This is a permit requirements document issued by the Kentucky Department of Environmental Protection for the Lampkin Park Pump Station Replacement project (GACT0000000343) in Bowling Green, Kentucky. The project involves the replacement of an existing sanitary sewer pump station at Lampkin Park with a new duplex grinder pump station rated at 57 gallons per minute at 30 feet of total dynamic head. The permit is valid for twenty-four months from issuance, and construction must commence within this period or a new permit must be obtained. The applicant must submit written certification signed by a registered professional engineer within thirty calendar days after completion of construction, confirming that facilities have been constructed and tested in accordance with approved plans, specifications, and permit conditions. No deviations from the approved plans and specifications are permitted without prior written authorization from the cabinet.
The permit establishes comprehensive technical and operational requirements for the project, including design standards based on the Ten States' Standards for wastewater facilities (2014 edition), minimum gravity sewer and force main velocities of two feet per second, audible and visible alarms at the pump station, wetwell sizing to limit fill time to thirty minutes based on average flow, and minimum two hours of detention time above the high-level alarm elevation. Pumps and force mains handling raw wastewater must be capable of passing three-inch diameter spheres with minimum four-inch diameter suction, discharge openings, and force main piping. Additional requirements address subfluvial pipe crossings, potential wetland or stream construction impacts requiring 401 water quality certification, and compliance with all applicable state, federal, and local regulations. The permittee remains the responsible party for all compliance obligations until a notarized change in ownership certification is submitted and acknowledged by the cabinet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Lampkin Park PS Replacement SLE Approval.pdf | ||
| 2-General Service Provider - GS1A.docx | DOCX document | |
| 1-Affidavits.pdf | ||
| 6-Subcontractors and Suppliers.xlsx | XLSX spreadsheet | |
| 5-Lampkin Park PS Replacement Construction Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GACT0000000343 (Lampkin Park PS Replacement) Duplex pump station capable of 57 gpm at 30 ft TDH:
Submittal/Action Requirements:
Condition No. Condition
S-1 When this project is completed, the applicant shall: submit written certification: Due 30 calendar days after Completion of Construction to the Division of Water that the facilities have been constructed and tested in accordance with the approved plans and specifications and the approval conditions. Such certification shall be signed by a registered professional engineer. Failure to certify may result in penalty assessment and/or future approvals being withheld. [401 KAR 5:005 Section 24(2)]
Narrative Requirements:
Condition No. Condition
T-1 The plans and specifications submitted for the project are approved by the Department of Environmental Protection as to sanitary features, subject to the requirements contained within the permit. [401 KAR 5:005 Section 24(3)]
T-2 Authority to construct these sewers is hereby granted. This approval is issued under the provisions of KRS Chapter 224.10-100 (19) regulations promulgated pursuant thereto. Issuance of this permit does not relieve the permittee from the responsibility of obtaining any permits or licenses required by this cabinet and other state, federal, and local agencies. [401 KAR 5:005 Section 24(3)(c)2]
T-3 A permit to construct a facility shall be effective and valid for twenty-four (24) months upon issuance unless otherwise conditioned. If construction has not commenced within twenty-four (24) months following a permit's issuance, a new permit shall be obtained before construction may begin. [401 KAR 5:005 Section 24(1)]
T-4 The permit is issued to the applicant, and the permittee shall remain the responsible party for compliance with all applicable statutes and administrative regulations until a notarized applicable change in ownership certification is submitted and the transfer of ownership is acknowledged by the cabinet. [401 KAR 5:005 Section 28(1)]
T-5 The issuance of a permit by the cabinet does not convey any property rights of any kind or any exclusive privilege. [401 KAR 5:005 Section 24(5)]
T-6 There shall be no deviations from the plans and specifications submitted with the application or the conditions specified, unless authorized in writing by the cabinet.
[401 KAR 5:005 Section 24(3)(b)1]
Sewer Line Construction Bowling Green Municipal Utilities Water Recovery Facility
Facility Requirements
Activity ID No.:APE20260019
Narrative Requirements:
Condition No. Condition
T-7 For subfluvial pipe crossings, a floodplain construction permit will not be required pursuant to KRS 151.250, if the following requirements of 401 KAR 4:050 Section 2 are met:
1) During the construction of the crossing, no material may be placed in the stream or in the flood plain of the stream to form construction pads, coffer dams, access roads, etc., unless prior approval has been obtained from the cabinet.
2) The trench shall be backfilled as closely as possible to the original contour. All excess material from construction of the trench shall be disposed of outside of the flood plain, unless the applicant has received prior approval from the cabinet to fill within the flood plain.
3) For subfluvial crossings of erodible channels, there shall be at least thirty (30) inches of clear cover above the top of the pipe or conduit at all points.
4) For subfluvial crossings of nonerodible channels, there shall be at least six (6) inches of clear cover above the top of the pipe or conduit at all points, and the pipe or conduit shall be encased on all sides by at least six (6) inches of concrete.
5) The weight of a pipe and its contents during normal operating conditions at all points must exceed that of an equal volume of water, or the applicant must provide the division with sufficient information to show that the pipe and joints have sufficient strength.
Contact the Floodplain Management Section of the Surface Water Permits Branch at (502) 564-3410 with any question on these requirements. [KRS 151.250 & 401
KAR 4:060]
T-8 If any portion of the sewer project will be constructed in or along a stream or wetland, contact the Water Quality Certification Section, located within the Water Quality Branch, at 502-564-3410, to determine if a 401 certification will be required. [KRS 224.16-050]
T-9 Facilities shall be designed and constructed in accordance with the "Recommended Standards for Wastewater Facilities" of the Great Lakes-Upper Mississippi River Board of State Public Health and Environmental Managers, commonly referred to as "Ten States' Standards", 2014 edition. [401 KAR 5:005 Section 7(1)(a)]
T-10 Gravity sewer lines and force mains shall be designed and constructed to give mean velocities, when flowing full, of not less than two (2) feet per second. Velocity calculations shall incorporate roughness coefficients pursuant to 401 KAR 5:005 Section 8(8). [401 KAR 5:005 Section 8(8)]
T-11 An audible and visible alarm shall be provided at any proposed wastewater pump station. [Ten States (WW) 46]
T-12 All proposed pump station wetwells shall be sized such that, based on the average flow, the time to fill the wetwell from the pump-off elevation to the pump-on elevation shall not exceed thirty (30) minutes. [401 KAR 5:005 Section 8(16)]
Sewer Line Construction Bowling Green Municipal Utilities Water Recovery Facility
Facility Requirements
Narrative Requirements:
Condition No. Condition
T-13 All pump stations shall provide a minimum of two (2) hours of detention time, based on the average design flow, above the high level alarm elevation or provide an alternate source of power with wetwell storage providing sufficient time for the alternate power source to be activated. [401 KAR 5:005 Section 8(18)]
T-14 Pumps and force mains handling raw wastewater shall be capable of passing spheres of at least three (3) inches in diameter. Pump suction and discharge openings, as well as sewer force main pipe, shall be a minimum of four (4) inches in diameter. The above requirements do not apply to grinder pump stations or force mains directly connected to grinder pump stations. [Ten States (WW) 42.33, 49.1]