This document is a Performance Work Statement (PWS) for the IDAHO PANHANDLE NUR LONE MOUNTAIN TOILET REPLACEMENT project. The project involves the decommissioning, removal, and replacement of a pit toilet at the Lone Mountain Tree Improvement Area on the Coeur d'Alene River Ranger District of the Idaho Panhandle National Forest. The objective is to improve health, safety, and environmental standards by replacing the existing pit toilet with a concrete vault toilet. The project location is approximately 7 miles north of Rathdrum, Idaho, on the Idaho Panhandle National Forest. The work is expected to commence around October 15, 2024, and be completed no later than December 31, 2024. Bonding requirements include a Payment Bond or Irrevocable Letter of Credit for 100% of the contract price for offers over $35,000 but not to exceed $150,000. The contract is being issued by the U.S. Department of Agriculture Forest Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Attachment Attachment 1: NUR Lone Mountain Toilet Replacement Map A Attachment 2: NUR Lone Mountain Toilet Replacement Map B Attachment 3: Single Vault Engineered Drawings
Figure 1. Existing pit toilet exterior.
Figure 2. Existing pit toilet interior.
Figure 3. Proposed location for concrete vault toilet.
Figure 4. Approximate locations of existing pit toilet and proposed vault toilet. Access road to designated burn pit shown in orange dashed line.