This is a sealed bid contract document for the Tullytown Borough, located in Bucks County, Pennsylvania, for Main Street Improvements including tree removal and stump grinding services. Bids must be submitted electronically through PennBid by 10:00 A.M. on June 24, 2026. The contract scope includes furnishing all materials, equipment, labor, and supervision necessary to complete tree removal and stump grinding work as shown on contract drawings and specified in the contract documents. The contract work must be completed within 60 consecutive calendar days. Site visits are required for all bidders to familiarize themselves with conditions affecting the work. Questions regarding the advertisement will be accepted online through PennBid until 10:00 A.M. on June 17, 2026. The contract award will be made to the lowest responsible bidder within 60 days of bid opening. The successful bidder must execute the contract within 10 days of award and furnish a performance bond and labor and materials bond, each in the amount of 100% of the contract value within 20 days after award.
Bid security of not less than 10 percent of the total bid amount must accompany each proposal in the form of a certified check or bid bond payable to Tullytown Borough. Only bonds from surety companies licensed to do business in Pennsylvania will be accepted. Liquidated damages are set at $1,000 per calendar day for failure to complete work within the 60-day contract period. The successful contractor must comply with the Pennsylvania Department of Labor and Industry prevailing minimum wage determination. Partial payments will be made based on estimated quantities of work completed, with 10 percent retainage until 50 percent completion and 5 percent thereafter until final payment. The contractor is responsible for all surveying, utility location, materials testing, insurance, workers' compensation, public liability coverage with limits of $500,000 per person and $1,000,000 per occurrence, and compliance with all applicable federal and state safety regulations including OSHA requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT
INSTRUCTION TO BIDDERS
FORM OF PROPOSAL
FORM OF GUARANTY
GENERAL AND SPECIAL CONDITIONS
CONSTRUCTION SPECIFICATIONS
FORM OF AGREEMENT
CONTRACT BOND
LIST OF CONTRACT DRAWINGS
STANDARD DETAILS
TULLYTOWN BOROUGH
BUCKS COUNTY, PENNSYLVANIA
MAIN STREET IMPROVEMENTS – TREE REMOVAL
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
WARRINGTON, PA 18976
PROJECT NO. TULLX25005
JUNE 2026
All documents prepared by Pennoni Associates are instruments of service in respect of the project. They are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Pennoni Associates will be at Owner's sole risk and without liability or legal exposure to Pennoni Associates; and Owner shall indemnify, and hold harmless Pennoni Associates from all claims, damages, losses and expenses arising out of or resulting therefrom.
-a-
TABLE OF CONTENTS PAGE
A - ADVERTISEMENT A-1
B - INSTRUCTIONS TO BIDDERS B-1
C - FORM OF PROPOSAL C-1
D - FORM OF GUARANTY D-1
E - GENERAL CONDITIONS
1. Definitions E-1
2. Other Contracts E-1
3. Sub-Contracts E-2
4. Mutual Responsibility of Contractors E-2
5. Fitting and Coordination of Work E-2
6. Superintendence by Contractors E-2
7. Permits, Licenses and Taxes E-2
8. Provisions Required by Law E-3
9. Protection of Work and Property E-3
10. Temporary Provision for Public Travel E-3
11. Shop Drawings E-3
12. Termination; Delays; and Liquidated Damages E-4
13. Inconsistent Specifications and Drawings E-5
14. Use of Premises E-5
15. Possession Prior to Completion E-5
16. Changes in the Work E-5
17. Claims for Extra Cost E-7
18. Disputes E-7
19. Materials and Workmanship E-8
20. Samples, Certificates and Tests E-8
21. Changes in Equipment and/or Materials E-9
22. Patents E-9
23. Warranty of Title E-9
24. The Owner's Right to do Work E-10
25. The Owner's Right to Terminate Contract E-10
26. Damages E-10
27. Engineers Status E-10
28. No Estoppel or Waiver of Legal Rights E-11
29. Safety and Health Regulations (OSHA) E-11
30. Remedies E-11
31. Indemnification E-12
-b-
F - SPECIAL CONDITIONS
1. Contract Security F-1
2. Contractor's Insurance F-1
3. Special Coverage Terms F-3
4. Progress Schedule F-3
5. Location of Utilities F-3
6. Inspection of Work F-4
7. Use of Explosives F-4
8. Night, Weekend and Holiday Work F-4
9. Payment to Contractor F-4
10. Correction of Work After Final Payment F-7
11. General Guaranty F-7
12. Sanitary Facilities F-7
13. Water F-7
14. Electricity F-7
15. Lines, Grades and Construction Surveying F-7
16. Contract Standards Act F-8
17. Steel Products Procurement Act F-8
18. Act 287 F-8
19. Non-Discrimination/Sexual Harassment Provisions F-9
20. Public Works Employment Verification F-10
22. Rates of Wages F-10
G - CONSTRUCTION SPECIFICATIONS G-1
H – FORM OF AGREEMENT H-1
CONTRACTORS RELEASE
STATEMENT OF SURETY
PUBLIC WORKS VERIFICATION
I - CONTRACT BOND I-1
FORM OF PERFORMANCE BOND
FORM OF LABOR AND MATERIALS BOND
J - LIST OF CONTRACT DOCUMENTS J-1
K - STANDARD DETAILS K-1
A-1
A. ADVERTISEMENT
TULLYTOWN BOROUGH
BUCKS COUNTY, PENNSYLVANIA
Sealed bids will be received by Tullytown Borough, electronically through PennBid until 10:00 A.M., prevailing time, on June 24, 2026, with the result posted thereafter for the following:
TULLYTOWN MAIN STREET IMPROVEMENTS – TREE REMOVAL
All documents and solicitation details are available and open to public inspection anytime at PennBid https://pennbid.bonfirehub.com. The bidder who is awarded the contract will be required to pay a fee to PennBid. The names of those who have secured plans/specifications may be obtained at PennBid.
Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. A performance bond or certified check in the amount of 100% of the contract shall be furnished by the successful bidder within 20 days after the contract is awarded. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same.
The work to be performed under this Contract consists of furnishing all materials, equipment, labor and supervision required for construction of the TULLYTOWN MAIN STREET IMPROVEMENTS – TREE REMOVAL as shown on the Contract Drawings and specified herein. This project includes tree removal and stump grinding. The successful Contractor must comply with the Federal Prevailing Minimum Wage Determination as indicated in the Contract Documents.
Questions regarding this advertisement will only be accepted online via the PennBid website, https://pennbid.bonfirehub.com until 10:00 A.M. on the 17th day of June 2026.
Bids must be submitted unconditionally. No bidder may withdraw bids within 30 days after the scheduled closing time for receipt of bids.
The borough reserves the right to reject any or all bids, or parts thereof, and to accept the bid that it deems, in its sole judgement, to be in the best interest of the Borough.
EOE
Borough Manager Patricia Marks
B-1
B. INSTRUCTIONS TO BIDDERS
1. BIDDER'S RESPONSIBILITY
Each bidder shall familiarize himself with all of the attached forms, Instruction, General Conditions, Specifications, Drawings, et cetera, as he will be held responsible to fully comply therewith. Each bidder must visit the site of the work and acquaint himself with conditions affecting the work.
Bidders shall properly register on the PennBid™ site (https://pennbid.bonfirehub.com).They shall familiarize themselves with the PennBid web site, navigating the PennBid web site, the PennBid bidding methodology, completing the PennBid bid form, and the uploading of required bid forms and surety certificates. If needed, it is incumbent upon bidders to request assistance in familiarizing themselves. Bidders are encouraged to contact PennBid if assistance is needed.
2. DELIVERY OF PROPOSALS:
Bids shall be collected electronically at PennBid™ (https://pennbid.bonfirehub.com). It is the responsibility of the bidder to complete in full their PennBid bid tab one minute prior to the time of opening. No bid shall be considered if it arrives after the time set for the receipt of bids. All required bid documents, as listed on PennBid website, must be uploaded one minute prior to the time of opening. PennBid website will automatically indicate when a bid document file has been successfully uploaded. Bidders must also acknowledge that the bid documents have been uploaded in their entirety. Bidders are encouraged to complete, scan, upload their bid document file, and complete their acknowledgement well ahead of bid opening time.
3. BULLETINS:
Bidders shall acknowledge receipt of all bulletins which have been issued during period of bidding and agree that said bulletins shall become part of this contract. The bidders shall list the numbers and issuing dates of the bulletins received and acknowledge same on the appropriate page provided in the Form of Proposal section of these specifications.
4. PROPOSAL GUARANTY:
Each Proposal shall be accompanied by either a certified check or Surety Company's Bid Bond as specified herein under "ADVERTISEMENT", in an amount of not less than ten (10) percent of the base bid, which check or bond shall be payable to the Owner as payee or obligee, and shall be forfeited as liquidated damages if the bidder fails to execute the contract in conformity with the Agreement incorporated in the Contract Documents, and furnish bonds as specified, within ten (10) days after receipt of Contract Documents. Such checks or bid bonds will be returned, to all except the three lowest bidders immediately after the award, and the remaining unsuccessful bidders checks or bid bonds will be returned when the contracts executed by both parties are delivered to the successful bidder.
5. METHOD FOR SUBMITTING BIDS:
No proposal will be considered unless submitted upon the proposal form for the project. The blank spaces in the proposal form shall be filled in correctly, where indicated, for each and every item for which a description is given, and the bidder must state the prices (which shall be written in ink, in
B-2 words and numerals) for which he proposes to do each part of the work contemplated. In case of discrepancy, the written words shall be considered as being the bid price.
The bidder shall sign his bid correctly and upload to the PennBid website. If the proposal is made by an individual, in addition to his signature, his complete post office address should be given. If made by a firm or partnership, the complete post office address of each member of the firm or partnership must be given. If made by a corporation, the person signing the proposal should be the President or Vice President and the Secretary or Treasurer of the corporation; otherwise, the signing individual's certificate or authority to execute such papers should accompany the proposal.
