4-Prospect Pool Detailed Technical Specs.pdf

PDF 4 MB Posted

Attached to
Altoona Prospect Pool Swimming Pool Renovations
Solicitation number
Not on record
Issued by
Blair County, Allentown City, Pennsylvania

About this file

This document consists of detailed technical specifications for the Altoona Prospect Pool Swimming Pool Renovations project in Altoona, Pennsylvania, submitted by the City of Altoona. The project encompasses comprehensive renovation work on the Prospect Pool facility located at 1201 2nd Avenue, Altoona, PA 16602, and includes multiple specialized construction sections addressing swimming pool tile installation, cementitious finishes, cast-in-place concrete, and shotcrete applications. Sealed proposals are being received electronically via the PennBid Program until 10:00 A.M. on Tuesday, May 5, 2026, with a mandatory on-site pre-bidder's conference scheduled for Tuesday, April 14, 2026, at 1:00 P.M. at Prospect Pool. The contractor must begin work within ten consecutive calendar days from the date of the Notice to Proceed and complete all work no later than May 21, 2027, with liquidated damages assessed at $1,000 per calendar day for non-compliance, subject to weather-related extension requests. The project requires substantial technical expertise in pool construction, including tile installation per ANSI standards, application of proprietary plaster finishes such as PebbleTec, reinforced concrete placement, and shotcrete application with specific compressive strength requirements of 5,000 psi at 28 days.

Bidders must submit a bid bond, certified check, official check, or cashier's check equal to 10 percent of the total bid amount, valid for 60 days from the bid opening date, with all bidding documents available at no cost on PennBid. Work performed on this project is subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry, and no bidder may withdraw their proposal within 60 days after the opening date. The City of Altoona Mayor and City Council reserve the right to reject any or all bids and waive informalities not material to the bid, with contract award determined by what is deemed in the best interest of the municipality. The specifications detail extensive quality assurance requirements including ACI certifications for installer personnel, preconstruction testing protocols, field quality control procedures with independent testing agencies, concrete compressive strength testing at 7 and 28 days, shotcrete core grade evaluations, and watertightness testing per ACI 350.1 and AWWA 400 standards. All materials must be sourced from single manufacturers or approved equivalents, with documentation of manufacturer representation site visits required to verify proper installation of proprietary systems including specialized pool finishes and waterproofing treatments.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF ALTOONA

DETAILED TECHNICAL SPECIFICATIONS FOR

ALTOONA PROSPECT POOL SWIMMING POOL RENOVATIONS

1201 2ND AVENUE, ALTOONA, PA 16602

DETAILED SPECIFICATIONS:

• COMMENCEMENT, COMPLETION OF WORK & LIQUIDATED DAMAGES

• DETAILED TECHNICAL SPECIFICATIONS

COMMENCEMENT, COMPLETION OF WORK, AND LIQUIDATED DAMAGES

The bidder agrees to begin work within ten (10) consecutive calendar days from the date of the Notice to

Proceed and to complete the entire contract no later than May 21, 2027.

It is agreed that if the contract is not completed as specified, liquidated damages shall be One Thousand

($1,000.00) Dollars per calendar day.

If the Contractor cannot complete the contract – due to weather conditions – within the specified amount of time allotted, an extension of time will then be requested, in writing, by the Contractor to the City. Nothing herein shall require the City to grant said extension of time.

Detailed Technical Specifications for

CITY OF ALTOONA

RENOVATIONS TO PROSPECT POOL

SWIMMING POOL

ALTOONA, PA

Aquatic Facility Design, Inc.

183 Moore Street Millersburg, Pennsylvania 17061

1-800-680-SWIM (7946)

Fax: 717-692-3280

DETAILED TECHNICAL

SPECIFICATIONS

TABLE OF CONTENTS

DETAILED TECHNICAL SPECIFICATIONS

• SECTION 09 3213 - SWIMMIING POOL TILE

• SECTION 09 9726 - SWIMMING POOL CEMENTITIOUS FINISH

• SECTION 13 1101 - SWIMMING POOL CAST-IN-PLACE CONCRETE

• SECTION 13 1102 - SWIMMING POOL SHOTCRETE

CITY OF ALTOONA – POOL

09 3213 SWIMMING POOL TILE

SECTION 09 3213 SWIMMING POOL TILE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. The drawings and General Provisions of the contract, including General and Supplementary Conditions apply to work of this section.

1.2 SUMMARY

A. The cementitious pool finish shall have ceramic tile markings and trim at locations including the pool vertical tile band, stairs, depth markings, and all other tile installations as shown and detailed on the contract drawings and in strict accordance with these specifications.

