4-Drawings Cudjoe Transfer Staion 11.06.2025.pdf
PDF 23 MB Posted
- Attached to
- Cudjoe Key Transfer Station New Storage Building
- Solicitation number
- RFP-624
- Issued by
- Monroe County, Florida
About this file
Summary
This is a construction document package consisting of architectural, structural, mechanical, electrical, and civil drawings for Monroe County's Cudjoe Key Transfer Station, a new one-story, 2,400 square-foot fleet garage building located at 780 Blimp Road, Cudjoe Key, Florida 33042. The project involves construction of a pre-engineered metal building designed to protect vehicles, with associated site improvements including concrete and asphalt paving, retaining walls, utilities, and landscaping. The facility is classified as S-2 Low-Hazard Storage occupancy and is designed to meet 2023 Florida Building Code requirements, with a finished floor elevation of 11 feet NAVD88 to accommodate the AE(10) flood zone. The drawings include detailed floor plans, reflected ceiling plans, roof plans, exterior elevations, building sections, foundation and structural details, mechanical and plumbing layouts, and comprehensive electrical plans with panel schedules and one-line diagrams. No specific bid due date, response deadline, or contract award date is referenced in these construction documents.
The project includes comprehensive specifications for all trades with quality control testing requirements, record drawing and as-built drawing submission requirements, and compliance with NPDES stormwater pollution prevention requirements. The contractor is responsible for all demolition, site preparation, grading, erosion and sediment control, utility installation and coordination, equipment procurement, and final site restoration. Structural design is based on 200 mph (3-second gust) wind loads per ASCE 7-22 and includes 14-inch diameter auger cast-in-place piles with 4,000 psi concrete, an 8-inch concrete slab on grade with vapor barrier, and concrete retaining walls with weep holes. Electrical service will be provided from an existing panel approximately 360 feet away, with a new 100-amp, 240/120-volt single-phase panel serving the building. All work must comply with applicable local, state, and federal regulations, including OSHA standards, NEC requirements, and manufacturer specifications, with the contractor bearing all costs for compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING SYMBOLS
REFERENCE SYMBOL (TYP.)
DETAIL #
MODIFIER
SHEET WHERE
DETAIL IS LOCATED
A101
1 SIM
WALL SECTIONS
A1 A101
SIM
BUILDING SECTIONS
A1 A101
SIM
A1
A101
SIM
ENLARGEMENT REFERENCE
A101
1 SIM
DETAIL SECTIONS
A101
1 SIM
CASEWORK ELEVATION EXTERIOR ELEVATION INTERIOR ELEVATION
ACCENT WALL FINISH TAG COLUMN GRID DATUM SPOT ELEVATION
ELEVATION LEVEL
1 / A101 A101
DETAIL #
SHEET #
1 RefDETAIL #
SHEET #
A101
Ref1DETAIL #
SHEET #
PT-1
FINISH
DESIGNATION
A
ROOM TAG DOOR TAG
WALL TAG WINDOW TAG CEILING TAG
FURNITURE TAG EQUIPMENT TAG
CASEWORK TAG MATCHLINE BREAKLINE FLOORING INSTALL
DIRECTION
1 Ref
Re f
1 Ref
Re f
1i
Ref1
Re f
Ref1
Re f
AL01
CEILING TYPE
CEILING HEIGHT
24/ 101
INDICATES WIDTH OF CABINET IN
INCHES
INDICATES CABINET DESIGN SERIES
STANDARD
WINDOW PREFIX LEGEND
AL ALUMINUM WINDOW
HM HOLLOW METAL WINDOW
SF STOREFRONT
CW CURTAINWALL
LV LOUVER
WINDOW PREFIX
WINDOW ID
PLUMBING FIXTURE TAGTOILET ACCESSORY TAG
T-XX
NOTE BLOCK TAG
(FOR KEYNOTE LEGEND)
X###
NAME
ELEVATION
A
WC-3 CH-000
A101 A101
(EXISTING)
REVISION TAG
AREA TAG
Area Name
150 SF
Room Name
101A
GB-1 10' - 0"
P-1 PAINT TYPE (IF APPLICABLE)
DIMENSIONING
FACE OF CMU UNIT OR FACE OF
CONCRETE WALL TO FACE OF CMU/WALL
1. DOORS NOT OTHERWISE DIMENSIONED SHALL BE:
A. 8" FROM FACE OF ADJACENT MASONRY WALL TO ROUGH DOOR OPENING.
B. 4" FROM FACE OF ADJACENT STUD WALL TO ROUGH DOOR OPENING.
2. SEE LARGE SCALE DETAILS FOR LOCATIONS AND ALIGNMENTS OF
PARTITIONS NOT DIMENSIONED ON FLOOR PLANS.
3. UNLESS OTHERWISE NOTED, PLAN DIMENSIONS ARE TAKEN FROM:
FACE OF STUD TO FACE OF STUD
CENTERLINE OF COLUMN TO
CENTERLINE OF COLUMN
FACE OF CMU OR FACE OF CONCRETE
WALL TO CENTERLINE OF CANOPY COLUMN
A.
B.
C.
D.
DIM.
DIM.
DIM.
DIM.
MATERIAL LEGEND
BATT INSULATION
BRICK
CONCRETE
CONCRETE MASONRY UNIT
CONTINUOUS WOOD MEMBER
EARTH
FINISHED WOOD MEMBER
GYPSUM WALL BOARD
PLYWOOD
INSULATION - RIGID
WOOD BLOCKING
METAL
INSULATION - SPRAY FOAM
SEMI RIGID INSULATION
ATS
TE
FO LF
AD
IR
O
AR13957
E R
S
G
ET RED RA CH
TCETI
I
BR
AN
DAN DECARO
Sheet No.
NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION
www.cphcorp.com A Full Service
A & E Firm
CPH Consulting, LLC.
Plans Prepared By :
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT COMPLETE
SET OF PLANS. SEE GENERAL NOTES
FOR MASTER LEGEND
1992 SW 1ST. STREET
MIAMI, FLORIDA 33135
Ph. (305) 274-4805
Professional Seal
Drawn:
Designed:
Checked:
Project No.:
Issue Date:
Autodesk Docs://M4312.1 Monroe County - Waste Transfer Station/M4312.1_Monroe County Transfer Station_Cudjoe Key.rvt9/11/2024 9:05:54 AM
G003
MO
NR
OE
C
OU
NT
Y T
RA
NS
FE
R
ST
AT
IO
N -C
UD
JO
E K
EY
0 B
LIM
P
RO
AD
CU
DJ
OE
K
EY
, F
L
AB
BR
EV
IAT
IO
NS
DR
AW
IN
G
CO
NV
EN
TIO
NS
© 2024
State of Florida Licenses:
Architect No. AR0013957
Engineer No. 3215 Landscape No. LC0000298
Surveryor No. 7143
100%
CONSTRUCTION
DOCUMENTS
08/16/2024
M4312.1
CPH
KR
PC; AC
& AND
@ AT
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
AC AIR CONDITIONING
ACC ACCESSIBLE
ACOUST ACOUSTICAL
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AD ACCESS DOOR
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGGR AGGREGATE
AGP ABOVE GRADE PLANE - STORY
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ATTN ATTENTION
AUTO AUTOMATIC
AV AUDIOVISUAL
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOB BOTTOM OF BEAM
BOC BOTTOM OF CURB
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMNT BASEMENT
BUR BUILT UP ROOFING
C CHANNEL
C/C CENTER TO CENTER
CAB CABINET
CAT CATEGORY
CB CATCH BASIN
CB CEMENT BOARD
CBU CEMENTITIOUS BACKER UNIT
CCTV CLOSED CIRCUIT TELEVISION
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED, CONTRACTOR
INSTALLED
CG CORNER GUARD
CH CHILLER
CI CAST IRON
CIP CAST-lN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTSK COUNTERSUNK
CUST CUSTODIAL
CW COLD WATER
D DEEP, DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIMS DIMENSIONS
DISP DISPENSER
DIV DIVISION
DMPF DAMP PROOFING
DN DOWN
DO DOOR OPENING
DR DOOR
DRN DRAIN
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENG ENGINEER
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN OR FIRE DEPARTMENT
FDC FIRE DEPARTMENT CONNECTION
FDVA FIRE DEPARTMENT VEHICLE ACCESS
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURES AND EQUIPMENT
FFB FLUSH FLOOR BOX
FFEL FINISH FLOOR ELEVATION
FH FULL HEIGHT OR FLAT HEAD
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLR FLOOR
FLUOR FLUORESCENT
FND FOUNDATION
FO FACE OF OR FINISHED OPENING
FP FIRE PROTECTION
FPG FIREPROOFING
FR FIRE RESISTANT
FRC FIBER REINFORCED CONCRETE
FRP FIBER REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FSD FIRE SEPARATION DISTANCE
FT FEET/FOOT
FTG FOOTING
FURN FURNITURE
FURR FURRING
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEN GENERAL
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS
GLAZ GLAZING
GR GRADE
GRAN GRANULAR
GRD GROUND
GRFG GLASS FIBER REINFORCED GYPSUM
GSM GALVANIZED SHEET METAL
GV GAS VALVE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HIG
HB HOSE BIB
HC HANDICAPPED OR HOLLOW CORE
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HRC HOSE REEL CABINET
HT HEIGHT
HTG HEATING
HVAC HEATING VENTILATION & AIR
CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IN INCH/INCHES
INCAND INCANDESCENT
INCL INCLUDED/INCLUDING
INFO INFORMATION
INSUL INSULATED OR INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
KIT KITCHEN
KO KNOCK OUT
LAM LAMINATE
LAV LAVATORY
LB POUND
LF LINEAR FEET
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LTG LIGHTING
LTWT LIGHTWEIGHT
LVL LEVEL
LVR LOUVER
MAINT MAINTENANCE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MED MEDIUM
MEMBR MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N NORTH
N/A NOT APPLICABLE AS PART OF THIS
PROJECT
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NON RATED
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OF OWNER FURNISHED
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED, OWNER INSTALLED
OH OVERHEAD
OL OCCUPANT LOAD
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P PAINT
PAV PAVING
PBD PARTICLE BOARD
PC PRECAST
PDF POWER DRIVEN FASTENER
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PI. PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNT PAINT OR PAINTED
POL POLISHED
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PT POINT
PT PRESSURE TREATED
PTD PAINTED
PTN PARTITION
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTY QUANTITY
R RADIUS/RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED REINFORCING
REINF REINFORCED
REL RELOCATE
REM REMOVABLE
REQ REQUIRE/REQUIRED
REQD REQUIRED
RESIL RESILIENT
REV REVISION/REVISED
RM ROOM
RO ROUGH OPENING
RTD RATED
RTG RATING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAF SELF ADHERED FLASHING
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FEET/FOOT
SH SPRINKLER HEAD
SHR SHOWER
SHT SHEET
SIM SIMILAR
SJ SAW JOINT
SM SHEET METAL
SM SURFACE MOUNTED
SP STANDPIPE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
STA STATION
STC SOUND TRANSMISSION COEFFICIENT
STL STEEL
STOR STORAGE
STRG STRINGER
STRUCT STRUCTURAL
STRUCT STRUCTURE OR STRUCTURAL
SUBCAT SUBCATEGORY
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TDC TRAFFIC DECK COATING
TEL TELEPHONE/TELECOM
TELE TELEPHONE
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TKBD TACK BOARD
TLT TOILET
TMPD TEMPERED
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE OR TOP OF CURB
TOS TOP OF STEEL
TOW TOP OF WALL
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
URNL URINAL
VAC VENTILATION AND AIR CONDITIONING
VAR VARIES
VCT VINYL COMPOSITION TILE
VER VERIFY
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VISION PANEL
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
WM WIRE MESH
WP WATERPROOF OR WATERPROOFING
WPM WATERPROOF MEMBRANE
WS WEATHER-STRIPPING
WSCT WAINSCOT
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
YR YEAR
ABBREVIATIONS
NO
DA
TE
RE
VI
SI
ON
MO
NR
OE
C
OU
NT
Y T
RA
NS
FE
R
ST
AT
IO
N -C
UD
JO
E K
EY
0 B
LIM
P
RO
AD
CU
DJ
OE
K
EY
, F
L
DS
LIFE SAFETY & ACCESSIBILITY LEGEND
MAXIMUM TRAVEL DISTANCE PATH
EGRESS DESIGNATION
PRIMARY EGRESS EXIT SIGN
LOCK BOX TAG
FIRE EXTINGUISHER TAG
LOCK BOX - EXACT LOCATION TO BE COORDINATED WITH LOCAL FIRE DEPARTMENT.
MOUNTING HEIGHT 6'-8" A.F.F.
DOOR CAPACITY TAG
FIRE EXTINGUISHER ON WALL BRACKETFE
ACCESSIBILITY CLEARANCES AT MANUAL SWINGING DOORS
ARROW INDICATES DOOR APPROACH
REQUIRED CLEAR SPACE PER
ADA/IBC-ACCESSIBILITY
REFERENCE TO ADA/IBC-ACCESSIBILITY 404.2.4.1
* REFERENCE 404.2.4.3
TO EXIT16' - 0" XX'-XX"
DOOR CLEAR WIDTH
EGRESS CAPACITY
ACTUAL LOAD
DOOR #
EXIT #
33"
XXX
EGRESS CAPACITY OF DOOR PER LIFE
SAFETY CODE (CALCULATED BASED ON
DOOR CLEAR WIDTH)
LIFE SAFETY GENERAL NOTES
1. FIRE EXTINGUISHERS SHALL BE LOCATED IN ACCORDANCE W/ THE REQUIREMENTS OF NFPA 10 & SECTION 13-6 OF NFPA 1 OF THE FFPC LOCATED SO THAT ALL AREAS ARE WITHIN 75' OF AN EXTINGUISHERS. FOR MECHANICAL & ELECTRICAL ROOMS, USE A "2A:10B:C" LOCATED SO THAT ALL AREAS ARE WITHIN 50' OF AN EXTINGUISHER.
2. TACTILE SIGNAGE SHALL BE PROVIDED AT ALL EXIT DOORS TO MEET THE FOLLOWING CRITERIA:
TACTILE SIGNAGE SHALL BE LOCATED AT EACH EXIT DOOR REQUIRING AN EXIT SIGN;
TACTILE SIGNAGE SHALL READ AS FOLLOWS: “EXIT”;
TACTILE SIGNAGE SHALL COMPLY WITH ICC/ANSI A117.1.
3. REFER TO MECHANICAL DRAWINGS FOR THE LOCATION OF FIRE AND SMOKE DAMPERS.
4. COORDINATE WITH ELECTRICAL DRAWINGS FOR THE EXACT LOCATION OF EMERGENCY LIGHTING.
5. REFER TO THE TRAVEL DISTANCE SCHEDULE FOR TRAVEL DISTANCES.
6. ALL SIGNAGE INCLUDING MAXIMUM OCCUPANCY, FIRE EXTINGUISHER INSIDE, EXIT DIAGRAMS, ETC. TO BE IN
ACCORDANCE WITH LOCAL, STATE, AND NATIONAL STANDARDS AND REQUIREMENTS.
7. CONTRACTOR SHALL ORDER THE APPROVED KNOX BOX THROUGH THE COUNTY FIRE MARSHAL'S SYSTEM AND
INSTALL IT AT THE LOCATION DIRECTED BY THE AHJ.
FE
FE
DOOR CLEAR WIDTH
EGRESS CAPACITY
ACTUAL LOAD
DOOR #
EXIT #
33"
101A
2264 SF
PARKING GARAGE
TRUE
NORTH
TO EXIT88' - 0"
PLAN
NORTH
PROJECT SCOPE OF WORK
This project consists of a new (1) one-story, 2,400 sf transfer station fleet garage building for Monroe County. Construction is a pre-engineered metal building.
PROJECT ADDRESS
780 Blimp Road Cudjoe Key, Florida 33042
PARCEL IDENTIFICATION #
00115410-000200
PROPERTY DESCRIPTION
19 66 28 CUDJOE KEY PART OF GOV LT 8 (10.20AC) OR901-1056/57 OR947-1677/78 OR3134-1728
AUTHORITIES HAVING JURISDICTION
• BUILDING Monroe County Building Department
• FIRE Monroe County Fire Mashal’s Office
REFERENCED CODES (FBC CHAPTER 1)
• 2023 Florida Building Code (IBC) FBC
• 2023 Florida Fire Prevention Code (NFPA 1 &101) FFPC
• 2023 Florida Building Code, Energy (IECC) FBC-E
• 2023 Florida Building Code, Accessibility (ADA) FBC-A
• 2020 National Electric Code (NFPA 70)
• Monroe County FL Code Chapter 6
BUILDING DATA
NEW TOTAL BUILDING AREA 2,400 SF
OCCUPANCY (FBC CHAPTER 3 & FFPC CHAPTER 6)
Primary Occupancy Classification FBC 311.3 Storage - S-2 Low-Hazard Storage; FFPC 6.1.13 Storage Occupancy
SPECIAL REQUIREMENTS (FBC CHAPTER 4)
In addition to the occupancy and construction requirements in this code, the provisions of this chapter apply to the occupancies and uses described herein.
