This document package includes construction drawings and specifications for the repair of the Arctic Warrior Chapel Building 3 at Joint Base Elmendorf-Richardson in Alaska. Work includes renovating the multi-purpose room with new flooring, perimeter and partition walls, ceiling, doors, lighting, and electrical upgrades. Asbestos and lead abatement is required. The project number is HJZH211093. Drawings show demolition plans, new construction details and notes, specifications for materials like flooring, walls, and ceilings. The renovation aims to update the multi-purpose room for various functions. The Department of the Air Force Pacific Air Forces is the contracting agency. The pre-solicitation indicates competitive bids will be sought.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2. STATEMENT OF WORK - Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOINT BASE ELMENDORF-RICHARDSON
673RD CIVIL ENGINEER SQUADRON
PROJECT LOCATION
KEY PLAN
(SEE KEY PLAN)
TRUE
NORTH
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-001 LOCATION PLAN AND SCHEDULE OF DRAWING
C-100 SITE PLAN
AD-100 FIRST FLOOR & CEIING DEMO PLAN
A-100 FIRST FLOOR NEW PLAN AND DETAILS
A-101 NEW REFLECTED CEILING PLAN
A-600 NEW ROOM PARTITION CONCEPT DIAGRAMS
A-701 FIRST FLOOR PLAN PICTURES
A-800 EXHIBIT INTERIOR WALL SECTION
MAP KEY
LOCATION DESCRIPTION
RICHARDSON VISITORS GATE
ARCTIC VALLEY GATE GLENN HWY SOUTHBOUND EXIT
ELMENDORF VISITORS GATE
654 6TH STREET: FIRE STATION 4
8517 20TH STREET: SECURITY FORCES
730 QUARTERMASTER ROAD: 673D CES CONTRACT MANAGEMENT
10480 SIJAN AVENUE: CONTRACTING
PROJECT NOTES:
1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.
2. AT NO TIME WILL THE CONTRACTORS WORK,
STORAGE OF MATERIALS, PARKING OF VEHICLES OR
OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH
THE WORK ACTIVITIES OF GOVERNMENT
PERSONNEL OR TO DAMAGE GOVERNMENT OR
PRIVATE PROPERTY.
3. PARKING SHALL BE ALLOWED IN APPROVED
PARKING SPACES ONLY. VEHICLES OTHERWISE
PARKED SO WILL BE REMOVED AT THE
CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR'S MATERIALS AND EQUIPMENT
SHALL NOT BE STORED WITHIN 20 FEET O F ANY
BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE
INTERFERE WITH FIRE FIGHTING FACILITIES. ANY
MATERIALS, EQUIPMENT OR VEHICLES DOING SO
WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.
5. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE
WORK AREA FREE FROM ACCUMULATION OF WASTE
MATERIALS. DEBRIS SHALL BE REMOVED ON A
DAILY BASIS.
6. ALL WELDING AND / OR THE USE OF FLAME
PRODUCING DEVICES SHALL BE CLEARED THROUGH
THE FIRE DEPARTMENT.
7. ALL CONSTRUCTION PERMITS, FEES AND
COORDINATION OF ANCILLARY ITEMS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
8. THE WORK OF THIS CONTRACT SHALL COMPLY WITH
APPLICABLE FEDERAL, STATE AND LOCAL CODES OR
STANDARDS. ALL WORK SHALL COMPLY WITH THE
MOST RECENT ADOPTED EDITION OF THE CODES OR
STANDARDS THAT FOLLOW:
· EPA STANDARDS
· INTERNATIONAL BUILDING CODE
· INTERNATIONAL FUEL GAS CODE
· INTERNATIONAL MECHANICAL CODE
· INTERNATIONAL PLUMBING CODE
· NATIONAL ELECTRICAL CODE
· NATIONAL ELECTRICAL SAFETY CODE
· NATIONAL FIRE PROTECTION ASSOCIATION
· OSHA STANDARDS
· FIRE CODES
· SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION INC.