If bidder has been incorporated in some state other than Pennsylvania, bidder shall state whether the corporation is registered to do business in Pennsylvania. If bidder operates under an assumed or fictitious name, he shall state whether such name has been registered in Pennsylvania.
No contract will be awarded to a bidder who is a foreign corporation or operating under a fictitious or assumed name unless he has complied or agreed to comply with the proper registration under the laws of this Commonwealth.
6. PROOF OF BIDDER'S RESPONSIBILITY:
On request, bidder shall file an experience questionnaire and financial statement with the Owner.
The questionnaire and statement shall be certified to be true and correct by an affidavit sworn to or affirmed before a notary public, or other officer empowered to administer oaths or affirmations.
Upon request, bidder shall prove that he has liquid assets, available for the project upon which he is bidding in an amount equal to fifteen percentum (15%) of the first $100,000.00 of the amount of the bid plus ten percentum (10%) of the next $900,000.00 plus five percentum (5%) of the remainder of the bid.
None of the following will be considered as liquid assets:
(a) Capital Stock of the Contractor.
(b) Accounts receivable against which assignments have been made.
(c) Equity in real estate.
(d) Life Insurance.
(e) Reserve representing pre-payment of taxes or other expenses.
(f) Deposits held as security for other contracts.
(g) Capital of proposed sub-contractors.
In addition to the financial qualifications, the bidder may be required to prove the satisfaction of the Owner that he has successfully completed a contract for similar work in an amount of not less than seventy-five percentum (75%) of the amount of the proposed contract.
The foregoing will guide the Owner in determining the responsibility of the bidder, but additional information may be requested by the Owner whenever in its judgment such information is necessary to determine the responsibility of the bidder.
If the bidder fails, refuses or neglects to submit any required information within the reasonable time stated in any request therefore or fails to qualify as a responsible bidder, his proposal guaranty shall be forfeited to the use of the Owner, not as a penalty, but as liquidated damages.
B-3
7. CHANGES WHILE BIDDING:
During the bidding period, bidders may be furnished addenda or bulletins for additions to or alterations of the plans or specifications, if any, which shall be included in the work covered by the Proposal and become a part of the contract documents.
If any prospective bidder on the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or other proposed contract documents, he may submit to the Engineer through the PennBid website, a written request for an interpretation thereof. The bidder submitting the request will be responsible for its prompt delivery. Any interpretation of the proposed documents will be made only by an addendum duly issued and a copy of such addendum will be posted to the PennBid website. A broadcast e-mail indicating the posting of a new addendum will be sent to all valid e-mail addresses as listed on the PennBid site. A copy of such addendum may be downloaded at any time by each prospective bidder who has received a set of such documents. Unless included in an addendum, the Engineer and/or Owner will not be responsible for any other explanations or interpretations of the proposed documents.
8. BIDDER QUESTIONS:
The PennBid website allows for bidders to post questions and Engineer responses. The questions and responses shall be considered part of the bid documents and will be incorporated into the bid documents through a statement in an addendum.
8. BID OPENING PROCEDURE:
Sealed bids on projects will be received by the Owner via PennBid until the time stated in the
"Advertisement". The bid will be reviewed and posted on the PennBid website. The Owner reserves the right to reject any or all bids, or parts thereof, as it may deem best for the interest of the Owner.
9. COLLUSIVE BIDS:
The proposal of any bidder or bidders who engage in collusive bidding shall be rejected. Any bidder who submits more than one proposal in such manner as to make it appear that the proposals submitted are on a competitive basis from different parties shall be considered a collusive bidder.
The Owner may reject the bid proposals of any collusive bidder upon bid opening. However, nothing in this section shall prevent a bidder from superseding a bid proposal by a subsequent proposal delivered prior to bid opening which expressly revokes the previous bid.
10. WITHDRAWAL OF BIDS:
No bidder may withdraw his bid unless the request is made in writing and is received by the Owner prior to the time set for bid opening. After bid opening, no bidder may withdraw his bid within the time period indicated herein under "ADVERTISEMENT". Requests for withdrawal of bids after bid opening due to clerical error shall be made in accordance with Commonwealth of Pennsylvania Act. No. 4 (S.B. 793).
B-4
11. AWARD OF CONTRACT:
The Owner shall have the right to reject any or all proposals or any parts thereof or items therein.
The Owner's Solicitor shall have the right to waive technicalities for the best interests of the Owner.
If an award of contract is made, it will be made to the lowest responsible bidder, within the time period indicated herein under "ADVERTISEMENT" on contract of $50,000.00 or less.
On public contracts in excess of $50,000.00 the contract will be awarded to the lowest responsible bidder within 60 days of the bid opening or all bids will be rejected. Thirty (30) day extensions of time may be made by the mutual written consent of the Owner and the lowest responsible bidder.
If the lowest bidder withdraws his bid, refuses award of contract, the Owner shall have the right to award to contract to the next lowest responsible bidder or to reject all bids and re-bid the contract.
