or requirements noted herein in excess of code requirements and permitted under the code shall take preference. All deliveries must be prepaid FOB destination. In no case will collect shipment be accepted.

5. Large painting projects are scheduled during the MCPS Summer Break when students are not in the building. This typically is from mid-June until mid-August. Pre-qualified contractors are expected to participate and provide a response to the request to perform the bulk of the work during this time frame.

C. AWARD

1. This solicitation does not commit MCPS to award any contract or to pay any costs incurred in the preparation of a response. It is the intention to prequalify painting contractors which will be able to respond to requests for individual projects, based on the responses to this IFB, awards to future projects will be made to the most favorable offers. Consideration will be given to any previous project performance for the Board of Education as to the quality of service, acceptable merchandise, and about the Contractor’s ability to perform should the contractor be awarded.

However, the Board of Education reserves the right to make awards according to the best interest of MCPS. In addition, the Board reserves the right to remove or add items to the specifications as our requirements change, as well as add Contractors throughout the contract term, should a need arise, that cannot be facilitated by the awarded contractor(s). Awards are contingent upon the availability of funds.

2. Wherever the term “provide” is used, it shall mean “furnish and install in place, complete in all detail”.

D. CONTRACT TERM

The term of the contract shall be for one year as stipulated in the bid documents. However, the contract may begin one day after approval by the Board of Education and will conclude as stated under the contract term. MCPS reserves the right to extend this contract for up to four additional one-year terms. A written notice indicating MCPS' intention to pursue the extension of the contract will be issued to the successful Contractors 90 days prior to the expiration of the original contract. The vendor will have 10 days from the date of notification to return the notice acknowledging its intent to accept or reject the extension. Once the response is evaluated, MCPS staff may make a recommendation to the Board of Education to extend this contract or decide to rebid. If the contract is extended by the Board of Education, a contract amendment will be issued.

GENERAL CONDITIONS 3 RFP #4022.9

E. QUANTITIES

MCPS shall not be obligated to purchase any specific quantity. Assigned projects are dependent upon the current requirements of MCPS and on budgetary limitations. Orders will be placed from time to time throughout the contract term.

F. MCPS EMERGENCY/CRISIS PROCEDURES, SHELTER/LOCKDOWN

Emergency/ Crisis Procedure Information

1. In the event of an emergency/crisis incident while working in an MCPS facility, the Contractor and/or their representative(s) shall be required to adhere to the established MCPS procedures and school administrative guidelines during such an occurrence.

2. Supplied herein under APPENDIX D for the Contractor’s information are the MCPS

Emergency/Crisis Procedures, Shelter/Lockdown. It is the Contractor’s responsibility to familiarize themselves and their representative(s) regarding the Shelter/Lockdown Procedures.

These procedures are subject to change due to new MCPS requirements.

1. The Contractor shall have at the worksite, a reasonable number of materials that will allow them to quickly secure the work area and/or secure buildings as required for the type of work being performed.

G. WARRANTY

1. The specifications require that all workmanship and materials should be guaranteed for two years. Final payment will be made once the painting project is complete and accepted by the

MCPS Project Coordinator for each project. The warranty shall begin once the MCPS Project

Coordinator has approved the Contractor’s final invoice for payment.

2. Warranty shall provide for the replacement of defective materials plus installation and labor.

This includes but is not limited to such issues as peeling, blistering, excessive fading, etc. Any warranty claim made by MCPS prior to the expiration of said warranty shall be satisfied even if the warranty has subsequently expired. Failure of a Contractor to provide satisfactory warranty service to MCPS will be grounds for exclusion from future solicitations.

3. Any manufacturer of material(s) used on the project, offering as standard, a longer warranty/guarantee than as specified herein, shall take precedence.

4. Upon completion of the projects, the point of contact may change between MCPS and the

Contractor when identifying and resolving any warranty claims during the warranty period.

H. BRAND NAMES

GENERAL CONDITIONS 4 RFP #4022.9

1. Commodity descriptions that state “Only a specified brand will be considered” are brands that have been evaluated and tested for inclusion on this BID and are the only brands acceptable at this time. No substitutions will be accepted. Other brands will be evaluated and tested for future projects by MCPS if materials are submitted at no cost to MCPS. Forward samples/information to Montgomery County Public Schools, Contract Office, 45 West Gude

Drive, Suite 4300, Rockville, Maryland 20850. Testing normally requires a minimum of

60 workdays to complete; therefore, your samples/materials for testing may be approved for future BIDs if the evaluation is satisfactory.

2. The brand name, code, or model number on each item being offered, even if bidding the specified brand shall be provided. If a brand and code or model number is not shown, your

BID may not be considered.

3. If an item specification shows code or model numbers that have been discontinued, the bidder shall state and indicate the current code or model number.

I. DEVIATIONS

All offers meeting the intent of the request will be considered for award. Contractors who are deviating from the terms, conditions, and/or specifications shall list such and explain fully on a separate sheet to be submitted with their BID. If these deviations are of a technical nature, the

Contractor shall supply the manufacturer’s description of the deviation. The absence of such a sheet shall indicate that the Contractor has taken no exception and shall be held responsible for performing in accordance with the terms, conditions, and specifications as stated herein.