SECTION 406 Motor-Vehicle-Related Occupancies
CONSTRUCTION TYPE (FBC CHAPTER 6)
The project is designed to meet the minimum required fire resistance ratings. Refer to the table on this sheet titled "Fire Resistance Rating Requirements for Building Elements (Hours)"
SECTION 602.5 Type VB (Combustible, unprotected)
Fire Resistance Rating Requirements for Building Elements (Hours) (FBC Table 601 & 705.5) Building Element Rating Primary Structural Frame 0-hours Bearing Walls, Exterior 0-hours Bearing Walls, Interior 0-hours Non-Bearing Walls and Partitions, Exterior > 30-Feet, 0-hours (FBC Table 705.5) Non-Bearing Walls and Partitions, Interior 0-hours Floor Construction and associated 0-hours Roof Construction and associated 0-hours
FIRE PROTECTION AND ALARM SYSTEMS (FBC CHAPTER 9 & FFPC)
FBC SECTION 903 Automatic Sprinkler Systems / FFPC 42.3.5
Required: No Provided: No
FBC SECTION 904 Alternative Automatic Fire Extinguishing Systems / FFPC 42.3.5 Required: No Provided: No
FBC SECTION 905 Standpipe Systems / FFPC 42.3.5 Required: No Provided: No
FBC SECTION 906 Portable Fire Extinguisher / FFPC 42.3.5 Required: No Provided: Yes, reference Life Safety Plan for locations.
FBC SECTION 907 Fire Alarm and Detection / FFPC 42.3.4 Required: No Provided: No
GENERAL BUILDING HEIGHTS AND AREAS (FBC CHAPTER 5)
Tabular Allowable Building Height 40’-0” (FBC Table 504.3) Actual/Proposed Building Height ±22’-9”
Tabular Allowable Number of Stories 2-Stories (FBC Table 504.4) Actual/Proposed Building Height 1-Story
Tabular Allowable Building Area 13,500-SF (FBC Table 506.2) Actual/Proposed Building Area 2,400-SF
FBC Section 507 Unlimited Area Building No FBC Section 509 Incidental Uses and FFPC 42.3.2 Protection from Hazards No Incidental uses in the project.
FBC Section 510 Special Provisions No Special Provisions used in the project.
INTERIOR FINISHES (FBC CHAPTER 8)
Flame Spread and Smoke-Developed Indexes (FBC Section 803.1.1 & FFPC Section 10.2.3.3) Class A = Flame spread index 0-25; smoke-developed index 0-450.
Class B = Flame spread index 26-75; smoke-developed index 0-450.
Class C = Flame spread index 76-200; smoke-developed index 0-450.
Interior Floor Finishes – Critical Radiant Flux (FFPC Section 10.2.7.4) Class I interior floor finish shall have a critical radiant flux of not less than 0.45 W/cm2, as determined by the test described in 10.2.7.3.
Class II interior floor finish shall have a critical radiant flux of not less than 0.22 W/cm2, but less than 0.45 W/cm2, as determined by the test described in 10.2.7.3.
Interior Wall, Ceiling, and Floor Finish Requirements (FBC Table 803.11 & FFPC Section 42.3.3) Location FBC Table 803.11 & 804.4.2 FFPC 42.3.3.2 & 42.3.3.3 Exits and Exit Access Corridors Class A, B, or C Interior Wall and Ceiling Finishes Class A, B, or C Class A, B, or C Interior Floor Finish Class I or II Class I or II
MEANS OF EGRESS (FBC CHAPTER 10 & FFPC SECTION 42.2)
Refer to the Egress Capacity Tables for egress by building or area. Refer to the Life Safety Drawings for the occupancy schedules.
Minimum Number of Exits 1 Exit (FBC Table 1006.2.1 & FFPC Section 7.4 & 42.2.4) Maximum Travel Distance 200-Feet (FFPC Section 42.2.6) Maximum Common Path of Travel 50-Feet (FFPC Section 42.2.5) Maximum Dead End Corridor 20-Feet (FBC 1020.4) Minimum Corridor Width 36-Inches (FBC Table 1020.3) Minimum Door Width Required 32-Inches (FBC Section 1005.3.2 & FBC-A Section 404) Minimum Door Width Provided 0.2" per occupant (FBC 1005.3.2 & NFPA 7.3.3.1) But no less than 32" (FBC
Section 1009.1) Note: Refer to the life safety drawings for the location and capacity of all egress components
ENERGY REQUIREMENTS (FBC-E)
The proposed building is intended to be an unconditioned space.
PLUMBING FIXTURE COUNT (FBC TABLE 2902.1 & FBC-P TABLE 403.1)
Per an email discussion with Rick Griffin, Building Official, Monroe County the facility will not be required to meet the minimum fixture count as the facility is intended to protect vehicles.
DESIGN LOADS
Reference structural sheets for design loads
CODE ANALYSIS SUMMARY
4"
MI
N -
" M
AX
WE
IG
HT
lb:
" M
AX
WE
IG
HT
lb:
" M
AX
FINISH FLOOR
FIRE EXTINGUISHERS SHALL BE LOCATED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-1, SECTION 13.6 AND NFPA-10 OF THE FLORIDA FIRE PROTECTION CODE (FFPC), LOCATED SO THAT ALL AREAS ARE WITHIN 75’ OF AN EXTINGUISHER. QUANTITY AND LOCATIONS WILL BE REVIEWED AND APPROVED
WITH THE AUTHORITY HAVING JURISDICTION.
• PROVIDE ABC DRY CHEMICAL TYPE 2A-10BC, OR EQUIVALENT, LIGHT HAZARD EXTINGUISHER, TYP.
WALL MOUNTED OR CABINET PER PLAN.
PROVIDE BLOCKING
SUPPORT IN WALL
WHERE REQUIRED
WALL MOUNTED
ATS
TE
FO LF
AD
IR
O
AR13957
E R
S
G
ET RED RA CH
TCETI
I
BR
AN
DAN DECARO
Sheet No.
NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION
www.cphcorp.com A Full Service
A & E Firm
CPH Consulting, LLC.
Plans Prepared By :
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT COMPLETE
SET OF PLANS. SEE GENERAL NOTES
FOR MASTER LEGEND
1992 SW 1ST. STREET
MIAMI, FLORIDA 33135
Ph. (305) 274-4805
Professional Seal
Drawn:
Designed:
Checked:
Project No.:
Issue Date:
Autodesk Docs://M4312.1 Monroe County - Waste Transfer Station/M4312.1_Monroe County Transfer Station_Cudjoe Key.rvt9/11/2024 9:05:55 AM
G101
MO
NR
OE
C
OU
NT
Y T
RA
NS
FE
R
ST
AT
IO
N -C
UD
JO
E K
EY
0 B
LIM
P
RO
AD
CU
DJ
OE
K
EY
, F
L
LIF
E S
AF
ET
Y P
LA
N
© 2024
State of Florida Licenses:
Architect No. AR0013957
Engineer No. 3215 Landscape No. LC0000298
Surveryor No. 7143
100%
CONSTRUCTION
DOCUMENTS
08/16/2024
M4312.1
CPH
KR
PC; AC
OCCUPANT LOAD & EGRESS WIDTH CALCULATIONS, 2023 FBC
OCCUPANCY
INTERIOR
AREA (SF)
OCCUPANT
LOAD FACTOR
OCCUPANT
LOAD EGRESS WIDTH
PARKING GARAGE 2264 200 11 2.2
2264 11 2.2
3/16" = 1'-0"1 LIFE SAFETY PLAN
1/2" = 1'-0"2 FIRE EXTINGUISHER LEGEND
THE FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE N.O.A. INDICATED ARE FOR BASIS OF DESIGN PRODUCTS. THE GC SHALL BE RESPONSIBLE FOR UPDATING THESE APPROVALS WITH THE
JURISDICATION HAVING AUTHORITY PRIOR TO INSTALLING ANOTHER PRODUCT OR SYSTEM.
WALL LOUVER GREENHECK 5IN. (127) DEEP, EXTRUDED ALUMINUM VERTICAL RAIN RESISTENT BLADE LOUVER 23-1030.04 08/06/2025
SIDING
WALL PANELS
ROLLUP WAYNE DALTON 800 SERIES ROLLUP DOOR 23-1129.09 01/11/2027
SWINGING TIGER DOOR EXTREME DUTY HURRICANE SERIES FIBERGLASS SINGLE OUTSWING FL-26591.1
EXTERIOR DOORS
Product Type Manufacturer Description (Model/Series)
Florida Product Approval # Miami-Dade NOA Expiration Date
PRODUCT APPROVALS
NO
DA
TE
RE
VI
SI
ON
MO
NR
OE
C
OU
NT
Y T
RA
NS
FE
R
ST
AT
IO
N -C
UD
JO
E K
EY
0 B
LIM
P
RO
AD
CU
DJ
OE
K
EY
, F
L
C100
M O
N R
O E
C O
U N
TY
T
R A
N
SF
ER
S
TA
TI
O N
C
U D
JO
E
B
LI
M P
R O
A D
, C U
D
JO
E, F
L
GENERAL PROVISIONS
1. THE CONTRACTOR SHALL RECOGNIZE AND ABIDE BY ALL OSHA EXCAVATION SAFETY STANDARDS, INCLUDING THE FLORIDA TRENCH SAFETY ACT (FS 553.60-553.64). ANY MATERIAL, CONSTRUCTION METHODS, OR MATERIAL COST TO COMPLY WITH THESE LAWS SHALL BE INCIDENTAL TO THE CONTRACT.
