This is a Scope of Work and bidding document for a window and door replacement project at SOWELA Technical Community College in Lake Charles, Louisiana, issued by the State of Louisiana's Division of Administration. The project involves replacement of windows and doors in the Charleston Building at SOWELA and is identified as Project No. 01-107-24-05, BID NUMBER F.01004577. A mandatory pre-bid conference is scheduled for December 2, 2026 at 2:00 PM, with the bid opening date set for December 16, 2026 at 2:00 PM at the Regional Training Center, Conference Room 204. Sealed bids must be submitted to SOWELA's Purchasing Office, located in the Charleston Building, Room 136, addressed to Susan Tucek. The contract completion time is 270 consecutive calendar days from the Notice to Proceed. The project involves selective structure demolition, metal fabrications, joint sealants, hollow metal doors and frames, aluminum framed entrances and storefronts, door hardware, glazing, Portland cement plaster, and roller window shades. Bids will be accepted only from contractors licensed under Louisiana Revised Statutes 37:2150-2192 for Building Construction classification.

Bidders must submit bid security equal to 5% of the base bid and all alternates in the form of a certified check, cashier's check, or bid bond. The successful bidder will be required to furnish a Performance and Payment Bond in an amount equal to 100% of the contract amount. Liquidated damages are assessed at $1,200.00 per consecutive calendar day for non-completion beyond the contract completion date. The project is exempt from sales and use taxes, with contractors required to apply for Louisiana tax exemption through the Louisiana Taxpayer Access Point (LaTAP). No bid may be withdrawn for 45 days after receipt unless under specific provisions of Louisiana law. The bid documents are available electronically without charge from LaPAC Public Menu and www.centralbidding.com, with printed copies available through reprographic firms. The contract requires compliance with FEMA Public Assistance Program requirements if federal funding is involved. The State reserves the right to reject any and all bids and states that the award is contingent upon the sale of bonds by the State Bond Commission, with no obligation incurred until the contract is fully executed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOWELA TECHNICAL COMMUNITY COLLEGE

SUSAN TUCEK

3820 SEN J B JOHNSTON AVENUE

LAKE CHARLES, LA 70615

LINE NO QUANTITY UNIT UNIT

ORDERED PRICE

1 1 JOB

EMAIL: susan.tucek@sowela.edu

STATE OF LOUISIANA

SOWELA TECHNICAL COMMUNITY COLLEGE

AGENCY INVITATION TO BID

PURCHASING AGENT: Susan Tucek BID NUMBER

F.01004577

BID OPENING DATE/TIME: MANDATORY PRE-BID CONFERENCE

12/16/26 12/02/26

2:00 PM 2:00 PM

VENDOR NAME DELIVER BID BEFORE OPENING DATE/TIME TO:

SIGNATURE:

DATE:

COMMODITY/SERVICE DESCRIPTION EXTENDED AMOUNT

WINDOW AND DOOR REPLACEMENT

PROJECT

TO THE VENDOR:

BID BOND OF 5% REQUIRED FOR THIS BID

TOTAL BID

BID BOND ATTACHED $

CERTIFIED CHECK ATTACHED $

PERFORMANCE BOND WILL BE REQUIRED

LOUISIANA CONTRACTORS LICENSE #

mailto:susan.tucek@sowela.edu mailto:susan.tucek@sowela.edu

PROJECT DESIGN TEAM:

David Brossett, AIA Laila Jones

Kayla Smith

Brossett Architect LLC · 414 Pujo St., Lake Charles, LA 70601 · 337.439.8400 · brossettarchitect.com

Project Manual July 30, 2026

Window and Door Replacements, Charleston Building, SOWELA Technical

Community College Project No. 01-107-24-05, F.01004577

Site code: 5-10-024 Building ID:

State of Louisiana Jeff Landry, Governor

Division of Administration Taylor Barras, Commissioner of Administration

Office of Facility Planning and Control Matthew Baker, Director

Window & Door Replacement Charleston Bldg-SOWELA 000110-1

BROSSETT ARCHITECT, LLC TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00

Advertisement for Bids Instructions to Bidders Bid Form Bid Bond AIA A201 General Conditions Supplementary Conditions Contract Between Owner and Contractor and Performance and Payment Bond Non-Collusion Affidavit Affidavit Schedule of Values Change Order Recommendation of Acceptance Partial Occupancy Liquid Damages Assessment Application and Certification for Payment Form

DIVISION 01 GENERAL REQUIREMENTS

Section 011000 Summary Section 012000 Price and Payment Procedures Section 013000 Administrative Requirements Section 014216 Definitions & Standards Section 014219 References Section 014500 Quality Requirements Section 015000 Temporary Facilities and Controls Section 016000 Product Requirements Section 017000 Execution and Closeout Requirements Section 017329 Cutting and Patching and Repair

DIVISION 02 EXISTING CONDITIONS

Section 024119 Selective Structure Demolition

DIVISION 05 METALS

Section 055000 Metal Fabrications

DIVISION 07 THERMAL AND MOISTURE PROTECTION

Section 079200 Joint Sealants

DIVISION 08 OPENINGS

Section 081113 Hollow Metal Doors and Frames Section 084113 Aluminum Framed Entrances and Storefronts Section 087100 Door Hardware Section 088000 Glazing

