4.02 SPRMM1-26-P-MB09.pdf
PDF 363 KB Posted
- Attached to
- Award Notice
- Solicitation number
- SPRMM126PMB09
About this file
This is a DD Form 1155 (Order for Supplies or Services) representing a delivery order issued on April 15, 2026, under contract SPRMM1-26-P-MB09. The order is issued by SPRMM1 DLA Mechanicsburg to Integrated Procurement Technologies (CAGE Code 4K0V2, located in Vandalia, Ohio) for the procurement of Motor Control units (NSN 7HH 6105-01-221-4438).
The delivery order specifies a quantity of 4 units at a unit price of $35,180.59, for a total contract value of $140,722.36. The item is manufactured under CAGE Code 95270 and is identified by drawing reference H288-CP489. Delivery is required by April 15, 2027 (365 days after receipt of order), with FOB Origin shipping terms. Inspection and acceptance occur at the source (CAGE 95270), with final packaging inspection and acceptance at CAGE 4K0V2. Payment will be made to DFAS Columbus West Entitlement Operations within NET 30 days of invoice receipt. The order includes standard military specifications for packaging and marking in accordance with MIL-STD-2073, and is designated for Foreign Military Sales (FMS) with specific marking requirements and shipping instructions to KOREA EXPRESS USA INC in Secaucus, New Jersey. The order includes extensive contractual clauses addressing quality assurance, cybersecurity requirements (NIST SP 800-171), small business representations, and compliance with federal acquisition regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF Form Approved ORDER FOR SUPPLIES OR SERVICES OMB No. 0704-0187
Expires Aug 31, 1992 5. CERTIFIED FOR NA- TIONAL DEFENSE UNDER 2. DELIVERY ORDER NO. 4. REQUISITION/PURCH REQUEST NO. 1. CONTRACT/PURCH ORDER NO. 3. DATE OF ORDER DPAS 15 CRF 700
DO
6. ISSUED BY 7. ADMINISTERED BY (If other than 6) CODE CODE 8. DELIVERY FOB
DEST
OTHER
(See Schedule if other)
11.MARK IF BUSINESS IS FACILITY CODE CODE 10. DELIVER TO FOB POINT BY (Date) 9. CONTRACTOR
SMALL
Q Q 12. DISCOUNT TERMS SMALL DISADVANTAGED NAME AND ADDRESS WOMEN-OWNED
13. MAIL INVOICES TO
Q Q
14. SHIP TO 15. PAYMENT WILL BE MADE BY CODE CODE
MARK ALL PACKAGES AND PAPERS WITH CONTRACT OR
ORDER NUMBER
16. T O DELIVERY This delivery order is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract. Y R P D Reference your furnish the following on terms specified herein. E E R PURCHASE O THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW ACCEPTANCE. F MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
If this box is marked, supplier must sign Acceptance and return the following number of copies:
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
22. 23. 18. 19. 20. 21. QUANTITY ORDERED/ SCHEDULE OF SUPPLIES/SERVICES UNIT AMOUNT ITEM NO. UNIT PRICE ACCEPTED*
Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gatheringand maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection ofinformation, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0187), Washington, DC 20503. Please DO NOT RETURN your form toeither of these addresses. Send your completed form to the procurement official identified in Item 6.
24. UNITED STATES OF AMERICA 25. TOTAL * If quantity accepted by the Government is same as quantity ordered indicate by X. If different, enter 29. actual quantity accepted below quantity ordered and encircle. DIFFERENCES
BY: CONTRACTING/ORDERING OFFICER
27. SHIP. NO. 26. QUANTITY IN COLUMN 20 HAS BEEN 28. D.O. VOUCHER NO. 30. INITIALS RECEIVED ACCEPTED, AND CONFORMS TO THE INSPECTED CONTRACT EXCEPT AS NOTED PARTIAL 33. AMOUNT VERIFIED CORRECT FOR 32. PAID BY
FINAL
31. PAYMENT 34. CHECK NUMBER DATE SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
COMPLETE 36. I certify this account is correct and proper for payment
PARTIAL 35. BILL OF LADING NO.