2. CONTRACTOR IS ADVISED TO FAMILIARIZE THEMSELVES WITH THE OVERALL SCOPE OF WORK TO BE PERFORMED PRIOR TO SUBMITTING A BID.
3. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
4. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE CONTRACTOR IS REQUIRED TO PROVIDE SAFETY MEASURES FOR THE PASSING PUBLIC AND THEIR WORKERS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.
5. ATTENTION IS DIRECTED TO THE FACT THAT THAT THESE PLANS MAY HAVE BEEN ALTERED IN SIZE DURING REPRODUCTION. THIS MUST BE CONSIDERED WHEN OBTAINING SCALED DATA.
6. THE CONTRACTOR SHALL FIELD VERIFY ANY AND ALL EXISTING CONDITIONS PRIOR TO COMMENCING CONSTRUCTION, AND SHALL NOTIFY THE ENGINEER PROMPTLY OF ANY
DISCREPANCIES.
7. THE CONSTRUCTION LENGTHS INDICATED IN THESE PLANS ARE APPROXIMATE. ACTUAL LIMITS MAY BE SET IN THE FIELD AS DIRECTED BY THE OWNER/ENGINEER.
8. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME THESE DRAWINGS WERE PREPARED. THE INDICATED LOCATION OF UNDERGROUND UTILITIES, STRUCTURES, AND FACILITIES IS APPROXIMATE, AND REFLECTS THE BEST INFORMATION AVAILABLE FROM SURVEYS AND RECORDS. THE CONTRACTOR SHALL NOT ASSUME ALL INFORMATION IS ABSOLUTELY CORRECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT SIZE, LOCATION DEPTH, HEIGHT, ELEVATION, DIMENSION, AND EXTENT OF ALL UNDERGROUND AND OVERHEAD FACILITIES AND OTHER FEATURES AFFECTING THEIR WORK PRIOR TO PROCEEDING WITH ANY CONSTRUCTION ACTIVITY THAT MAY AFFECT SUCH FACILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY
FAILURE TO COMPLY WITH THESE INSTRUCTIONS.
9. THE CONTRACTOR SHALL USE EXTREME CARE IN THE INSTALLATION OF STRUCTURES AND PIPING, DUE TO THE CLOSE PROXIMITY OF OVERHEAD AND/OR UNDERGROUND ELECTRICAL
POWER LINES, GAS MAINS, COMMUNICATIONS CONDUITS/CABLES, ETC.
10. THE LOCATION AND ELEVATION OF THE PROPOSED AMENITIES, AS SHOWN ON THE PLANS, IS FOR GRAPHICAL ORIENTATION PURPOSES ONLY. ACTUAL LOCATION OF THE PROPOSED AMENITIES IS TO BE DETERMINED IN THE FIELD UTILIZING THE MINIMUM STANDARDS DEPICTED ON THE PLANS AND THE EXISTING TOPOGRAPHY AND PHYSICAL FEATURES FOUND IN THE FIELD. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE MONROE COUNTY INSPECTOR/ ENGINEER OF THE ACTUAL LAYOUT PROPOSED PRIOR TO ORDERING OF MATERIALS AND/OR
COMMENCEMENT OF WORK.
11. EXCEPT WHERE THE PLANS AND SPECIFICATIONS PROVIDE THAT SUCH WORK SHALL BE PERFORMED UNDER THE CONTRACT FOR THIS PROJECT, ALL UTILITIES INTERFERING WITH CONSTRUCTION SHALL BE REMOVED, RELOCATED OR ADJUSTED BY THEIR OWNERS, AT THEIR EXPENSE. THE CONTRACTOR SHALL ARRANGE THEIR SCHEDULE TO ALLOW UTILITY OWNERS TIME FOR THE NECESSARY RELOCATION AND ADJUSTMENT OF UTILITIES AND RELATED STRUCTURES. THE FOLLOWING UTILITIES MAY HAVE LINES AND FACILITIES WITHIN THE PROJECT
AREA.
A. FLORIDA KEYS AQUEDUCT AUTHORITY.......................................KIMBERLY JUDGE (305) 295-2154 B. KEYS ENERGY ..................................................................................MATTHEW ALFONSO (305) 295-1055 C. AT&T...................................................................................................FARIBORZ FAKHRALSHOARA (786) 478- 2964
12. ABOVE GROUND AND/OR UNDERGROUND UTILITIES MAY BE IN THE AREA OF THIS PROJECT- PROCEED WITH CAUTION- THE CONTRACTOR SHALL CALL "SUNSHINE 811" (1-800-432-4700 OR 811) AND THE UTILITY OWNERS IN ADVANCE OF BEGINNING WORK. IN ACCORDANCE WITH CHAPTER 556, FLORIDA STATUS, UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY ACT, THE CONTRACTOR SHALL CONTACT SUNSHINE 811 AT LEAST TWO (2) FULL BUSINESS DAYS PRIOR TO BEGINNING EXCAVATION OR DEMOLITION ACTIVITIES TO ALLOW FOR ALL AFFECTED UTILITIES TO MARK THEIR UNDERGROUND FACILITIES AND RESPOND TO THE POSITIVE RESPONSE SYSTEM. ALTHOUGH ALL UTILITIES ARE REQUIRED TO BE MEMBERS OF SUNSHINE 811 AND TO MARK THEIR RESPECTIVE FACILITIES, CARE SHOULD BE TAKEN IN UNMARKED AND/OR UNKNOWN FACILITIES ARE ENCOUNTERED DURING THE PERFORMANCE OF THE WORK REQUIRED BY THIS PROJECT. THE CONTRACTOR SHALL FURTHER COORDINATE WITH UTILITY OWNERS TO RESOLVE CONFLICTS THAT MAY ARISE IN THE FIELD DURING CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY UTILITIES DAMAGED AS A RESULT OF THE CONTRACTOR'S FAILURE TO CALL "SUNSHINE 811" AND THE UTILITY OWNERS.
13. ALL CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 3,000 PSI (28 DAY STRENGTH).
14. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND WILL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCIES EXIST WITH THE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE ENGINEER IN WRITING AND REQUESTING A CLARIFICATION OF PLANS PRIOR TO DEMOLITION.
15. ADJUSTMENT OF INLETS, JUNCTION BOXES, MANHOLE TOPS, WATER VALVES, WATER METERS, ETC., SHALL BE INCLUDED IN THE CONTRACTOR'S BID AND NO CLAIM SHALL BE MADE AGAINST
THE OWNER OR ENGINEER FOR THESE ADJUSTMENTS , IF REQUIRED.
16. ALL CONSTRUCTION PROJECTS 1 OR MORE ACRES IN SIZE THAT DISCHARGE TO OFFSITE AREAS ARE REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR STORMWATER DISCHARGE FROM SMALL AND LARGE CONSTRUCTION ACTIVITIES. IN ORDER TO MEET NPDES REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR PREPARING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IMPLEMENTING, INSPECTING, MAINTAINING, AND REPORTING ON ALL ELEMENTS OF THE SWPPP, COMPLETING AND SUBMITTING THE REQUIRED NOTICE OF INTENT (NOI) AND NOTICE OF TERMINATION (NOT) FORMS AS THE OPERATOR, AND PAYING ALL ASSOCIATED FEES. FOR PROJECTS LESS THAN 1 ACRE IN SIZE THAT ARE NOT REQUIRED TO COMPLY WITH THE NPDES GENERAL PERMIT, THE CONTRACTOR IS STILL RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO AND DURING CONSTRUCTION IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
17. UNLESS OTHERWISE NOTED ON THE PLANS, THE CONTRACTOR SHALL USE THE GEOMETRY PROVIDED ON THE CONSTRUCTION PLANS. BENCHMARK INFORMATION SHALL BE PROVIDED TO THE CONTRACTOR BY THE OWNER OR OWNER'S SURVEYOR. ANY DISCREPANCIES BETWEEN FIELD MEASUREMENTS AND CONSTRUCTION PLAN INFORMATION SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER IMMEDIATELY.
18. BASE SURVEY INFORMATION INCLUDING BUT NOT LIMITED TO ELEVATIONS, EASEMENTS, RIGHTS OF WAY, AND OTHER TOPOGRAPHIC INFORMATION HAS BEEN PREPARED BY OTHER PROFESSIONALS. CPH, LLC. ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION.