Window & Door Replacement Charleston Bldg-SOWELA 000110-2

BROSSETT ARCHITECT, LLC TABLE OF CONTENTS

DIVISION 9 FINISHES

Section 092400 Portland Cement Plaster

DIVISION 12 FURNISHINGS

Section 122413 Roller Window Shades

Brossett Architect LLC · 414 Pujo St., Lake Charles, LA 70601 · 337.439.8400 · brossettarchitect.com

The following specification sections have been prepared by Brossett Architect LLC by or under the direct supervision of David Brossett, AIA

Specification sections

Section 011000 Summary Section 012000 Price and Payment Procedures Section 013000 Administrative Requirements Section 014216 Definitions & Standards Section 014219 References Section 014500 Quality Requirements Section 015000 Temporary Facilities and Controls Section 016000 Product Requirements Section 017000 Execution and Closeout Requirements Section 017329 Cutting and Patching and Repair Section 024119 Selective Structure Demolition Section 055000 Metal Fabrications Section 079200 Joint Sealants Section 084113 Aluminum Framed Entrances and Storefronts Section 088000 Glazing Section 122413 Roller Window Shades david 2026 10 10

ADVERTISEMENT FOR BIDS

Sealed bids for the SOWELA Charleston Building Window and Door Replacement project will be received by the SOWELA

Purchasing Office, located in the Charleston Building, Room 136, Attention: Susan Tucek, 3820 Senator J Bennett Johnston Ave, Lake Charles, LA 70615. The deadline for receipt of bids is 2:00 PM on Wednesday, December 16, 2026, at which time bids will be opened and read aloud in a public meeting in the Regional Training Center, Conference Room 204, 3749 Senator J Bennett Johnston

Ave, Lake Charles LA 70615

FOR: Window and Door Replacements, Charleston Building, SOWELA Technical Community College

PROJECT NUMBER: 01-107-24-05, F.01004577

Complete Bid Documents for this project are available in electronic form. They may be obtained without charge and without deposit from LaPAC Public Menu https://wwwcfprd.doa.louisiana.gov/osp/lapac/pubMain.cfm (#40002_F.01004577) OR Brossett Architect, LLC. Bid Documents may also be obtained from www.centralbidding.com for a nominal charge or subscription. Printed copies are not available from the Designer, but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to the Designer at:

Designer Firm Name Brossett Architect, LLC

Address 414 Pujo Street, Lake Charles LA 70601

Telephone (337) 439-8400

Email david@brossettarchitect.com

All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project.

The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project.

A MANDATORY PRE-BID CONFERENCE WILL BE HELD

at 2:00 PM on Wednesday, December 2, 2026 at Regional Training Center, Conference Room 204, 3749 Senator J Bennett

Johnston Ave, Lake Charles LA 70615

Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Building

Construction. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214.

Bids may also be submitted by electronic means via website www.centralbidding.com. Free registration is required to submit a bid via the Central Bidding website.

The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity.

When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed.

Louisiana Community and Technical Colleges is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the Veteran-Owned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation. Information is available from its website at https://www.doa.la.gov/doa/fpc/.

If you have a disability and would like to request an accommodation in order to participate in this meeting, please contact Scott

Anderson at scott.anderson@sowela.edu or (337) 421-6923 as soon as possible but no later than 48 hours before the scheduled meeting.

LOUISIANA COMMUNITY AND TECHNICAL COLLEGES Advertisement Run Dates

EXECUTIVE VICE PRESIDENT November 17, 2026

W. CHANDLER LEBOEUF November 24, 2026

FEBRUARY 2026 December 1, 2026 https://wwwcfprd.doa.louisiana.gov/osp/lapac/pubMain.cfm http://www.centralbidding.com/ http://www.centralbidding.com/ https://www.doa.la.gov/doa/fpc/ mailto:scott.anderson@sowela.edu

February 2026 IB -1

INSTRUCTIONS TO BIDDERS

COMPLETION TIME:

The Bidder shall agree to fully complete the contract within (270) consecutive calendar days, subject to such extensions as may be granted under Paragraph 8.3, in the General Conditions and the Supplementary Conditions, and acknowledges that this construction time will start on or before the date specified in the written “Notice to Proceed” from the Owner.

LIQUIDATED DAMAGES:

The Bidder shall agree to pay as Liquidated Damages the amount of One thousand two hundred Dollars ($1,200.00) for each consecutive calendar day for which the work is not complete, beginning with the first day beyond the contract completion date stated on the “Notice to Proceed” or as amended by change order.

