This is a pricing and submittal template for energy conservation measures (ECMs) associated with the Housing Authority of the City of San Antonio's self-managed Energy Performance Contract Phase III (EPC III). The template is designed for pre-construction and general contracting services across multiple residential properties operated by Opportunity Home San Antonio. The project encompasses five primary ECMs: kitchen and bathroom aerators (3-112), common area lighting retrofits with LED components (3-122), attic insulation upgrades to R-36 specifications (3-131), split-system air source heat pumps (3-132), and air sealing measures (3-210). The scope includes 31 apartment complexes and residential communities across San Antonio, totaling 3,066 residential units. Attic insulation and air sealing measures must be substantially completed by June 30, 2027. Product submittals and approvals are scheduled to occur during the pre-construction phase following contract award. All pricing submissions must be warranted for 270 days.
The template establishes a detailed cost structure with separate line items for material, labor, and design costs across all ECMs, followed by standard contractor markups including 0 percent contractor contingency (with 50/50 savings split between contractor and owner), 5 percent overhead, 5 percent profit, 4 percent management fee, 3 percent general conditions, and 2 percent bonding, culminating in a Guaranteed Maximum Price (GMP). All submitted pricing and products must comply with requirements specified in the investment grade audit narrative and associated specifications, with detailed post-award review by the commissioning agent and owner. The template references related specifications including submittal procedures, quality requirements, operation and maintenance data, project record documents, demonstration and training requirements, and general commissioning requirements, indicating a comprehensive and heavily regulated energy efficiency upgrade program financed through future utility savings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ECM Pricing Summary | |||||||
| ECM | Description | Costs | |||||
| Material | Labor | Design | Allowances | Total | |||
| 3-112 | Aerators -Kitchen/Bath | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 |
| 3-122 | Lighting - Common Area | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 3-131 | Attic Insulation | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 3-132 | Heat Pumps P3 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 3-210 | Air Sealing | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Sub Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | |
| Contractor Contingency | 0.0000% | $ - 0 | - 0 | ||||
| Overhead | 5.0000% | - 0 | - 0 | ||||
| Profit | 5.0000% | - 0 | - 0 | ||||
| Management Fee | 4.0000% | - 0 | - 0 | ||||
| General Conditions | 3.0000% | - 0 | - 0 | ||||
| Sub Total | $ - 0 | - 0 | |||||
| Bond | 2.0000% | - 0 | - 0 | ||||
| Sub Total | $ - 0 | - 0 | |||||
| Tax | 0.0000% | - 0 | - 0 | ||||
| Project Total GMP | $ - 0 | - 0 |
Please note that for all ECMS, submitted pricing and products need to meet all requirements as described in the investment grade audit narrative and associated specs. Project submittals will be reviewed in detail by the commissioning agent and owner post award for compliance with audit narratives and specifications. All pricing should be warranted for 270 days.
Page &P of &N &D &T
RS Summary
| ECM Pricing Summary | Apartments | Cost per Apartment | Total Cost | Aerators -Kitchen/Bath | Lighting - Common Area | Attic Insulation | Heat Pumps P3 | Air Sealing | ||
| All | All | All | 3-112 | 3-122 | 3-131 | 3-132 | 3-210 | |||
| 1 | Alazan | 6001.0 | 685 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Alazan-Guadalupe | 6127.0 | 56 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 3 | Cassiano | 6006.0 | 499 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 4 | Villa Veramendi | 6012.0 | 166 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 5 | Villa Hermosa | 6022.0 | 66 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 6 | Sun Park Lane | 6023.0 | 65 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 7 | Frank Hornsby | 6024.0 | 59 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 8 | Williamsburg | 6033.3 | 15 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 9 | Matt Garcia | 6055.0 | 55 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 10 | Linda Lou | 6026.3 | 10 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 11 | Riverside Apts | 6031.0 | 74 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 12 | Madonna | 6032.1 | 60 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 13 | Sahara Ramsey | 6032.2 | 16 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 14 | Cheryl West | 6034.0 | 82 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 15 | Col. Cisneros | 6054.0 | 55 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 16 | Highview Apts | 6043.0 | 68 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 17 | William Sinkin | 6052.0 | 50 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 18 | Cross Creek | 6044.0 | 66 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 19 | Morris C. Beldon | 6049.0 | 35 