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
G-001
COVER SHEET
WITH SCHEDULE
OF DRAWINGS
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093G001.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
C-100
SITE PLAN
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093C100.dwg
HJZH21-1093
NTS
COLBURN
COLBURN
TYLER
MAG
NORTH
NTS
SITE PLAN
CONTRACTOR
EQUIPMENT
STAGING
AREA
FACILITY 3
S
S S
S
S S
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
AD-100
FIRST FLOOR &
CEILING DEMO
PLAN
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093AD100.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
PLAN
NORTH
PARTIAL FIRST FLOOR DEMO PLAN
DEMOLITION NOTES:
MULTI-PURPOSE ROOM
ROOM 6
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
1. DEMO THE FOLLOWING:
A. CARPET AND CARPET PAD.
B. INTERIOR PERIMETER GWB WALLS, WALL FURRING STRIPS, VAPOR BARRIER, INSULATION AND WALL COVE BASE.
C. CEILING GWB, CEILING VAPOR BARRIER AND INSULATION.
D. FOLDABLE PARTITION WOOD FRAME.
E. THREE EACH WOOD FRAMES, DOORS AND HARDWARE SET.
F. SMALL WALL ACCESS DOOR AND HARDWARE.
G. CARPETING COVERING FLOOR CRAWL SPACE HATCH.
H. CEILING LIGHT FIXTURES AND BULBS.
I. ELECTRICAL WALL OUTLET AND LIGHT SWITCH COVER PLATES.
J. RE-USE EXISTING FIRE STROBE AND HORN.
KEY PLAN
AREA OF WORK
FIRE ALARM STROBE
RE-USE DEVICE
VENTILATOR
FLOOR UNIT
VENTILATOR
FLOOR UNIT
SYMBOL LEGEND:
SPROTRUDING PLUMBING
ABOVE FLOOR. SEE A-701
DETAIL 2.
VENTILATOR
FLOOR UNIT
CEILING
FLUORESCENT
LIGHT FIXTURE
(TYPICAL)
TV MONITOR
WALL
MOUNTED
FLOOR CRAWL
SPACE HATCH
FLOOR CRAWL
SPACE HATCH
LADDER
WALL MOUNTED
CLIMATE CONTROL
UNIT
WALL MOUNTED
CLIMATE CONTROL
UNIT
WALL MOUNTED
CLIMATE CONTROL
UNIT
ELECTRICAL WALL OUTLET
ELECTRICAL LIGHT WALL SWITCH
ACCESS DOOR
ELECTRICAL BOX
AND CONDUIT. SEE
A-701 DETAIL 1
ELECTRICAL LIGHT
SWITCH AND CONDUIT
FOLDABLE
PARTITION
WOOD FRAME
GENERAL NOTES:
1. TV MONITOR AND MOUNT REMOVED BY GOVERNMENT.
2. REMOVE AND RE-INSTALL (OR PROTECT IN PLACE) ALL EXISTING EQUIPMENT AND DEVICES TO REMAIN ON OR IN WALLS, FLOORS AND CEILING.
3. SEE A-800 FOR AS-BUILT CONDITION.
PERIMETER GWB
CARPET
THROUGH OUT
ROOM
CARPET THROUGH OUT
ROOM
EXISTING ABC
FIRE EXTINGUISHER
AND HOSE REEL
A701
CORRIDOR
CEILING DUCT.
SEE A-701, DETAIL 5.
ELECTRICAL BOX
AND CONDUIT. SEE
A-701 DETAIL 1
S S
S
S S
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
A-100
FIRST FLOOR NEW
PLAN AND
DETAILS
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093A100.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
PLAN
NORTH
PARTIAL FIRST FLOOR NEW PLAN
NEW CONSTRUCTION NOTES:
MULTI-PURPOSE ROOM
ROOM 6
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
1 NEW SPORTS RUBBER TILE FLOOR, NON-POROUS, SLIP RESISTANT, 24" x 24", 3/8" THICK.
USE A SUITABLE FLOOR LEVELING COMPOUND. TILE FLOOR SHALL BE GLUED DOWN.
2 NEW INTERIOR PERIMETER DOUBLE LAYER 5/8" LEVEL 4 FINISH GREEN GLUED TYPE "X" GWB, WALL HAT CHANNELS, SOUND ISOLATION CLIPS, 5 1/2" THICK MINERAL WOOL BATT
INSULATION, 48" FRP WAINSCOT WITH TRIM AND 4" RUBBER WALL COVE BASE. REFERENCE
DETAIL "A" THIS SHEET.