J. eMARYLAND MARKETPLACE ADVANTAGE

K. DELIVERY, STORAGE, AND HANDLING

1. The Contractor shall store the paint at the facility they are painting, and the MCPS Project

Coordinator will work with the school staff and Contractor to identify appropriate staging areas.

2. MCPS will not be held responsible for any material stored at job sites; it is the Contractor’s responsibility to arrange for securing their materials and equipment.

L. INQUIRIES

Maryland law requires local and state agencies to post solicitations on eMaryland

Marketplace Advantage. Registration with eMaryland Marketplace is free. It is recommended that any interested supplier register at https://emma.maryland.gov/, regardless of the award outcome for this procurement as it is a valuable resource for upcoming bid notifications for municipalities throughout Maryland.

GENERAL CONDITIONS 5 RFP #4022.9

Inquiries regarding this solicitation must be submitted in writing, to Laly Bowers, Senior Buyer, Montgomery County Public Schools, 45 West Gude Drive, Suite 3100, Rockville Maryland 20850, email to Laly_A_Bowers@mcpsmd.org. Questions must be received no later than four business days prior to BID opening in order for the bidder to receive a reply prior to submitting its BID. The

Board of Education will not be responsible for any oral or telephone explanations or interpretations.

Bidder contact with any other MCPS employee regarding this solicitation until the contract is awarded by the Board of Education will be considered by MCPS as an attempt to obtain an unfair advantage and result in non-consideration of its BID. The MCPS Procurement Unit website address is https://www.montgomeryschoolsmd.org/departments/procurement/staff.aspx

Subsequent to the award if the bidder finds any discrepancy or omission and has questions of

MCPS’s intent, prior to performing work, they shall notify the MCPS project manager and the

Procurement Unit Buyer by email to resolve and receive clarification.

M. SPECIAL CONDITIONS

1. Audit Provisions – MCPS shall have the right to examine the successful bidder(s) records pertaining to work performed under the contract to determine and verify their compliance with all contractual conditions. MCPS shall be granted access to such records at all reasonable times during the contract period and for three years thereafter.

2. Contingent Fee – The successful bidder(s) hereby represents that they have not retained anyone to solicit or secure this contract from MCPS upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, except for bona fide employees or bona fide established commercial selling agencies maintained by the person so representing for the purpose of securing business, or any attorney rendering professional legal services consistent with applicable canons of ethics.

3. Assignments – Neither this contract nor any interest therein nor claim thereunder shall be assigned or transferred by the successful vendor except as expressly authorized in writing by

MCPS and no contract shall be made by the successful vendor with any other party for furnishing any of the work or services herein contracted for without the written approval of

MCPS.

4. Disputes – Any dispute concerning a question of fact arising under this contract shall be disposed of by written agreement between the Contractor and the MCPS Department of

Planning and Construction (DPC) director. Pending final decision of a dispute hereunder, the

Contractor shall proceed diligently with the contract performance.

N. SAMPLE PROJECT LOCATION, DATE AND TIME

mailto:Laly_A_Bowers@mcpsmd.org https://www.montgomeryschoolsmd.org/departments/procurement/staff.aspx

GENERAL CONDITIONS 6 RFP #4022.9

Contractors will be required to provide pricing for the mock-up painting projects with their BID response for the four (4) locations listed below. The on-site meetings will be the Contractor’s opportunity to walk the buildings with MCPS staff and discuss the details of the projects. The prices provided shall include all labor (regular and premium) and materials required to comply with the detailed specifications herein and to complete the project in the time frames identified below.

ALL PROPOSALS SHALL HAVE LABOR CALCULATED AT THE HOURLY RATES THAT

WILL BE OFFERED ON THE QUOTATION FORM HEREIN. The locations are scheduled to be painted Summer 2027. The proposal offered for the mock-up projects will be one of the components used in the evaluation of the bid. Contractors who are interested in participating in this solicitation MUST attend the Pre-Bid meeting identified below on the date and time specified. The identified site visits are scheduled for Thursday, November 12, 2026, starting at

7:30 a.m. The site visits have been scheduled when students are not in the building. Contractors will not be allowed to return to the building. Only Contractors in attendance at the Pre-Bid meeting will be considered. You must provide a proposal for the project as part of your bid response. No partial submittals will be accepted.

There will be a Mandatory site visit at the four (4) locations starting November 12, 2026, at 8:00

A.M.

The first meeting will be held at:

Rockville High School, 2100 Baltimore Rd, Rockville, MD 20851 The next three (3) visits will occur in succession, starting with:

Rockville High School, 2100 Baltimore Rd, Rockville, MD 20851

Kensington Parkwood Elementary School, 4710 Saul Road, Kensington, MD 20895

Fields Road Elementary School, 1 School Drive, Gaithersburg, MD 20878

Clarksburg High School, 22500 Wims Rd, Clarksburg, MD 20871

The Contractor shall provide with the BID response a proposal with cost breakdowns identifying individual line items, quantities, and labor costs as indicated on the quotation form, plus the cost of materials, equipment, etc. to complete the project as required.