TAX EXEMPTION:

The project is to be exempt from sales and use taxes imposed by any taxing authority. The successful contractor / subcontractors will be required to submit the appropriate tax exemption form To apply for Louisiana tax exemption, contractors must have a LaTAP account and be registered for Sales Tax in order to submit the application. The Form R-85012 application can now only be filed electronically through Louisiana Taxpayer Access Point (LaTAP). The application must include the LaGov contract number which can be found on the executed contract, a brief project description, Notice to Proceed (NTP) start and end dates, and an uploaded copy of the executed contract. The following is information to include on the form for the project:

Public Entity: Louisiana Community and Technical Colleges LCTC State Tax ID #: 0407197 LDR Sales Tax Account #: N/A For assistance or questions on this process, contact the following:

LaTAP Questions or Assistance: Call (855) 307 3893 or email Taxpayer.AccessPoint@LA.GOV Application Process Questions: LDRSales.ExemptionApplications@la.gov General Sales Tax Questions: Sales.inquiries@la.gov Exemption Qualification Questions: PolicySales@la.gov Legal Interpretation Questions: PolicySales@la.gov

ARTICLE 1

DEFINITIONS

1.1 The Bid Documents shall include the following:

Advertisement for Bids Instructions to Bidders Bid Form Bid Bond Form General Conditions of the Contract for

Construction, AIA Document A201, 2017 Edition

Supplementary Conditions Contract Between Owner and Contractor and Performance and Payment Bond and Non-Collusion Affidavit

Attestations Affidavit – 10 day document User Documents (if applicable) Pre-Construction Conference Agenda Schedule of Values Change Order Form

Recommendation of Acceptance Partial Occupancy Form Building Plaque (if applicable)

Asbestos Abatement (if applicable) Other Documents (if applicable) Specifications & Drawings Addenda issued during the bid period to be acknowledged on the Bid Form

1.2 All definitions set forth in the General Conditions

of the Contract for Construction, AIA Document A201 and the Supplementary Conditions are applicable to the Bid Documents.

1.3 Addenda are written and/or graphic instruments

issued by the Designer prior to the opening of bids, which modify or interpret the Bid Documents by additions, deletions, clarifications, corrections and prior approvals.

https://latap.revenue.louisiana.gov/_/

February 2026 IB -2

1.4 A bid is a complete and properly signed proposal

to do the work or designated portion thereof for the sums stipulated therein supported by data called for by the Bid Documents.

1.5 Base bid is the sum stated in the bid for which the

Bidder offers to perform the work described as the base, to which work may be added, or deleted for sums stated in alternate bids.

1.6 An alternate bid (or alternate) is an amount stated

in the bid to be added to the amount of the base bid if the corresponding change in project scope or materials or methods of construction described in the Bid Documents is accepted.

1.7 A Bidder is one who submits a bid for a prime

Contract with the Owner for the work described in the Bid Documents.

1.8 A Sub-bidder is one who submits a bid to a

Bidder for materials and/or labor for a portion of the work.

1.9 Where the word "Architect" is used in any of the

documents, it shall refer to the Designer of record of the project, regardless of discipline.

ARTICLE 2

PRE-BID CONFERENCE

2.1 A Pre-Bid Conference shall be held at least 10

days before the date for receipt for bids. The Designer shall coordinate the setting of the date, time and place for the Pre-Bid Conference with the User and shall notify, in writing, the Owner and all who have received sets of the Bid Documents to attend.

The purpose of the Pre-Bid Conference is to familiarize Bidders with the requirements of the Project and the intent of the Bid Documents, and to receive comments and information from interested Bidders. If the Pre-Bid Conference is stated in the Advertisement for Bids to be a Mandatory Pre-Bid Conference, bids shall be accepted only from those Bidders who attend the Pre-Bid Conference. Bidders who are not in attendance for the entire Pre-Bid Conference will be considered to have not attended.

2.2 Any revision of the Bid Documents made as a

result of the Pre-Bid Conference shall not be valid unless included in an addendum.

ARTICLE 3

BIDDER'S REPRESENTATION

3.1 Each Bidder by making his bid represents that:

3.1.1 He has read and understands the Bid

Documents and his bid is made in accordance therewith.

3.1.2 He has visited the site and has familiarized

himself with the local conditions under which the work is to be performed.

3.1.3 His bid is based solely upon the materials, systems and equipment described in the Bid Documents, as advertised and as modified by addenda.

3.1.4 His bid is not based on any verbal

instructions contrary to the Bid Documents and addenda.

3.1.5 He is familiar with Code of Governmental

Ethics requirement that prohibits public servants and/or their immediate family members from bidding on or entering into contracts; he is aware that the Designer and its principal owners are considered Public Servants under the Code of Governmental Ethics for the limited purposes and scope of the Design Contract with the State on this Project (see Ethics Board Advisory Opinion, No. 2009-378 and 2010-128); and neither he nor any principal of the Bidder with a controlling interest therein has an immediate family relationship with the Designer or any principal within the Designer’s firm (see La. R.S.

42:1113). Any Bidder submitting a bid in violation of this clause shall be disqualified and any contract entered into in violation of this clause shall be null and void.

3.2 The Bidder must be fully qualified under any

State or local licensing law for Contractors in effect at the time and at the location of the work before submitting his bid. In the State of Louisiana, Revised Statutes 37:2150, et seq. will be considered, if applicable.