19. THE CONTRACTOR IS RESPONSIBLE FOR ALL QUALITY CONTROL TESTING. AS A MINIMUM, TESTING SHALL INCLUDE A) PIPING AND STRUCTURAL EXCAVATION, BEDDING AND BACKFILL MATERIALS AND DENSITY TESTS; B) DETERMINATION OF COMPACTIVE EFFORT NEEDED FOR COMPLIANCE WITH THE DENSITY REQUIREMENTS; C) PORTLAND CEMENT CONCRETE AND ASPHALT PAVING QUALITY CONTROL TESTING INCLUDING DESIGN MIX REVIEW, MATERIALS, FIELD SLUMP AND AIR CONTENT, AND FIELD AND LAB CURED STRENGTH SAMPLES AND TESTING.
20. IN ADDITION TO QUALITY CONTROL TESTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED TESTING OR APPROVALS FOR ANY WORK (OR ANY PART THEREOF) IF LAWS OR REGULATIONS OF ANY PUBLIC BODY HAVING JURISDICTION SPECIFICALLY REQUIRE TESTING, INSPECTIONS OR APPROVAL. THE CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION THEREWITH AND SHALL FURNISH THE OWNER AND ENGINEER THE REQUIRED CERTIFICATES OF INSPECTION, TESTING OR APPROVAL.
21. ANY DESIGN OR TESTING LABORATORY UTILIZED BY THE CONTRACTOR SHALL BE AN INDEPENDENT LABORATORY ACCEPTABLE TO THE OWNER AND THE ENGINEER, APPROVED IN WRITING, AND COMPLYING WITH THE LATEST EDITION OF THE "RECOMMENDED REQUIREMENTS FOR INDEPENDENT LABORATORY QUALIFICATION", PUBLISHED BY THE AMERICAN COUNCIL OF
INDEPENDENT LABORATORIES.
22. TESTING RESULTS SHALL BE PROVIDED TO THE OWNER/OPERATOR AND THE ENGINEER. ALL TEST RESULTS SHALL BE PROVIDED (PASSING AND FAILING) ON A REGULAR AND IMMEDIATE
BASIS.
23. THE ENTIRE PROJECT SITE SHALL BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK. CLEAN ALL INSTALLED PIPELINES, STRUCTURES, SIDEWALKS, PAVED AREAS, ACCUMULATED SILT IN PONDS, PLUS ALL ADJACENT AREAS AFFECTED BY CONSTRUCTION, AS DIRECTED BY THE OWNER OR JURISDICTIONAL AGENCY. EQUIPMENT TO CLEAN THESE
SURFACES SHALL BE SUBJECT TO APPROVAL BY THE OWNER.
RECORD DRAWING REQUIREMENTS
1. RECORD DRAWINGS SHALL DEPICT SURVEYED AS-BUILT INFORMATION INCLUDING HORIZONTAL AND VERTICAL LOCATIONS AS REQUIRED BELOW. RECORD DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER AT LEAST THREE WEEKS PRIOR TO FINAL INSPECTION. ALL AS-BUILT DATA SHALL BE PROVIDED BY A FLORIDA LICENSED SURVEYOR, SIGNED, SEALED AND DATED BY THE RESPONSIBLE PARTY.
2. ALL RECORD DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR IN ACAD FORMAT USING CONSTRUCTION PLAN SHEETS PROVIDED BY THE ENGINEER. AS-BUILT INFORMATION SHALL BE FIELD VERIFIED, MEASURED, ADDED TO THE ACAD FILES OF THE CONSTRUCTION PLAN SHEETS PROVIDED BY THE ENGINEER, AND CERTIFIED, SIGNED AND SEALED BY THE CONTRACTOR'S LICENSED SURVEYOR WHO WILL BE RESPONSIBLE FOR THE ACCURACY OF ALL DIMENSIONS AND ELEVATIONS. SHEET SIZES AND THE SCALE OF THE RECORD DRAWINGS SHALL MATCH SHEET SIZING AND SCALE OF THE CONSTRUCTION PLANS. ADD BLOWUP DETAILS IF NECESSARY.
3. THE AS-BUILT INFORMATION IS TO INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
A. HORIZONTAL LOCATIONS AND VERTICAL ELEVATIONS FOR ALL UTILITY AND STORM STRUCTURES INCLUDING BUT NOT LIMITED TO MANHOLES, INLETS AND CLEANOUTS, INCLUDING
STRUCTURE TOP AND INVERT ELEVATIONS.
B. DISTANCE ALONG PIPELINES BETWEEN STRUCTURES.
C. STORMWATER POND TOP OF BERM AND POND BOTTOM ELEVATIONS AND HORIZONTAL DIMENSIONS MEASURED AT A MINIMUM OF TEN LOCATIONS PER POND, AT LOCATIONS DESIGNATED BY THE ENGINEER. TOP OF POND HORIZONTAL DIMENSIONS ARE ALSO TO BE TIED TO PROPERTY CORNERS, EASEMENTS, AND RIGHTS-OF-WAY.
D. STORMWATER CONTROL STRUCTURE DIMENSIONS AND ELEVATIONS, INCLUDING ALL WEIRS, SLOTS, ORIFICES, GRATES, AND SKIMMERS.
E. STORMWATER CONVEYANCE SYSTEMS INCLUDING DIMENSIONS, ELEVATIONS, CONTOURS, AND CROSS SECTIONS.
F. VERTICAL ELEVATIONS OF ALL PIPELINES AT CROSSINGS OF POTABLE WATER MAINS (WHETHER THE WATER MAIN IS EXISTING OR NEW) IN ORDER TO DOCUMENT THAT THE MINIMUM
REQUIRED VERTICAL SEPARATION HAS BEEN MET, AS APPLICABLE.
G. GRADE ELEVATION ABOVE UTILITY PIPELINE WHERE VERTICAL ELEVATIONS ARE REQUIRED AT ALL UTILITY VALVES, FITTINGS, CONNECTION POINTS, ETC.
H. UTILITY PIPELINE TIED HORIZONTALLY TO EDGE OF PAVEMENT AND RIGHT-OF-WAY LINES, LOCATED EVERY 200-FT PLUS ALL CHANGES IN HORIZONTAL OFFSET.
I. PAVEMENT WIDTH AND ELEVATIONS AT THE CENTERLINE AND EDGE OF PAVEMENT EVERY 200 FEET PLUS AT ALL CHANGES IN LONGITUDINAL SLOPE, CROSS SLOPE, INLET LOCATIONS, AND AT ALL DRIVEWAY AND STREET INTERSECTIONS. FOR PARKING LOTS, RECORD CENTERLINE AND EDGE OF PAVEMENT ELEVATIONS ALONG ALL DRIVE AISLES AND ISLANDS.
J. ALL PARKING AREAS AND SIDEWALK RAMPS DESIGNATED FOR HANDICAP ACCESS SHALL CONTAIN HORIZONTAL AND VERTICAL MEASUREMENTS IN ORDER TO VERIFY REQUIRED
WIDTHS AND SLOPES HAVE BEEN MET.
K. HORIZONTAL AND VERTICAL DATA FOR ANY CONSTRUCTION THAT DEVIATES FROM THE APPROVED ENGINEERING DRAWINGS.
L. WHERE THE PLANS CONTAIN SPECIFIC HORIZONTAL LOCATION DATA, SUCH AS STATION AND OFFSET, THE RECORD DRAWINGS ARE TO REFLECT THE ACTUAL HORIZONTAL LOCATION.
M. WHERE THE PLANS CONTAIN SPECIFIC VERTICAL ELEVATION DATA, THE RECORD DRAWINGS ARE TO REFLECT THE ACTUAL MEASURED VERTICAL ELEVATION.
5. RECORD DRAWINGS ARE TO BE PREPARED BY THE CONTRACTOR, CERTIFIED BY THE CONTRACTOR'S LICENSED SURVEYOR, AND DELIVERED TO THE ENGINEER FOR REVIEW. THE ENGINEER WILL REVIEW THE DRAWINGS FOR COMPLETENESS IN ACCORDANCE WITH THE REQUIREMENTS OF THESE NOTES WITHIN SEVEN (7) FULL WORKING DAYS. FOR PRELIMINARY REVIEW, SUBMITTAL IN ACAD AND PDF FORMAT IS SUFFICIENT AND SIGNED AND SEALED COPIES ARE NOT NECESSARY. FINAL SUBMITTAL OF COMPLETE RECORD DRAWINGS SHALL CONSIST OF ONE SET SIGNED AND SEALED BY THE CONTRACTOR'S LICENSED SURVEYOR PLUS ACAD AND PDF FILES OF THE RECORD DRAWINGS DELIVERED TO THE ENGINEER. IF THE DRAWINGS ARE FOUND TO BE INCOMPLETE OR INACCURATE, THE DRAWINGS WILL BE RETURNED TO THE CONTRACTOR FOR CORRECTION.
