This is a comprehensive project manual and contract document for the Washington State Parks and Recreation Commission's Fish Barrier Removal Interior Culverts project at Ocean City State Park in Grays Harbor County, Washington. The project involves the removal of four existing fish barriers (at Crossings 423, 514, 515, and 516) and their replacement with new structures, including two box culverts and two pipe culverts, along with associated roadway, utility, and stream restoration work. The estimated bid range is $1,325,000 to $1,525,000. A pre-bid project site tour is scheduled for January 28, 2026, at 10:00 AM at Ocean City State Park Welcome Center. Sealed electronic bids are due by 1:00 PM on Thursday, March 5, 2026, through the MRSC Rosters Bonfire Procurement Portal. Bids will be opened within three business days of the deadline. Substantial completion is required within 125 calendar days from the Notice to Proceed, with final completion within 30 additional calendar days. Crossings 515 and 516 must be substantially complete with Loop 4 access open to park users by September 3, 2026. The in-water work window permitted under the Hydraulic Project Approval runs from July 15 to September 30, 2026.

The project includes mandatory prevailing wage compliance, 15 percent apprenticeship labor hour participation requirements, and voluntary diversity goals of 10 percent for Minority Business Enterprises, 6 percent for Women's Business Enterprises, 5 percent for Washington small businesses, and 5 percent for veteran-owned businesses. Bidders must provide subcontractor listings for structural steel, rebar installation, HVAC, plumbing, and electrical work if the total bid exceeds $1,000,000, which this project does. Contractors are required to register with the Washington State Department of Labor and Industries and maintain commercial general liability insurance with specified minimum coverage limits. Liquidated damages of $250 per day apply for failure to achieve timely completion. Work is subject to Section 404 and 401 permits, the Hydraulic Project Approval, and Construction General Stormwater Permit requirements. Utility interruptions shall not exceed four hours with required advance notice. The project follows the 2026 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction with project-specific special provisions addressing fish barrier removal, box and pipe culvert installation, water main relocations, sanitary sewer work, temporary stream diversion, and erosion control measures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O200-1359-2025 December 30, 2025

INVITATION TO BID

PUBLIC WORKS

PROJECT NUMBER

SW-C1359

PROJECT MANUAL

FOR

FISH BARRIER REMOVAL INTERIOR CULVERTS

AT

OCEAN CITY STATE PARK

IN

GRAYS HARBOR COUNTY

BID OPENING: 1:00 P.M., Thursday, March 05, 2026.

Bidders are required to submit bid prices electronically through the State

Parks Public Opportunities-MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com

**BIDS WILL BE OPENED WITHIN THREE BUSINESS DAYS**

WASHINGTON STATE PARKS & RECREATION COMMISSION

300 DESMOND DR SE

LACEY, WA 98503-1274

POST OFFICE BOX 42650

OLYMPIA, WASHINGTON 98504-2650

https://mrscrosters.bonfirehub.com/

PROJECT MANUAL

FOR

AT

IN

GRAYS HARBOR COUNTY

Approved for Construction ________________________________________

Heather Saunders, Director of Parks Development

WASHINGTON STATE PARKS AND RECREATION COMMISSION

1111 ISRAEL ROAD SW

TUMWATER, WASHINGTON 98501-6512

P.O. BOX 42650

OLYMPIA, WASHINGTON 98504-2650

TECHNICAL SPECIFICATIONS STAMP PAGE

The following sections of the Technical Specifications contained, herein, have been prepared by or under the supervision of the licensee described under “Prepared by” in the following table:

Section No. Section Name Prepared by

3-02 Removal of Obstructions

[Kolton Emery; David Evans and Associates]

5-04 Hot Mix Asphalt

6-10 Concrete Barrier

8-21 Permanent Signing

8-SA1 Field Office Building

6-20 Buried Structures

[Chad Booth; David Evans and Associates]

7-02 Culvert Pipe

8-31 Temporary Stream Diversion

TECHNICAL SPECIFICATIONS STAMP PAGE

7-08 General Pipe Installation Requirements

[Nhan Vo; David Evans and Associates]

7-09 Water Mains

7-17 Sanitary Sewers

8-01 Erosion Control and Water Pollution Control

[Jon Gage; David Evans and Associates]

8-02 Roadside Restoration

TABLE OF CONTENTS - 1

“ADVERTISEMENT FOR BID" LETTER

INVITATION TO BID ................................................................................................................. i-iii

INSTRUCTIONS TO BIDDERS ...................................................................................... 19 pages

BID PROPOSAL FORM ................................................................................................... 8 pages

SUMMARY OF PAY ITEMS AND QUANTITIES ............................................................... 3 pages

SUPPLEMENTAL RESPONSIBILITY CRITERIA ........................................................... 10 pages

GENERAL CONDITIONS ............................................................................................... 43 pages

PREVAILING WAGE STATEMENT .................................................................................... 1 page

AVAILABLE INFORMATION

Appendix A – Geotechnical Data Report ............................................................ 26 pages