The Bidder shall be responsible for determining that all of his Sub-bidders or prospective Subcontractors are duly licensed in accordance with law.

https://ethics.la.gov/EthicsOpinion/DocView.aspx?id=75159&searchid=eb0bbd79-91f9-4b22-960c-bce2b816a427&dbid=0 https://ethics.la.gov/EthicsOpinion/DocView.aspx?id=23157&searchid=ee695476-bc17-452f-883d-223f91fdb9bf&dbid=0 https://legis.la.gov/legis/Law.aspx?d=99217 https://legis.la.gov/legis/Law.aspx?d=99217 https://www.legis.la.gov/legis/Law.aspx?d=93566 https://www.legis.la.gov/legis/Law.aspx?d=93566

February 2026 IB -3

ARTICLE 4

BID DOCUMENTS

4.1 Copies

4.1.1 The Designer shall provide the Bid

Documents in electronic format. They may be obtained without charge and without deposit as stated in the Advertisement for Bids.

Bid Documents may also be obtained from www.centralbidding.com for a nominal charge or subscription. Printed copies are not available from the Owner or Architect, but arrangements can be made to obtain printed Bid Documents through most reprographic firms. Bidders are responsible for any subscription, downloading, reproduction or mailing costs.

4.1.2 Printed copies will not be available from the

Designer, but arrangements can be made to obtain them through most reprographic firms and/or plan rooms. All plan holders are responsible for their own reproduction costs.

4.1.3 Complete sets of Bid Documents shall be

used in preparing bids; neither the Owner nor the Designer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.

4.1.4 The Owner or Designer in making the Bid

Documents available on the above terms, do so only for the purpose of obtaining bids on the work and do not confer a license or grant for any other use.

4.2 Interpretation or Correction of Bid Documents

4.2.1 Bidders shall promptly notify the Designer

of any ambiguity, inconsistency or error which they may discover upon examination of the Bid Documents or of the site and local conditions.

4.2.2 Bidders requiring clarification or

interpretation of the Bid Documents shall make a written request to the Designer, at least seven days prior to the date for receipt of bids.

4.2.3 Any interpretation, correction or change to

the Bid Documents will be made by addendum.

Interpretations, corrections or changes to the Bid Documents made in any other manner will not be binding and Bidders shall not rely upon such interpretations, corrections and changes.

4.3 Substitutions

4.3.1 The materials, products and equipment

described in the Bid Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. All substitutions shall be in accordance with La. R.S.

38:2212(T)(2).

4.3.2 For closed specifications, when a potential

supplier submits a particular product for prior approval other than a product specified in the Bid Documents, said product will not be considered unless written request for approval has been submitted by the Bidder and has been received by the Designer at least fourteen (14) working days prior to the opening of bids. (La. R.S. 38:2295(C)) Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitution, including model numbers, drawings, cuts, performance and test data and any other information necessary for an evaluation. A statement setting forth any changes in other materials, equipment or work that incorporation of the substitution would require shall be included. It shall be the responsibility of the Bidder to include in his bid all changes required of the Bid Documents if the proposed product is used.

Prior approval, if given, is contingent upon supplier being responsible for any costs which may be necessary to modify the space or facilities needed to accommodate the materials and equipment approved.

4.3.3 If the Designer approves any proposed

substitution, such approval shall be set forth in an addendum. Bidders shall not rely upon approvals made in any other manner.

4.4 Addenda

4.4.1 Addenda will be transmitted to all who are

known by the Designer to have requested and/or received a complete set of Bid Documents.

4.4.2 Copies of addenda will be made available for

inspection wherever Bid Documents are on file for that purpose.

https://www.legis.la.gov/legis/Law.aspx?d=94916 https://www.legis.la.gov/legis/Law.aspx?d=94916 https://legis.la.gov/legis/Law.aspx?d=94989

February 2026 IB -4

4.4.3 In accordance with La. R.S.

38:2212(O)(2)(b) addenda shall not be issued within a period of seventy-two (72) hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays. If the necessity arises of issuing an addendum modifying plans and specifications within the seventy-two (72) hour period prior to the advertised time for the opening of bids, then the opening of bids shall be extended at least seven but no more than twenty-one (21) working days, without the requirement of re-advertising. LCTC shall be consulted prior to issuance of such an addendum and shall approve such issuance. The revised time and date for the opening of bids shall be stated in the addendum.

4.4.4 Each Bidder shall ascertain from the

Designer prior to submitting his bid that he has received all addenda issued, and he shall acknowledge their receipt on the Bid Form.

4.4.5 The Owner shall have the right to extend the

bid date by up to (30) thirty days without the requirement of re-advertising. Any such extension shall be made by addendum issued by the Designer.

ARTICLE 5

BID PROCEDURE

5.1 Form and Style of Bids

5.1.1 Bids shall be submitted on the Louisiana

Uniform Public Work Bid Form provided by the Designer for this project.

5.1.2 The Bidder shall ensure that all applicable

blanks on the Bid Form are completely and accurately filled in.

5.1.3 Bid sums shall be expressed in both words

and figures, and in case of discrepancy between the two, the written words shall govern.

5.1.4 Any interlineation, alteration or erasure must

be initialed by the signer of the bid or his authorized representative.

5.1.5 Bidders are cautioned to complete all

alternates should such be required in the Bid Form.

Failure to submit alternate prices will render the bid non responsive and shall cause its rejection.

5.1.6 Bidders are cautioned to complete all unit

prices should such be required in the Bid Form. Unit prices represent a price proposal to do a specified quantity and quality of work. Unit prices are incorporated into the base bid or alternates, as indicated on the Unit Price Form, but are not the sole components thereof.