6. COMPLETE RECORD DRAWINGS THAT ARE FOUND TO BE SATIFACTORY AS A RESULT OF THE ENGINEER'S REVIEW WILL BE USED AS THE BASEIS FOR THE FINAL PROJECT RECORD DRAWINGS PREPARED BY THE ENGINEER USING THE CONTRACTOR PROVIDED RECORD DRAWINGS PLUS ENGINEER ADDED INFORMATION.
7. COMPLETE SIGNED AND SEALED RECORD DRAWINGS ARE REQUIREED TO BE DELIVERED TO THE ENGINEER PRIOR TO FINAL INSPECTION OF THE PROJECT. FINAL INSPECTIONS WILL ONLY BE SCHEDULED UPON RECEIPT OF SIGNED AND SEALED RECORD DRAWINGS THAT HAVE BEEN REVIEWED BY THE ENGINEER AND DELIVERED BY THE ENGINEER TO THE OWNER.
AS-BUILT DRAWINGS
1. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED, AND SEALED BY A PROFESSIONAL LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES AND LOCATIONS ON ALL CONSTRUCTED AND ADJUSTED FACILITIES. THE CONTRACTOR SHALL PROVIDE TWO PAPER COPIES, ONE AUTOCAD, AND ONE PDF DIGITAL FILE OF THE
CERTIFIED RECORD DRAWINGS TO THE ENGINEER.
2. AS-BUILTS:
A. AS-BUILTS SHALL BE PROVIDED ON THE CPH, LLC. CAD SHEET FILES MATCHING PLAN AND PROFILE VIEWS.
B. CONTRACTOR'S SURVEY TO PROVIDE MUNICIPALITY'S ASSET TABLES IN EXCEL FORMAT ON DISC AND HARD COPY SIGNED AND SEALED.
C. WATER AS-BUILTS SHALL BE SUBMITTED TWO WEEKS PRIOR TO ANY PRESSURE TESTING OF WATERMAIN (PARTIAL CLEARANCE/FULL CLEARANCE).
D. THE REMAINING AS-BUILTS SHOULD BE SUBMITTED AS SOON FOR REVIEW AS EACH SYSTEM IS COMPLETED IN THE FIELD
GENERAL ITEMS FOR AS-BUILT SUBMITTALS:
E. ASSET TABLES-ASSET TABLE ARE TO BE CURRENT FROM LOCAL MUNICIPALITY AND DOWN LOADED FROM THE UTILITIES WEBSITE.
F. WATER- PROVIDE COORDINATES FOR POINT OF CONNECTION, CONSTRUCTED PIPE LOCATIONS THROUGHOUT SYSTEM, VALVE/HYDRANT /BLOW OFF/FLUSHING DEVICE LOCATIONS, SURVEY SEPARATIONS FOR ALL WATERMAIN CROSSINGS AND HORIZONTAL SEPARATIONS, JACK AND BORE LOCATIONS.LENGTH/CASING INVERT ELEVATION, CONFIRMATION OF PIPE
SIZE AND MATERIAL INSTALLED.
G. WATER SEPARATION - SURVEYOR TO PROVIDE ON THE SIGNED AND SEALED DRAWINGS FROM CAD SUPPLIED DRAWINGS OF APPROVED CIVIL PLANS ALL VERTICAL SEPARATIONS (TOP OF BOTTOM PIPE AND BOTTOM OF TOP PIPE) AND ALL HORIZONTAL SEPARATIONS REQUIREMENTS FROM THE LOCAL UTILITY PROVIDER AND FDEP REQUIREMENTS.
H. RECLAIMED WATER/FORCEMAIN/GRAVITY SEWER/LIFT STATION - SURVEYOR TO PROVIDE ON THE SIGNED AND SEALED DRAWINGS FROM CAD SUPPLIED DRAWINGS OF APPROVED CIVIL PLANS THE MUNICIPALITY'S ASSET TABLES AS PROVIDED ON THE UTILITIES PROVIDER'S WEBSITE.
I. FINISHED GRADE SPOT ELEVATIONS, FINISHED FLOOR ELEVATIONS, STRUCTURE CORNER ELEVATIONS, PAVEMENT SPOT ELEVATIONS, ETC.
POTABLE WATER CROSSING:
J. ALL CROSSINGS BETWEEN A POTABLE WATERMAIN AND STORM SEWER, SANITARY SEWER, FORCEMAIN OR RECLAIMED WATERMAIN WILL NEED TO BE FIELD VERIFIED/PHOTOGRAPHED
BY THE CONTRACTOR, VERIFICATION BY THE SURVEYOR ON THE AS-BUILT SHEETS WILL REQUIRE AN ELEVATION ON THE TOP OF THE BOTTOM CROSSING PIPE AND THE ELEVATION OF
THE BOTTOM OF THE TOP CROSSING PIPE.
SIDEWALK & SIGN RESTORATION
1. SIDEWALK SHALL BE CONSTRUCTED ACCORDING TO FDOT INDEX 310, AND SIDEWALK RAMPS SHALL BE CONSTRUCTED ACCORDING TO FDOT INDEX 304, UNLESS A SEPARATE DETAIL IS PROVIDED. SIDEWALK RAMPS SHALL BE CONSTRUCTED TO A MINIMUM THICKNESS OF FOUR (4) INCHES, MINIMUM WIDTH OF FIVE (5) FEET, AND SHALL BE REINFORCED WITH EITHER WELDED WIRE FABRIC OR REINFORCING STEEL BARS, AS SHOWN ON THE PLANS OR AS APPROVED BY THE ENGINEER. SIDEWALKS THROUGH DRIVEWAYS SHALL BE SIX (6) INCHES THICK. THE CONTRACTOR WILL CUT AS SHOWN ON THE STANDARD DETAIL FOR SIDEWALKS AND DRIVEWAY REPLACEMENT.
2. ALL SIGNS SHALL BE INSTALLED ACCORDING TO THE APPROPRIATE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS INDEX AND THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION, SECTION 700.
EROSION AND SEDIMENT CONTROL
1. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PROVIDED AND INSTALLED PRIOR TO COMMENCEMENT OF CONSTRUCTION. SEDIMENT CONTROL CONSISTS OF SILT FENCING (SEDIMENT BARRIER) AND FLOATING TURBIDITY BARRIERS PER DETAILS ON THE DRAWINGS. EROSION CONTROL CONSISTS OF SEEDING AND MULCHING, HYDROSEEDING, SODDING, WETTING SURFACES, PLACEMENT OF COARSE AGGREGATE, TEMPORARY PAVING.
2. INSPECT EVERY TWO WEEKS DURING CONSTRUCTION. REMOVE ANY SEDIMENT BUILD-UP. REPAIR AND REINSTALL ANY DAMAGED OR MISSING SEDIMENT CONTROL MEASURES.
INSTALL ADDITIONAL MEASURES IF INSPECTION REVEALS ADDITIONAL SEDIMENTATION CONTROL IS NECESSARY.
3. AREAS TO BE PAVED SHALL BE TREATED WITH A BITUMINOUS PRIME COAT AND SANDED TO MINIMIZE EROSION, WHERE PAVING IS SCHEDULED TO OCCUR MORE THAN 48 HOURS AFTER INSTALLATION OF BASE COURSE. AREAS TO RECEIVE CONCRETE PAVING SHALL BE EITHER PROTECTED WITH A LAYER OF FDOT COARSE AGGREGATE MATERIAL OR SHALL BE PAVED WITHIN 48 HOURS OF INSTALLATION OF THE SUBGRADE. INSTALL FINAL SURFACE COURSES WITHIN 14 DAYS AFTER REMOVAL OF EXISTING PAVEMENT.
4. THE CONTRACTOR SHALL PROVIDE SILT BARRIERS TO CONTROL EROSION AND SEDIMENTATION FROM MIGRATION OUTSIDE THE LIMITS OF THE PROJECT. SILT BARRIERS SHALL BE
PLACED IN ACCORDANCE WITH FDOT INDEX 102, OR AS DIRECTED BY THE ENGINEER.
STORMWATER POLLUTION PREVENTION REQUIREMENTS
1. CONSTRUCTION OF THIS PROJECT IS REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FDEP GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM SMALL AND LARGE CONSTRUCTION ACTIVITIES.
2. IN ORDER TO MEET NPDES REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR PREPARING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IMPLEMENTING, INSPECTING, MAINTAINING, AND REPORTING ON ALL ELEMENTS OF THE SWPPP, COMPLETING AND SUBMITTING THE REQUIRED NOTICE OF INTENT (NOI) AND NOTICE OF TERMINATION (NOT) FORMS AS THE OPERATOR, AND PAYING ALL ASSOCIATED FEES. COPIES OF THE NPDES GENERIC PERMIT, NOI, AND NOT FORMS, AND PERMIT APPLICATION FEE
INFORMATION ARE AVAILABLE FOR DOWNLOAD FROM FDEP.
