402-14-567 Record Drawings 2 of 5.pdf

PDF 5 MB Posted

Attached to
J061--Tri-annual Testing Federal contract opportunity
Solicitation number
36C24122Q1146
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains record drawings for electrical system changes made under contract number 36C24122Q1146 for tri-annual testing services. Key details include woodard curran generating the record drawings to document discrepancies found between the actual installed electrical infrastructure and the contract drawings for a medical facility. The drawings note transformer locations and configurations, feeder routes, switch positions, panel locations and circuits. Discrepancies addressed include unknown transformer configurations and feed sources, missing radial connections, non-feed through transformers, and switch and panel modifications.

View the file

Other files for this federal contract opportunity

Other files attached to J061--Tri-annual Testing, newest first.
File Type Posted
LOS Certification.pdf PDF
402-14-567 Record Drawings 4 of 5.pdf PDF
402-14-567 Record Drawings 3 of 5.pdf PDF
402-14-567 Record Drawings 1 of 5.pdf PDF
Coordination Study 03-18-22.pdf PDF
Arc Flash Hazard Analysis 03-18-22.pdf PDF
402-14-567 Record Drawings 5 of 5.pdf PDF
WD-2015-4009.pdf PDF
Past Performance Worksheet.xlsx XLSX spreadsheet
36C24122Q1146.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECORD DRAWINGS

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

12/23/20191 MV SYSTEM CHANGE ORDER ESI #001

4. It is unknown if the other transformers not listed in general note 3 are feed through as shown on contract drawings.

3. Transformers T27, T26, T13, T31 are not feed through as shown on contract drawings.

5. For actaual feeder A routing, see added manholes. Routing was only determined between OH pole line & T22.

FEEDER A (ETR) DISCREPANCIES AS FOUND

Manhole 27Manhole 29 Manhole 32

Radial/tee connection from MH33 does not exist as shown.

B239

This is not a feed through transformer.

It is unknown where the feed comes from - 3/31/21 survey.

Fed from tee splice in MH27 - 6/21 survey due to feeder A issue.

CABINS IN THE WOODS

OH POLE LINE

This transformer does not contain switches for the MV loop. There is only a coil switch - 3/31/21 survey.

There is no load on this transformer - 3/31/21 survey.

ɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

Panelboard MDP-200 remain in place as a junction box for isolated ground conductors from MRI equipment and other imaging equipment B-200 (see RFI 071R).

Panelboard 200-XR is fed from MDP-MRI (room 151) through a 600A breaker in MDP-200 (room 20).

MDP-MRI

600A "200-Xray" circuit ɸ ɸɸ ɸ ɸɸ ɸɸ ɸ ɸ ɸ ɸ ɸ ɸɸ ɸ ɸ ɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

No demolition - per

CO #2.

ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

B200E EF-22 remains in MCC 2N.

There is no space in MCC2NE to relocate per keyed note 2.

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

12/23/20191 MV SYSTEM CHANGE ORDER ESI #001

600A dead break splice

T-4 has a 4 position switch on the primary side:

A only B only A& B Feed through The switch is in the A&B position.

NC

Feeder "F" - 360' Feeder "G" - 1,340'

Switch "F" - T-24 - 45' T-4 - Switch "F" Loop - 1,165'

250MCM 250MCM

ɸ ɸɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

(4) 250

Not installed -fed from

200-DP-LS.

Room 162A

(8) 4/0 w GND

(3) 250 w 350 N ɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

Panel 200-MDP Room 20 600A breaker

Panel MDP-200 is ETS (isolated ground junction box).

(4) 1/0 - 2"C

4" C existing

VFD

ROOM

4 -4C 350 CLX

CABLE

(room 192)

PB

125 AF

125 AT

250 AF

125 AT

60AT

125AF

MP-CT

ROOM

C102

CB-1

(Cat Scan

UPS)

ROOM

C102 ɸ ɸɸ ɸ ɸɸ ɸɸ ɸ ɸ ɸ ɸ ɸ ɸɸ ɸ ɸ ɸɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

All elevator work deleted from contract - per C0 #2.

ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827 ground floor junction box

3- 4C 350 CLX

4th floor junction box new HOA motor starter per

RFI

ɸ ɸ ɸ ɸ ɸɸ ɸ

WOODARD

CURRAN COMMITMENT & INTEGRITY DRIVE RESULTS

| www.woodardcurran.com

41 Hutchins Drive, Portland, Maine 04102 207.774-2112

ISSUE FOR CONSTRUCTION

S T

A T E O F M A I N E

P R O F E S S I O N A L E N G I N E E

RL

I C E N S E D

ANDREW J.

FITZPATRICK

No. 11827

B200E EF-22 remains in MCC 2N

File details come from the government source that posted it. Updated .