12. EXECUTION OF CONTRACT
The individual, firm or corporation to whom or to which the contract has been awarded within ten
(10) days after receipt of said documents shall sign and return to the Owner, the contract documents and substitute for the certified check, or bid bond, which accompanied the proposal, a contract bond or bonds in the penal sum at least equal to the amount of such contract, for the faithful performance of the contract, and also an additional bond for labor and materials, in the penal sum at least equal to the amount of such contract, to cover the prompt payment in full for all materials furnished and labor supplied or performed, executed by a surety company or companies qualified to do business in the state where bid and a maintenance bond in the amount stipulated herein under "SPECIAL CONDITIONS". Each such bond shall be on the form approved by the Owners Solicitor.
On contracts in excess of $50,000.00 the contract shall be executed by the Owner and the successful bidder within 30 days of the date the contract is awarded unless the time shall be extended by the mutual written consent of the Owner and the successful bidder.
No proposals or awards shall be considered binding upon the Owner unless and until the contract documents are properly executed by both parties.
13. FAILURE TO EXECUTE CONTRACT:
If the lowest responsible bidder to whom the contract is awarded fails to submit bonds or execute the contract within the time specified, the amount of the proposal guaranty shall be paid to the Owner as liquidated damages. In such case the Owner, at his discretion, may award the contract to the next lowest responsible bidder, or reject all bids.
14. SUBLETTING OR ASSIGNING OF CONTRACT:
The Contractor shall not sublet, sell, transfer, assign or otherwise dispose of the contract or any portion thereof, of his right, title or interest therein, without the written consent of the Owner.
B-5
15. REJECTION OF PROPOSALS:
The right is reserved by the Owner at its discretion to reject any or all bids or parts thereof.
Proposals may be rejected if they show any omission, alterations of form, addition or deductions not called for, conditional or uninvited alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any defects or irregularities on proposals.
16. REQUIRED INFORMATION TO BE PROVIDED:
A. BID DOCUMENTS
Information and Forms to be posted via the PennBid site:
The following documents are to be uploaded to or completed on the PennBid site BEFORE bid opening.
1. Form of Proposal
2. Addendum Acknowledgment (Page D-1)
3. Form of Guaranty (Page D-1, in addition to completing the Bid Bond)
4. Bid Bond with Bonding company form (No specific form. The AIA bid bond form is acceptable)
Information and Forms to be submitted to the Borough:
Hardcopies of the bid documents are not required at the time of bid opening. All documents are to be received electronically via PennBID. Original copies shall be coordinated upon Intent to Award.
C-1
C. FORM OF PROPOSAL
TO: Borough of Tullytown Bucks County, Pennsylvania
All:
This proposal is submitted in accordance with your advertisement inviting proposals to be received until 10:00 o’clock A.M. on the 24th day of June 2026 for:
MAIN STREET IMPROVEMENTS – TREE REMOVAL
Having carefully examined the Contract Documents together with all Addenda or Bulletins, as prepared by the Engineers, and being familiar with the various conditions affecting the work, (including those under the General Conditions which provide for the payment of liquidated damages to the owner, hereafter set at $ 1,000.00 per calendar day, in the event the contract is not completed within the allotted time) the undersigned agrees to furnish all lab or, materials and equipment to construct and complete within 60 consecutive calendar days, all the necessary contract work, in accordance with said contract documents, for which the following units and/or lump sum prices are submitted.
ITEM NO. DESCRIPTION UOM QTY
#1-1 Mobilization / Demobilization LS 1
#1-2 Maintenance and Protection of Traffic LS 1
ITEM NO. DESCRIPTION UOM QTY
#2-1 Clearing and Grubbing (Tree Removal) LS 1
#2-2 Stump Grinding LS 1
GENERAL
SCHEDULE OF WORK - UNIT BREAKDOWN
BASE BID
MAIN STREET
D-1
D. FORM OF GUARANTY:
Accompanying this Proposal is a in the amount of
Dollars $ as bid security.
BULLETINS:
The bidder acknowledges receipt of the hereinafter enumerated bulletins which have been issued during period of bidding and agrees that said bulletins shall become a part of this contract. The bidder shall list below the numbers and issuing dates of the bulletins.
Bulletin No. Issuing Date
The undersigned hereby certifies that this Proposal is genuine, and not sham or collusive, or submitted in the interest or on behalf of any person, firm or corporation not herein named, and has not, induced any other persons to refrain from biddings, and has not in any way sought by collusion to secure for himself an advantage over any other bidder.
FIRM NAME
ADDRESS
Official
By
TITLE
E-1
E. GENERAL CONDITIONS
1. DEFINITIONS:
The OWNER is the party referred to in the Advertisement and whenever the word Owner is used herein it shall refer to and designate the party of the first part of the contract contained herein.
The CONTRACTOR is the individual, group, partnership or corporation undertaking to do the work herein specified (including his or their heirs, legal representatives, successors or assigns) and is the party of second part of the contract contained herein.
The ENGINEER, the person, firm or corporation who represents the OWNER on the contract contained herein.
The CONTRACT DOCUMENTS consist of the Advertisement, Instructions to Bidders, Form of
Proposal, General and Special Conditions, Construction Specifications, Form of Agreement, Form of Bond, List of Contract Drawings, Standard Details and the plans.
A SUB-CONTRACTOR is an individual group, partnership or corporation, having a direct contract with the Contractor to furnish a special service, labor or material towards the completion for the Contractors contract.
An INSPECTOR is an authorized representative of the Engineers and/or Owner, assigned to inspect the work performed and the materials supplied by the Contractor as to compliance with the Contract Documents.
The term WORK, used herein, includes all labor and/or materials, equipment and any other facilities necessary for the Contractor to complete the contract.
The term APPROVED, used herein, shall be held to mean as approved by the Engineer.
The term SUBSTANTIAL COMPLETION used herein shall be held to mean construction that is sufficiently completed in accordance with the Contract Documents and certified by the Engineer of the Owner, as modified by change orders agreed to by the parties, so that a project can be used, occupied or operated for its intended use. In no event shall a project be certified as substantially complete until at least 90% of the work on the project is completed.
NOTICE shall be deemed to have been duly served if written and delivered in person to the individual, or to a member of the firm, or to an officer of the Corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives notice.
2. OTHER CONTRACTS
The Owner may award, or may have awarded other contracts for additional work, and the Contractor shall cooperate fully with such other Contractors, by scheduling his own work with that to be performed under other contracts as may be directed by the Owner. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other Contractor as scheduled.
E-2
3. SUB-CONTRACTS
No part of the contract shall be sublet without the prior written approval of the Owner and setting forth requirements to be met.
4. MUTUAL RESPONSIBILITY OF CONTRACTORS
If, through acts or neglect on the part of the Contractor, any other Contractors, or any subcontractor, shall suffer loss or damage on the work, the Contractor shall settle with such other Contractor or subcontractor by agreement or arbitration, if such other Contractor or subcontractor will so settle. If such other Contractor, or subcontractor shall assert any claim against the Owner on account of any damage alleged to have been so sustained, the Owner will notify this Contractor, who shall defend at his own expense any suit based upon such claim and, if any judgment or claims against the Owner shall be allowed, the Contractor shall pay or satisfy such judgment or claim and pay all costs and expenses in connection therewith.
5. FITTING AND COORDINATION OF WORK
The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors, or materialmen engaged upon this contract. He shall be prepared to guarantee to each of his subcontractors the locations and measurements which they may require for the fitting of their work to all surrounding work.
6. SUPERINTENDENCE BY CONTRACTOR
At all times during which work is being performed under or affecting this contract, the Contractor shall keep a competent superintendent acceptable to the Engineer constantly on the site from the commencement of work under this contract until the completion thereof, who shall be constantly in touch with work and in all interlocking contracts affected thereby. The superintendent shall, in the absence of the Contractor, see that the instructions of the Engineer are carried out and all directions given such superintendent shall be as binding as if given to the Contractor.
7. PERMITS, LICENSES AND TAXES
The Contractor shall give all notice required by and comply with all applicable laws, ordinances, and codes of the Local Government, all construction work and/or utility installations shall comply with all applicable ordinances, and codes including all written waivers. Before installing any work, the Contractor shall examine the Drawing and Detail Specifications for compliance with applicable ordinances and codes and shall immediately report any discrepancy to the Owner. Where the requirements of the Drawings and Detail Specifications fail to comply with such applicable ordinances or codes, the Owner will adjust the Contract by Change Order to conform to such ordinances or codes (unless waivers in writing covering the difference have been granted by the governing body or department) and make appropriate adjustment in the Contract Price or stipulated unit prices.
E-3
Should the Contractor fail to observe the foregoing provisions and proceed with the construction and/or install any utility varying with any applicable Ordinance or code, including any written waivers (notwithstanding the fact that such installation is in compliance with the Drawings and Detail Specifications) the Contractor shall remove such work without cost to the Owner.
8. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed to be inserted herein and the Contract shall be read and enforced as though it were included herein; and, if through mistake or otherwise, any such provision is not inserted or is not correctly inserted, then upon the application of either party the Contract shall forthwith be physically amended to make such insertion.
9. PROTECTION OF WORK AND PROPERTY
The Contractor shall provide adequate protection against injury or loss arising in connection with this contract for all his work and the property of the Owner. He shall make good any such damage, injury or loss, except such as may be due directly to errors in the drawings or specifications or caused by agents or employees of the Owner. He shall adequately protect adjacent property as provided by law and the specifications and drawings. He shall provide facilities for protection required by public authority or local conditions as passageways, guard fences, lights, etc.
The Contractor shall preserve and protect all trees, shrubs and grass on or adjacent to the site which do not reasonably interfere with the construction as may be determined by the Engineer and the Contractor shall be responsible for all unauthorized cutting or damaging or trees and shrubs, including damage due to careless operation of equipment, stockpiling of materials or tracking of grass areas by equipment. The Contractor shall remove only those trees designated by the Engineer to be removed.
10. TEMPORARY PROVISION FOR PUBLIC TRAVEL
The Contractor shall perform his work in such a manner as to interfere as little as possible with the use of intersecting roads or adjoining property. No excavation shall be left open or other obstruction allowed to remain longer than is absolutely necessary; and the Contractor shall provide all safeguards and temporary passageways that may be necessary for the convenience and protection of all persons using said property either day or night.