DIVISION 1 – GENERAL REQUIREMENTS

010000 - General Requirements.......................................................................... 6 pages 010099 - Surveying ............................................................................................. 2 pages 013233 - Photographic Documentation ................................................................ 3 pages 013300 - Submittal Procedures ............................................................................ 4 pages 013501 - Inadvertent Discovery Cultural Resources Skeletal Remains................. 5 pages 014000 - Quality Requirements ............................................................................ 7 pages 014100 - Regulatory Requirements ...................................................................... 2 pages 014200 - References ............................................................................................ 3 pages 015000 - Temp Fac and Controls .......................................................................... 5 pages 015526 - Traffic Control ........................................................................................ 2 pages 015639 - Temp Tree and Plant Protection ............................................................. 7 pages 016000 - Product Requirements ........................................................................... 3 pages 017419 - Construction Waste Management ............................................................ 1 page 017700 - Closeout Procedures ............................................................................. 3 pages

DIVISION 3 – 8 TECHNICAL DIVISIONS – WSDOT SPECIAL PROVISIONS ............... 54 pages

Division 3 – Earthwork

Division 5 – Surface Treatments and Pavements

Division 6 – Structures

Division 7 – Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits

Division 8 – Miscellaneous Construction

Standard Plans – 2024 Standard Plans Desktop Reference Manual M-21.01 https://wsdot.wa.gov/publications/fulltext/Standards/Standard-Plan-Manual-September2024.pdf

END OF SECTION

https://wsdot.wa.gov/publications/fulltext/Standards/Standard-Plan-Manual-September2024.pdf

Diana Dupuis, Director

STATE OF WASHINGTON

WASHINGTON STATE PARKS AND RECREATION COMMISSION

300 Desmond Dr SE • PO Box 42650 • Olympia, WA 98504-2650 • (360) 902-8500

Internet Address: http://www.parks.wa.gov

Public Works — State Parks Page 1

ADVERTISEMENT FOR BID

Sealed bids will be received for the following project:

PROJECT NUMBER: SW-C1359

PROJECT TITLE: Ocean City State Park – Fish Barrier Removal Interior Culverts

PROJECT DESCRIPTION: Removal of four existing fish barriers and replacement with new structures.

PROJECT LOCATION: Ocean City State Park – Grays Harbor County

ESTIMATED BID RANGE: $ 1,325,000.00 - $ 1,525,000.00

PROJECT REPRESENTATIVE: Deana Bishop

PROCUREMENT COORDINATOR Jason Bologna

PREBID WALKTHROUGH: 10:00 AM on January 28, 2026: Meet at Ocean City State Park Welcome Center

SUBMITTAL DUE DATE/TIME: 1:00 PM on Thursday, March 05, 2026 ELECTRONIC BIDDING: Bidders are required to register as vendors on the

MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com to be eligible to submit bids. All bid submissions must be completed electronically through the State Parks Public Opportunities section of the portal. Bidders must use the official Bid Proposal Form, provided as part of the electronic bid documents, ensuring that all required fields are properly filled out and submitted before the deadline. (See Bonfire support details further down.)

PLANS, SPECIFICATIONS, ADDENDA, AND PLAN HOLDERS LIST: Contractors can access plans and specifications through the State Parks Public Opportunities-MRSC Bonfire Procurement Portal at https://mrscrosters.bonfirehub.com/portal.

Important: Bidders are encouraged to “Register as a Prime/GC Interest” on the project details page of the MRSC Rosters Bonfire Procurement Portal to be placed on the Bidders List. This service is free for Prime Bidders, Subcontractors, and Vendors interested in bidding on this project.

Additionally, plans and specifications are available through Builders Exchange Washington, Inc.

at http://www.bxwa.com. Posted Projects”; “Public Works”, “Washington State Parks and Recreation. Bidders have the option to access Bid Documents, including Specifications and Drawings, at www.parks.wa.gov/contracts by clicking on the Construction Projects link for https://mrscrosters.bonfirehub.com/ https://mrscrosters.bonfirehub.com/portal http://www.bxwa.com/ http://www.parks.wa.gov/contracts

Letter of Advertisement Friday, January 16, 2026

Public Works — State Parks Page 2 reference purposes. However, the official channel for bid notifications and addenda is the State Parks Public Opportunities-MRSC Rosters Bonfire Portal, and bidders should rely on it for the most up-to-date information.

PLANS MAY ALSO BE VIEWED THROUGH: Associated Builders And Contractors, Spokane WA; Tri City Construction Council, Kennewick WA; Daily Journal of Commerce, Seattle WA;

Weekly Construction Reporter, Bellingham WA; Daily Journal Of Commerce Plan Center, Portland OR; Lower Columbia Contractor Plan Center, Longview WA; Abadan Spokane Plan Center, Spokane WA; ARC Document Solutions, Seattle, WA; Associated General Contractors, Boise, ID; Dodge Construction, Bedford, MA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Clackamas, OR; Wenatchee Plan Center, Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Associated General Contractors, Spokane, WA; Walla Walla Valley Plan Center, Walla Wall, WA; Yakima Plan Center, Yakima, WA.

TECHNICAL QUESTIONS regarding this project shall be directed to: Debra Seeman, P.E., telephone: (253) 307-0093, email: debra.seeman@deainc.com, at: David Evans and Associates Inc., 676-B Woodland Square Loop SE #301E, Lacey, WA 98503..

BID RESULTS will be published on the State Parks Public Opportunities-MRSC Rosters Bonfire Portal https://mrscrosters.bonfirehub.com/portal following the bid deadline and in the Construction Projects section at www.parks.wa.gov/contracts after the bid submittal. This practice ensures that those involved and interested can readily view bid outcomes, enhancing transparency and efficiency in the bidding process.

THE STATE OF WASHINGTON PREVAILING WAGE RATES are applicable for this public works project. Bidders are responsible to verify and use the most recent prevailing wage rates. The “Effective Date” for this project is the bid submittal time and date above.