B. The CONTRACTOR shall furnish and install the work of this section.

1.3 RELATED SECTIONS

A. Division 1 – Mock Ups

B. Division 7 - Joint Sealers

C. Section 131100 - Swimming Pool

D. Section 099726 - Swimming Pool Cementitious Finish

1.4 QUALITY ASSURANCE

A. Reference Standards: Conform to the following standards unless otherwise required herein.

1. American National Standards Institute (ANSI)

a. A108.01 – General Requirements: Subsurfaces and Preparations by Other Trades.

b. A108.02 – General Requirements: Materials, Environmental, and Workmanship.

c. A108.1, Glazed Wall Tile, Ceramic Mosaic Tile, Quarry Tile and Paver Tile installed with Portland Cement Mortar.

d. A108.1C – Contractor’s Option: Installation of Ceramic Tile in the Wet-Set Method with Portland Cement Mortar or Installation of Ceramic Tile on a Cured Portland Cement Mortar or Installation of Ceramic Tile on a Cured Portland Cement Mortar Setting Bed with Dry Set or Latex-Portland Cement Mortar.

e. A108.5 – Installation of Ceramic Tile with Dry-Set Portland Cement Mortar or Latex- Portland Cement Mortar.

f. A108.10 – Installation of Grout in Tile Work.

g. A137.1 Standard Specifications for Ceramic Tile.

2. American Society for Testing and Materials (ASTM)

a. C144-99, Aggregate for Masonry Mortar

b. C150-00, Portland Cement

c. C171-97a, Sheet Materials for Curing Concrete

d. C206-97, Finishing Hydrated Lime

e. C207-91 (R1997), Hydrated Lime for Masonry Purposes

f. F-1869, Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

g. F-2170, Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In Situ Probes

3. Tile Council of North America (TCNA); 2013 Edition, Handbook for Ceramic Tile Installation.

4. International Standards Organization (ISO)

a. ISO 13007 – Part 1: 2004 Ceramic Tiles – Grouts and adhesives; specifies the value of performance requirements for all tile adhesives.

b. ISO 13007 – Part 2: 2005 Ceramic Tiles – Grouts and adhesives; test method for adhesives.

c. ISO 13007 – Part 3: 2005 Ceramic Tiles – Grouts and adhesives; terms, definitions and specifications for grout.

d. ISO 13007 – Part 4: 2005 Ceramic Tiles – Test methods for grout.

5. American Concrete Institute

a. ACI 302 – Guide for Concrete and Floor Slab Construction

6. International Concrete Repair Institute (ICRI)

a. Concrete Surface Profile (CSP)

B. Tile installers shall have two years experience in similar pool projects which the Owner may require written proof thereof and proper tools to install tile.

1.5 MANUFACTURERS

A. Subject to compliance with requirements provide ceramic tile, mortar and grout of the following manufacturers: MasterTile Co. (tile), Dal-Tile Co. (tile), and Laticrete International Inc. (thin-set, waterproofing, grout and admixtures) or approved equal.

1.6 SUBMITTALS

A. Submit shop drawings indicating tile layout, patterns, joint layout, color arrangement, perimeter conditions, junctions with dissimilar materials, thresholds and setting details.

B. Submit product data indicating material specifications, characteristics, and instructions for using adhesives and grouts.

C. Samples:

1. Mount tile and apply grout on 24 x 24 inch backerboard to indicate pattern, color variation and grout joint size variations of each pattern. Furnish mounted tile samples as requested by the architect/owner.

D. Submit manufacturer's installation instruction.

E. Submit maintenance data.

1. Include recommended cleaning and stain removal methods, cleaning materials.

1.7 PRODUCT DELIVERY AND STORAGE

A. Deliver tile materials to site in unopened factory containers sealed with grade seals bearing printed name or manufacturer and the words "Standard Grade". Keep the grade seals intact and containers dry until tiles are used. Keep cementitious materials dry until used.

1.8 JOB CONDITIONS

A. Inspect and verify job conditions. Report all defects in base surfaces for correction before proceeding.

B. Maintain a temperature range of 40 degrees Fahrenheit to 90 degrees Fahrenheit during installation of tile and grout materials. Tile installation should cure for a minimum 14 days with average an temperature of 70 degrees, while maintaining the minimum 40 degrees and maximum 90 degrees Fahrenheit, prior to filling pool with water.

C. Vent temporary heaters to outside to avoid carbon dioxide damage to the new tile work.

1.9 COLORS

A. Colors to be selected by the Architect or Interior Designer. Note that swimming pool regulations may dictate color selections within the pool tank. See 2.01 Tile Materials for price group breakdowns.

1.10 WARRANTIES

A. The CONTRACTOR warrants to the Owner that materials and equipment furnished under the contract will be of good quality and new unless otherwise required or permitted by the contract documents, that the work will be free from defects not inherent in the quality required or permitted and that the work will conform with the requirements of the contract documents. Work not conforming to these requirements including substitutions not properly approved and authorized, may be considered defective. The CONTRACTOR’S warranty excludes remedy for damage or defect caused by abuse, improper or insufficient maintenance, improper operation, modifications not executed by the CONTRACTOR or improper wear and tear under normal usage. If required by the Owner, the CONTRACTOR shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All warranties shall be for a period of five years, unless otherwise specified.