5.1.7 Bidder shall make no additional stipulations

on the Bid Form nor qualify his bid in any other manner.

5.1.8 Written evidence of the authority of the

person signing the bid for the public work shall be submitted in accordance with La. R.S.

38:2212(B)(5).

5.1.9 On any bid in excess of fifty thousand dollars

($50,000.00), the Bidder shall certify that he is licensed under La. R.S. 37: 2150-2173 and show his license number on the bid above his signature or his duly authorized representative.

5.2 Bid Security

5.2.1 No bid shall be considered or accepted

unless the bid is accompanied by bid security in an amount of five percent (5.0%) of the base bid and all alternates.

The bid security shall be in the form of a certified check or cashier's check drawn on a bank insured by the Federal Deposit Insurance Corporation, or a Bid Bond written by a surety company licensed to do business in Louisiana and signed by the surety's agent or attorney-in-fact. The Bid Bond shall be written on the LCTC Bid Bond Form, and the surety for the bond must meet the qualifications stated thereon.

The Bid Bond shall include the legal name of the Bidder, be in favor of the State of Louisiana, Division of Administration, Office of LCTC, and shall be accompanied by appropriate power of attorney. The Bid Bond must be signed by both the Bidder/principal and the surety in the space provided on the LCTC Bid Bond Form. Failure by the Bidder/principal or the surety to sign the Bid Bond shall result in the rejection of the bid.

Bid security furnished by the Bidder shall guarantee that the Bidder will, if awarded the work according to the terms of his proposal, enter into the https://www.legis.la.gov/legis/Law.aspx?d=94916 https://www.legis.la.gov/legis/Law.aspx?d=94916 https://legis.la.gov/legis/Law.aspx?d=94916 https://legis.la.gov/legis/Law.aspx?d=94916 https://legis.la.gov/legis/Law.aspx?d=93566

February 2026 IB -5

Contract and furnish Performance and Payment Bonds as required by these Bid Documents, within fifteen (15) days after written notice that the instrument is ready for his signature.

Should the Bidder refuse to enter into such Contract or fail to furnish such bonds, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as penalty.

5.2.2 The Owner will have the right to retain the

bid security of Bidders until either (a) the Contract has been executed and bonds have been furnished, or

(b) the specified time has elapsed so that bids may be withdrawn, or (c) all bids have been rejected.

5.3 Submission of Bids

5.3.1 The bid shall be sealed in an opaque

envelope. The bid envelope shall be identified on the outside with the name of the project, and the name, address, and license number of the Bidder.

The envelope shall not contain multiple bid forms, and will be received until the time specified and at the place specified in the Advertisement for Bids. It shall be the specific responsibility of the Bidder to deliver his sealed bid to designated Designer at the appointed place and prior to the announced time for the opening of bids. Late delivery of a bid for any reason, including late delivery by United States Mail, express delivery, or misdirection by any party, shall disqualify the bid.

If the bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "Bid Enclosed" on the face thereof. Such bids shall be sent by Registered or Certified Mail, Return Receipt Requested, addressed to:

SOWELA

Charleston Building, Room 136

Attn: Susan Tucek, Purchasing

3820 Senator J Bennett Johnston Ave

Lake Charles, LA 70615

5.3.2 Bids shall be deposited at the designated

location prior to the time on the date for receipt of bids indicated in the Advertisement for Bids, or any extension thereof made by addendum. Bids received after the time and date for receipt of bids will be returned unopened.

5.3.3 Bidder shall assume full responsibility for

timely delivery at location designated for receipt of bids.

5.3.4 Oral, telephonic or telegraphic bids are

invalid and shall not receive consideration. Owner shall not consider notations written on outside of bid envelope which have the effect of amending the bid.

Written modifications enclosed in the bid envelope, and signed or initialed by the Contractor or his representative, shall be accepted.

5.3.5 Bids may also be submitted by electronic

means via website www.centralbidding.com. Free registration is required in order to submit a bid via the Central Bidding website.

5.4 Modification or Withdrawal of Bid

5.4.1 A bid may not be modified, withdrawn or

canceled by the Bidder during the time stipulated in the Advertisement for Bids, for the period following the time and bid date designated for the receipt of bids, and Bidder so agrees in submitting his bid, except in accordance with La. R.S. 38:2214 which states, in part, "Bids containing patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to the public entity within forty-eight hours of the bid opening excluding Saturdays, Sundays, and legal holidays".

5.4.2 Prior to the time and date designated for

receipt of bids, bids submitted early may be modified or withdrawn only by notice to the party receiving bids at the place and prior to the time designated for receipt of bids.

5.4.3 Withdrawn bids may be resubmitted up to

the time designated for the receipt of bids provided that they are then fully in conformance with these Instructions to Bidders.

5.4.4 Bid Security shall be in an amount sufficient

for the bid as modified or resubmitted.

5.5 Prohibition of Discriminatory Boycotts of Israel

https://legis.la.gov/legis/Law.aspx?p=y&d=94923

February 2026 IB -6

By submitting a bid, the Bidder certifies and agrees that the following information is correct:

In preparing its bid, the Bidder has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not, in the solicitation, selection, or commercial treatment of any subcontractor or supplier, refused to transact or terminated business activities, or taken other actions intended to limit commercial relations, with a person or entity that is engaging in commercial transactions in Israel or Israel-controlled territories, with the specific intent to accomplish a boycott or divestment of Israel. The Bidder has also not retaliated against any person or other entity for reporting such refusal, termination, or commercially limiting actions. The state reserves the right to reject any bid if this certification is subsequently determined to be false and to terminate any contract awarded based on such a false response.