BIDDER RESPONSIBILITY will be evaluated for this project. In determining bidder responsibility, the Agency shall consider an overall accounting of the criteria set forth in Division 00 – Supplemental Responsibility Criteria. Please direct questions regarding this subject to the Project Representative.

MANDATORY 15% APPRENTICE LABOR HOURS of the total labor hours are a requirement of this construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs.

SUBCONTRACTOR LISTINGS: Per RCW 39.30.060, when the bid proposal combined with any alternates totals one million dollars or more, the Bidder must list the Subcontractors they intend to use for structural steel, rebar installation, heating, ventilation, and air conditioning (HVAC), plumbing, and electrical work on the Subcontractor Utilization List form for this project.

ACCESS EQUITY: The successful Bidder is required to complete their vendor registration in Access Equity, a secure B2GNow online vendor management system. Prime Contractors already registered with B2GNow for any public entity must ensure their information is up to date. The system can be accessed either directly at https://omwbe.diversitycompliance.com/ or via the Office of Minority and Women’s Business Enterprises (OMWBE) website at https://omwbe.wa.gov/.

mailto:debra.seeman@deainc.com https://mrscrosters.bonfirehub.com/portal http://www.parks.wa.gov/contracts https://omwbe.diversitycompliance.com/ https://omwbe.wa.gov/

Letter of Advertisement Friday, January 16, 2026

Public Works — State Parks Page 3

FOR THIS PROJECT, VOLUNTARY DIVERSITY GOALS HAVE BEEN SET: 10% for Minority Business Enterprises (MBE), 6% for Women’s Business Enterprises (WBE), 5% for Washington Small Businesses, and 5% for Veteran-owned businesses. While meeting these goals is not mandatory, it is strongly encouraged to promote diversity in business participation.

Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at:

http://omwbe.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in WEBS at https://pr-webs-vendor.des.wa.gov/ and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-ownedbusinesses/vob-search.

Washington State Parks reserves the right to accept or reject any or all proposals and to waive informalities.

STATE OF WASHINGTON

PARKS AND RECREATION COMMISSION

CONTRACTS AND GRANTS

For assistance with the Bonfire Vendor Registration Process, please visit the following link:

Vendor Registration Support

For guidance on the Bonfire Bid Submission Process, refer to this link: Bid Submission Support

Additional Bonfire Vendor Support resources, including support articles and instructional videos, are available at: Bonfire Vendor Support

If vendors experience any technical issues, they can contact Bonfire Support via email at support.bonfire@eunasolutions.com.

http://omwbe.wa.gov/ https://pr-webs-vendor.des.wa.gov/ https://www.dva.wa.gov/veterans-their-families/veteran-ownedbusinesses/vob-search https://www.dva.wa.gov/veterans-their-families/veteran-ownedbusinesses/vob-search https://customer.eunasolutions.com/public/s/article/vendor-registration https://customer.eunasolutions.com/public/s/article/creating-and-uploading-a-submission https://customer.eunasolutions.com/public/s/knowledge-base/bonfire-hub mailto:support.bonfire@eunasolutions.com

INVITATION TO BID - i

INVITATION TO BID

1.1 SPECIAL NOTICE(S)

A. Park Closure: Reservations for Ocean City State Park Loop 4 will be closed beginning July 15, 2026. Reservations will be opened upon receiving Contractor’s work schedule.

B. Work Sequence: Crossings 515 and 516 shall be substantially complete, with Loop 4 access road open to Park Users, by September 3, 2026.

C. Utility Interruptions: Any planned interruption shall not exceed 4 hours. Provide written notice to Owner and all potentially affected customers ≥72 hours in advance, with a 24-hour reminder; coordinate the timing to avoid business impacts and adjust sequencing or provide an alternative temporary supply if needed.

D. In-Water Work Window: The permitted in-water work window allowed by the HPA begins on July 15, 2026, and ends on September 30, 2026.

1.2 DESCRIPTION OF WORK

E. This Contract includes the removal of four existing fish barriers and replacement with new structures.

1.3 LOCATION OF PROJECT

A. The project is located within the Ocean City State Park campground.

1.4 TECHNICAL QUESTIONS

A. Direct project questions to:

Debra Seeman, P.E., at: David Evans and Associates Inc., 676-B Woodland Square Loop SE #301E, Lacey, WA 98503.

Phone: (253) 307-0093; e-mail: debra.seeman@deainc.com.

1.5 PRE-BID PROJECT SITE TOUR

DATE: January 28, 2026

TIME: 10:00 AM

LOCATION:

Ocean City State Park – Welcome Center: 148 State Route 115, Hoquiam, WA 98550 [47.03307427166137, -124.15953648702316]

INVITATION TO BID - ii

1.6 BID OPENING

A. Bidders must be registered as vendors through the MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal, which is free to sign up for, before submitting their bids electronically through the State Parks Public Opportunities section of the same portal. All bids must be submitted using the Bid Proposal Form, provided as part of the electronic bid documents. Submissions must fully comply with the requirements outlined in Sections 3.1 and 4.1 of the Instructions to Bidders. Bids are due at 1:00 p.m., Thursday, March 05, 2026. Late submissions will not be accepted.

B. The Agency does not guarantee a specific timeframe for the public release of bid results;

however, they are typically available within three business days of the bid opening, often on the same day. Bid results can be accessed through the MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal and public notices. Additionally, they may be available on the Washington State Parks website at www.parks.wa.gov/contracts under "Construction Projects – Public Works Bid Results." Bid results may also be shared through Plan Centers, but Bidders should note that the State Parks Public Opportunities - MRSC Rosters Bonfire Procurement Portal serves as the official release point for the Bid Tabulation or Bid Record for this solicitation.

C. The Agency reserves the right to accept or reject all bids and to waive informalities. The Bidder will allow 60 days from bid opening date for acceptance of its bid by the Agency.

1.7 COVID 19

A. COVID-19 Refer to the Department of Labor & Industries website for requirements regarding any safety plans needed. Novel Coronavirus Outbreak (COVID-19) Resources (wa.gov)

1.8 FOR INFORMATION ON:

A. Bidder Responsibility: Bidder responsibility will be evaluated for this project. In determining bidder responsibility, the Agency will consider an overall assessment of the criteria outlined in Division 00 – Instructions to Bidders.

For any questions regarding this topic, please contact the Project Representative or submit a vendor discussion through the State Parks Public Opportunities - MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal. To ensure consideration, all inquiries must be received at least seven (7) working days before the bid opening date.

B. Reciprocal Preference: See Instructions to Bidders 11.1 Reciprocal Preference for Resident Contractors.

C. Apprenticeship Requirements: For projects estimated at or over $1,000,000, Apprenticeship Participation, Mandatory 15 percent apprentice labor, see Instructions to Bidders 5.1B Apprenticeship Participation.

D. Subcontractor Listings: When the base bid combined with any alternates totals https://mrscrosters.bonfirehub.com/portal https://mrscrosters.bonfirehub.com/portal http://www.parks.wa.gov/contracts https://www.lni.wa.gov/agency/outreach/novel-coronavirus-outbreak-covid-19-resources https://www.lni.wa.gov/agency/outreach/novel-coronavirus-outbreak-covid-19-resources

INVITATION TO BID - iii

$1,000,000 or more, the Bidder must list the Subcontractors they intend to use for structural steel, rebar installation, heating, ventilation, and air conditioning (HVAC), plumbing, and electrical work on the Subcontractor Utilization List form for this project, see Instructions to Bidders 5.1A Subcontractor Listing.

E. MWBE goals: See Instructions To Bidders 12.1 Minority And Women's Business Enterprise (MWBE) Utilization. For Veteran-Owned and Small Business utilization, see Instruction to Bidders 12.2.

F. Modification of Bid: See Instructions to Bidders 6.3 Modification of Bid.

G. Withdrawal of Bid: See Instructions to Bidders 6.4 Withdrawal of Bid.

H. Bid Guarantee: See Instructions to Bidders 4.1 Bid Bond. No particular bid bond form is required.

I. Bid Tabulation and Bid Record: See Instructions to Bidders 7.1B for Bid Tabulation, Bid Record, and Announcement of Apparent Low Bid.

J. Records Request: All submitted bids are subject to public records request once the lowest bidder has been determined and officially announced. See Instructions to Bidders 7.1D Records Request.

1.9 ACCESSIBILITY

A. Sites may not be fully accessible to people with disabilities. Please contact the Project Representative at least five (5) days prior to scheduled pre-bid tour if special accommodation is required for your attendance.

END OF SECTIONt

WASHINGTON STATE PARK AND RECREATION COMMISSION

PUBLIC WORKS PROJECT

INSTRUCTIONS TO BIDDERS - 1

1.1 BIDDER DEFINED

A. A "Bidder" is an entity or person who submits a bid proposal for the work described in the contract documents.

B. The Bidder must be registered with the Washington State Department of Labor and Industries in accordance with RCW 18.27.020. The contractor registration number, expiration date, Uniform Business Identifier (UBI) number, and federal tax identification number must be entered in the applicable spaces on the Bidder Compliance Form within the Bid Proposal Form.

2.1 EXAMINATION OF THE WORK SITE AND BIDDING DOCUMENTS

A. Bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work.

The bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the Bidder to take the actions described and acknowledged in this paragraph will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.

B. No statement by any officer, agent, or employee of the Owner pertaining to the physical conditions of the site of the work will be binding on the Owner other than those statements issued in the contract documents.

C. Bidders shall promptly notify the Owner of ambiguities, inconsistencies, or errors, if any, which they may discover upon examination of the Bidding Documents or of the site and local conditions.

D. Interpretations and Clarifications

1) Prospective Bidders seeking clarification or interpretation of the solicitation, drawings, or specifications must submit a written request to the Project Representative listed in the Invitation to Bid or through the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal by submitting a vendor discussion. Requests must be received at least seven (7) working days prior to the bid deadline to be considered.

2) Any Owner responses that do not modify the Scope of Work outlined in the contract documents may be posted on the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal prior to the bid submission deadline. Such clarifications will not be considered part of the contract documents and do not need to be acknowledged by Bidders in their Bid Proposal Form. The Owner retains sole discretion to determine whether a clarification or interpretation affects the Scope of Work and requires inclusion in the Contract Documents.

INSTRUCTIONS TO BIDDERS - 2

3) Changes to the Scope of Work or schedule described in the contract documents will only be issued as written ADDENDA.

4) Oral interpretations or clarifications are not legally binding.

E. Substitutions

1) The product, equipment, materials, or methods described or noted within the Bidding Documents, whether currently available or not, are to establish a standard of quality, function, appearance and dimension. A proposed substitution shall have equal attributes in all respects.