O. SITE INSPECTION

Responses to submit proposals for future projects will only be accepted by the pre-qualified contractors under this solicitation. The Pre-qualified contractors will be required to inspect future work sites, take measurements, and develop proposals as requested by MCPS for future projects.

When a proposal has been submitted and received, it shall be understood that the work site has been inspected and that the Contractor is aware of the needs and conditions under which the work is to be accomplished including, but not limited to, all work required to satisfy any and all laws, codes, regulations, etc. that are applicable, and in compliance with conditions and specifications herein.

After inspection, the Contractor shall report to the MCPS Project Coordinator any conditions that might prevent them from performing their work in the manner intended. Failure to do so will not relieve the contractor of their obligation to furnish all materials and labor necessary to fully carry out the provisions of the contract document.

GENERAL CONDITIONS 7 RFP #4022.9

P. SCHEDULE

1. After the pre-qualified Contractors are selected and approved, MCPS Project Coordinator will contact the pre-qualified contractors to conduct site inspections to develop proposals. The

MCPS Project Coordinator will contact each contractor in writing, at least two business days prior to the site inspection for each project. The Project Coordinator will provide contractors with scope of work, schedule, and all other information needed to provide a proposal for project during this site inspection.

2. All pre-qualified Contractors interested in supplying a written proposal shall do so within five business days after the MCPS scheduled project site inspection meeting. Contractors shall utilize the BID hourly rates to develop the project proposals. Contractors shall list each hourly rate and quantity used to develop the proposal individually on each proposal. The proposal prices offered shall be all-inclusive. All proposals shall list labor rates, the total cost for labor, material cost, and shall include completion date for projects.

3. Start and completion dates MUST be identified on each proposal. No work shall commence without MCPS approval. A purchase order issued and signed by the Director of the Department of Materials Management (DMM) will be the Contractor’s authorization to proceed with an approved proposal. All work is to be totally completed on or before the stated completion date identified and accepted on each proposal. This includes, but is not limited to, final inspections by the MCPS Project Coordinator, all cleaning tasks, punch-out work, etc. Late charges will be deducted for failure to meet any target dates without an MCPS approved extension. (See

“Late Charges for Failure to Complete on Time” under Section I. Contract

Administration.)

4. Contractor shall take into consideration that some school activities will be taking place

(administration and special activities) while work is being performed. No work performed by the Contractor shall disrupt normal school functions. Any traffic blockages, utility outages, etc., which may be required in the execution of the Contractor's work shall be scheduled with the

MCPS Project Coordinator and will require the Contractor to perform such work at premium labor times. The Contractor shall anticipate these occurrences in their proposals, and no changes in amounts or completion date will be made for such occurrences. The intent is to have this project performed without closing the building during regular weekday hours. Contractors shall plan for the possibility that work may be performed over a weekend or at night, so as not to affect the building usage and to satisfy the completion dates.

5. Normal Work Periods

Work may be performed Monday through Friday, 6:30 A.M. through 7:00 P.M. (MCPS building service staff are normally onsite during these hours.) Changes may be made only by obtaining approval in advance from the MCPS Project Coordinator. Contractor(s) must make prior arrangements for building access beyond the normal working hours of school building service staff. An authorized MCPS staff person shall be in attendance in the building whenever any Contractor is in the building.

GENERAL CONDITIONS 8 RFP #4022.9

6. The Contractor shall maintain an adequate labor force on the worksite from the start of the project until the completion in order to satisfy the schedule. MCPS expects the work to proceed uninterrupted with regard to labor and material availability. The Contractor shall inventory materials as they are received from the manufacturer and not wait until work is under way to determine if inventory is sufficient.

Q. GENERAL ASBESTOS INFORMATION

1. Asbestos Free Materials

NO MATERIALS PROVIDED SHALL CONTAIN ASBESTOS!!!! All Contractors providing and/or installing any of the building materials listed below shall secure laboratory analysis confirming that materials contain NO ASBESTOS. The cost for testing shall be included in the BID prices offered. After the initial testing has been performed additional annual testing will be required thereafter or immediately upon any change in materials or manufacturers.

• Acoustical ceiling tile

• Adhesives

• Caulking

• Fire Rated Doors

• Fire Board

• Floor tile and sheet flooring

• Folding Doors

• Gypsum Panels (Drywall)

• Insulation (All types; roof, HVAC, piping, wall, etc.)

• Mastics

• Plaster

• Roofing System Components e.g. BUR

• Asphalt, Felts, Cap Sheets, Shingles, etc.