E-4
11. SHOP DRAWINGS
The Contractor shall check and verify all field measurements and shall submit with such promptness as to cause no delay in his own work or in that of any other Contractor, three copies, checked and approved by him, of all shop or setting drawings and schedules required for the work of the various trades. The Engineers shall check and approve, with reasonable promptness, such schedules and drawings only for conformance with the design concept of the Project and compliance with the information given in the Contract Documents. The Contractor shall make any corrections required by the Engineers, file with him two copies and furnish such other copies as may be needed. The Engineers' approval of such drawings or schedules shall not relieve the Contractor from responsibility for deviations from Drawings or Specifications, unless he has in writing called the Engineers' attention to such deviations at the time of submission, and secured his written approval, nor shall it relieve him from responsibility for errors in shop drawings or schedules.
12. TERMINATION; DELAYS; LIQUIDATED DAMAGES
If the Contractor refuses or fails to prosecute the work with such diligence as will insure its completion within the time specified in these Contract Documents, or as modified as provided in these Contract Documents, the Owner, by written notice to the Contractor, may terminate the Contractor's right to proceed with the work. Upon such termination, the Owner may take over the work and prosecute the same to completion by contract or otherwise, and the Contractor and his sureties shall be liable to the Owner for additional cost incurred by the Owner for liquidated damages for any delay in the completion of the work as provided below. If the Contractor's right to proceed is so terminated, the Owner may and take possession of and utilize in completing the work and materials, tools, equipment and plant as may be on the site of the work and necessary therefore.
If the work not be completed within the time stipulated, including any extensions of time for excusable delays as herein provided, the Contractor shall pay to the Owner Liquidated Damages for each calendar day of delay, as set forth in the Form of Agreement, and the Contractor and his sureties shall be liable to the Owner for the amount thereof.
The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with Liquidated Damages for any delays in the completion of the work due:
To any acts of the Government, including controls or restriction upon or requisitioning of materials, equipment, tools, or labor by reason or war, national defense, or any other national emergency;
To any acts of the Owner;
To causes not reasonably foreseeable by the parties to this contract at the time of the execution of the contract which are beyond the control and without the fault of negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, acts of another Contractor in the performance of some other contract with the Owner, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions; and
To any delay of any subcontractor occasioned by any of the causes specified in sub-paragraphs above.
E-5
Provided, however, that the contractor promptly notified the Owner within ten (10) days in writing of the cause of the delay. Upon receipt of such notification, the Owner shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this contract, the delay is properly excusable, the Owner shall extend the time of completing the work for a period of time commensurate with the period of excusable delay.
Should the completion of the work be delayed beyond the time herein specified for completion for any reason other than the act of neglect of the Owner, or an approved extension of time, the Contractor shall pay the Owner the actual engineering expenses incurred by the Owner as a result of such delay and the Owner may deduct such engineering costs from any payments due or to become due the Contractor.
13. INCONSISTENT SPECIFICATIONS AND DRAWINGS
Anything mentioned in the Detail Specifications and not shown on the Drawings, or shown on the
Drawings and not mentioned in the Detail Specifications, shall be of like effect as if shown on or mentioned in both. In case of difference between Drawings and Detail Specifications, the better quality or greater quantity of work or materials and the more stringent requirements shall be included in the proposal, and unless otherwise ordered in writing, shall be performed or furnished.
14. USE OF PREMISES
The Contractor shall confine his equipment, storage of materials and construction operations to the
Contract Limits as shown on the Drawings and as prescribed by ordinances or permits, or as may be directed by the Owner, and shall not unreasonably encumber the site or public rights of way with his materials and construction equipment.
The Contractor shall comply with all reasonable instructions of the Owner and the ordinances and codes of the Local Government regarding signs, advertising, traffic, fires, explosives, danger signals, and barricades.
15. POSSESSION PRIOR TO COMPLETION
The Owner shall have the right to take possession or use any completed or partially completed part of the work, but such possession or use shall not be deemed an acceptance of any work not completed in accordance with the Contractor.
16. CHANGES IN THE WORK
The Owner may make changes in the scope of the work required to be performed by the Contractor under the Contract or make additions thereto, or omit work therefrom, without invalidating the Contract, and without relieving or releasing the Contractor from any of his obligations under the Contract or any guarantee given by him pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds.
All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise.
E-6
Except for the purpose of affording protection against endangering life or property, the Contractor shall make no changes in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services, or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the Owner authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract price will be valid unless so ordered.
Where applicable, when unit prices are contained in the Proposal, the Owner may order the Contractor to proceed with desired changes in the work. The value of such changes are to be determined by the measured quantities involved and the applicable unit prices specified in the Contract. The Owner shall, before ordering the Contractor to proceed with desired changes, request an itemized proposal from him covering the work involved in the change, following which the procedure shall be as follows:
If the proposal is acceptable, the Owner will prepare the change order in accordance therewith for acceptance by the Contractor and;
If the proposal is not acceptable, and prompt agreement between the two parties cannot be reached, the Owner may order the Contractor to proceed with the work on a COST OF WORK basis.