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 20 | L.C. Rutledge | 6056.0 | 66 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 20 | Westway | 6047.0 | 152 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 21 | H.B. Gonzalez | 6051.0 | 51 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 22 | Lila Cockrell | 6058.0 | 70 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 23 | South San | 6130.0 | 30 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 24 | Raymundo Rangel | 6129.0 | 26 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 25 | Mirasol Homes | 6135.0 | 130 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 26 | Mirasol Townhomes | 6137.0 | 24 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 27 | Mirasol Cottages | 6138.0 | 20 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 28 | Christ the King | 6143.0 | 48 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 29 | Spring View | 6136.0 | 108 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 30 | Spring View Sr. | 6140.0 | 40 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| 31 | Pin Oak I | 6054.1 | 50 | $ - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | ||||||
| 0.0000% | Contractor Contingency | $ - 0 | Contractor contingency is to be used for unexpected and unforseen cost events and is controlled by the contractor. Any savings at the end of the project will be split 50/50 by the Contractor and Owner | |||||||
| 5.0000% | Overhead | - 0 | ||||||||
| 5.0000% | Profit | - 0 | ||||||||
| 4.0000% | Management Fee | - 0 | ||||||||
| 3.0000% | General Conditions | - 0 | ||||||||
| Subtotal | $ - 0 | |||||||||
| 2.0000% | Bond | - 0 | ||||||||
| Subtotal | $ - 0 | For all ECMS, submitted pricing and products need to meet all requirements as described in the investment grade audit narrative and associated specs. | ||||||||
| 0.0000% | Tax | - 0 | ||||||||
| Project Total GMP | $ - 0 | |||||||||
| - 0 |
Page &P of &N &D &T
3-112
| Aerators -Kitchen/Bath | ECM # | 3-112 | |||||||||
| NOTE: Product submittal and approval will take place after the pre-construction phase of the project | |||||||||||
| 1 | Villa Hermosa | Items | Spec Tag | Quantity | Costs | ||||||
| Aerators | Material | Labor | Design | Total | Per Unit | Kitchen Aerators | Bathroom Aerators | ||||
| Kitchen Aerators | WF-1 | 66 | $ - 0 | $ - 0 | Manufacturer and Model # | Manufacturer and Model # | |||||
| Bathroom Aerators | WF-2 | 66 | $ - 0 | $ - 0 | Per Unit Cost | Per Unit Cost | |||||
| Allowance | (insert description) | - | Flow Rate | Flow Rate | |||||||
| 66 Apartments | Project 6022.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Finish | Finish | |||
| Product Cut Sheet Included in Proposal? | Product Cut Sheet Included in Proposal? | ||||||||||
| TOTAL | Items | Spec Tag | Quantity | Costs | |||||||
| Material | Labor | Design | Total | Per Unit | |||||||
| Kitchen Aerators | WF-1 | 66 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Bathroom Aerators | WF-2 | 66 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Allowance | (insert description) | - 0 | |||||||||
| 66 Apartments | All Projects | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Related Specs |
| 013300 – SUBMITTAL PROCEDURES |
014000 – QUALITY REQUIREMENTS
017823 – OPERATION AND MAINTENANCE DATA
017839 – PROJECT RECORD DOCUMENTS
017900 – DEMONSTRATION AND TRAINING
019113 – GENERAL COMMISSIONING REQUIREMENTS
224200 – PLUMBING FIXTURES
Project Narrative
Page &P of &N &D &T
3-122
| Lighting - Common Area | ECM # | 3-122 | |||||||||||||||
| NOTE: Product submittal and approval will take place after the pre-construction phase of the project | |||||||||||||||||
| 1 | Villa Hermosa | Items | Spec Tag | Quantity | Costs | ||||||||||||
| Bulb Quantity | Material | Labor | Design | Total | Per Unit | 8.5W LED 2 pin bulb | 8.5W LED 4 pin bulb | 2' Type C LED Tube with Remote Driver | 2' Type C LED Tube with Remote Driver | 4' Type C LED Tube with Remote Driver | 4' Type C LED Tube with Remote Driver | 4' Type C LED Tube with Remote Driver | |||||
| 8.5W LED 2 pin bulb | L2 | 8 | - 0 | $ - 0 | Manufacturer | ||||||||||||
| 8.5W LED 4 pin bulb | L4 | 8 | - 0 | - 0 | Type | ||||||||||||
| 2' Type C LED Tube with Remote Driver | RL4a | 8 | - 0 | - 0 | Wattage | ||||||||||||
| 2' Type C LED Tube with Remote Driver | RL4b | 48 | - 0 | - 0 | Lumens | ||||||||||||
| 4' Type C LED Tube with Remote Driver | RL6a | 45 | - 0 | - 0 | Color Temperature | ||||||||||||
| 4' Type C LED Tube with Remote Driver | RL6b | 240 | - 0 | - 0 | Energy Star qualified? | ||||||||||||
| 4' Type C LED Tube with Remote Driver | RL6c | 66 | - 0 | - 0 | Product Cut Sheet Included? | ||||||||||||
| Allowance | (insert description) | - 0 | |||||||||||||||
| 66 Apartments | Project 6022.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL | Description | Spec Tag | Bulb Quantity | Costs | ||||
| Material | Labor | Design | Total | Per Unit | ||||
| 8.5W LED 2 pin bulb | L2 | 8 | - 0 | - 0 | - 0 | - 0 | ||
| 8.5W LED 4 pin bulb | L4 | 8 | - 0 | - 0 | - 0 | - 0 | ||
| 2' Type C LED Tube with Remote Driver | RL4a | 8 | - 0 | - 0 | - 0 | - 0 | ||
| 2' Type C LED Tube with Remote Driver | RL4b | 48 | - 0 | - 0 | - 0 | - 0 | ||
| 4' Type C LED Tube with Remote Driver | RL6a | 45 | - 0 | - 0 | - 0 | - 0 | ||
