4_ES7034.pdf

PDF 10 KB Posted

Attached to
UWARS Parachute Release
Solicitation number
FA821335R3032
Issued by

About this file

This document is a federal contract clause (ES7034) defining procedures for rework and repair of nonconforming material in a federal contract. The clause provides detailed definitions and requirements for two types of material reprocessing: rework (completely reprocessing nonconforming material to meet all contract specifications) and repair (reprocessing material to reduce nonconformance but not fully eliminate it). Key procedural requirements include documenting and submitting rework and repair procedures to government representatives for review and approval, including descriptions of nonconformance causes and prevention actions, and ensuring reinspection provisions that provide government assurance of reprocessed material quality. The clause applies to the contractor and extends through the entire supply chain, including suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
FA821325R3032 0002.pdf PDF
FA821325R3032 0001.pdf PDF
9_Packaging_Requirements.pdf PDF
1_Air Specification_SS34.docx DOCX document
FA821325R3032.pdf PDF
3_CDRL_1377013941271.pdf PDF
7_CADPAD_Item_Marking.pdf PDF
1_Air Specification_SS35.docx DOCX document
10_SOW_for_Packaging_and_Preservation.pdf PDF
12_Item_Description_1271.pdf PDF
3_CDRL_1377013941272.pdf PDF
11_Special_Packaging_Instructions.pdf PDF
12_Item_Description_1272.pdf PDF
5_REPSHIP_of_HAZMAT.docx DOCX document
2_Ammunition _Data_Card.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)