Payment under COST OF WORK will be for the actual and necessary direct cost of the work in accordance with the orders of the Engineer, and in addition thereto the percentage of such cost hereafter stated. "Actual and necessary direct cost" shall be deemed to include the following:
(1) The actual expenditure for labor for the time actually engaged in the work, including the distributed cost of foreman in direct charge of such labor and insurance, taxes and other payments applicable to such labor.
(2) The actual expenditure for materials used up or incorporated in the work.
(3) A reasonable hourly, weekly or monthly rental as applicable, as determined by the
Engineers, for use of motor trucks and special equipment such as power-operated shovels, cranes, drills, paving breakers, etc. (but not including small hand tools), at a rate not to exceed the current local rate charged for the type of equipment used, for the time that such equipment is required on the work for the performance of COST OF WORK EXCLUSIVELY. The rental price shall be for the equipment provided on the work and shall include transportation to and from the work, fuel, power, lubricants, operating tools, repairs, depreciation, replacements, and the sharpening of drills and other tools required to keep them in the best working condition.
To the actual and necessary direct cost of the work done under COST OF WORK as noted above, fifteen (15) percent will be added to the expenditure for labor as set forth in sub-paragraph (1) above and then (10) percent will be added to the expenditure for materials. No additions will be allowed to the rental of trucks, and special equipment. These percentages, and the rental price for equipment furnished, shall be deemed to cover the cost of heat, light, use and upkeep of small hand tools, administration, engineering, superintendence, all loss, damage, risk, and expenses incidental to the work and profit. The Contractor shall have no claim in excess of the above, such payments being in full compensation for the performance of such work and the furnishing of such materials and for all expense in connection therewith and incidental thereto.
E-7
Should the Contractor sublet any portion of the work to be executed under COST OF WORK payment for that portion will be computed as the actual and necessary direct cost as defined above, exclusive of any profit to the subcontractor, plus the percentages allowed, plus five (5) percent of the total paid to the sub-contractor.
The Contractor shall submit daily a statement in duplicate of work done on a COST OF WORK basis within twenty-four hours of the time the work is done, and representatives of the Engineer and the Contractor shall make daily comparison of the time and rates of labor, material used, etc., as given therein. After correction, if necessary, this comparison shall be signed by each and filed with the Engineer and the Contractor. The Contractor shall submit to the Engineer monthly, prior to each current estimate, four copies of an itemized statement of the amount and value of labor and materials furnished, accompanied by the original receipted bills for commodities purchased or for work performed under a subcontract, and by an affidavit certifying the correctness of the said statement.
The Engineer shall have access to any books, vouchers, records, and memoranda showing the labor employed and the materials actually used on the specific operation and the actual net cost thereof.
17. CLAIMS FOR EXTRA COST
If the Contractor claims that any instructions by Drawing or otherwise involve extra cost or extension of time, he shall, within ten (10) days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the Owner, stating clearly and in detail the basis of his objections. No such claim will be considered unless so made.
Any discrepancies which may be discovered between actual conditions and those represented by the
Drawings and maps shall at once be reported to the Owner and work shall not proceed except at the Contractor's risk, until written instructions have been received by him from the Owner.
If, on the basis of the available evidence, the Owner determines that an adjustment of the Contract
Price and/or Time is justifiable, the procedure shall then be as provided herein.
18. DISPUTES
All disputes arising under this Contract or its interpretation, whether involving law or fact or both, or extra work and all claims for alleged breach of contract within ten (10) days of commencement of the dispute be presented by the Contractor to the Owner for decision. All papers pertaining to claims shall be filed in quadruplicate. Such notice need not detail the amount of the claim but shall state the facts surrounding the claims in sufficient detail to identify the claim, together with its character and scope. In the meantime, the Contractor shall proceed with the work as directed. Any claim not presented within the time limit specified within this paragraph shall be deemed to have been waived, except that if the claim is of a continuing character and notice of the claim is not given within ten (10) days of its commencement, the claim will be considered only for a period commencing ten (10) days prior to the receipt by the Owner of notice thereof.
The Contractor shall submit in detail his claim and his proof thereof. Each decision by the governing body of the Owner will be in writing and will be mailed to the Contractor by registered mail, return receipt requested.
E-8
If the Contractor does not agree with any decision of the Owner, he shall in no case allow the dispute to delay the work but shall notify the Owner promptly that he is proceeding with the work under protest and he may then except the matter in question from the final release.
19. MATERIALS AND WORKMANSHIP
Unless otherwise specifically provided for in the Detail Specifications, all workmanship, equipment, materials and articles incorporated in the work shall be new and the best grade of the respective kinds for their purpose. Where equipment, materials, articles or workmanship are referred to in the Detail Specifications as "Equal To" any particular standard, the Engineer shall decide the question of equality.
The Contractor shall furnish to the ENGINEERS for approval the manufacturer's detailed specifications for all machinery, mechanical and other special equipment, which he contemplates installing together with full information as to type, performance characteristics, and all other pertinent information as required, and shall likewise submit for approval as required full information concerning proposes all other materials or articles which he proposes to incorporate in the work.