| 4' Type C LED Tube with Remote Driver | RL6b | 240 | - 0 | - 0 | - 0 | - 0 | ||
| 4' Type C LED Tube with Remote Driver | RL6c | 66 | - 0 | - 0 | - 0 | - 0 | ||
| Allowance | (insert description) | - 0 | ||||||
| 66 Apartments | All Projects | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Related Specs |
| 013300 – SUBMITTAL PROCEDURES |
014000 – QUALITY REQUIREMENTS
017823 – OPERATION AND MAINTENANCE DATA
017839 – PROJECT RECORD DOCUMENTS
017900 – DEMONSTRATION AND TRAINING
265100 – ELECTRICAL POWER AND LIGHTING SYSTEMS
Project Narrative
Page &P of &N &D &T
3-131
| Attic Insulation | ECM # | 3-131 | ||||||||
| NOTE: Product submittal and approval will take place after the pre-construction phase of the project. This measure must be substantially complete by June 30, 2027. | ||||||||||
| 1 | Alazan | Items | Spec Tag | Quantity | Costs | |||||
| Apts. | Material | Labor | Design | Total | Per Unit | |||||
| Increased Attic Insulation (R-36) | EN1 | 685 | $ - 0 | $ - 0 | ||||||
| Allowance (include Description) | 0.0 | - 0 | ||||||||
| 685 Apartments | Project 6001.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Increased Attic Insulation (In1) | |||
| Insulation Type | ||||||||||
| 2 | Alazan-Guadalupe | Items | Spec Tag | Quantity | Costs | R-value per inch | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | Product Cut Sheet Included? | ||||
| Increased Attic Insulation (R-36) | EN1 | 56 | $ - 0 | $ - 0 | ||||||
| Allowance (include Description) | 0.0 | - 0 | ||||||||
| 56 Apartments | Project 6127.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Sun Park Lane | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 65 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 65 Apartments | Project 6023.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Williamsburg | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 15 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 15 Apartments | Project 6033.30 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Matt Garcia | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 55 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 55 Apartments | Project 6055.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | Linda Lou | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 10 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 10 Apartments | Project 6026.30 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | Madonna | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 60 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 60 Apartments | Project 6032.10 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | Sahara Ramsey | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 16 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 16 Apartments | Project 6032.20 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | Cheryl West | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 82 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 82 Apartments | Project 6034.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | Highview Apts | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 68 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 68 Apartments | Project 6043.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11 | William Sinkin | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 50 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 50 Apartments | Project 6052.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12 | Westway | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 152 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 152 Apartments | Project 6047.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13 | Lila Cockrell | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 70 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 70 Apartments | Project 6058.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14 | South San | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 30 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 30 Apartments | Project 6130.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 15 | Raymundo Rangel | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 26 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 26 Apartments | Project 6129.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 16 | Mirasol Homes | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 130 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 130 Apartments | Project 6135.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 17 | Mirasol Townhomes | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 24 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 24 Apartments | Project 6137.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 18 | Mirasol Cottages | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 20 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 20 Apartments | Project 6138.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 19 | Christ the King | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 48 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 48 Apartments | Project 6143.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 20 | Spring View | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 108 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 108 Apartments | Project 6136.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 21 | Spring View Sr. | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 40 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 40 Apartments | Project 6140.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 22 | Pin Oak I | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 50 | $ - 0 | $ - 0 | |||||