B. All setting materials shall be provided by the same manufacturer. All mixing materials and application procedures shall be done in accordance with manufacturer’s recommendations and requirements. Documentation shall be provided to this effect by the contractor with verification from the manufacturer. This documentation shall be included in the operations and maintenance manual under warranties as documentation qualifying the project for a 15 Year Systems Warranty by Laticrete International, Inc., Mapei, Inc. or approved equal.

C. The CONTRACTOR shall agree to repair or replace any work at no cost to the Owner upon written notification from the Owner within the warranty period. Pro-rated warranties are not acceptable.

PART 2 - PRODUCTS

2.1 TILE MATERIALS

A. Standard grade conforming to ANSI A137.1. Provide trimmer units as indicated and specified, including special shapes as detailed or required. Tile patterns and colors shall be as indicated and specified, colors of approved shades. Mesh mounted or perforated paper backed tile is not allowed where the mesh of paper remains as a permanent part of the installation. If dot mounting is used, a minimum of 67% of the depth of the tile shall be free from any dots to ensure proper grout curing.

B. All tile shall be “frost-proof” and all tile and walking surfaces shall be non skid.

C. Message Tile and Depth Markings

1. Horizontal and vertical depth markings and warning signs shall be 6” x 6” with 4” high numbers and letters. All horizontal depth markers shall be slip resistant. Single tile abbreviations shall be used for ‘FT’ and ‘IN’.

2.2 SWIMMING POOL TILE SETTING MATERIALS AND INSTALLATION

A. Surface Preparation

1. Surface preparation shall be in accordance with ACI 302. The surface shall be structurally sound and free of any foreign substances and debris that could reduce or impair adhesion.

Sound and remove all loose concrete to firm substrate. Surfaces shall be roughened to a CSP of 3 to 5 (reference ICRI CSP Standards 7 to 9 for acceptable profile height). Thoroughly wash/rinse with clean potable water. Surface defects or holes in the substrate shall be patched per manufacturer’s recommendations.

B. Slurry Bond Coat

1. Horizontal surfaces to receive a thick bed mortar application shall be installed over a slurry bond coat of either Laticrete 254 Platinum one-step, polymer-fortified, thin-set mortar, or Mapei 4:1 bag mix with Planicrete AC Additive over a clean concrete slab, in compliance with ANSI A108.1A (2.2 & 5.2). As manufactured by Laticrete International, Mapei, Inc., or approved equal. Note that slurry bond coats are not required under vertical applications of the render and scratch coat.

C. Mortar & Leveling Beds

1. Bonded Thick Bed Method (Floor / Horizontal Surfaces): Provide a dry pack, thick mortar bed on horizontal surfaces consisting of either Laticrete 3701 Fortified Mortar Bed, or Mapei, 4:1 bag mix with Planicrete AC Additive. Apply over a properly prepared slurry bond coat.

Maximum lift thickness not to exceed 2”.

2. Render- Scratch and Float Coats (Wall / Vertical Surfaces): Provide wall render (scratch and float coats) on vertical competition turning surfaces to a depth of 4 feet below the water surface, consisting of either Laticrete 3701 Fortified Mortar Bed, or Mapei, 4:1 bag mix with Planicrete AC additive for lift thicknesses up to ½”. Wall render is made to a plastic consistency when used vertically. Fill all holes and bring surface up to line and plane as required. As manufactured by Laticrete International, Mapei, Inc. or approved equal. Note that slurry bond coats are not required under vertical applications of the render and scratch coat.

D. Tile Thin-Set

1. Use either Laticrete 254 Platinum one-step, polymer fortified, thin-set mortar or Mapei Ultraflex 3 one-step, polymer modified, thin-set mortar, used in accordance with the manufacturer’s requirements. As manufactured by Laticrete International, Mapei, Inc., or approved equal.

E. Tile Grout

1. Use Laticrete SpectraLock Grout in accordance with the manufacturer’s requirements. As manufactured by Laticrete International or approved equal.

F. Elastomeric Sealant

1. Use Laticrete Latasil sealant for all inside/outside corners, expansion/movement joints, and to seal lighting/plumbing fixture penetrations. Apply sealant over Latasil 9118 primer. All primer and sealant installation shall be in accordance with the manufacturer’s requirements. As manufactured by Laticrete International, Inc., or approved equal.

G. All mixing and application procedures shall be done in accordance with the manufacturer’s recommendations and requirements. The manufacturer’s representative shall visit the site to verify field conditions, confirm materials and application requirements and ascertain that all materials and systems are so installed. Documentation shall be provided to this effect.

PART 3 - EXECUTION

3.1 PREPARATION

A. Complete water tightness test prior to tile installation. Concrete tank shall be watertight per ASTM D5957, the Tile Council of North America, and specification 131100.