ARTICLE 6

CONSIDERATION OF BIDS

6.1 Opening of Bids

6.1.1 The properly identified Bids received on

time will be opened publicly and will be read aloud, and a tabulation abstract of the amounts of the base bids and alternates, if any, will be made available to Bidders after bid opening.

6.2 Rejection of Bids

6.2.1 The Owner shall have the right to reject any

or all bids and in particular to reject a bid not accompanied by any required bid security or data required by the Bid Documents or a bid in any way incomplete or irregular.

6.3 Acceptance of Bid

6.3.1 It is the intent of the Owner, if he accepts any

alternates, to accept them in the order in which they are listed in the Bid Form. Determination of the Low Bidder shall be on the basis of the sum of the base bid and the alternates accepted. However, the Owner shall reserve the right to accept alternates in any order which does not affect determination of the Low Bidder.

ARTICLE 7

POST-BID INFORMATION

7.1 Submissions

7.1.1 At the Pre-Construction Conference, the

Contractor shall submit the following information to the Designer.

7.1.1.1 A designation of the work to be performed

by the Contractor with his own forces.

7.1.1.2 A breakdown of the Contract cost

attributable to each item listed in the Schedule of Values Form. No payments will be made to the Contractor until this is received.

7.1.1.3 The proprietary names and the suppliers of

principal items or systems of material and equipment proposed for the work.

7.1.1.4 A list of names and business domiciles of all

Subcontractors, manufacturers, suppliers or other persons or organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the work. It is the preference of the Owner that, to the greatest extent possible or practical, the Contractor utilize Louisiana Subcontractors, manufacturers, suppliers and labor.

7.1.2 The General Contractor shall be responsible

for actions or inactions of Subcontractors and/or material suppliers.

The General Contractor is totally responsible for any lost time or extra expense incurred due to a Subcontractor's or Material Supplier's failure to perform. Failure to perform includes, but is not limited to, a Subcontractor's financial failure, abandonment of the project, failure to make prompt delivery, or failure to do work up to standard. Under no circumstances shall the Owner mitigate the General Contractor's losses or reimburse the General Contractor for losses caused by these events.

7.1.3 The lowest responsive and responsible

Bidder shall submit to the Designer and the Owner within ten days after the bid opening a letter/letters from the manufacturer stating that the manufacturer will issue the roof system guarantee complying with the requirements of LCTC based on the specified roof system and include the name of the applicator

February 2026 IB -7 acceptable to the manufacturer at the highest level of certification for installing the specified roof system.

This manufacturer shall be one that has received prior approval or is named in the specifications.

In accordance with La. R.S. 38:2227 [references La. R.S. 38:2212(A)(3)(c)(ii), which has since been renumbered as La. R.S. 38:2212(B)(3)(a)], La. R.S.

38:2212.10 and La. R.S. 23:1726(B) the apparent low Bidder on this project shall submit the completed Attestations Affidavit (Past Criminal Convictions of Bidders, Verification of Employees and Certification Regarding Unpaid Workers Compensation Insurance) form found within this bid package to LCTC within 10 days after the opening of bids. The Attestations Affidavit may also be submitted in the bid envelope.

ARTICLE 8

PERFORMANCE AND PAYMENT BOND

8.1 Bond Required

8.1.1 The Contractor shall furnish and pay for a

Performance and Payment Bond written by a company licensed to do business in Louisiana, which shall be signed by the surety's agent or attorney-in-fact, in an amount equal to 100% of the Contract amount. Surety must be listed currently on the U. S. Department of Treasury Financial Management Service List (Treasury List) as approved for an amount equal to or greater than the contract amount, or must be an insurance company domiciled in Louisiana or owned by Louisiana residents. If surety is qualified other than by listing on the Treasury list, the contract amount may not exceed fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance and may not exceed the amount of $500,000. However, a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A. M.

Best's Key Rating Guide shall not be subject to the $500,000 limitation, provided that the contract amount does not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide nor fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance.

The Bond shall be signed by the surety's agent or attorney-in-fact. The Bond shall be in favor of the State of Louisiana, LCTC.

8.2 Time of Delivery and Form of Bond

8.2.1 The Contractor shall deliver the required

bond to the Owner simultaneous with the execution of the Contract.

8.2.2 Bond shall be in the form furnished by -

LCTC, Entitled Contract Between Owner And Contractor And Performance And Payment Bond, a copy of which is included in the Bid Documents.

8.2.3 The Contractor shall require the

Attorney-in-Fact who executes the required bond on behalf of the surety to affix thereto a certified and current copy of his power of Attorney.

ARTICLE 9

FORM OF AGREEMENT BETWEEN OWNER

AND CONTRACTOR

9.1 Form to be Used

9.1.1 Form of the Contract to be used shall be

furnished by LCTC, an example of which is bound in the Bid Documents.