2) No substitution will be considered unless a written request for approval is submitted by the Contractor, after Award, in accordance with the applicable provisions of Section 012500 of the specifications. If no Section 012500 is available, then see section 016000 Product Requirements, sub-section 1.5. Each such request shall describe the proposed substitution in its entirety including name of the material or equipment, drawings, catalog cuts, performance or test data and all other information required for an evaluation. The submittal shall also include a statement noting all changes required in adjoining, dependent or other interrelated work necessitated by the incorporation of the proposed substitute. The Bidder shall bear the burden of proof of merit of the proposed substitution.

The Project Representative’s decision of approval or disapproval of a proposed substitution shall be final.

3.1 BID PROPOSAL

A. Bidders must be registered as vendors through the MRSC Rosters Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal. All bid submissions must be made through the State Parks Public Opportunities section on the same portal. The individual who signs and submits the bid through the Bonfire Portal must be an authorized designee responsible for the bid submission.

B. All bidders for Small Works Projects must be currently registered on the MRSC Small Works Roster (vendor list) found http://mrscrosters.org/.

C. Bidders are required to submit bid prices electronically through the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal. Submissions must be completed using the Bid Proposal Form, provided as part of the electronic bid proposal documents. The Bid Proposal Form is a spreadsheet consisting of four tabs:

1. Bidder Compliance Form

2. Bid Form

3. MWBE

4. Subcontractor Utilization (if applicable)

All fields in the Bid Proposal Form tabs must be properly and completely filled out to ensure compliance. Failure to fill in all required fields may result in the bid being deemed non-responsive.

http://mrscrosters.org/

INSTRUCTIONS TO BIDDERS - 3

The Bidder Compliance Form must include the Bidder's full and complete address and information, typed in the spaces provided. The Bid Form must be electronically signed in the firm’s name, and a typewritten name is acceptable as an electronic signature, provided it complies with electronic submission requirements.

Once the Bid Proposal Form is completed, it must be uploaded in its original form to the appropriate section of the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal. Bidders are reminded to thoroughly review their submission before uploading to ensure compliance with all instructions and requirements. Incomplete submissions will be deemed non-responsive.

D. Except as otherwise provided in these instructions, bid proposals that are incomplete, or that are conditioned in any way, or that contain alterations, or items not called for in the contract documents, or that do not conform to the call for bids, may be rejected as non-responsive at the discretion of the Owner unless the law requires that the omission be deemed non-responsive, in which case the bid will be rejected as non-responsive. Only the amounts and information asked for on the Bid Proposal Form and the plans and specifications furnished will be considered as the bid. Bid amounts include all taxes imposed by law, except for Washington Sales Tax unless noted otherwise.

E. Each Bidder must submit their bid exactly as specified and as provided in the Bid Proposal Form. Bidders are required to include bids for all alternates if alternates are indicated on the Bid Form. For alternates that have no charge, the Bidder must type “$0.00” in the column for the unit price on the Bid Form.

F. Bidders shall acknowledge receipt of any ADDENDA to the solicitation for bids on the Bid form.

Failure to do so may result in the bid being declared non-responsive.

G. Substitute bid forms will not be considered unless this solicitation authorizes their submission.

H. The bid prices listed in the Bid Form must include all labor, materials, equipment, overhead, and compensation necessary to complete the work for each item, while the costs for the building permit and public utility hookup fees will either be reimbursed directly to the Contractor or paid by the Owner to the permitting agency and therefore should not be included in the bid amount.

I. The low Bidder, for purposes of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the Owner, and within funds available for the project. The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid deadline.

4.1 BID GUARANTEE: BID BOND

A. A bid bond is not required when the total bid amount, including the base bid and all additive alternates, is $35,000 or less. In such cases, instead of providing a bid bond, Bidders must complete and upload the Bid Bond Requirement Statement as part of their bid submission.

This ensures compliance with the bidding requirements for projects below the $35,000 threshold.

B. When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.

INSTRUCTIONS TO BIDDERS - 4

C. Acceptable forms of bid guarantee are: A bid bond. A scanned copy (e.g., PDF) of the bid bond must be uploaded to the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal (https://mrscrosters.bonfirehub.com/portal) along with your bid response to the Owner.

See also, Section 6.1 SUBMISSION OF BID.

D. The Bidder will allow 60 days from bid deadline for acceptance of its bid by the Owner.

E. Should the successful Bidder fail to enter into a contract and furnish a satisfactory performance bond within 15 days after receiving properly prepared contract forms from the Owner, the bid bond may be forfeited as liquidated damages for advertisements and administration of bid procedures. Additionally, the Owner reserves the right to terminate the contract award.

F. Bid bonds must be held for the three low bids for 30 days or until a contract is executed with the successful Bidder. All other bid bonds will be released or returned to the Bidders within 15 days of the bid deadline.

5.1 REQUIREMENTS FOR PROJECTS ESTIMATED AT $1,000,000 OR MORE

A. SUBCONTRACTOR LISTING

Pursuant to RCW 39.30.060, if the base bid combined with the sum of the alternates is one million dollars ($1,000,000.00) or more for the construction, alteration, or repair of any public building or public work of the state, the Bidder shall submit the names of subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation and air conditioning (HVAC), plumbing, electrical, structural steel installation, and rebar installation, or to name itself for the work.

1. Submission Deadlines:

• HVAC, Plumbing, and Electrical: The names of subcontractors and proof of license for these trades (or the Bidder's own name and proof of license) must be submitted at the published bid submittal time. Errors identified by the Owner in the proof of license information may be corrected by the Bidder within 48 hours of submission.