B. Clean substrates of dust, dirt, oil, grease and deleterious substances and mechanically roughen concrete and shotcrete for bond. Conform to applicable reference standards and to recommendations of manufacturers of materials used and meeting ICRI, CSP of 3-5.

C. Substrates to Receive Mortar Setting Beds

1. Dampen concrete substrate to receive tile work according to above referenced standards or tile manufacturer’s instructions, as required.

D. Substrates to receive thin set tile applications shall meet normal construction tolerances of 1/4" in 10' where competition tolerances do not apply, and shall meet competition tolerances where required elsewhere in these specifications, and shall be free of bumps, dips and surface irregularities that may effect the satisfactory installation of the tile.

E. Tile Wetting

1. Dampen tile according to above reference standards or tile manufacturer's instructions, as required.

F. Screeds

1. Accurately set temporary screeds to control the finish plane of mortar-bed set tile and remove as soon as setting bed is sufficiently hardened. Fill void spaces from screeds with same mortar.

3.2 TILE INSTALLATION

A. Arrange tile according to patterns detailed. Set tile with flush well-fitted joints, finished in true planes, plumb, square, joints of uniform size. Provide approved trimmers as shown or required.

Cut tile without marring. Carefully grind and joint tile edges and cuts.

B. Follow Tile Council of North America installation methods P601 and B417 to achieve total tile system thickness for thin or thick-set.

1. Thick Set

a. Apply specified setting bed mortar, up to 1/2” in thickness, on cured and dried concrete pool shell. Tamp and screed to required planes. Spread no more mortar than can be covered with tile before initial set. Do not use re-tempered mortar. Trowel 3/32” to 1/8” thick bond coat over plastic setting bed mortar just before setting tile or apply bond coat to back of each tile placed. 95% coverage of the back of the tile or tile sheet is required. Set tile in position and beat firmly into the setting bed mortar. Bring tile faces to a true and correct plane. Complete all beating and leveling before mortar sets and in no case later than one hour after first placing. When ready, wet and remove paper and glue avoiding excess water. At this time adjust any out-of-line or out-of-level tile.

2. Thin Set

a. Apply specified bond coat on cured and dried concrete pool shell. Trowel 3/32” to 1/8” thick bond coat over concrete pool shell just before setting tile or apply bond coat to back of each tile placed. 95% coverage of the back of the tile or tile sheet is required. Set tile in position and beat firmly into the setting bed mortar. Bring tile faces to a true and correct plane. Complete all beating and leveling before mortar sets and in no case later than one hour after first placing. When ready, wet and remove paper and glue avoiding excess water. At this time adjust any out-of-line or out-of-level tile.

C. Finished tile surface shall be level and in plane, with no sharp or protruding edges. Tiles out or plane more then 1/16" shall be removed and replaced. Sharp edges shall be stoned smooth.

D. Grout Joint Sizes

1. Unless otherwise approved, install tile with uniform 3/32 inch joint width. A maximum 1/8" joint width may be utilized to meet specific installation requirements, if required.

E. Ceramic Tile Joint Grouting

1. Mix grout to a thick creamy consistency and force into joints for entire thick depth, flush with surface. Clean off all excess and fill skips and gaps before grout sets. Color selection by Architect or Interior Designer. Provide dampness for minimum 3-day curing and polish with clean dry cloths (not required when epoxy grouts are used).

F. Expansion Joints

1. Place expansion joint per applicable TCNA Method P601MB, P601TB, or P602 and conforming to Method EJ171. Provide shop drawings showing backer rod and joint dimensions. All expansion, control, construction, cold, and seismic joints in the pool structure should continue through the tile work, including such joints at vertical surfaces. Movement joints shall be placed at all changes in direction and elevation. Refer to the structural engineer for additional required movement joints. Joint size shall be a minimum of 1/8”. Joints through tile work directly over structural joints shall not be narrower than the structural joint. The Contractor shall use cement compatible coatings when using chalk lines for joint layout purposes.

G. Fill and Empty Rates

1. Use a fill and drain rate of 2 feet per 24 hours to minimize thermal shock and structural movement. Maintain a temperature differential of 10 degrees Fahrenheit or less between the pool water and the substrate during fill and drain cycles.

3.3 TESTING AND INSPECTION

A. Before filling of the pool, and its subsequent provisional acceptance at substantial completion, the tile installation shall be visually inspected and sounded in the presence of the Architects and/or the Owner’s representative to verify adhesion of the tile to its substrate as well as its overall compliance with the requirements of this Section.

B. Any and all tile work found to be loose, improperly adhered, out of plane, misaligned or otherwise non-conforming shall be removed and replaced at no additional cost to the Owner.

3.4 CLEANING

A. Upon completion of placement and grouting, clean tile installation as recommended by TCNA and manufacturers of proprietary materials. Tile shall be cleaned with pH neutral solutions, free of both sodium and potassium, in accordance with the tile and grout manufacturer's printed instruction.