• Spackle

• Toilet Partitions

• Window Glazing

The laboratory performing the analysis must have received U.S. Environmental Protection

Agency (EPA) accreditation and be a member of the National Voluntary Laboratory

Accreditation Program (NVLAP). The Contractor or the manufacturer can have the laboratory testing performed. No other form of confirmation such as Material Safety Data Sheets, manufacturer documentation, historical testing, etc. will be accepted. A list of EPA accredited laboratories can be found at http://ts.nist.gov/standards/scopes/programs.htm

The Contractor shall provide the required laboratory analysis report(s) and a completed

“Asbestos Free Material Verification Form” herein (see APPENDIX H within 10 working days after receipt of the “Pre-Award Notification” letter for each listed product required in the execution of the scope of work.

2. Existing Asbestos Materials

MCPS shall be responsible for all asbestos abatement tasks as may be required regarding existing materials on site. Any questions concerning asbestos materials shall be directed to the Indoor Air

Quality Leader 301-926-4378.

http://ts.nist.gov/standards/scopes/programs.htm

GENERAL CONDITIONS 9 RFP #4022.9

R. MANDATORY SUBMISSION

1. BID Documents

One original and one copy of the bid response are requested. The cover page of each copy must be clearly marked original or copy. Contractors may wish to reproduce and retain an additional copy for their files. Proposals must contain all required information to be considered responsive.

2. Quotation Form (page 1-4)

a. Quotations are to be entered on the Quotation Form, APPENDIX I. Faxed responses are not acceptable. SEALED BID ONLY.

b. Contractors shall submit a separate price for each item listed on the Quotation Form.

Submission of one price for all the items without indicating a price per item shall be considered non-responsive and will invalidate the Bid response. Prices offered shall be valid for acceptance during a period of no less than 90 days from the date of bid opening.

3. Pre-Qualification Questionnaire, APPENDIX G

Contractor shall submit Pre-Qualification Questionnaire APPENDIX G.

4. Bid submission for Sample Project

Proposal for listed sample projects:

a. Clarksburg High School

b. Fields Road Elementary School

c. Kensington-Parkwood Elementary School

d. Rockville High School.

5. Addenda/Errata

Changes and addenda to a solicitation may occur prior to the bid opening date and time. It is the bidder’s responsibility to check the MCPS website under the event calendar http:www.montgomeryschoolsmd.org/departments/procurement/ or contact the Department of

Procurement by email at procurement@mcpsmd.org and Laly_A_Bowers@mcpsmd.org to confirm that they have all addenda/errata. Failure to acknowledge addenda/errata on the form may result in a bid being deemed non-responsive and consequently rejected.

6. Licenses/Certifications to be Submitted with BID Response

Copies of valid licenses must be submitted with the bid response. Failure to provide licenses may disqualify your response.

mailto:procurement@mcpsmd.org mailto:Laly_A_Bowers@mcpsmd.org

GENERAL CONDITIONS 10 RFP #4022.9

a. Maryland Tax Liability Licenses

The contractor shall possess a current “State of Maryland” Construction Business License or a Maryland Home Improvement Commission License. These are considered “TAX

LIABILITY” Licenses and do not authorize a contractor to perform any trade-specific work in the State of Maryland without the appropriate trade licenses as required. NOTE: All out-of-state bidders must provide an out-of-state Maryland Construction Business or Home

Improvement License.

• Construction Business License: This type of business license is issued through the

County or Baltimore City, or the Clerk of the Circuit Court in which your business is located within the State of Maryland. Contact the State License Bureau http://ww.marylandtaxes.com/ or at 410-260-6240 for additional information as required.

• Maryland Home Improvement Commission License: This type of license is issued through the State of Maryland, Department of Labor, Licensing and Regulations, Maryland Home Improvement Commission. For further information, and to locate the closest office go to www.DLLR.state.md.us or call 410-230-6309.

b. Lead Certification License:

The successful Contractor must be certified by the United States, Environmental Protection

Agency (EPA) as a “Lead-Safe Firm” under the Lead Renovation, Repair and Painting Rule.

If Contractor is certified, a copy of the valid certification shall be provided with the bid response. If Contractor is not certified, they must submit a Commitment Letter stating that they will become certified within 90 days of pre-award.

The Contractor must maintain this certification throughout the term of the contract. The

Contractor who fails to maintain this certification during the terms of this contractor, may be disqualified and removed as MCPS authorized painting contractor.

7. Minority Business Enterprise in Public Schools

The goal has been set at 10% MBE participation Pages D1 through D10 of Attachment D of the

MBE procedure (APPENDIX A), reflecting minimum 10% MBE participation shall be submitted with your bid. (See Section II “Contract Administration” for additional MBE information). Failure to supply as specified will disqualify your bid response.

http://ww.marylandtaxes.com/ http://www.dllr.state.md.us/

GENERAL CONDITIONS 11 RFP #4022.9

8. Bid Security

1. SURETY STATEMENT

The Surety Agent for the Offeror shall provide on his letterhead a letter addressed to

Montgomery County Public Schools signed by an authorized representative of the bonding company, stating:

(Name of Applicant) has been a client of (name of surety company) for over ____ years. During that time, we have supported this firm in their pursuit of projects in the $________ range and total programs in excess of $____________.

