4. Fence Diagram.pdf
PDF 289 KB Posted
- Attached to
- GAOA Southzone Fence Replacement
- Solicitation number
- 1240LT25R0021
- Issued by
-
Department of Agriculture Forest Service
About this file
The file is a detailed fence diagram for a federal contract opportunity (Solicitation 1240LT25R0021) with the U.S. Forest Service, specifying technical specifications for fence construction across multiple sites in the Manti La Sal National Forest. The diagram provides precise measurements and materials requirements, including 6' metal T-posts with 48" ground depth, wooden stays between 2"-4" diameter, 12.5 gauge wire (smooth on top and bottom, barbed on 2nd and 3rd strands), and specific fence spacing (10" intervals with 16" base). Fence configurations are designed for 10'-16' terrain spans, with detailed instructions for wire attachment and post placement.
The accompanying federal contract opportunity involves comprehensive fence replacement and new construction across multiple locations near Moab and Monticello, Utah, with an estimated project value between $500,000 and $1,000,000. The project includes full rebuilds and new constructions at sites like Warner, Mason, Oowah, Buckeye, Buckboard, Devils, Nizhoni, Porcupine Rim, and Monticello Lake, with additional optional sites. The contract has a 365-calendar day timeline, anticipated to start on 08/1/2025, and requires specialized equipment like skid-steers and mini-track loaders, with strict environmental protocols including equipment pressure washing to prevent noxious weed transportation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10'-16' t 1 O l 1 O
! 1 O
16" x" terrain
File details come from the government source that posted it. Updated .