B. Leave finished installation clean and free of cracked, chipped, broken, un-bonded or otherwise defective tile work.

C. Protect installed tile work with non-staining Kraft paper, polyethylene sheeting, or other approved heavy covering during the construction period to prevent damage.

3.5 REPLACEMENT TILE

A. Provide Owner with approximately 10% or 25 square feet (whichever is least) of each color and type tile used on the project for Owner’s repair and replacement requirements.

END OF SECTION

09 9726 SWIMMING POOL CEMENTITIOUS FINISH

SECTION 09 9726 SWIMMING POOL CEMENTITIOUS FINISH

PART 1 - GENERAL

1.1 SUMMARY

a. Provide a conventional proprietary aggregate plaster finish to the pool structure(s). Provide installation of bond coat prior to application of pool finishes. A ceramic tile trim shall be furnished and installed on the pool vertical tile band, stairs, underwater bench nosings, recessed wall steps, depth markings, wall targets, floor lane markings, along construction joints, and all other tile installations as shown and detailed on the contract drawings and in strict accordance with these specifications.

b. Provide water analysis and pre-fill requirements.

1.2 SUBMITTALS

a. Samples

1. Prepare 12-inch square panel at the site showing color and texture for pool plaster. Finished cementitious finish work shall match the approved sample panel.

b. Certificates

1. Submit certificates attesting that the materials furnished meet the requirements specified herein.

c. Test Report

1. Submit results of domestic water analysis and calculation of amounts of chemicals required to balance pool water on initial fill of pool.

1.3 PRODUCT DELIVERY AND STORAGE

a. Deliver manufactured materials to site in manufacturers' original unbroken packages or containers bearing manufacturers' name and brand labels. Keep cementitious materials dry until ready to be used and stored off the ground, under cover and away from damp surfaces.

1.4 JOB CONDITIONS

a. Apply plaster in swimming pool only when ambient temperature is above 40 degrees F and below 90 degrees F, and protect applied plaster from rapid drying by sun or wind until curing is completed or pool is filled with water. Confirm and comply with all applicable manufacturers installation requirements.

1.5 QUALITY ASSURANCE

a. Plaster installers shall have two years experience in similar pool projects which the Owner may require written proof thereof and proper tools to install plaster.

1.6 SURFACE PREPARATION

a. Surface Preparation

1. Surface shall be structurally sound and free of any foreign substances and debris that could reduce or impair adhesion, free of dirt, oil, grease or other foreign materials. Sound and remove all loose concrete to firm substrate. Surfaces shall be roughened by sand blasting, water jetting, shot blasting, scarifying, or grinding. Pressure-wash the entire surface. Wash with trisodium phosphate (TSP) using a stiff broom. Thoroughly wash/rinse with clean potable water. Surface defects or holes in the substrate shall be patched per manufacturer’s recommendations.

2. Apply and cure bond coat per manufacturer’s recommendations. After proper curing of bond coat, lightly moisten with clean potable water prior to application of cementitious finish. Ensure bond coat is free of any foreign matter prior to plastering.

PART 2 - PRODUCTS

2.1 PEBBLETEC

A. The CONTRACTOR shall install a slip-resistant proprietary plaster finish in the areas indicated on the drawings. Description: PebbleTec finish shall be a blend of selected aggregates and fortified Portland cement. Color and texture shall be selected by the Engineer. Confirm all installation requirements with the manufacturer.

B. Bond Coat

1. Bond Kote by SGM, Inc., or approved equal. Apply and cure bond coat per manufacturer’s recommendations. After proper curing of bond coat, lightly moisten with clean potable water prior to application of cementitious finish. Ensure bond coat is free of any foreign matter prior to plastering.

C. Mixing

1. Thoroughly mix PebbleTec to a homogeneous lump-free consistency using 1-1/2 to 2 gallons of potable water per 80 lb. bag.

D. Application

1. PebbleTec shall be applied to a uniform thickness of 3/8” to 1/2” over the entire surface. The walls shall be scratch-coated followed by a finish coat. Material applied to the floor after the walls have been applied shall be accelerated to assure uniform setting time throughout the pool surface.

E. Coverage

1. Each 80 lb. bag shall cover approximately 25 square feet to a thickness of 3/8”.

F. Proprietary plaster finish is to be applied by a licensed applicator as approved by the manufacturer.

PART 3 - EXECUTION

3.1 PREPARATION OF SURFACES AND BOND COAT

A. Clean base surfaces of projections, dust, loose particles, grease, bond breakers, and foreign matter; make sufficiently rough to provide a strong mechanical bond. Sandblast, acid etch, or waterblast to achieve appropriate profile. If acid etching, surfaces must be neutralized and powerwashed prior to proceeding. Do not apply cementitious finishes directly to the surfaces of masonry or concrete that is coated with any acidic solution compound or similar agent until compound or agent is completely removed by water blasting. Thoroughly wash entire surface with 2,000 psi high-pressure water immediately prior to application of finishes. Wet cementitious base surfaces with a fine fog water spray to produce a uniformly moist condition and check screeds, pool equipment, and accessories for correct alignment before work is started. Do not apply finish materials to base surfaces containing frost. Install temporary coverings as required to protect adjoining surfaces from staining or damage by plastering operations.

