4-RFP265X901162 Exhibit A.pdf
PDF 829 KB Posted
- Attached to
- Columbia Tusculum Fiber Project
- Solicitation number
- RFP265X901162
- Issued by
- Hamilton County, Ohio
About this file
This is an Exhibit A document related to the Columbia Tusculum Fiber Project, a fiber optic communications network initiative for the City of Cincinnati, Ohio. The exhibit provides a technical schematic and site plan identifying existing and proposed infrastructure for integrating traffic signals into the city's Computerized Traffic Control System (CTCS). The project encompasses Zone 12, which includes existing 72 single-mode fiber installed in 2012, with identified signal locations at intersections including Delta & Linwood, Eastern & Linwood, and Kellogg & Wilmer. The document indicates a proposed Layer 3 Switch connection point at CFD Station 18 located at 478 Wilmer Avenue to connect to the City's Metropolitan Area Network (MAN). Additional signal infrastructure approximately 3,600 feet from the existing Kellogg & Wilmer signal is noted as a potential system expansion if connected to the WW Pump Station at 2545 Riverside. The exhibit identifies multiple traffic signal locations coded with alphanumeric designations representing the network infrastructure to be designed and eventually constructed.
The exhibit serves as a planning and design reference document outlining the existing fiber infrastructure installed during the 2012 Zone 12 project and the proposed modifications to integrate traffic signals into a modernized, centralized control system. The document does not contain pricing, contract terms, or specific project delivery schedules, but rather provides the technical and geographic foundation necessary for the design consultant to develop detailed plans and specifications for the fiber optic network replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing 72 SM Fiber installed for Zone 12 project (2012)
D-033
E-002
Additional Signal approx 3600' from Kellogg & Wilmer
Existing Signal but not currently included in project. It could be added if overall system connected to WW Pump Station at 2545 Riverside.
Existing Zone 12 Signal
Existing Signal included in Columbia Tusculum Fiber Project
D-032
D-015
E-035
L-023 H-030
Existing 72 SM Fiber installed for
Zone 12 project (2012)
D-059
D-051
E-035
R-057
C-080
D-056 C-099
C-083
C-085E-006 K-005
C-100
K-801
C-140 A-001
K-006
A-033
B-099
A-032
CFD Station 18 478 Wilmer Avenue Proposed Location of Layer 3 Switch to Connect to City's Metropolitan Area Network (MAN)
Proposed Branch Columbia Tusculum
Project
Traffic Signal at Delta & Linwood
Traffic Signal at Eastern & Linwood
Signal Removed
ZONE 12
File details come from the government source that posted it. Updated .