• Structural Steel and Rebar: The names of subcontractors for these trades may be submitted at the published bid submittal time but must be submitted no later than 48 hours after the published bid submittal time.

2. The Bidder shall not list more than one subcontractor for each category of work identified, unless subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate.

3. The Bidder can name itself for the performance of the work. Bidders who name themselves to perform the work are expected to perform the work and the Owner reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.

4. The Subcontractor Utilization List is intended to discourage bid shopping, not to verify subcontractor qualifications. The Owner does not use the Subcontractor Utilization List as a tool to disqualify or qualify bidders.

5. Substitution of a listed subcontractor (at any tier) before or after the award of the prime https://app.leg.wa.gov/RCW/default.aspx?cite=39.30.060

INSTRUCTIONS TO BIDDERS - 5

contract is prohibited except for the following reasons:

• Refusal of the listed subcontractor to sign a contract with the prime contractor,

• Bankruptcy or insolvency of the listed subcontractor,

• Inability of the listed subcontractor to perform the requirements of the proposed contract or the project,

• Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract,

• Refusal or inability to provide a letter of bondability from a surety company, or

• The listed subcontractor is barred from participating in the project as a result of a court order.

Subcontractor listing is not required for Small Works Projects under $350,000.

Failure of the Bidder to submit, the names and license numbers of such subcontractors, or to name itself to perform such work, or the naming of two or more subcontractors to perform the same work, or failure to sign the form shall render the bid as non-responsive and therefore void.

B. APPRENTICESHIP PARTICIPATION

In projects estimated to cost one million dollars ($1,000,000.00) or more, be aware that the following requirements will be part of the resulting contract.

Apprenticeship requirements do not apply to Small Works Projects estimated below $350,000.

In accordance with RCW 39.04.320 (Apprenticeship Training Programs), for all public works estimated by the Owner Project Engineer to cost one million dollars or more, the state of Washington requires no less than 15% of the labor hours be performed by apprentices. A contractor or subcontractor may not be required to exceed the 15% requirement. The bid advertisement and Bid Proposal Form shall establish a minimum required percentage of apprentice labor hours compared to the total labor hours. The project’s apprenticeship utilization rate is calculated using the approved affidavits from the L&I portal.

1. Incentives - The Contractor who meets or exceeds this utilization requirement on eligible contracts, will be awarded a monetary incentive described in the Apprentice Utilization Requirements section of the Bid Proposal Form.

2. Penalties - The Contractor who fails to meet the utilization requirement and fails to demonstrate a Good Faith Effort, as outlined below, is subject to penalties described in the Apprentice Utilization Requirements section of the contract Bid Proposal Form.

Contractor will receive an invoice payable to the Owner within 30 days. The contractor will have 30 days to pay the penalty invoice at the time of receipt before the penalty is considered outstanding. Contractors with outstanding apprenticeship penalties may be considered non-responsive.

3. Cost Value - The expected cost value associated with meeting the goal is included in the Base Bid as described on the Bid Proposal Form.

https://app.leg.wa.gov/RCW/default.aspx?cite=39.04.320

INSTRUCTIONS TO BIDDERS - 6

4. Utilization Plan - The Contractor shall provide an Apprentice Utilization Plan (Plan) demonstrating how and when they intend to achieve the Apprenticeship Utilization Requirement. The Plan shall have enough information to track the Contractor’s progress in meeting the utilization requirement. The Contractor shall submit the Plan on the Apprentice Utilization Plan template within 10 business days of Notice to Proceed of the contract and prior to submitting the first invoice. The Contractor shall provide an updated Plan during the course of construction when there are significant changes to the Plan which may affect their ability to meet the requirement.

a) The Plan shall be uploaded to the Department of Labor & Industries’ (L&I):

Prevailing Wage Intents and Affidavit (PWIA) system on L&I’s website.

b) The Plan is not submitted for approval.

c) It is expected that the Contractor will actively seek out opportunities to meet the Apprentice Utilization Requirement during construction even if the Plan indicates a shortfall in meeting the requirement.

d) If the Plan indicates that the Contractor will not attain the Apprentice Utilization Requirement, then Contractor must submit “Good Faith Effort” (GFE) documentation with their Plan to L&I’s PWIA system.

C. APPRENTICESHIP - GOOD FAITH EFFORT (GFE)

1. Good Faith Effort (GFE) documentation shall describe in detail why the Contractor is not or was not able to attain the Apprentice Utilization Requirement.

a) Contractors may submit Good Faith Effort (GFE) documentation at any time during the construction.

b) All GFE documentation must be submitted no later than 30 days before substantial completion.

c) Only the awarding Owner can approve GFEs. The Department of Labor & Industries (L&I) may provide assistance but does not have approval authority

d) The Awarding Owner must document its GFE decision in writing, including any monetary penalty if denied.

e) Good Faith Effort (GFE) documentation must be in signed letter format uploaded to the PWIA system and include:

1. The contract number, title and the apprentice utilization requirements,

2. The amount of apprentice labor hours the contract can or did attain along with the percentage of labor hours,

3. Contractors may receive a GFE credit for graduated Apprentice hours through the end of the calendar year for all projects worked on as long as the Apprentice remains continuously employed with the same Contractor they were working for when they graduated. If an Apprentice graduates during employment on a project of significant duration, they may be counted towards a GFE credit for up to one year after their graduation or until the end of the project (whichever

