4-RFB 2026-008 Bid Sheet - Excel.xls

XLS spreadsheet 51 KB Posted

Attached to
Street Preservation - Thin Overlay Mix
Solicitation number
RFB 2026-008
Issued by
Mclennan County, Texas

About this file

This is a Bid Sheet (Excel format) for Request for Bids 2026-008 issued by the City of Waco, Texas, for a Street Preservation - Thin Overlay Mix project. The project encompasses 2.99 lane miles of thin overlay mix application and pavement markings across various streets within the city. Sealed bids will be accepted at the City of Waco's Operations Center, 1415 N. 4th Street, Waco, Texas, with a deadline of 2:00 P.M. on Thursday, February 26, 2026. A non-mandatory pre-bid meeting is scheduled for Tuesday, February 10, 2026, at 10:00 A.M. via Zoom video conference and dial-in options. Interested bidders should contact Purchasing Agent Paul Campos at pcampos@wacotx.gov or 254-750-8062 for additional project details and inquiries.

The bid sheet serves as the formal pricing document for submission by prospective contractors. Additional project specifications and requirements are available through the City of Waco's procurement portal at https://waco-texas.bonfirehub.com/portal. No information regarding pricing structure, set-asides, incumbent contractors, funding sources, or contract term and renewal options is specified within the bid sheet itself.

View the file

Other files

File Type Posted
1-RFB 2026-008 Zoom Information.pdf PDF
3-RFB 2026-008 Plans.pdf PDF
2-RFB 2026-008 Bid Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID_PROPOSAL

RFB 2026-008
BID PROPOSAL FOR
Street Preservation - Thin Overlay Mix (18ST2501G)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)Pavement Rehabilitation (Districts 1 & 4) (18ST2302A)
ITEM NODESCRIPTIONEST QTYUNITUNIT PRICEITEM AMOUNT
BASE BID
1MOBILIZATION1LS
2BONDING AND INSURANCE1LS
3TRAFFIC CONTROL PLAN AND IMPLEMENTATION1LS
4STORMWATER POLLUTION PREVENTION PLAN AND IMPLEMENTATION (1 ACRE OR LESS)1LS
5BASE FAILURE REPAIR (CONCRETE)59SY
6BASE FAILURE REPAIR (HMAC TY B)46SY
71" THIN OVERLAY MIX (TY C)33,180SY
8EDGE MILL (7' WIDE, 1" DEEP, EACH SIDE OF STREET)11,010SY
9MILLING 0"-1"4,040SY
10ASPHALT FATIGUE REPAIR USING TY D HMAC PG 64-22114SY
11MANHOLE LID HEIGHT ADJUSTMENT A/B30EA
12VALVE BOX HEIGHT ADJUSTMENT A/B25EA
13REPLACE MANHOLE RING AND COVER AND INSTALL CONCRETE DIAMOND4EA
14REPLACE OLD STYLE VALVE BOX COVER AND INSTALL CONCRETE DIAMOND4EA
15REMOVAL OF ALL PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS AND PLACEMENT OF TEMPORARY MARKINGS1LS
16REMOVE AND REPLACE STANDARD CURB AND GUTTER (TO INCLUDE ALL ITEMS IN
DETAIL ST-20)90LF
17RIBBON CURB (TO INCLUDE ALL ITEMS IN DETAIL ST-20)70LF
18REFL PAV MRK TY I (W) 6" (SLD)(100MIL)4,854LF
19REFL PAV MRK TY I (Y) 6" (SLD)(100MIL)7,267LF
20REFL PAV MRK TY I (Y) 6" (BRK)(100MIL)360LF
21REFL PAV MRK TY I (W) 6" (DOT)(100MIL)56LF
22REFL PAV MRK TY I (W) 8" (SLD)(100MIL)250LF
23REFL PAV MRK TY I (W) 24" (SLD)(100MIL)105LF
24REFL PAV MRK TY I (W) 24" (SLD)(100MIL)(XWALKS)820LF
25REFL PAV MRK TY I (W) ARROW (SLD)(100MIL)5EA
26REFL PAV MRK TY I (W) WORD (SLD)(100MIL)3EA
27REFL PAV MRK TY I (W) 36" YIELD LINE (SLD)(100MIL)24EA
28REFL PAV MRKR TY II-B-B8EA
29REFL PAV MRKR TY II-A-A276EA
BASE BID SUBTOTAL AMOUNT BID:
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
SUBCONTRACTOR TYPE OF WORK
FIRM NAME:
BY (SIGNED):
TITLE:
ADDRESS:
Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying
the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the
extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should
be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor.
Contractor also acknowledges and agrees to perform the work utilizing its own organization on at least 30%
of the total original Contract cost, excluding any specialty items as determined by the Engineer. Specialty
items are those that require specialized knowledge, abilities, or equipment not usually available in the
contracting firm expected to bid on the proposed Contract as a whole.