We are prepared to provide Bid, Performance, and Payment Bonds on MCPS projects bid between (dates of the contract) ________ and _________ provided (name of applicant) makes application to us at the time of the Bid, and we are satisfied with the prevailing underwriting conditions, including but not limited to, acceptable contract terms, job specifications and acceptable bond forms.

Payment and performance bonds:

For projects over $100,000, the Bidder to whom a contract is awarded must furnish Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the project awarded amount, including executed Change Orders, in the form specified.

These must be provided at the time of the project award notice and prior to the start of any work.

Note: Failure to submit the Bid Security with the bid proposal may be considered non-responsive and may disqualify your bid

S. MCPS has introduced a new program geared to offer our scholars the opportunity to gain experience with employers before they leave high school by participating is programs such as apprenticeship, internship, site-based work experience and other available programs.

If awarded for the subject bid will be interested willing to offer an MCPS student this opportunity.

If so would you please open the below link and fill out the google sheet, if you are not able to participate please respond to this email at your earliest convenience.

https://www.montgomeryschoolsmd.org/departments/work-based-learning/employers/

A negative reply will not adversely affect consideration of your contract.

Yes, I am interested _______________

No, I am unable to participate _________ https://nam04.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.montgomeryschoolsmd.org%2Fdepartments%2Fwork-based-learning%2Femployers%2F&data=05%7C02%7Claly_a_bowers%40mcpsmd.org%7C9d9bc3214eae45e1ed9f08dd0e393850%7Cddf755e9bcd64a5ea4727c378a78c6c7%7C0%7C0%7C638682361122926859%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=o7sXXv0Y5vIibX1nkx%2FpJfzmB7B5BY9yjbkNDOWQmag%3D&reserved=0

GENERAL CONDITIONS 12 RFP #4022.9

T. CONTRACTOR’S OBLIGATION REGARDING CRIMINAL RECORDS OF INDIVIDUALS

ASSIGNED TO WORK IN MCPS FACILITIES

a. Prohibition against assigning registered sex offenders and individuals convicted of sexual offenses, child sexual abuse, and other crimes of violence to MCPS contracts:

Maryland Law requires that any person who enters into a contract with a county board of education “may not knowingly employ an individual to work at a school” if the individual is a registered sex offender. Under § 11-722 of the Criminal Procedure Article of the Maryland

Code, an employer who violates this requirement is guilty of a misdemeanor and, if convicted, may be subject to up to five years imprisonment and/or a $5000 fine.

Effective July 1, 2015, amendments to §6-113 of the Education Article of the Maryland Code further require that a contractor or subcontractor for a local school system may not knowingly assign an employee to work on school premises with direct, unsupervised, and uncontrolled access to children, if the employee has been convicted of or pled guilty or nolo contendere to a crime involving:

1. A sexual offense in the third or fourth degree under § 3–307 or § 3–308 of the Criminal

Law Article of the Maryland Code or an offense under the laws of another state that would constitute an offense under § 3–307 or § 3–308 of the Criminal Law Article if committed in Maryland;

2. Child sexual abuse under § 3-602 of the Criminal Law Article, or an offense under the laws of another state that would constitute child sexual abuse under § 3-602 of the Criminal Law

Article if committed in Maryland; or

3. A crime of violence as defined in § 14–101 of the Criminal Law Article, or an offense under the laws of another state that would be a violation of § 14–101 of the Criminal Law

Article if committed in Maryland, including: (1) abduction; (2) arson in the first degree;

(3) kidnapping; (4) manslaughter, except involuntary manslaughter; (5) mayhem; (6) maiming; (7) murder; (8) rape; (9) robbery; (10) carjacking; (11) armed carjacking; (12) sexual offense in the first degree; (13) sexual offense in the second degree; (14) use of a handgun in the commission of a felony or other crime of violence; (15) child abuse in the first degree; (16) sexual abuse of a minor; (17) an attempt to commit any of the crimes described in items (1) through (16) of this list; (18) continuing course of conduct with a child under § 3-315 of the Criminal Law Article; (19) assault in the first degree; (20) assault with intent to murder; (21) assault with intent to rape; (22) assault with intent to rob; (23) assault with intent to commit a sexual offense in the first degree; and (24) assault with intent to commit a sexual offense in the second degree.

Each contractor is required to submit, following the award of a contract, documentation confirming that its direct employees and those of any subcontractors and/or independent contractors assigned to perform work in a MCPS school facility under the contract meet this obligation. Additionally, the contractor must confirm that it continues to meet this

GENERAL CONDITIONS 13 RFP #4022.9

obligation on an annual basis and/or when there are changes in the workforce that the contractor and/or its subcontractors use to perform the work required by the contract.

Violation of this provision is a material breach of contract for which MCPS may take appropriate action up to and including termination of the contract.

b. Required criminal background check process for certain individuals in the contractor’s workforce:

Under recent amendments to § 5-551 of the Family Law Article of the Maryland Code, each contractor and subcontractor shall require that any individuals in its workforce must undergo a criminal background check, including fingerprinting, if the individuals will work in a MCPS school facility in circumstances where they have direct, unsupervised, and uncontrolled access to children. The term “workforce” in this and the preceding section refers to all of the contractor’s direct employees, subcontractors and their employees, and/or independent contractors and their employees that the contractor uses to perform the work required by the contract.

Fingerprinting for the criminal background check may be performed by the MCPS Office of

Human Resources and Development, 45 W. Gude Drive, Rockville, MD 20850, or through another service approved by MCPS. Individuals fingerprinted by MCPS will be required to provide written consent, and MCPS will maintain copies of all records for criminal background checks performed by MCPS. If the contractor uses another service approved by MCPS, the results of the criminal background check must be provided to MCPS for record- keeping. A list of MCPS approved fingerprinting agencies can be found on the Procurement Unit website at http://www.montgomeryschoolsmd.org/departments/procurement.

The contractor must take appropriate steps to promptly follow up on information identified in the criminal background check related to the sexual offenses, child sexual abuse offenses, and crimes of violence enumerated above, as well as any information regarding offenses involving the distribution of drugs or other controlled substances, or any other criminal information identified by MCPS as warranting further explanation insofar as it may significantly affect the safety and security of MCPS students. If, after following up, the contractor believes that the individual is qualified and should be assigned to work (or continue to work) in a MCPS school facility, then the contractor will provide a written summary to MCPS justifying its recommendation. MCPS will rely on the contractor’s summary to determine whether to accept the contractor’s recommendation, and the contractor will be responsible for any consequences of a material misrepresentation in its written summary.

Once the contract is awarded, the contractor is responsible for implementing the background check process. An individual in the contractor’s workforce may not begin work in a MCPS school facility on an assignment where the individual will have direct, unsupervised, and uncontrolled access to children, until: (a) the background check results for that individual have been received by MCPS; (b) the contractor certifies to MCPS that the individual has received training and/or reviewed informational materials, as appropriate, regarding recognizing, reporting, and preventing child abuse and neglect, consistent with the content provided in training for MCPS employees; and (c) the individual obtains a MCPS identification badge.

The badge will be issued by the MCPS.

http://www.montgomeryschoolsmd.org/departments/procurement

II. CONTRACT ADMINISTRATION 14 RFP #4022.9

II. CONTRACT ADMINISTRATION

A. PRE-CONSTRUCTION MEETING

1. MCPS reserves the right to convene a meeting with the apparent awardees prior to awarding a contract. The purpose of this meeting is to afford all parties an opportunity to discuss any aspects of the project and contract execution, which may be of concern for the successful and timely completion of the project.

2. Documents required elsewhere in this solicitation, such as service and warranty agreements, shall be provided at this meeting.

3. Issues raised during this meeting that cannot be resolved to the satisfaction of MCPS will be reason to reject the bid response and to consider the next Contractor.

B. CONTRACT SECURITY

1. Security may be in the form of Certified Cashier's or Bank Treasurer's Check OR Bonds (AIA

Documents A-311, A-312, or similar). The bonding firm must be licensed to do business in the

State of Maryland.

2. The successful bidder(s) shall deliver to MCPS Performance and Payment Bonds within five working days after receiving notification of award for individual projects with a contract value of $100,000.00 or more. This cost shall be included in the proposal.

3. The cost of the bond(s) shall be included in all proposal $100,000.00 or more by the contractor.

Note: Failure to supply the Contract Securities as specified will be considered a contract violation and shall be grounds for contract cancellations.

C. POST BID SUBMISSIONS

1. The Contractor may be required to supply within 48 hours after MCPS requests, applicable business and Contractors licenses, master licenses for trades appropriate for work to be performed, and/or company financial statements, etc., as required to allow MCPS time for contactor evaluation.

Failure to supply a copy as specified may disqualify your BID proposal.

2. Sub-Contractors

a. MCPS must approve all sub-contracting work in advance; it is MCPS’ intent that the successful bidder has the in-house resources to perform the primary task and only sub-contract secondary task(s) in which they do not specialize, e.g., electrical, mechanical and/or plumbing, etc. The contractor shall supply a complete list of all sub-contractors and the cost of their work for evaluation by MCPS. This list must be submitted within two workdays after MCPS makes the request. Failure to do so will be grounds for termination. The Contractor shall be

II. CONTRACT ADMINISTRATION 15 RFP #4022.9

responsible for ensuring that all proposed sub-contractors are in good standing with MCPS and have a minimum of five years of experience performing the type of work they will be performing under this BID/contract and possess appropriate licensing.

b. MCPS shall notify the Contractor in writing if, after due investigation, there is a reasonable objection to any of the proposed sub-contractors. Failure of MCPS to make an objection to any proposed sub-contractor shall constitute notice of no objection. Each sub-contractor may be required to furnish to MCPS, in duplicate, proof of their financial stability and experience to perform the particular work for which they will be engaged. All contractual agreements between the Contractor and their sub-contractors shall be written, unamended, on the Standard Form of

Agreement between Contractor and Sub-Contractor, AIA Document A401 (most recent edition).

Upon request, the Contractor shall supply copies of this contract to MCPS within five workdays.

c. MCPS acceptance of Sub-Contractors in no way relieves the Contractor from being responsible for the total and complete performance of the work for the project: i.e., failures of the Sub-

Contractors to satisfactory perform the work in timely fashion is the Contractor's responsibility and not that of MCPS.

d. All work must be performed by a bona-fide licensed trade person.

3. Minority Business Enterprise (MBE) in Public Schools

a. Certified Minority Business Enterprises are highly encouraged to respond to this solicitation.

b. Since state funds may be involved in future project(s) performed under this BID, it is important that bidders review the new state revised MBE Procedures carefully to ensure compliance.

There is a 10% MBE goal set for this BID. On future state funded project(s) that may be performed under this BID and exceed $50,000 a new MBE goal may be established based on the scope and size of the work. The bidder may be required to solicit MBE participation, which will include providing revised Certified MBE Utilization and Fair Solicitation Affidavit (Attachment

A) and the MBE Participation Schedule (Attachment B) along with other required MBE forms that may be applicable. Bidders are always strongly encouraged to make a good faith effort to solicit Certified Minority Business participation to provide materials, supplies, equipment, and/or service whenever possible at any time prior to bidding or throughout the course of the project.

c. Refer to the document, MINORITY BUSINESS ENTERPRISE PROCEDURES, September 22, 2008, included with this BID solicitation package under APPENDIX A.

d. The Certified MBE Utilization and Fair Solicitation Affidavit (Attachment A) and the MBE

Participation Schedule (Attachment B) located herein under APPENDIX A., must be completed and submitted with the BID proposal identifying the bidder’s specific commitment of certified minority business. Failure to supply as specified may disqualify your BID proposal.

e. Contact the MCPS MBE Liaison, at 240-740-7700; regarding any other MBE procedure questions. The current listing of MBE Certified Contractors can be obtained at http://mbe.mdot.state.md.us/directory/search_select.aspn.

http://mbe.mdot.state.md.us/directory/search_select.aspn

II. CONTRACT ADMINISTRATION 16 RFP #4022.9

4. Submit Evidence of Insurance

a. Insurance

See Article XXI of the General Stipulations and Instructions to Bidders. The successful

Contractor(s) shall submit an actual certificate of insurance made in favor of MCPS within five workdays after an award of BID/contract.

b. Additional Insurance

The Montgomery County Board of Education shall be named as an additional insured on all liability policies.

c. Policy Cancellation/Certificate Holder

1) Sixty days’ written notice of cancellation or material change in any of the policies is required.

2) The Department of Procurement, Montgomery County of Board of Education shall be the insurance certificate holder.

5. Invoicing

a. Bidder shall submit invoices preferred electronically to Project Coordinator or Contract Officer, via email or regular mail to Project Coordinator at Montgomery County Public Schools, 45

West Gude Drive, Suite 4300, Rockville, Maryland 20850 for payment approval. All invoices shall identify pertinent information such as purchase order number and building name where work was performed. The MCPS Project Coordinator shall submit invoices and receiving reports to the Division of Controller to process payments, and shall specify final or partial payments.

b. A completed State of Maryland, “CERTIFIED MINORITY BUSINESS ENTERPRISE

PARTICIPATION STANDARD MONTHLY CONTRACTOR’S REQUISITION FOR

PAYMENT” IAC/PSCP Form 306.4 must accompany all invoices (See Appendix A, Attachment G herein.) No invoices will be processed for payment without this form being submitted. INVOICES THAT DO NOT HAVE PAYMENTS TO MBE SUB-

CONTRACTORS IDENTIFY BY PLACING A ZERO ON THIS FORM.

c. MCPS is not obligated to make any partial payments. However, partial payments may be considered based upon the Contractor’s justification of expenditures and satisfactory work performed up to 75% of the total contract cost. The remaining balance will be paid upon MCPS acceptance of the project as being 100% complete and in compliance with specifications. MCPS will refrain from making any partial payments if, in MCPS' opinion, the project falls behind schedule. MCPS may resume making partial payments once all delays have been overcome and the project is back on schedule. Final payment shall be made after the project is complete in all detail as specified and accepted by the MCPS Project Coordinator.

II. CONTRACT ADMINISTRATION 17 RFP #4022.9

d. Partial payment invoices shall be accompanied by a detailed schedule of values allocated to various portions of the work (similar to AIA Documents G702 & G703). This schedule, unless objected to by the MCPS Project Coordinator, shall be used as a basis for reviewing the

Contractor’s application for partial payment.

6. Permits & Inspection

The Contractor shall obtain all required permits, pay all fees, and certify that other required permits have been obtained prior to commencing work. Upon completion of all work, obtain all certificates of inspections required and deliver them to the MCPS Project Coordinator. All required permit certificates and related documentation shall be submitted to the MCPS Project Coordinator for approval prior to final payment.

The Contractor is responsible for determining the permitting jurisdiction that has authority and what permits are required such as Montgomery County Government, City of Rockville, City of

Gaithersburg, and Town of Poolesville, etc.

