This document is a Statement of Work (SOW) for the GVIC Fish Screen Rehabilitation project under Solicitation No. 140R4018Rxxxx. The work site is located in Mesa County, Colorado, downstream of the GVIC Canal from the GVIC River Gates.
The principal components of the work include demolishing existing concrete structures, installing new cast-in-place concrete for a fish return structure and bypass channel, removing and disposing of existing fish screens and screen cleaning equipment, furnishing and installing new bi-fold overshot gates, fabricating and installing metal framework for new government-furnished fish screens and trash conveyor system, and installing the government-furnished equipment. The contractor will also furnish and install the Wash Water Supply System, plumbing and water control connections, three new gate actuators, and provide electrical and data connections. The construction period is from the Notice to Proceed date to April 1, 2025, for substantial completion, with all work to be completed by May 1, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOURCES_SOUGHT_SYNOPSIS_-_GVIC_Fish_Screen_Rehabilitation_26_Jun_24_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GVIC Fish Screen Rehabilitation Upper Colorado River Endangered Fish Recovery Program Solicitation No. 140R4018Rxxxx
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. The work site is in Mesa County south of downtown Palisade, Colorado. The existing fish screen is directly downstream on the GVIC Canal from the GVIC River Gates.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Demolish concrete sections of existing fish return structure, and bypass channel area, and adjacent slabs.
B. Place new cast in place concrete for fish return structure, the bypass channel structure, and adjacent slabs.
C. Remove and dispose of 21 existing weld wire fish screens and screen cleaning equipment.
D. Furnish and install 4 new bi-fold overshot gates.
E. Fabricate and install metal framework for new government furnished fish screens and trash conveyor system.
F. Install 16 new government furnished fish screens and government furnished trash conveyor system on the installed metalwork.
G. Furnish and install all components of the Wash Water Supply System.
H. Furnish and install all plumbing and water control connections between the Wash Water Supply System and the Washwater Pipeline.
I. Furnish and install 3 new gate actuators to existing check structure gates.
J. Provide electrical service and data connections to all new components.
1.03 WORK RESTRICTIONS AND LIMITATIONS
A. Do not interfere with GVIC’s maintenance or operations in the vicinity.
B. On April 1st, 2025, GVIC will supply the canal with water for their deliveries. Facilities shall be able to receive water by this date.
GVIC Fish Screen Rehabilitation Upper Colorado River Endangered Fish Recovery Program Solicitation No. 140R4018Rxxxx
Summary of Work
01 11 00 - 2
1.04 SCHEDULE
A. Construction Period: Notice to proceed date to April 1st, 2025, for substantial completion.
B. Contractor shall complete all work by May 1st, 2025.
1.05 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.06 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
1. GVIC: Grand Valley Irrigation Company.
2. BOR: Bureau of Reclamation
3. CO: Contracting Officer
4. COR: Contracting Officer’s Representative
5. CY: Cubic yard
6. LF: Linear Foot
1.07 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION