PROJECT LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

MOUNTAIN REST WATER SYSTEM IMPROVEMENTS PROJECT

FROM THE HIGH SIERRA RANGER DISTRICT OFFICE (PRATHER, CA) , TRAVEL EAST ON STATE HIGHWAY

168 FOR 12 MILES. TURN RIGHT ONTO TOLLHOUSE ROAD FOR 0.7 MILES TO REACH DESTINATION

34911 TOLLHOUSE ROAD, AUBERRY, CA 93602.

GPS (37.053873, -119.371875 )

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

RO FACILITIES PROGRAM MANAGER DATE

CALIFORNIA

FRESNO COUNTY

(R05) PACIFIC SOUTHWEST REGION

SIERRA NATIONAL FOREST

HIGH SIERRA DISTRICT RANGER

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET 3/31/2020

2 G01 MOUNTAIN REST SITE PLAN 3/31/2020

3 G02 PLAN VIEW - WELL HOUSE 3/31/2020

4 G03 NEW TANK LAYOUT 3/31/2020

5 G04 CHLORINATION SYSTEM 3/31/2020

6 G05 ENGINE BAY - LAYOUT NEW PAIPE 3/31/2020

High Sierra Ranger

District Office

FS1307

FS2016

FS2310

F

S

TANK 2

TANK1

GAS TANK

Ø9.0000

Ø12.5000

Parking lot.Engine Building

Office Building

Storage

Area

Install Tank #2

See sheet G2

Connect to existing water line & Install gate valve

Install 70 ft -2" ppe see note #2

Install new filtration system inside the building

T o l l h o u s e

R d

Min slope 1%

See note #4

Existing water line

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

MOUNTAIN REST

WATER SYSTEM

SIERRA NATIONAL

FOREST

HIGH SIERRA RANGER DISTRICT

MOUNTAIN REST

SITE MAP

03/18/2020

PABLO G.

PABLO G.

ANTONIO C.

G-01 002 006

Well House

& Tank 1 & 2

MOUNTAIN REST SITE MAP

Access Road

Mountain Rest

Fire Station

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

F

S

TANK 2

TANK1

Ø9.0000

Ø12.5000

W

W

W

W

W

W

F S

T A

N K

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

Ø 21'7"

Ø 23'0"

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

MOUNTAIN REST

WATER SYSTEM

SIERRA NATIONAL

FOREST

HIGH SIERRA RANGER DISTRICT

PLAN VIEW

WELL HOUSE

03/18/2020

PABLO G.

PABLO G.

ANTONIO C.

G-02 003 006

EXISTING

PROPOSED

New Tank

41,000 Gallons

E x i s t i n g o a d

E x i s t i n g o a d

Note:

* Tank 2 will be relocated next to facility FS 1307.

* Install concrete base per details as shown on drawings G-03.

* Chlorination systems shall be install inside well house.

* Ground disturbance is prohibited unless is approved bby CO and marked by COR.

PLAN VIEW - WELL HOUSE

Relocate next to FS 1307

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

MOUNTAIN REST

WATER SYSTEM

SIERRA NATIONAL

FOREST

HIGH SIERRA RANGER DISTRICT

NEW TANK

LAYOUT

03/18/2020

PABLO G.

PABLO G.

ANTONIO C.

G-03 004 006

Notes:

A. All plumbing shall comply with NSF/ANSI 61 Annex G, "Drinking Water System Components

- Health Effects," for plumbing materials that will be in contact with potable water.

MOUNTAIN REST FIRE STATION

Install 2" galvanized pipe

Connect to existing water line

Install 3 gate valves

Trench Detail:

Install 8" concrete

23 feet diameter

4"

#4 Bars@18" OC

Both directions

Detail Concrete Base

Install backflow

6"

'0

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

MOUNTAIN REST

WATER SYSTEM

SIERRA NATIONAL

FOREST

HIGH SIERRA RANGER DISTRICT

CHLORINATION

SYSTEM

03/18/2020

PABLO G.

PABLO G.

ANTONIO C.

G-04 005 006

Notes:

* Chlorination feed pump. Stenner Pump, model 45M2 (Single head adjustable 25 psi maximum) or equivalent.

* Space available to accommodate chlorination system is 5'x4'

CHLORINATION SYSTEM

Submersible Pump

Well #2

Check valve

Digital flow meter

Raw water sample tap

Digital flow computer

Chlorine feed pump

Chlorine solution tank

(30 Gallon)

To Tank

Pressure gauge

Pressure switch

Chlorine injection site

Submersible Pump

Well #1

Treated sample water tap

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

FS1307

FS2016

FS2310

GAS TANK

W W

W

Parking lot.Engine Building

Office Building

Storage

Area

Connect to existing water line & Install gate valve

Install 70 ft -2" ppe see note #2

Install new filtration system inside the building

Min slope 1%

See note #4

Existing water line

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

MOUNTAIN REST

WATER SYSTEM

SIERRA NATIONAL

FOREST

HIGH SIERRA RANGER DISTRICT

ENGINE BAY - LAYOUT

NEW PIPE

03/18/2020

PABLO G.

PABLO G.

ANTONIO C.

G-05 006 006

Notes:

1.- To install new piping system see trench detail on sheet G-03-Well new line.

2.- Install 70 feet of 2" galvanized pipe with "wrap on" heating tape or equivalent. Wrapped with 2" of fiber glass insulation.

3.- Contractor shall install at least 4 supports to keep the new pipe in place. Supports shall be installed at the connection, at elbow, between elbow and end of the pipe and at end of the pipe.

4.- Install a 2" back pressure relief valve and a 2" gate valve.

ENGINE BAY - LAYOUT NEW PIPE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Mountain Rest 3-16-COVERSHEET
OLE1
Mountain Rest 3-16-G01 MR Site plan
Mountain Rest 3-16-G02 Plan View - well house
OLE1
Mountain Rest 3-16-G03 New Tank Layout
OLE1
Mountain Rest 3-16-G04 Chlorination System
OLE1
Mountain Rest 3-16-G05 Engine Bldg
OLE1