INSTRUCTIONS TO BIDDERS - 7

comes first). Determination of whether or not Contract requirements were met in good faith will be made by subtracting the hours from the journeyman total reported hours for the project and adding them to the apprentice hour total. If the new utilization percentage meets the Contract requirement, the Contractor will be reported as meeting the requirement in good faith,

4. Anticipated or actual shortfall (in apprentice labor hours and percentage) and the reason(s) for not attaining the required apprentice labor hours,

5. Information from one or more of the following areas:

(a) Names of any State-Approved Apprentice Training Programs contacted with the name(s) of person(s) contacted and dates of contacts, and a copy of each response from the Training Program(s),

(b) Reference Contract Specifications or documents that affected the Contractor’s ability to attain apprentice utilization,

(c) Discuss efforts the Contractor has taken to require Subcontractors to solicit and employ apprentices,

6. Backup documentation to the letter consisting of the following:

(a) Letters, emails, phone logs including names dates and outcomes, posters, photos, payrolls, timecards, schedules, copies or references to other contract specifications or documents.

Additional Resource Information

(a) For questions regarding how to complete the Apprentice Utilization Plan template or Good Faith Effort documentation, please contact the Project Manager listed in the Bid Advertisement.

(b) Step-by-step instructions on how to access and navigate the L&I’s PWIA system, including uploading required documents can be found on the L&I website.

(c) Additional information about apprentice utilization on Public Works Project can be found on the L&I website.

6.1 SUBMISSION OF BID

A. Bids must be submitted on or before the time as specified in the Invitation to Bid.

B. Bid responses will only be accepted electronically through the State Parks Public Opportunities section using the MRSC Rosters Bonfire Procurement Portal as specified in the Invitation to Bid. https://mrscrosters.bonfirehub.com/portal.

C. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, braille, etc.) need to contact the Owner ten (10) working days prior to the scheduled bid deadline.

INSTRUCTIONS TO BIDDERS - 8

D. In the event the MRSC Rosters Bonfire Procurement Portal is unavailable to all users at the bid submittal deadline, the Owner will contact the Bidders within 24 hours and the Owner will extend the bid submittal time.

E. Neither Owner nor MRSC Rosters Bonfire Procurement Portal can guarantee the availability of Internet connectivity or related telecommunication and hosting services and will not be liable or responsible if the Bidder and its representative(s) or designee(s) cannot connect to the MRSC Rosters Bonfire Procurement Portal.

F. The Bidder must comply with the MRSC Rosters Bonfire Portal’s Terms of Service (https://gobonfire.com/termsservice/) when submitting the Bid through the MRSC Rosters Bonfire Procurement Portal.

6.2 BID CLOCK:

A. After the 1 P.M. bid deadline, which serves as the official bid clock to determine timely submission, Owner staff will review the bids. The MRSC Rosters Bonfire Procurement Portal does not permit submissions after the deadline, so bidders must ensure their bids are submitted on time. Late submissions will not be accepted under any circumstances.

B. CAUTION: To avoid issues, submit your bid response electronically well in advance of the deadline to account for potential technological delays, slow-downs, or malfunctions. Bids received after the deadline, regardless of the reason or responsibility, will be rejected.

6.3 MODIFICATION OF BID

A. Bidders may update their bid electronically via the MRSC Rosters Bonfire Procurement Portal before the bid due date.

Modifying: Modifying refers to altering information already contained in a submitted bid. If your submission has been finalized but needs modifications, you may update it electronically before the bid due date by navigating to the Submissions page and un-submitting your submission.

NOTE: Un-submitting removes your original bid, so ensure you resubmit before the deadline.

Only upload updated files; unchanged files remain in place. A new confirmation email will be sent upon resubmission.

6.4 WITHDRAWAL OF BID

A. Withdrawal refers to a bid that has already been submitted to the Owner. A bid response may be withdrawn electronically by the Bidder’s authorized representative before the Bid Deadline (due date) for the bid. The FAILURE TO WITHDRAW a bid prior to the bid due date deadline exposes the Bidder to the possibility that the Owner will make a demand against the Bidders bid bond.

B. Procedure for Withdrawing a Bid After Bid Deadline Due to Error: If a Bidder discovers an error in its bid following the bid deadline, the Bidder must submit written notification of the withdrawal to contracts@parks.wa.gov within 24 hours following the bid deadline. Follow the example subject line. Example email subject line: SW-C9999 Withdraw Bid ACME Construction Inc.

• The Bidder must provide written documentation of the claimed error to the satisfaction of https://gobonfire.com/termsservice/ mailto:contracts@parks.wa.gov

INSTRUCTIONS TO BIDDERS - 9

the Owner within 72 hours following the bid deadline.

• The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the Bidder’s request for withdrawal of its bid is approved, the Bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the Bidder’s bid bond.

6.5 REJECTION OF BID

A. The Owner reserves the right to reject any or all bids and to waive informalities in connection with the bids.

7.1 BID EVALUATION AND AWARD OF CONTRACT

A. Award of contract will be made by the Owner based upon any combination of the base bid and alternates that, in the Owner’s sole discretion, is in the Owner’s best interest considering price, schedule, and other factors. The numbering of the alternates in the bid proposal bears no relationship to the order in which the alternates may be selected by the Owner. Additionally, the Owner reserves the right to negotiate base bid prices (including changes to the contract plans and specifications) with the low responsive, responsible Bidder to bring the final contract amount within the funds available per RCW 39.04.015.