B. Prepare and clean concrete surfaces by removing oil or grease. Repair all cracks, surface damage as required prior to proceeding. Protect or mask all adjacent surfaces that are not scheduled to receive cementitious finish. If expansion or construction joints exist in the areas where cementitious finish will be applied cover plastic joints for protection (if plastic joints are used). Additionally, mark joints for saw-cutting if area will be saw-cut.

C. Apply and cure bond coat per manufacturer’s recommendations. After proper curing of bond coat, lightly moisten with clean potable water prior to application of cementitious finish. Ensure bond coat is free of any foreign matter prior to plastering.

D. Contractor to thoroughly verify the site conditions prior to the application of cementitious finish.

Verify concrete is free of ridges and sharp projections. Verify that all concrete surfaces that are to receive a cementitious finish have cured for a minimum of 5 days. Consideration should be given for the application of a primer for all concrete structures that is over 28 days old to improve bonding.

3.2 APPLICATION OF CEMENTITIOUS FINISH

A. General

1. Confirm all application requirements with the manufacturer. Apply finish plaster to the properly prepared substrate at the minimum thickness required by the manufacturer, but no less than 3/8 inch thickness at any location. Apply finish plaster by hand or machine. If plastering machine is used, control fluidity of plaster to have a slump not exceeding 2-1/2 inches when tested using a 2" by 4" by 6" high slump cone. Do not add additional water to the mix subsequent to determining water content to meet this slump. Perform slump test according to following procedure:

a. Place cone on level, dry non-absorptive base plate.

b. While holding cone firmly against base plate, fill cone with plaster taken directly from hose or nozzle of plastering machine, tamping with a metal rod during filling to release all air bubbles.

c. Screed off plaster level with top of cone. Remove cone by lifting it straight up with a slow and smooth motion.

d. Place cone in a vertical position adjacent to freed plaster sample suing care not to jiggle base plate.

e. Lay straightedge across top of cone being careful not to vibrate cone; measure slump in inches from bottom edge of straightedge to the top of slumped plaster sample.

2. All mixing of materials and application procedures shall be done in accordance with the manufacturer’s recommendations and requirements. The manufacturer’s representative shall visit the site to verify field conditions, confirm materials and application requirements and ascertain that all materials and systems are so installed. Documentation shall be provided to this effect.

B. Workmanship

1. Unless otherwise required by the manufacturer, apply finish plaster in two coats by "double-back" method with second coat applied as soon as first coat is tamped and initially floated.

Apply plaster with sufficient pressure to provide a good bond on bases. Work plaster to screeds at intervals of from 5 feet to 8 feet on straight surfaces. Apply smooth trowel finish without waves, cracks, trowel marks, ridges, pits, crazing, discoloration, projections, or other imperfections. Form plaster carefully around curves and angles, well up to screeds. Take special care to prevent sagging and consequent drooping of applications. Produce surfaces free of visible junction marks in finish coat where one day's work adjoins another. Finish proprietary plaster as required by the manufacturer.

2. All cementitious finishes shall be applied by a licensed applicator as approved by the manufacturer.

C. Curing

1. Curing cementitious finishes with fine fog water spray applied to finish coat as frequently as required to prevent dry-out of surface, or as directed by the manufacturer of the cementitious finish. Keep plaster damp until pool is filled. Prevent damage or staining of plaster by troweling or curing.

D. Patching, Pointing, and Cleaning Up

1. Upon completion, cut out and patch loose, cracked, damaged, or defective plaster; patches matching existing plaster in texture, color, and finish, flush with adjoining plaster. Perform pointing and patching of surfaces and plasterwork abutting or adjoining any other finish work in a neat and workmanlike manner. If 10 percent or more of the pools plaster finish is found to be defective, the plaster shall be removed and replaced complete from all surfaces.

Remove plaster droppings or spattering from all surfaces. Leave plaster surfaces in clean, unblemished condition ready for pool filling. Remove protective coverings from adjoining surfaces. Remove rubbish and debris from the site.

3.3 PRE-FILL SPECIFICATION

A. Contractor shall employ a qualified water testing agency to analyze the domestic water with which the pool will be filled within 2 weeks of the plaster date, and shall employ a swimming pool experienced water chemistry consultant to determine types and quantities of chemicals required to ensure calcium-balanced water immediately upon the completion of water filling.

Refer to section 131100 for water filling requirements.

