4 - Notional Payload Life Cycle and Examples.pdf
PDF 5 MB Posted
- Solicitation number
- 80JSC024UTILIZATIONOPERATIONSANDREQUIREMENTS
About this file
This document is a draft of a Special Notice for a Technical Interchange Meeting (TIM) hosted by the National Aeronautics and Space Administration (NASA) Johnson Space Center's Commercial Low-Earth Orbit Development Program (CLDP). The purpose of the TIM is to discuss NASA's draft concepts on utilization operational context and requirements for Commercial Low-Earth Orbit (LEO) Destinations (CLDs) that could support NASA astronauts and other spaceflight participants in LEO on a commercially owned and operated space system.
The two-day TIM on June 11-12, 2024 will cover NASA's utilization operational context, basic laboratory requirements, payload interoperability, and a notional payload lifecycle. CLD-Providers and Implementation Partners (IPs) are invited to provide 5-minute lightning talks to introduce their capabilities. One-on-one feedback sessions with NASA CLDP team members may also be requested. Attendance is limited, and pre-registration is required by June 7, 2024. NASA intends to record the event and post it online after the meeting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Early Integration
Initial payload resources estimated on CLDS
Initial payload facility throughput estimated
Non‐standard payload needs identified
Initial increment utilization content defined
Design and Analyze
Increment task order placed on contract
Manifest, inflight stowage, and operational volume assessed
Preliminary flight/mission assigned
Applicable safety and engineering requirements and verifications documented and testing scheduled
Operational products identified and drafted based on mature ops concept
Individual payload schedule
Planning for return/disposal
Operations Readiness
Publication of planning, crew/ground procedures, flight rules, provider to user communication protocols, topology, exceptions
Hardware/software testing (engineering and safety), ground configuration testing
Safety and engineering verifications submitted and closed
Crew/ground and in‐flight training published. Pre‐ flight training complete.
Certification of flight readiness (CoFR)
Turnover and Launch
Hardware/software delivered
Hardware/software received, appropriate personnel and processes available for sample handling (e.g. radioactive material, narcotics)
Launch/ascent vehicle
– monitor vehicle environmental data
In‐Flight Operations
Activation checkout operations
Re‐planning that impacts NASA priorities or ability to complete science (Executing Priorities)
Hardware and software logistics, preparing facilities
Anomaly Response and resolution for NASA payloads or facilities /capabilities required by NASA payloads
Science Objective Completion
Payload return prep or In‐flight disposal
Return to Earth – monitor vehicle environmental data
Payload return to
PD/PI
Publish results
Track results, create metrics, communication
DRAFT Payload Lifecycle 1-pager: Notional Stages and Tasks
6/11/2024 3 All content is considered draft and subject to change prior to final RFP release.
Early Integration
Initial payload resources estimated on
CLDS
‐ NASA
Initial payload facility throughput estimate
‐ NASA
Non‐standard payload needs identified
‐ NASA
Initial increment utilization content defined ‐ NASA delivers to
Provider
Design and Analyze
Increment task order placed on contract ‐ Provider and NASA
Manifest, inflight stowage, and operational volume assessed
‐ Provider
Preliminary flight/mission assigned ‐ Provider and NASA
Applicable safety and engineering requirements and verifications documented and testing scheduled
‐ Provider and PD/PI with NASA support
Operational products identified and drafted based on mature ops concept
‐ Provider with PD/PI/NASA support
Individual Payload schedule ‐ Provider and PD/PI
Planning for return/disposal ‐ Provider and NASA
Operations Readiness
Publication of Planning, Crew/Ground procedures, Flight Rules, provider to user communication protocols, topology, exceptions ‐ Provider with NASA support
Hardware/software testing (engineering and safety), ground configuration testing ‐ Provider, PD/PI, and
NASA
Safety and engineering verifications closed
‐ Provider, PD/PI, and NASA
Crew/Ground and in‐flight training published. Pre‐ flight training complete.
‐ Provider and PD/PI with
NASA support
Certification of Flight Readiness (CoFR) ‐ Provider with NASA support
Turnover and Launch
Hardware/software delivered ‐ PD/PI with NASA support
Hardware/software received, appropriate personnel and processes available for sample handling (e.g. radioactive material, narcotics)
‐ Provider with NASA support
Launch/ascent – monitor vehicle environmental data
‐ Provider and PD/PI with NASA support
In‐Flight Operations
Activation checkout operations ‐ Provider and PD/PI with NASA support
Re‐planning that impacts NASA priorities or ability to complete
‐ Provider and NASA
Hardware and software logistics, preparing facilities
‐ Provider with NASA support
Anomaly Response/Resolution for NASA payloads or facilities/capabilities required by NASA payloads ‐ Provider and PD/PI with NASA support
Science Objective Completion
Payload return prep or In‐flight disposal ‐ Provider with PD support
Return to Earth – monitor vehicle environmental data
‐ Provider and PD/PI with NASA support
Payload return to PD ‐ Provider with PD support
Publishing results
‐ PD/PI
Track results, create metrics, communication
‐ NASA
DRAFT Notional Payload Lifecycle 1-pager: NASA Payload in a CLD Payload Facility
Text highlighted in teal denotes NASA safety engagement
6/11/2024 18All content is considered draft and subject to change prior to final RFP release.
Human Research “Early Integration”
Experiment Feasibility Assessment, Definition, IRB approval
• Amount of time depends on study complexity
• This must be done prior to being included in an
ICB.
• PI obtains IRB approval
Pre‐ICB Work: Working Group of all Payload Developers (PDs) requesting Human Research
• All PDs discuss planned research and possible conflicts for upcoming mission
• Potential combinations of experiments (complement scenarios) are developed that do not conflict or exceed resources such as post‐flight duty day and blood volume limits
Initial ICB (At L‐12 to 13 months)
• Crew receives ICB on all human research experiments planned for the increment
• Crewmembers provide interest surveys
Approval of Individual Crew Complements (At L‐12 to 11 months)
• Takes into account both crew interests and priorities
Text highlighted in teal denotes NASA safety engagement
IRB = Institutional Review Board ICB = Informed Consent Briefing
Example additional “Early Integration” considerations for any spacefaring human participating in a human research investigation
DRAFT Human Research Investigation Considerations
6/11/2024 24All content is considered draft and subject to change prior to final RFP release.
File details come from the government source that posted it. Updated .