| Allowance (include Description) | 0.0 | - 0 | |||||||
| 50 Apartments | Project 6054.10 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL | Items | Spec Tag | Quantity | Costs | ||||
| Material | Labor | Design | Total | Per Unit | ||||
| Increased Attic Insulation (R-36) | EN1 | 1,860 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Allowance (include Description) | (insert description) | - 0 | ||||||
| 1860 Apartments | All Projects | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Related Specs |
| 013300 – SUBMITTAL PROCEDURES |
014000 – QUALITY REQUIREMENTS
017823 – OPERATION AND MAINTENANCE DATA
017900 – DEMONSTRATION AND TRAINING
072100 – THERMAL INSULATION
Project Narrative
Page &P of &N &D &T
3-132 Heat Pumps P3 ECM # 3-132
| 1 | William Sinkin | Items | Spec Tag | Quantity | Costs | |||||
| Apts. | Material | Labor | Design | Total | Per Unit | Manufacturer / Model # | ||||
| Split-System Air Source Heat Pump | HP1 | 50 | $ - 0 | $ - 0 | Condensing Unit | |||||
| Electrical Upgrades | N/A | - 0 | - 0 | Air Handling Unit | ||||||
| Thermostat | N/A | - 0 | - 0 | Thermostat | ||||||
| - 0 | - 0 | - 0 | ||||||||
| - 0 | - 0 | - 0 | Product Cut Sheet Included? | |||||||
| - 0 | - 0 | - 0 | Condensing Unit | |||||||
| Allowance | 0.0 | - 0 | Air Handling Unit | |||||||
| 50 Apartments | Project 6052.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Morris C. Beldon | Items | Spec Tag | Quantity | Costs | NOTE: Product submittal and approval will take place after the pre-construction phase of the project | ||||
| Material | Labor | Design | Total | Per Unit | ||||||
| Split-System Air Source Heat Pump | HP1 | 35 | $ - 0 | $ - 0 | ||||||
| Electrical Upgrades | N/A | - 0 | - 0 | |||||||
| Thermostat | N/A | - 0 | - 0 | |||||||
| - 0 | - 0 | - 0 | ||||||||
| - 0 | - 0 | - 0 | ||||||||
| - 0 | - 0 | - 0 | ||||||||
| Allowance | 0.0 | - 0 | ||||||||
| 35 Apartments | Project 6049.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL | Items | Spec Tag | Quantity | Costs | ||||
| Material | Labor | Design | Total | Total | ||||
| Split-System Air Source Heat Pump | HP1 | 85 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Electrical Upgrades | N/A | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |
| Thermostat | N/A | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| Allowance | 0.0 | - 0 | ||||||
| 85 Apartments | All Projects | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Related Specs |
| 013300 – SUBMITTAL PROCEDURES |
014000 – QUALITY REQUIREMENTS
017823 – OPERATION AND MAINTENANCE DATA
017900 – DEMONSTRATION AND TRAINING
019113 – GENERAL COMMISSIONING REQUIREMENTS
230529 – HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
232300 – REFRIGERANT PIPING
238126 – SPLIT-SYSTEM HEAT PUMPS
Project Narrative
Page &P of &N
3-210
| Air Sealing | ECM # | 3-210 | ||||||||
| NOTE: Product submittal and approval will take place after the pre-construction phase of the project. This measure must be substantially complete by June 30, 2027. | ||||||||||
| 1 | Frank Hornsby | Items | Spec Tag | Quantity | Costs | |||||
| Apts. | Material | Labor | Design | Total | Per Unit | |||||
| Air Sealing | EN2 | 59 | $ - 0 | $ - 0 | ||||||
| Allowance | 0.0 | - 0 | ||||||||
| 59 Apartments | Project 6024.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Col. Cisneros | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Air Sealing | EN2 | 55 | $ - 0 | $ - 0 | |||||
| Allowance | 0.0 | - 0 | |||||||
| 55 Apartments | Project 6054.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | H.B. Gonzalez | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Air Sealing | EN2 | 51 | $ - 0 | $ - 0 | |||||
| Allowance | 0.0 | - 0 | |||||||
| 51 Apartments | Project 6051.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Lila Cockrell | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Air Sealing | EN2 | 70 | $ - 0 | $ - 0 | |||||
| Allowance | 0.0 | - 0 | |||||||
| 70 Apartments | Project 6058.00 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Pin Oak I | Items | Spec Tag | Quantity | Costs | ||||
| Apts. | Material | Labor | Design | Total | Per Unit | ||||
| Air Sealing | EN2 | 50 | $ - 0 | $ - 0 | |||||
| Allowance | 0.0 | - 0 | |||||||
| 50 Apartments | Project 6054.10 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL | Items | Spec Tag | Quantity | Costs | ||||
| Material | Labor | Design | Total | Per Unit | ||||
| Air Sealing | EN2 | 285 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Allowance | 0.0 | - 0 | ||||||
| 285 Apartments | All Projects | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Related Specs |
| 013300 – SUBMITTAL PROCEDURES |
014000 – QUALITY REQUIREMENTS
017823 – OPERATION AND MAINTENANCE DATA
017900 – DEMONSTRATION AND TRAINING
Project Narrative
&G
&F &G Page &P of &N &D &T &G image1.png image2.jpeg image3.png
File details come from the government source that posted it. Updated .