3. THE CONTRACTOR MUST INCLUDE IN THE SWPPP THE NAMES AND ADDRESSES OF ALL THE CONTRACTORS OR SUBCONTRACTORS WHO WILL BE INVOLVED WITH THE MAJOR CONSTRUCTION ACTIVITIES THAT DISTURB SITE SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL MEASURE. THESE SUBCONTRAVTORS, IN ADDITION TO THE CONTRACTOR, SHALL COMPLY WITH THE REQUIREMENTS OF THE NPDES GENERIC PERMIT AND ANY LOCAL GOVERNING AGENCY HAVING JURISDICTION CONCERNING EROSION AND SEDIMENTRATION
CONTROL AND SHALL SIGN A COPY OF THE CERTIFICATION STATEMENT IN THE SWPPP.
4. THE SWPPP SHALL DESCRIBE AND ENSURE THE IMPLEMENTATION OF BEST MANAGEMENT PRACTICES WHICH WILL BE USED TO REDUCE THE POLLUTANTS IN STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITY AND TO ASSURE COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE NPDES GENERIC PERMIT. THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THESE DRAWINGS ARE THE MINIMUM REQUIRED THAT ARE TO BE INSTALLED PRIOR TO CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE RULES, REGULATIONS AND WATER QUALITY STANDARDS AND MAY NEED TO INSTALL ADDITIONAL EROSION AND SEDIMENT
CONTROLS TO MEET THESE REQUIREMENTS.
5. THE SWPPP SHALL BE COMPLETED PRIOR TO SUBMITTAL OF THE NOI AND SHALL INCLUDE THE ELEMENTS NECESSARY TO COMPLY WITH THE NPDES GENERIC PERMIT AND SHALL ALSO INCLUDE ALL LOCAL GOVERNING AGENCY AND OWNER REQUIREMENTS. THERE MAY BE MORE STRINGENT LOCAL GOVERNMENT OR OWNER REQUIREMENTS FOR EROSION AND SEDIMENT CONTROL, WHICH WOULD BE LOCATED IN THE SPECIFICATIONS OR ELSEWHERE ON THESE DRAWINGS.
6. THE CONTRACTOR MUST FILE THE NOI WITH FDEP AND THE OWNER AT LEAST TWO (2) BUSINESS DAYS PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO SUBMIT A COPY OF THE NOI TO THE MS4 OPERATOR FOR ALL PROJECTS THAT DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY TO A MUNICIPAL SEPARATE STORMWATER SYSTEM (MS4). A COPY OF THE NOI AND A DESCRIPTION OF THE PROJECT MUST BE POSTED IN A PROMINENT PLACE FOR PUBLIC VIEWING AT THE CONSTRUCTION
SITE.
7. THE SWPPP MUST BE IMPLEMENTED AT THE START OF CONSTRUCTION. A COMPLETE COPY OF THE SWPPP, INCLUDING COPIES OF ALL INSPECTION REPORTS, PLAN REVISIONS, ETC., MUST BE RETAINED AT THE PROJECT SITE AT ALL TIMES DURING WORKING HOURS AND KEPT IN THE PERMANENT PROJECT RECORDS FOR AT LEAST THREE YEARS
FOLLOWING SUBMISSION OF THE NOT.
8. FINAL STABILIZATION MEANS THAT ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED, AND THAT A UNIFORM PERENNIAL VEGETATIVE COVER (EVENLY DISTRIBUTED, WITHOUT LARGE BARE AREAS) WITH A DENSITY OF AT LEAST 70% FOR ALL UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN ESTABLISHED OR EQUIVALENT PERMANENT STABILIZATION MEASURES (SUCH AS GEOTEXTILES) HAVE BEEN EMPLOYED. ONCE CONSTRUCTION IS COMPLETED AND FINAL STABILIZATION HAS BEEN ACHIEVED, THE CONTRACTOR MUST FILE THE NOT TO FDEP, THE OWNER, AND THE MS4 OPERATOR WITHIN 14 DAYS.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THE ADEQUACY OF SITE POLLUTANT DISCHARGE CONTROLS. BETWEEN THE TIME THE SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS ACHIEVED, ALL DISTURBED AREAS AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE INSPECTIONS ARE TO BE CONDUCTED BY THE CONTRACTOR'S QUALIFIED DESIGNATED REPRESENTATIVE.
10. ALL INSPECTIONS SHALL BE DOCUMENTED IN AN INSPECTION REPORT THAT SUMMARIZES THE SCOPE OF THE INSPECTION, THE NAMES AND QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION; THE DATE OF THE INSPECTION; RAINFALL DATA; MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION OF THE SWPPP, AND ACTIONS TAKEN IN ORDER TO ENSURE COMPLIANCE WITH NPDES REQUIREMENTS AND THE SWPPP. SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE AND ACTIONS TAKEN TO BRING THE PROJECT INTO COMPLIANCE. WHERE A REPORT DOES NOT IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE, THE REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN COMPLIANCE WITH THE NPDES REQUIREMENTS AND THE SWPPP. EACH INSPECTION REPORT SHALL BE SIGNED AND CERTIFIED BY EACH INSPECTOR.
11. BASED ON INSPECTION RESULTS, ANY MODIFICATIONS NECESSARY TO INCREASE EFFECTIVENESS OF THE SWPPP TO AN ACCEPTABLE LEVEL MUST BE MADE WITHIN SEVEN
CALENDAR DAYS OF THE INSPECTION.
12. THE SWPPP MUST BE UPDATED EACH TIME THERE ARE SIGNIFICANT MODIFICATIONS TO THE POLLUTANT PREVENTION SYSTEM OR A CHANGE OF CONTRACTORS WORKING ON THE PROJECT WHO DISTURBS SITE SOIL. FOR CONSTRUCTION ACTIVITIES WHERE THE OPERATOR CHANGES, THE NEW OPERATOR SHALL FILE AN NOI FOR COVERAGE UNDER THE GENERIC PERMIT AT LEAST TWO (2) DAYS BEFORE ASSUMING CONTROL OF THE PROJECT AND THE PREVIOUS OPERATOR SHALL FILE AN NOT TO TERMINATE PERMIT COVERAGE IN ACCORDANCE WITH THE NPDES GENERIC PERMIT. AMENDMENTS TO THE PLAN SHALL BE PREPARED, SIGNED, DATED, AND KEPT AS ATTACHMENTS TO THE ORIGINAL SWPPP.
13. EACH SWPPP SHALL PROVIDE A DESCRIPTION OF POLLUTANT SOURCES AND OTHER INFORMATION INCLUDING A DESCRIPTION OF THE NATURE OF THE CONSTRUCTION ACTIVITY;
THE INTENDED SEQUENCE OF MAJOR ACTIVITIES THAT DISTURB SOILS FOR MAJOR PORTIONS OF THE SITE; ESTIMATES OF THE TOTAL AREA OF THE SITE AND THE TOTAL AREA OF THE SITE THAT IS EXPECTED TO BE DISTURBED BY EXCAVATION, GRADING, OR OTHER CONSTRUCTION ACTIVITIES; EXISTING DATA DESCRIBING THE SOIL OR THE QUALITY OF ANY DISCHARGE FROM THE SITE AND AN ESTIMATE OF THE SIZE OF THE DRAINAGE AREA FOR EACH DISCHARGE POINT; A SITE MAP INDICATING DRAINAGE PATTERNS AND APPROXIMATE SLOPES ANTICIPATED AFTER MAJOR GRADING ACTIVITIES, AREAS OF SOIL DISTURBANCE, AN OUTLINE OF AREAS WHICH MAY NOT BE DISTURBED, THE LOCATION OF MAJOR STRUCTURAL AND NONSTRUCTURAL CONTROLS IDENTIFIED IN THE PLAN, THE LOCATION OF AREAS WHERE STABILIZATION PRACTICES ARE EXPECTED TO OCCUR, SURFACE WATERS, WETLANDS, AND LOCATIONS WHERE STORMWATER IS DISCHARGED TO A SURFACE WATER OR MS4; AND THE LATITUDE AND LONGITUDE OF EACH DISCHARGE POINT AND
THE NAME OF THE RECEIVING WATER(S) FOR EACH DISCHARGE POINT.
14. STABILIZE ALL CONSTRUCTION SITE EXITS WITH COARSE AGGREGATE OR OTHER APPROVED MATERIALS IN ACCORDANCE WITH DETAILS IN THESE PLANS. OTHER MINIMUM CONSTRUCTION REQUIREMENTS THAT NEED TO BE IMPLEMENTED IN ORDER TO COMPLY WITH THE NPDES GENERIC PERMIT INCLUDE INSTALLATION OF SEDIMENT BARRIERS DOWN SLOPE FROM CONSTRUCTION ACTIVITIES THAT DISTURB SITE SOIL; CONSTRUCTING ROCK SURFACE TEMPORARY PARKING AREAS; INSTALLATION OF SEDIMENT BARRIERS DOWN SLOPE PRIOR TO CLEARING AND GRUBBING; INSTALLATION OF SEDIMENT BARRIERS ON THE DOWN SLOPE SIDE OF UTILITY CONSTRUCTION AND SOIL STOCKPILES; AND THE
INSTALLATION OF SEDIMENT BARRIERS ON THE DOWN SLOPE SIDE OF GRADING ACTIVITIES.
15. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE, BUT IN NO CASE MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE
TEMPORARILY OR PERMANENTLY CEASED.
16. THE OWNER HAS THE AUTHORITY TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND GRUBBING, EXCAVATION, TRENCHING, BORROW AND EMBANKMENT OPERATIONS. THE OWNER ALSO HAS AUTHORITY TO DIRECT CONTRACTOR TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES.
17. THE CONTRACTOR SHALL RESPOND TO EROSION AND SEDIMENT CONTROL MAINTENANCE REQUIREMENTS OR IMPLEMENT ADDITIONAL MEASURES TO CONTROL EROSION ORDERED BY OWNER OR GOVERNING AUTHORITIES WITHIN 48 HOURS OR SOONER IF REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
18. THE CONTRACTOR SHALL INCORPORATE PERMANENT EROSION CONTROL FEATURES INTO PROJECT AT EARLIEST PRACTICAL TIME TO MINIMIZE NEED FOR TEMPORARY CONTROLS.
19. FOR DRAINAGE BASINS WITH 10 OR MORE DISTURBED ACRES AT ONE TIME, A TEMPORARY (OR PERMANENT) SEDIMENT BASIN PROVIDING 3,600 CUBIC FEET OF STORAGE PER ACRE DRAINED, OR EQUIVALENT CONTROL MEASURES, SHALL BE PROVIDED WHERE ATTAINABLE UNTIL FINAL STABILIZATION OF THE SITE. THE 3,600 CUBIC FEET OF STORAGE AREA PER ACRE DRAINED DOES NOT APPLY TO FLOWS FROM OFFSITE AREAS AND FLOWS FROM ONSITE AREAS THAT ARE EITHER UNDISTURBED OR HAVE UNDERGONE FINAL STABILIZATION WHERE SUCH FLOWS ARE DIVERTED AROUND BOTH THE DISTURBED AREA AND THE SEDIMENT BASIN. FOR DRAINAGE BASINS WITH 10 OR MORE DISTURBED ACRES AT ONE TIME AND WHERE A TEMPORARY SEDIMENT BASIN PROVIDING 3,600 CUBIC FEET OF STORAGE PER ACRE DRAINED, OR EQUIVALENT CONTROLS IS NOT ATTAINABLE, A COMBINATION OF SMALLER SEDIMENT BASINS AND/OR SEDIMENT TRAPS AND OTHER BMPS SHOULD BE USED. AT A MINIMUM, SILT FENCES (SEDIMENT BARRIERS), OR EQUIVALENT SEDIMENT CONTROLS ARE REQUIRED FOR ALL SIDESLOPE AND DOWNSLOPE BOUNDARIES OF THE CONSTRUCTION AREA.
20. WATER TRUCKS SHALL BE USED AS NEEDED DURING CONSTRUCTION TO REDUCE DUST GENERATED ON THE SITE. DUST CONTROL MUST BE PROVIDED BY THE CONTRACTOR AND
SHALL BE IN COMPLIANCE WITH APPLICABLE LOCAL AND STATE DUST CONTROL REGULATIONS.
21. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. REPAIR OR REPLACE ALL DAMAGED SEDIMENT BARRIERS. REMOVE ACCUMULATED SEDIMENT ALONG ALL SILT FENCES WHERE THE HEIGHT OF THE SEDIMENT EXCEEDS ONE-THIRD OF THE HEIGHT OF THE SILT FENCE. INSPECT ALL TEMPORARY AND PERMANENT GRASSING AREAS AND RE-GRASS WHERE THERE ARE BARE SPOTS, WASHOUTS, OR UNHEALTHY GROWTH.
22. AT THE COMPLETION OF CONSTRUCTION, ONCE FINAL STABILIZATION HAS BEEN ACHIEVED, CLEAN ALL ACCUMULATED SEDIMENT FROM ALL STORM STRUCTURES, PIPELINES, AND STORMWATER PONDS. REMOVE ALL TEMPORARY SEDIMENT CONTROLS UPON RECEIPT OF AUTHORIZATION TO REMOVE HAS BEEN RECEIVED FROM THE OWNER OR ENGINEER.
NOTE THAT THIS MAY NOT OCCUR FOR SOME TIME AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED, IN ORDER TO ENSURE THEIR REMOVAL HAS NOT OCCURRED UNTIL FINAL STABILIZATION HAS BEEN ACHIEVED TO THE SATISFACTION OF THE OWNER AND ENGINEER.
23. NON_STORMWATER COMPONENTS OF SITE DISCHARGE MUST BE CLEAN WATER. WATER USED FOR CONSTRUCTION, WHICH DISCHARGES FROM THE SITE, MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE GOVERNING LOCAL AGENCY. WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBLIC SUPPLY MUST NOT DISCHARGE FROM THE SITE. ALLOWABLE NON-STORMWATER DISCHARGES INCLUDE DISCHARGES FROM FIRE FIGHTING ACTIVITIES; FIRE HYDRANT FLUSHING; WATER USED TO WASH VEHICLES OR CONTROL DUST; WATER FLOWING FROM POTABLE SOURCES AND WATER LINE FLUSHING; IRRIGATION DRAINAGE; AND RUNOFF FROM PAVEMENT WASH DOWN WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILLED MATERIAL HAS BEEN REMOVED) AND
WHERE DETERGENTS HAVE NOT BEEN USED.
24. SOLID MATERIALS, INCLUDING BUILDING MATERIALS, ARE NOT ALLOWED TO BE DISCHARGED FROM THE SITE WITH STORMWATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS SHALL BE EMPTIED PERIODICALLY BY A
CONTRACT TRASH DISPOSAL SERVICE AND HAULED AWAY FROM THE SITE.
25. SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND
DISPOSAL OF SOIL IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS.
26. ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS. TEMPORARY SANITARY FACILITIES SHALL BE PROVIDED AT THE SITE THROUGHOUT THE CONSTRUCTION PHASE FOR USE BY ALL CONSTRUCTION PERSONNEL AND SHALL BE SERVICED BY A COMMERCIAL
OPERATOR AT LEAST ONCE A WEEK.
27. DISCHARGES RESULTING FROM GROUNDWATER DEWATERING ACTIVITIES AT CONSTRUCTION SITES ARE PERMITTED PROVIDED THE GROUNDWATER IS FREE OF SEDIMENTS, IS NOT CONTAMINATED, AND DEWATERING OCCURS IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AGENCY REGULATIONS.
28. CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER TOXIC MATERIAL MUST BE STORED IN WATERPROOF CONTAINERS. EXCEPT DURING APPLICATION, THE CONTENTS MUST BE KEPT IN TRUCKS OR WITHIN STORAGE FACILITIES. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM THE SITE, TREATED, AND DISPOSED AT AN
APPROVED SOLID WASTE OR CHEMICAL DISPOSAL FACILITY.
29. THE DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL IN THE STORMWATER DISCHARGE(S) FROM A FACILITY OR ACTIVITY SHALL BE PREVENTED. THIS DOES NOT RELIEVE THE OPERATOR OF THE REPORTING REQUIREMENTS OF 40 CFR PART 117 AND 40 CFR PART 302. THE OPERATOR SHALL SUBMIT WITHIN 14 CALENDAR DAYS OF KNOWLEDGE OF THE RELEASE A WRITTEN DESCRIPTION OF: THE RELEASE (INCLUDING THE TYPE AND ESTIMATE OF THE AMOUNT OF MATERIAL RELEASED), THE DATE THAT SUCH RELEASE OCCURRED, THE CIRCUMSTANCES LEADING TO THE RELEASE, AND REMEDIAL STEPS TO BE TAKEN. THE SWPPP MUST BE MODIFIED WITHIN 14 CALENDAR DAYS OF KNOWLEDGE OF THE RELEASE TO: PROVIDE A DESCRIPTION OF THE RELEASE, THE CIRCUMSTANCES LEADING TO THE RELEASE, AND THE DATE OF THE RELEASE. IN ADDITION, THE PLAN MUST BE REVIEWED TO IDENTIFY MEASURES TO PREVENT THE REOCCURRENCE OF SUCH RELEASES AND TO RESPOND TO SUCH RELEASES, AND THE PLAN MUST BE MODIFIED WHERE
APPROPRIATE.
LANDSCAPE / IRRIGATION SYSTEMS
1.