401911-OP JOHNSTONE OSP.pdf

PDF 78 KB Posted

Attached to
PUMPS
Solicitation number
S-29100-00004714
Issued by
Marion County, Oregon

About this file

This document is a purchase order from the Oregon Department of Corrections for the procurement of two Grundfos CR 15-7 A-GJ-A-E-HQQE pumps and three Taco CI series close-coupled suction pumps from vendor WSI Manufacturing Inc. The pumps are required to be delivered by February 17, 2023. This is not an open bid opportunity, as the purchase order has already been awarded to Johnstone Supply of Waltham.

The total order value is $29,545.87, which includes the cost of the pumps and an estimated freight charge of $2,000. The purchase order specifies the detailed technical specifications for each type of pump, including motor size, rpm, voltage, and other critical details. No further information is provided about the overall project or contract this purchase order is associated with.

View the file

Other files

File Type Posted
Notice of Intent to Purchase - NW Bus Sales.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHD1

Page - 1 STATE OF OREGON Order No. - 401911 OP PHD2 DEPARTMENT OF CORRECTIONS Date - 10/18/22 99364 PHD3RRAN8 08 PURCHASE ORDER Brn/Plt - 89597015 PHD4RRMCU 12

401911 PHD5RRDOC2 08

SHIP TO: BILL TO: PHD6

DEPARTMENT OF CORRECTIONS Oregon Department Of Corrections PHD7

OREGON STATE PENITENTIARY DOC.APINVOICES@DOC.OREGON.GOV PHD8

2605 STATE ST NE 3723 Fairview Industrial DR SE, STE 200 PHD9 SALEM OR 97310-0505 Salem OR 97302 PHDA

PHDB

PHDC

PHDD

PHDE

VENDOR: PHDF

PHDG

WSI Manufacturing Inc PHDH Johnstone Supply of Waltham PHDI 303 Bear Hill Rd PHDJ Waltham MA 02451 PHDK

PHDL

PHDM

PHDN

PHDO

PHDP

QUOTED BY : STEVE K. NOTE: Order number must be marked PHDQ SHIPPING FOB : Prepay and Add to Invoice clearly on outside of shipping PHDR DELIVERY DATE: 02/17/23 cartons or order may be rejected. PHDS ----------------------------------------------------------------------------------------------- CHD1 Line Description Quantity UM Unit Price Total Price CHD2

TXT2

1 GRUNDFOS CR 15-7 A-GJ-A-E-HQQE 2 EA 6,870.7000 13,741.40 DTL1* DETAIL

15 HP, 3PH, 3500 RPM, TRI-VOLT DTL2

GR99917483 DTL3

TEFC PREMIUM EFFICIENCY MOTOR. TXT1

. TXT1

LEAD TIME 12 - 14 WEEKS (APPROXIMATELY 2/17/23) TXT1

TXT2

2 C1509F2JADZAC730D 3 EA 4,601.4900 13,804.47 DTL1* DETAIL

TACO CI SERIES CLOSE COUPLED DTL2

SUCTION PUMP, 2 1/2" (64 MM) SUCTION, 1 1/2" (38 MM) TXT1

DISCHARGE, 9 1/2" NOMINAL IMPELLER DIAMETER, 1750 RPM, TEFC, TXT1

NO DRIP COVER, 3 HP, STARTING OPTION = ACROSS THE LINE TXT1

(STANSTANDARD),230-460/60/3 USABLE AT 208, 40 DEG C TXT1

AMBIENT/NEMA STD./CCW (STANDARD), BALDOR,PREMIUM EFFICIENCY TXT1

MEETS MG1-12.55 WITH AEGIS SHAFT GROUNDING, SEAL = SILICON- TXT1

CARBIDE SEAT, CARBON ROTOR, EPT RUBBER, 250 DEG F, CLEAN TXT1

WATER, ATERRIAL OF CONSTRUCTION = CAST IRON CASING, BRONZE TXT1

IMPELLER, BRONZE SHAFT SLEEVE, ANSI CLASS 125 TXT1

FLANGES WITHOUT WEAR RING, MOTOR FRAME = 182, MOTOR FRAME TXT1

STYLE = JM WITH FEET. SIZED FOR 60 GPM @ 60' TDH TXT1

. TXT1

LEAD TIME 12-16 WEEKS (APPROXIMATELY 2/17/23). TXT1

TXT2

3 FREIGHT ESTIMATE - SUPPLIER 2000 EA 1.0000 2,000.00 DTL1* DETAIL

WILL INVOICE ACTUAL AMOUNT. DTL2

TXT2*EDETAIL

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

TXT2

Total Order: 29,545.87 TOTB ----------------------------------------------------------------------------------------------- TOTC Req No 368852 OR TOTD

TOTE

TOTF

X TOTG

Authorized Purchasing Agent TOTH

CRAIG HEILMAN TOTI

(503) 983-0969 TOTJ

Fax # TOTK mailto:craig.l.heilman@doc.oregon.gov TOTL

2022-10-18T06:12:58-0700
Craig L. Heilman