D. STATE FUNDED PROJECT COMPLIANCE REQUIREMENTS

1. The Contractor shall complete and submit to MCPS, CONTRACTOR’S CERTIFICATION OF

RECEIPT OF PAYMENT, included with this BID solicitation package under APPENDIX B. This form shall be completed after the Contractor has received payments from MCPS exceeding the amount of the State funding. At the time of the contract award, the Contractor shall be informed of the actual dollar amount being funded by the State for the project. Once the Contractor has received payment from MCPS exceeding this amount, the Contractor shall have ten days in which to submit

CONTRACTOR’S CERTIFICATION OF RECEIPT OF PAYMENT to MCPS. No further payments will be made to the Contractor until this form has been submitted.

2. THE CONSTRUCTION SIGN SHALL BE ERECTED FOR ALL STATE OF MARYLAND

SCHOOL FUNDED CONSTRUCTION PROGRAM PROJECTS THAT EXCEED

$100,000.00. The Contractor shall supply and install the sign as specified herein in APPENDIX C on the project site. The Contractor has the option of making a specified sign or obtaining the sign from MCE Sign Platt (a State Agency) at 410-799-5102 or 5103. The current price from Maryland

Correctional Enterprises for this sign is $525.00 with a lead-time of approximately one week. The

Contractor shall coordinate the location of the sign with the MCPS Project Coordinator. The

Contractor shall remove the sign and restore the site to its original condition upon the completion of the contract. It will be MCPS option to either retain the sign for future use or have the Contractor dispose of the sign.

E. MARYLAND BUY AMERICAN STEEL ACT

Steel purchased under this BID must be in compliance with the “Maryland Buy American Steel Act “, Sections 17-301 to 17-306 of the State Finance and Procurement Article of the Annotated Code of

Maryland. This applies to steel purchases that are combined or a single purchase that is composed of at least 10,000 pounds of steel products. More detailed information can be found at:

II. CONTRACT ADMINISTRATION 18 RFP #4022.9

http://www.dsd.state.md.us/comar/AnnotCodeIdx/StateFinProcIndex.htm it is the bidder’s responsibility to be in compliance as required if purchasing steel in excess of 10,000 pounds.

F. SALES TAX

Section 326 (a) of Chapter 452 of the Laws of Maryland, 1968, provides, among other things, for the taxation of “any sale . . . of tangible personal property to the Contractors or Builders to be used for the construction, repair, or alteration of real property Sales tax, as applicable, shall be included in any BID made to the Board of Education of Montgomery County, Maryland.

G. PERFORMANCE

1. The Contractor(s) shall specify whether they can provide services during periods outside of normal business hours to include evenings and weekends. MCPS anticipates that work will usually occur during normal business hours. However, some projects, to be determined on a case-by-case basis, may require the Contractor to perform work other than during normal business hours.

2. The Contractor(s) may be asked to provide painting services for multiple school sites concurrently.

The Contractor must provide an estimate of the number of site installations they can support at one time.

3. The Contractor shall have on the job site at least one person fluent in English at all times.

All employees shall have and wear an MCPS badge at all times.

4. The Contractor(s) must provide to the MCPS Project Coordinator cellular telephone numbers and email addresses of project managers to allow for day-to-day direct communications.

5. Work is to be completed in a timely workmanlike manner; fumes, odors, materials, and work procedures will be controlled to protect occupants and property from harm and damage.

6. The Contractor(s) shall furnish the services of an experienced supervisor, who shall be in charge of the work and always provide direction to the crew. The supervisor shall provide constant directions to the crew. The Contractor(s) shall provide the names of the crew assigned to each project. The crew and supervisor must remain the same throughout each project. After the project has started, any employee changes must be approved by the MCPS Project Coordinator prior to the employee reporting to the job.

7. The Contractors and employees:

a. Contractors shall have all employees complete the fingerprint and background check, so they can receive an MCPS badge. All workers will be required to check in daily at the facility’s main office to receive identification badges that shall be worn while on premises.

b. Use of any form of tobacco products, liquor, and/or illegal drugs is not permitted in MCPS buildings and on grounds.

http://www.dsd.state.md.us/comar/AnnotCodeIdx/StateFinProcIndex.htm

II. CONTRACT ADMINISTRATION 19 RFP #4022.9

c. May not routinely use facility equipment and buildings, i.e., telephone, lounges, toilet rooms, parking lots, etc. The MCPS Project Coordinator will designate such facilities as authorized for Contractor use.

8. All work shall be scheduled to the mutual satisfaction of the School Administration and the

MCPS Project Coordinator to avoid conflicts with school activities.

9. Work area shall be left clean and ready for use after the installation. The Contractor must remove all debris generated by the work from the premises daily adhering to Montgomery County Solid

Waste and Recycling Regulation NO. 15-04 AM, COMCOR 48.00.03. The Contractor shall track all recyclable materials such as metal, concrete, asphalt, cardboard, etc., and provide MCPS recyclable amounts by weight.

10. Installation shall be performed in strict compliance with the latest local, state, and federal regulations…

This is the start of the file's text. The full file is on GovTribe.