Machinery, mechanical and other equipment, materials or articles installed or used without such prior approval shall be at the risk of subsequent rejections.
Materials specified by reference to the number or symbol of a specific standard, such as an A.S.T.M.
Specification, a Federal Specification or other similar standard, shall comply with requirements in the latest revision thereof and any amendment or supplement thereto in effect on the date of the Invitation for Bids, except as limited to type, class or grade, or modified in such reference. The standards referred to, except as modified in the Detail Specifications, shall have full force and effect as though printed therein.
The Owner may require the Contractor to dismiss from the work such employee or employees as the
Owner or the Engineer may deem incompetent or careless or insubordinate.
20. SAMPLES, CERTIFICATES AND TESTS
The Contractor shall submit all material or equipment samples, certificates, affidavits, etc., as called for in the contract documents or required by the Engineer; promptly after award of the contract and acceptance of the Contractor's bond. No such material or equipment shall be manufactured or delivered to the site, except at the Contractor's own risk, until the required samples or certificates have been approved in writing by the Engineer. Any delay in the work caused by late or improper submission of samples or certificates for approval shall not be considered just cause for an extension of the contract time.
Each sample submitted by the Contractor shall carry a label giving the name of the Contractor, the project for which it is intended, and the name of the producer. The accompanying certificates or letter from the Contractor shall state that the sample complies with contract requirements, shall give the name and brand of the product, its place of origin, the name and address of the producer and all specifications or other detailed information which will assist the Engineer in passing upon the acceptability of the sample promptly. It shall also include the statement that all materials or equipment furnished for use in the project will comply with the samples and/or certified statements.
E-9
Approval of any materials shall be general only and shall not constitute a waiver of the Owner's right to demand full compliance with Contract requirements. After actual deliveries, the Engineer will have such check tests made as he deems necessary in each instance and may reject materials and equipment and accessories for cause, even though such materials and articles have been given general approval. If materials, equipment or accessories which fail to meet check tests have been incorporated in the work, the Engineer will have the right to cause their removal and replacement by proper materials or to demand and secure such reparation by the Contractor as is equitable.
21. CHANGES IN EQUIPMENT AND/OR MATERIALS
In these specifications and on accompanying drawings, there are specified and shown certain pieces of equipment and/or materials which are deemed most suitable for service anticipated. This is not done to eliminate other equipment and material equally as good and efficient. Contractor shall prepare his bid on particular material and equipment specified. Following award of contract, should Contractor desire to use some other make of machinery, equipment or material, he shall submit to Engineers a written request for such change and in same shall state advantage to Owner and saving or additional cost involved by substitution. Determination as to whether or not such change will be permitted rests solely with the Engineer.
If the requested change resulted in added engineering costs, the Contractor and Owner will be notified of the magnitude of same, by the Engineer, and the change will only be processed upon agreement by the Contractor to pay for the added engineering costs. If the Contractor refuses to pay said added costs, he must supply the equipment and/or materials specified.
22. PATENTS
The Contractor shall hold and save the Owner, its officers, and employees, harmless from liability of any nature or kind including costs and expenses, for, or on account of, any patented or unpatented invention, process, article, or appliance manufactured or used in the performance of the Contract including its use by the Owner unless otherwise specifically stipulated in the Detail Specifications.
23. WARRANTY OF TITLE
No material, supplies, or equipment for the work shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. The Contractor shall warrant good title to all materials, supplies, and equipment installed or incorporated in the work and upon completion of all work, shall deliver the same together with all improvements and appurtenances, constructed or places thereon by him to the Owner free from any claim, liens, or charges. Neither the Contractor nor any person, firm or corporation furnishing any material or labor for any work covered by this contract shall have any right to a lien upon any improvement or appurtenance thereon. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor to recover under any bond given by the Contractor for their protection or any rights under any law permitting such persons to look to funds due the contractor in the hands of the Owner. The provisions of this paragraph shall be inserted in all sub-contracts and material contracts and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into for such material.
E-10
24. THE OWNER'S RIGHT TO DO WORK
If the Contractor should neglect to prosecute the work properly or fail to perform any provision of the
Contract, the Owner, after three days' written notice to the Contractor may, without prejudice to any other remedy he may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor, provided, however, that the Engineers shall approve both such action and the amount charged to the Contractor.
25. THE OWNER'S RIGHT TO TERMINATE CONTRACT
If the Contractor should be adjudged bankrupt, or if he should make a general assignment for the benefit of his creditors, or if a receiver should be appointed on account of his insolvency, or if he should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payment to subcontractors or for material or labor, or persistently disregard laws, ordinances or the instructions of the Engineers, or otherwise be guilty of a substantial violation of any provision of the Contract, then the Owner, upon the certification of the Engineers that sufficient cause exists to justify such action, may, without prejudice to any other right or remedy and after giving the Contractor, and his surety if any, seven (7) days' written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method he may deem expedient. In such case the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the Contract Sum shall exceed the expense of finishing the work including compensation for additional managerial and administrative services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the Owner.