B. BID TABULATION, BID RECORD AND ANNOUNCEMENT OF APPARENT LOW BID:

The Owner does not guarantee when the Bid results will be released to the public. The bid results are usually released within three business days of the bid deadline and often the same day. Bid results can be obtained from MRSC Rosters Bonfire Procurement Portal (https://mrscrosters.bonfirehub.com/portal) and viewing public notices. Bid Results may also be obtained by accessing the Washington State Parks webpage at www.parks.wa.gov/contracts (see “Construction Projects- Public works bid results”). The Bid results may also be released through the Plan Centers. But, Bidders are cautioned that the State Parks Public Opportunities- MRSC Rosters Bonfire Procurement Portal is the official release point for the Bid Tabulation or Bid Record for this solicitation.

The bid tabulation will identify all bids received by the Owner. Bids that were not rejected and not withdrawn prior to the bid deadline will be ranked by base bid price. The first three lowest base bids will reflect detailed pricing information. The remaining Bidders will reflect only the base bid pricing. Bids that were rejected for any reason will reflect Non-Responsive in the bid tabulation but may include its total pricing.

The bid record will list all bids received, ordered alphabetically. Rejected bids will not show detailed pricing. The bid record is used for projects with Alternates. The Owner may consider Alternate Bid Items in any combination. The low Bidder for award purposes is the responsive Bidder offering the lowest aggregate amount for the base bid plus selected alternates, within available project funds.

Release of the Bid Tabulation or Announcement of the Apparent Low bid information that a Firm was identified as the apparent low base bid simply means that at this point in time the Owner believes the subject bid was the lowest cost responsive bid, but designation as the apparent low responsive bid is not a guarantee of a contract with the Owner. The Owner reserves the right to reevaluate the bid and determine whether the bid was responsive and responsible and successful as first thought. The Bidder identified as the apparent low responsive bid is cautioned not to commit funds, resources, and effort prior to receiving an http://www.parks.wa.gov/contracts

INSTRUCTIONS TO BIDDERS - 10

actual executed contract. The Bidder identified as the apparent low responsive bid that commits funds, resources, and effort prior to a contract do so at its own risk and peril.

Within two (2) business days following the day of the release of the Bid Tabulation/Bid Record or the Announcement of the Apparent Low bid, the Bidder may file a Protest (Protest procedures are outlined in Section 9.1).

C. REJECTION LETTER & PROTEST: No matter the phase of the evaluation, if the Owner determines that the bid is not responsive or the Bidder is not responsible, the Owner will reject the bid/bidder, and send the bidder a Rejection Letter explaining why the bid/bidder was rejected. Within two (2) business days following the day of the release of the Rejection Letter, the Bidder may file a Protest, provided it meets one of the three (3) protest grounds (Protest procedures are outlined in Section 9.1 E.). The Rejection Letter will be sent by email/email attachment to the email address provided by the Bidder in the Bidder’s bid response.

D. RECORDS REQUEST: All submitted bids are subject to public records request once the lowest bidder has been determined and officially announced.

After the announcement of the lowest bidder, any member of the public may request access to the bid documents. No official format is required for making a records request; however, the Owner recommends that requests be made through the Public Records Request Center on our website:https://parks.wa.gov/about/contact-us/public-records-requests.

E. The intent of the Owner is to award a contract to the low responsive, responsible bidder.

8.1 RESPONSIVE AND RESPONSIBLE BIDDER

A. The Owner will evaluate bids responsiveness and responsibility in the MRSC Rosters Bonfire Procurement Portal https://mrscrosters.bonfirehub.com/portal.

B. RESPONSIVE - A bid will be considered responsive if its electronic response meets the following requirements:

1. It is received at the proper submittal time, date and location online through the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal.

2. It meets the required requested information of the Bid Proposal Form through the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal.

3. It meets the requirements as stated in section 3.1. of the Instructions To Bidders.

4. It is submitted by a licensed/registered contractor within the state of Washington at the time of bid deadline and is not banned from bidding by the Department of Labor and Industries.

5. It is accompanied by a bid guarantee, if required.

If inconsistencies or errors are noted in the bid proposal prices, the unit and lump sum prices have precedence over their total amounts; and the total amounts have precedence over the total base bid.

The apparent low Bidder, for purpose of award, is the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.

https://parks.wa.gov/about/contact-us/public-records-requests

INSTRUCTIONS TO BIDDERS - 11

C. RESPONSIBLE – Before award of a public works contract, a Bidder must meet the following mandatory responsibility criteria under RCW 39.04.350 (1) & (2) to be considered a responsible Bidder and qualified to be awarded a public works project. The individual who has signed/submitted the Bid through the State Parks Public Opportunities-MRSC Rosters Bonfire Procurement Portal shall be the authorized designee responsible for bid submissions. The Bidder must:

1. At the time of bid submittal, have a certificate of registration in compliance with RCW 18.27, a plumbing contractor license in compliance with RCW 18.106, an elevator contractor license in compliance with RCW 70.87, or an electrical contractor license in compliance with RCW 19.28 as required under the provisions of those chapters;

2. Have a current state Unified Business Identifier (UBI) number;

3. If applicable, have industrial insurance coverage for the Bidder's employees working in Washington as required in RCW 51; an employment security department number as required in RCW 50; and a state excise tax registration number as required in RCW 82;

4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);

5. If bidding on a public works project subject to the…