3 NEW INTERIOR PERIMETER SINGLE LAYER LEVEL 4 FINISH 5/8" TYPE "X" GWB WALLS,
FURRING STRIPS, 2" RIGID INSULATION, VAPOR BARRIER, 48" FRP WAINSCOT WITH TRIM AND
4" HIGH X 1/8" THICK RUBBER WALL COVE BASE.
4 NEW FULL ROOM HEIGHT SINGLE PANELED AND SOUND PROOFED (MINIMUM 50 STC RATING)
MANUAL OPERABLE FOLDING SUSPENDED PARTITION WITH A SINGLE VIEWING GLAZE. THE
FULL-HEIGHT PARTITION FINISH SHALL BE A FULL-HEIGHT WHITE MARKER BOARD.
SEE SOW 2.1.1.2 PARA "B". SEE DRAWING A-600 FOR CONCEPT.
5 NEW METAL HOLLOW CORE GLAZED DUTCH DOOR, FRAME AND LOCKSET. REFERENCE
SOW FOR LOCKSET SPECIFICATION.
6 NEW METAL HOLLOW CORE DOOR , FRAME AND LOCKSET. REFERENCE SOW FOR LOCKSET
SPECIFICATIONS.
NEW FLOOR TRANSITION STRIPS AT ALL THREE ROOM ENTRANCE DOORS.
NEW 3/8" SPORTS RUBBER TILE FLOOR ON TOP OF CRAWL SPACE HATCH.
NEW SMALL ACCESS DOOR AND HARDWARE. PAINT TO MATCH WAINSCOT
COLOR.
NEW ELECTRICAL OUTLET OR LIGHT SWITCH COVER PLATES.
COLOR TO MATCH WAINSCOT COLOR.
CONCEAL PLUMBING PIPE PROTRUSION BEHIND NEW WALL.
CONCEAL DEVICE NEW CONDUIT BEHIND NEW WALL AND / OR CEILING.
CONCEAL ELECTRICAL CONDUIT AND BOX BEHIND NEW GWB.
RE-FINISH AND PAINT VENTILATOR FLOOR UNITS TO MATCH WAINSCOT COLOR.
RE-FINISH AND PAINT LADDER TO MATCH WALL WAINSCOT COLOR.
GYPSUM BOARD CORNER BEADS 1" X 1" x 48".
KEY PLAN
AREA OF WORK
RE-USE EXISTING FIRE ALARM
STROBE AND HORN
ABOVE DOOR
SYMBOL LEGEND:
S
EXISTING
FLOOR CRAWL
SPACE HATCH
EXISTING
FLOOR CRAWL
SPACE HATCH
LADDER
EXISTING WALL
MOUNTED
CLIMATE CONTROL
UNIT
EXISTING WALL
MOUNTED CLIMATE
CONTROL
UNIT
EXISTING WALL
MOUNTED CLIMATE
CONTROL
UNIT
ELECTRICAL WALL OUTLET
ELECTRICAL LIGHT WALL SWITCH
5 5
EXISTING ABC
FIRE EXTINGUISHER
AND HOSE REEL
CORRIDOR
2 222
10 13 10 13
WALL DETAIL
A
5/8" GWB
GREEN GLUE
DRYWALL SCREW
SOUND
ISOLATION
CLIP
7/8" HAT
CHANNEL 12" OC
WOOD
STUD
FLOOR
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
A-101
NEW REFLECTED
CEILING PLAN
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093A101.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
PLAN
NORTH
NEW REFLECTIVE CEILING PLAN
NEW CONSTRUCTION NOTES:
MULTI-PURPOSE ROOM
ROOM 6
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
1 NEW COMMERCIAL GRADE 2' X 2' 5,000K LED TROFFER FIXTURE. LOCATION OF TROFFER FIXTURES ARE REPRESENTATIONAL ONLY . INSTALL TO
OBTAIN A ROOM LIGHTING LEVEL OF 50FT CANDLES.
2 NEW 2' X 2' SUSPENDED CEILING GRID UTILIZING RESILIENT RUBBER SOUND ISOLATION HANGERS INSTALLED PER MANUFACTURES INSTRUCTIONS.
NEW 2' X 2' X 5/8" MINERAL FIBER TEGULAR ACOUSTICAL TILES. NEW 5 1/2" THICK MINERAL WOOL BATT INSULATION PLACED ABOVE TILES. FINISHED
FLOOR TO SUSPENDED CEILING TILE SURFACE SHALL BE NO LESS THAN 8 FEET.