1. Have on hand quantities of the chemicals as determine above, plus 25% overage for follow-up treatment. These chemicals, typically including calcium chloride, bicarbonate of soda, and muriatic acid are in addition to standard bromine/chlorine products and alkalizer/pH control products required elsewhere.

B. The pool(s) shall not be plastered until directed by the Owner’s representative and the filtration system and chlorination system are complete and ready for start-up. The Contractor shall supply all chemicals required for treatment of the pool water.

C. The Contractor shall submit domestic water analysis to the Owner and/or Engineer at least 2 weeks prior to filling the pool(s).

13 1101 SWIMMING POOL CAST-IN-PLACE CONCRETE

SECTION 13 1101 – SWIMMING POOL CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:

1. Swimming pools.

B. Related Sections:

1. Division 31 Section "Earth Moving" for drainage fill under slabs-on-grade.

a. Drainage Course under base slabs: Narrowly graded mixture of frost-free, washed crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone; subject to compliance with requirements.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.

D. Formwork Shop Drawings: Prepared by or under the supervision of a qualified professional engineer detailing fabrication, assembly, and support of formwork.

1. Shoring and Reshoring: Indicate proposed schedule and sequence of stripping formwork, shoring removal, and reshoring installation and removal.

2. Location of construction joints is subject to approval of the Engineer.

E. Samples: For waterstops.

F. Qualification Data: For manufacturer.

G. Material Certificates: For each of the following, signed by manufacturers:

1. Cementitious materials.

2. Admixtures.

3. Form materials and form-release agents.

4. Steel reinforcement and accessories.

5. Waterstops.

6. Curing compounds.

7. Bonding agents.

8. Adhesives.

9. Repair materials.

H. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:

1. Aggregates. Include service record data indicating absence of deleterious expansion of concrete due to alkali aggregate reactivity.

I. Field quality-control reports.

J. Minutes of preinstallation conference.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs on Project personnel qualified as ACI-certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.

B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

C. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.

D. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301, "Specifications for Structural Concrete," Sections 1 through 5.

2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

E. Pre installation Conference: Conduct conference at Project site.

1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete subcontractor.

e. Pool finish subcontractor.

2. Review special inspection and testing and inspecting agency procedures for field quality control, concrete finishes and finishing, cold- and hot-weather concreting procedures, curing procedures, forms and form removal limitations, shoring and reshoring procedures, steel reinforcement installation, concrete repair procedures, and concrete protection.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.

B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil, and other contaminants.

PART 2 PRODUCTS

2.1 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

1. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:

a. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.

B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material.

Provide lumber dressed on at least two edges and one side for tight fit.

C. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads. See drawings for locations and applicability.

D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch (19 by 19 mm), minimum.

E. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal.

F. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

G. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that will leave no corrodible metal closer than 2 inch (51 mm) to the plane of exposed concrete surface.

2. Furnish ties that, when removed, will leave holes no larger than 1 inch (25 mm) in diameter in concrete surface.

3. Furnish ties with integral water-barrier plates to walls indicated to receive damp proofing or waterproofing.

2.2 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

2.3 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.

B. Dowel Bar Substitutes: Tapered, threaded couplers, pre-assembled to reinforcing with mounting plate for attachment to form work and a pressed in metal disc thread protector which can be easily removed. The mechanical connection shall meet building code requirements of developing in tension or compression. The mechanical connection shall be the positive locking, taper threaded type coupler manufactured from high quality steel. The bar ends must be taper threaded using the manufacturer’s requirements.

1. Lenton Form Saver; Erico Corp.

2.4 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

1. Portland Cement: ASTM C 150, Type I/II, gray.

B. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source with documented service record data of at least 10 years' satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials.

C. Water: ASTM C 94/C 94M and potable.

2.5 ADMIXTURES

A. Air-Entraining Admixture: ASTM C 260.

B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Retarding Admixture: ASTM C 494/C 494M, Type B.

3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.

5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.

6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.

2.6 WATERSTOPS

A. Flexible PVC Waterstops: CE CRD-C 572, with factory-installed metal eyelets, for embedding in concrete to prevent passage of fluids through joints. Factory fabricate corners, intersections, and directional changes.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. BoMetals, Inc.

b. Greenstreak.

c. Paul Murphy Plastics Company.

d. Vinylex Corp.

2. Profile: Ribbed without center bulb.

3. Dimensions: 4 inches by 3/16 inch thick (100 mm by 4.75 mm thick); nontapered.

B. Expanding Adhesive Waterstops: Manufactured rectangular strip, single-component, RX101.

1. Products: Subject to compliance with requirements, provide the following:

a. VOLCLAY

b. CETCO

2.7 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to concrete not receiving plaster, paint or stained finish.