9.2 Award

9.2.1 After award of the Contract and prior to

Contract execution, the successful Bidder, if a corporation, shall have on file with the Louisiana Secretary of State, a Disclosure of Ownership Affidavit, in accordance with La. R.S. 12:1-1622, 12:205(C) and 12:304(A)(11).

9.2.2 In accordance with Louisiana Law, when the

Contract is awarded, the successful Bidder shall, at the time of the signing of the Contract, execute the Non-Collusion Affidavit included in the Contract Documents

9.2.3 When this project is financed either partially

or entirely with State Bonds, the award of this Contract is contingent upon the sale of bonds by the State Bond Commission. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is duly executed.

https://legis.la.gov/legis/Law.aspx?d=94942 https://legis.la.gov/legis/Law.aspx?d=94916 https://legis.la.gov/legis/Law.aspx?d=762928 https://legis.la.gov/legis/Law.aspx?d=83691 https://www.legis.la.gov/legis/Law.aspx?d=920470 https://www.legis.la.gov/legis/Law.aspx?d=76391 https://www.legis.la.gov/legis/Law.aspx?d=76475

February 2026 IB -8

ARTICLE 10

10.1.1 The Owner intends to pursue reimbursement

of eligible Project costs from funding sources including Federal Emergency Management Agency (FEMA) Public Assistance Program, therefore compliance with applicable Federal Contract Clauses (attached as Exhibit A to Owner-Contractor Agreement) is required.

LOUISIANA UNIFORM PUBLIC WORK BID FORM

TO: SOWELA Charleston Bldg, Room 136 Attn: Susan Tucek, Purchasing 3820 Senator J Bennett Johnson Ave Lake Charles, LA 70615

BID

FOR:

Window and Door Replacements, Charleston Building, SOWELA Technical Community College Lake Charles, LA Project No: 01-107-24-05, F.014004577

(Owner to provide name and address of owner) (Owner to provide name of project and other identifying information)

The undersigned bidder hereby declares and represents that she/he: a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Brossett Architect, LLC and dated: July, 2026 (Owner to provide name of entity preparing bidding documents.)

Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the

Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________ .

TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid”

* but not alternates) the sum of:

Dollars ($ )

ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.

Alternate No. 1 Add for additional curtainwall system areas as noted and shown on drawings for the lump sum of:

Alternate No. 2 Add Patch and repair of plaster soffit areas as indicated on drawings for the lump sum of:

Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

N/A Dollars ($ N/A )

NAME OF BIDDER:

ADDRESS OF BIDDER:

LOUISIANA CONTRACTOR’S LICENSE NUMBER:

NAME OF AUTHORIZED SIGNATORY OF BIDDER:

TITLE OF AUTHORIZED SIGNATORY OF BIDDER:

SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:

DATE: _______________________

THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA

UNIFORM PUBLIC WORK BID FORM:

* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.

** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).

BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.

LO

U

IS

IA

N A

U N

IF

O

R M

P U

BL

IC

W O

R K

B

ID

F O

R M

N

IT

P R

IC

E

FO

M

TO

SO

W

EL

A

, C ha rle sto n B ld g, R oo m

B

ID

F O

R : W in do w a nd D oo r R ep la ce m en ts, C ha rle sto n B ui ld in g

A tn

: S us an T uc ek

, P ur ch as in g

S

O W

EL

A

T ec hn ic al C om m un ity

C ol le ge

S en at or J

B en ne tt

Jo hn sto n

A ve

L ak e

Ch ar le s, LA

La ke

C ha rle s, LA

P ro je ct N o:

1-

7-

-0 5, F .0

(O wn er to p ro vi de n am e a nd a dd re ss o f o wn er

O wn er to p ro vi de n am e o f p ro je ct a nd o th er id en tif yi ng in fo rm at io n)

IT

P

R

IC

ES

Th is fo rm sh al l b e us ed fo r a ny a nd a ll w or k re qu ire d by th e B id di ng D oc um en ts an d de sc rib ed a s u ni t p ric es

A m ou nt s s ha ll be st at ed in fi gu re s a nd o nl y in fi gu re s.

D

ES

C R

IP

TI

O as e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

E:

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri ce

C e m e n t la th a n d p la s te r sq ft

D

ES

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri ce

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

C R

IP

TI

O e B id o r A lt.

R

EF

. N O

Q

U A

N

TI

TY

U N

IT

O

F M

EA

SU

IT

P R

IC

E

U N

IT

P

R

IC

E

EX

TE

N

SI

O

N (Q ua nt ity ti m es

U ni t P ri

W or di ng fo r “D

ES

C

R

IP

TI

O

N is to b e pr ov id ed b y th e

O w ne r.

A ll qu an tit ie s a re e st im at ed

T he c on tr ac to r w ill b e pa id b as ed u po n ac tu al q ua nt iti es a s v er ifi ed b y th e O w ne r.

Document A201® – 2017

Init.

AIA Document A201® – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A201," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 14:01:58 ET on 03/24/2021 under Order No.5821330073 which expires on 03/24/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (2020624458)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary Conditions.

