PR_40219010_Revised_Questions_and_Answers.pdf

PDF 47 KB Posted

Attached to
TR Island Memorial Fountain Cured In Place Pipe Repair/Install
Solicitation number
40219010
Issued by

About this file

Revised Answers to Questions

View the file

Other files

File Type Posted
Pictures_-_Staging_Area_and_Control_Vault.pdf PDF
SF1442-14a_final_7.pdf PDF
PR_40219010_Questions_and_Answers.pdf PDF
854_80109.pdf PDF
854_80115.pdf PDF
850_100109.pdf PDF
Specifications_2015.pdf PDF
Final_Plans-2015.pdf PDF
Section_L_-_Instructions_to_Offerors _Section_M_-_Evaluation_of_Offers.docx DOCX document
DC1_Davis_Bacon_WD_7-15-15.pdf PDF
BID_SHEET_40219010.xlsx XLSX spreadsheet
SF1442-14a_final_6.pdf PDF
SAMPLE_Construction_Clause_under_SAT_(2).docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR 40219010 – TR Island

Questions and Answers

1. Is video of the inside of the pipes available?

a. No.

2. Are all of the drain pipes that lead back to the moat included in the project?

a. Yes.

3. Will there be another site visit?

a. No. Access to the site is not restricted.

Additional Questions and Answers

1. Is the float (that triggers the pump to turn on) operational? Can we assume it is operational?

a. One float is not operational because it does not shut off water supply when water level is met (solenoid stays open). Specifications Section 01 11 000 Summary of Work 1.3(B)(4)(a).

2. What is the age of the liner?

a. Unknown

3. Is the intent to have a working fountain?

a. Yes, the intent is to have an operational fountain and Autofill system. Specifications Section 01 11 000 Summary of Work 1.3(B)(5).

4. Is caulking at the base of the fountains required?

a. Yes. Specifications under Section 01 11 000 Summary of Work 1.3(B)(3) and Section 07 92 13 ‐ Sealant Caulk and Primer 1.1(A)(1)(f).