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. Axim Italcementi Group, Inc.; CATEXOL CimFilm.

b. BASF Construction Chemicals - Building Systems; Confilm.

c. ChemMasters; SprayFilm.

d. Conspec by Dayton Superior; Aquafilm.

e. Dayton Superior Corporation; Sure Film (J-74).

f. Edoco by Dayton Superior; BurkeFilm.

g. Euclid Chemical Company (The), an RPM company; Eucobar.

h. Kaufman Products, Inc.; Vapor-Aid.

i. Lambert Corporation; LAMBCO Skin.

j. L&M Construction Chemicals, Inc.; E-CON.

k. Meadows, W. R., Inc.; EVAPRE.

l. Metalcrete Industries; Waterhold.

m. Nox-Crete Products Group; MONOFILM.

n. Sika Corporation; SikaFilm.

o. SpecChem, LLC; Spec Film.

p. Symons by Dayton Superior; Finishing Aid.

q. TK Products, Division of Sierra Corporation; TK-2120 TRI-FILM.

r. Unitex; PRO-FILM.

s. Vexcon Chemicals, Inc.; Certi-Vex Envio Set.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) when dry.

C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, 18 to 25 percent solids, nondissipating, certified by curing compound manufacturer to not interfere with bonding of pool finish.

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. BASF Construction Chemicals - Building Systems; Kure-N-Seal W.

b. ChemMasters; Safe-Cure Clear.

c. Conspec by Dayton Superior; High Seal.

d. Dayton Superior Corporation; Safe Cure and Seal (J-19).

e. Edoco by Dayton Superior; Spartan Cote WB II 20 Percent.

f. Euclid Chemical Company (The), an RPM company; Diamond Clear VOX;

Clearseal WB STD.

g. Kaufman Products, Inc.; SureCure Emulsion.

h. Lambert Corporation; Glazecote Sealer-20.

i. L&M Construction Chemicals, Inc.; Dress & Seal WB.

j. Meadows, W. R., Inc.; Vocomp-20.

k. Metalcrete Industries; Metcure 0800.

l. Nox-Crete Products Group; Cure & Seal 200E.

m. Symons by Dayton Superior; Cure & Seal 18 Percent E.

n. Vexcon Chemicals, Inc.; Starseal 0800.

2.8 RELATED MATERIALS

A. Latex Bonding Agent: ASTM C 1059/C 1059M, Type II.

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. Latex Bonding Agent, Type II (Non-Redispersible):

1) Daraweld C- gap applied technologies

2) Dayton Superior Corporation; Conspec Strong Bond.

3) Euclid Chemical Company (The), an RPM company; Flex-Con.

4) W. R. Meadows, Inc.; Sealtight Acry-Lok.

5) Kaufman Products, Inc.; Surebond.

B. Expansion- and Isolation-Joint-Filler Strips: non-asphalt foam.

1. Provide for constriction and expansion joints.

2.9 REPAIR MATERIALS

A. Concrete Patching Mortar, Repair Underlayment and Repair Topping: Chemical treatment for waterproofing concrete.

1. Xypex Concrete Waterproofing by Crystallization, Xypex Chemical Corporation.

a. Xypex Concentrate.

http://www.specagent.com/LookUp/?uid=123456816459&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816464&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816460&mf=04&&mf=04&src=wd

2.10 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

B. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

C. Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use water-reducing or plasticizing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete, and concrete with a water-cementitious materials ratio below 0.50.

2.11 CONCRETE MIXTURES FOR SWIMMING POOL ELEMENTS

A. Slabs, Walls, Coping and Other Elements:

1. See attached documents – Mix Designs

2.12 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.13 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M, and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F (30 and 32 deg C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

PART 3 EXECUTION

3.1 FORMWORK

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Limit concrete surface irregularities, designated by ACI 347 as abrupt or gradual, as follows:

1. Class A, 1/8 inch (3.2 mm) for smooth-formed finished surfaces.

2. Class D, 1 inch (25 mm) for rough-formed finished surfaces.

D. Construct forms tight enough to prevent loss of concrete mortar.

E. Fabricate forms for easy removal without hammering or prying against concrete surfaces.

Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

1. Install recesses, pipe sleeves and the like, for easy removal.

2. Do not use rust-stained steel form-facing material.

F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.

G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.

H. Chamfer exterior corners and edges of permanently exposed concrete.

I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items.

J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

3.3 REMOVING AND REUSING FORMS

A. General: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F (10 deg C) for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations and curing and protection operations need to be maintained.

1. Leave formwork for beam soffits, joists, slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.

Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Engineer.

3.4 SHORES AND RESHORES

A. Comply with ACI 318 (ACI 318M) and ACI 301 for design, installation, and removal of shoring and reshoring.

1. Do not remove shoring or reshoring until measurement of slab tolerances is complete.

B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection.

3.5 STEEL REINFORCEMENT

A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

3.6 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Engineer.

1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.

2. Form keyed joints as indicated. Embed keys at least 1-1/2 inches (38 mm) into concrete.

3. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

4. Vertical joints in walls shall be located at…

This is the start of the file's text. The full file is on GovTribe.