General Conditions of the Contract for Construction for the following PROJECT:

(Name and location or address)

Window and Door Replacements, Charleston Building, SOWELA Technical Community College Project No.: 01-107-24-05, F.01004577 3820 Sen J Bennett Johnston Avenue, Lake Charles, LA 70615

THE OWNER:

(Name, legal status and address)

State of Louisiana Division of Administration Office of Facility Planning and Control 1201 North Third Street, Claiborne Office Bldg, Suite 7-160 Baton Rouge, LA 70802

THE ARCHITECT:

(Name, legal status and address)

Brossett Architect, LLC.

414 Pujo Street Lake Charles, LA 70601

TABLE OF ARTICLES

1 GENERAL PROVISIONS

2 OWNER

3 CONTRACTOR

4 ARCHITECT

5 SUBCONTRACTORS

6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7 CHANGES IN THE WORK

8 TIME

9 PAYMENTS AND COMPLETION

10 PROTECTION OF PERSONS AND PROPERTY

11 INSURANCE AND BONDS

12 UNCOVERING AND CORRECTION OF WORK

13 MISCELLANEOUS PROVISIONS

mailto:copyright@aia.org.

http://www.novapdf.com/

AIA Document A201® – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A201," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 14:01:58 ET on 03/24/2021 under Order No.5821330073 which expires on 03/24/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (2020624458)

14 TERMINATION OR SUSPENSION OF THE CONTRACT

15 CLAIMS AND DISPUTES

AIA Document A201® – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A201," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 14:01:58 ET on 03/24/2021 under Order No.5821330073 which expires on 03/24/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (2020624458)

INDEX

(Topics and numbers in bold are Section headings.)

Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2 Addenda 1.1.1 Additional Costs, Claims for 3.7.4, 3.7.5, 10.3.2, 15.1.5 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10 Approvals 2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1 Arbitration 8.3.1, 15.3.2, 15.4

ARCHITECT

Architect, Definition of 4.1.1 Architect, Extent of Authority 2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2, 14.2.2, 14.2.4, 15.1.4, 15.2.1 Architect, Limitations of Authority and Responsibility 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.4, 9.6.4, 15.1.4, 15.2 Architect’s Additional Services and Expenses 2.5, 12.2.1, 13.4.2, 13.4.3, 14.2.4 Architect’s Administration of the Contract 3.1.3, 3.7.4, 15.2, 9.4.1, 9.5 Architect’s Approvals 2.5, 3.1.3, 3.5, 3.10.2, 4.2.7

Architect’s Authority to Reject Work 3.5, 4.2.6, 12.1.2, 12.2.1 Architect’s Copyright 1.1.7, 1.5 Architect’s Decisions 3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.4.2, 15.2 Architect’s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.4 Architect’s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.4.2 Architect’s Interpretations 4.2.11, 4.2.12 Architect’s Project Representative 4.2.10 Architect’s Relationship with Contractor 1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.3.2, 13.4, 15.2 Architect’s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3 Architect’s Representations 9.4.2, 9.5.1, 9.10.1 Architect’s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Asbestos 10.3.1 Attorneys’ Fees 3.18.1, 9.6.8, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1 Binding Dispute Resolution 8.3.1, 9.7, 11.5, 13.1, 15.1.2, 15.1.3, 15.2.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.3.3, 15.4.1 Bonds, Lien 7.3.4.4, 9.6.8, 9.10.2, 9.10.3 Bonds, Performance, and Payment 7.3.4.4, 9.6.7, 9.10.3, 11.1.2, 11.1.3, 11.5 Building Information Models Use and Reliance 1.8 Building Permit 3.7.1 Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, 9.8.5

AIA Document A201® – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, "A201," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 14:01:58 ET on 03/24/2021 under Order No.5821330073 which expires on 03/24/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (2020624458)

Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.4 Certificates of Inspection, Testing or Approval 13.4.4 Certificates of Insurance 9.10.2 Change Orders 1.1.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.7, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.2, 11.5, 12.1.2 Change Orders, Definition of 7.2.1

CHANGES IN THE WORK

2.2.2, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, 9.3.1.1, 11.5 Claims, Definition of 15.1.1 Claims, Notice of 1.6.2, 15.1.3

CLAIMS AND DISPUTES

3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims 15.4.1 Claims for Additional Cost 3.2.4, 3.3.1, 3.7.4, 7.3.9, 9.5.2, 10.2.5, 10.3.2, 15.1.5 Claims for Additional Time 3.2.4, 3.3.1, 3.7.4, 6.1.1, 8.3.2, 9.5.2, 10.3.2, 15.1.6 Concealed or Unknown Conditions, Claims for 3.7.4 Claims for Damages 3.2.4, 3.18, 8.3.3, 9.5.1, 9.6.7, 10.2.5, 10.3.3, 11.3, 11.3.2, 14.2.4, 15.1.7 Claims Subject to Arbitration 15.4.1 Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.2, 15.1.5 Commencement of the Work, Definition of 8.1.2 Communications 3.9.1, 4.2.4 Completion, Conditions Relating to 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 14.1.2, 15.1.2

COMPLETION, PAYMENTS AND

Completion, Substantial 3.10.1, 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2 Compliance with Laws 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3

Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, 6.1.4 Consent, Written 3.4.2, 3.14.2, 4.1.2, 9.8.5, 9.9.1, 9.10.2,…