3 RE-INSTALL EXISTING HVAC GRILL.
NEW FIRE STROBE AND HORN. CONCEAL STROBE HORN CONDUIT ABOVE NEW SUSPENDED CEILING. TIE-IN TO EXISTING LOCAL NOTIFICATION
CIRCUIT. SEE A-701 DETAIL 6 AND 7. DEVICE SHALL BE COMPATIBLE WITH EXISTING MONACO FIRE ALARM CONTROL PANEL. INSTALLATION AND
TESTING SHALL BE PER NFPA 72.
RE-INSTALL EXISTING FIRE STROBE AND HORN AND CONCEAL CONDUIT ABOVE NEW SUSPENDED CEILING. SEE A-701 DETAIL 6.
KEY PLAN
AREA OF WORK
NEW
FOLDABLE
PARTITION
SYSTEM
GENERAL NOTES:
1. INSTALL NEW FIRE DEVICE CONDUIT, FOR EXISTING FIRE STROBE / HORN, ABOVE NEW SUSPENDED CEILING. SEE A-101 FOR PLAN LOCATION.
CORRIDOR
NEW FIRE
STROBE AND
HORN ABOVE
DOOR
RE-INSTALL EXISTING
FIRESTROBE AND HORN
ABOVE DOOR
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
A-600
EXHIBIT MOVABLE
PARTITION
CONCEPT
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093A600.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
SHEET NOTES:
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
PLAN
ELEVATION
DETAILS
TRACK LAYOUT
CONCEPT ONLY NOT FOR CONSTRUCTION
ELECTRICAL OUTLETS
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
A-701
FIRST FLOOR
PHOTOS
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093A701.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
SHEET NOTES:
1. SEE AD-100 FOR PLAN LOCATION.
PLUMBING PROTRUSION
STEEL LADDER AND ELECTRICAL LIGHT SWITCH / CONDUIT
ROOM PARTITION WOOD FRAME
EXISTING HVAC GRILL
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
EXISTING FIRE ALARM STROBE AND HORN
EXISTING FIRE ALARM CONTROL PANEL
WALL SECTION
A B C D E F G H
F I L
E
N
O
I
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
D E
S C
R I P
T I O
N
R E
V I S
I O
N S
RICHARDSON, ALASKA
AF CONTRACT NUMBER:
FACILITY NO:
D A
T E
A P
P R
O V
E R
JOINT BASE ELMENDORF
PROJ. MGR:
DRAFTER:
CHECKER:
PROJ. ENGR:
DATE:
DATE:
DATE:
DATE:
DESIGNER LOGO
AIR FORCE
S Y
M B
O L
D A
T E
A-800
EXHIBIT INTERIOR
WALL SECTION
REPAIR ARCTIC
WARRIOR
CHAPEL B3
HJZH211093A800.dwg
HJZH21-1093
NONE
COLBURN
COLBURN
TYLER
SHEET NOTES:
KEY PLAN
BEAM DETAIL SECTION J-J
CONTRACTOR TO FIELD VERIFY ALL MEASUREMENTS
ROOF PLAN
SEE DETAIL 3 AND 4
THIS SHEET
A
B
U
I
L
T
E
X
H
I
B
I
T
BEAM DETAIL SECTION N-N
SEE SHEET NOTE 1
SEE DETAIL 4
THIS SHEET
| G-001 |
| Sheets and Views |
| Layout1 |
| C-100 |
| Sheets and Views |
| FIRST FLOOR |
| AD-100 |
| Sheets and Views |
| FIRST FLOOR |
| A-100 |
| Sheets and Views |
| FIRST FLOOR |
| A-101 |
| Sheets and Views |
| FIRST FLOOR |
| A-600 |
| Sheets and Views |
| FIRST FLOOR DAMAGE PHOTOS |
| A-701 |
| Sheets and Views |
| FIRST FLOOR DAMAGE PHOTOS |
| A-800 |
| Sheets and Views |
| FIRST FLOOR DAMAGE PHOTOS |
| A-701.pdf |
| Sheets and Views |
| FIRST FLOOR DAMAGE PHOTOS |
File details come from the government source that posted it. Updated .