FINAL SIGNATURE AND TITLE OF CERTIFYING OFFICER DATE
38. RECEIVED BY 40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO. 37. RECEIVED AT 39. DATE RECEIVED
CONTRACTOR MUST SUBMIT FOUR COPIES OF INVOICE PREVIOUS EDITIONS ARE OBSOLETE EDADD Form 1155, MAY 90
SPRMM1-26-P-MB09 2026 APR 15 25218-0083 (FMS* )
DO-A3
SPRMM1 S0140A
SPRMM1 DLA MECHANICSBURG DCMA OHIO RIVER VALLEY
DLR PROCUREMENT OPS DSCC-ZI COC W5 1725 VAN PATTON DRIVE
P. O. BOX 2020, 5450 CARLISLE PIKE BUILDING 30 AREA A X
MECHANICSBURG,PA 17055-0788 WRIGHT PATTERSON AFB,OH 45433-5302
BUYER: N. BIRBECK/ZIA3 SCD: B
4K0V2 95270
SEE SCHEDULE X
INTEGRATED PROCUREMENT TECHNOLOGIES
1025 S BROWN SCHOOL ROAD NET 30 DAYS
VANDALIA,OH 45377-9632
POC: (937) 415-0000 SEE BLOCK 15
HQ0339
SEE SCHEDULE DFAS COLUMBUS
WEST ENTITLEMENT OPERATIONS
P O BOX 182381
COLUMBUS,OH 43218-2381
EFT:T
X GTN-26-6218
SEE SECTION G
SEE SCHEDULE
FMS
$140,722.36
KLMNOPQRSTT. DANOWSKI
PAGES
OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SPRMM1-26-P-MB09 2 31
INTEGRATED PROCUREMENT TECHNOLOGIES
0001 NSN 7HH 6105-01-221-4438
MOTOR,CONTROL SHELF LIFE 0-00
MADE TO: 95270
IAW: H288-CP489
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS
HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI
N 001 000 51 1 00 JA GH H ED A 00 B 03 EFF 37.0 1.032 M
PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073
INSPECT AT SOURCE
ACCEPT AT SOURCE
SHIP TO
0001AA FMS-REQUIREMENT PKS003 4 EA $35,180.59
MARK FOR: PKSE00 $140,722.36
RQN: PKSE5452040076 DO-A3 FMS CASE: RDZ
TP: 2 PROJ: RDD: 521 SUPP ADD: PA3RDZ
DEL BY: 2027 APR 15 ACRN: AA
NOTE:
SEE SECTION F OF THIS AWARD FOR TRANSPORTATION INFORMATION
AWARD NOTES:
All contractual documents (contracts, purchase orders, task orders, delivery orders and modifications) related to this procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile or sent by other electronic methods, such as email.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Post Award Administrator: dlamechanicsburgcontractadmin@dla.mil
CONTACT INFORMATION: Maise Hill EMAIL: maise.hill@iptsb.com
PHONE: 805-682-0842
DELIVERY: 365 Days ARO
FOB: ORIGIN
SOURCE INSPECTION AND ACCEPTANCE: CAGE CODE: 95270
PACKAGING, FINAL INSPECTION & ACCEPTANCE: CAGE CODE: 4K0V2
If you do not anticipate meeting the required delivery date set forth in this order, please notify the Contracting Officer IMMEDIATELY so new delivery terms can be established.
CONTINUED ON NEXT PAGE
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SPRMM1-26-P-MB09 3 31
INTEGRATED PROCUREMENT TECHNOLOGIES
AWARD NOTES:
Early/partial shipment is requested and authorized at no additional cost to the Government.
Inspection and acceptance (I/A) at source is REQUIRED. Inspection and acceptance at destination is not authorized and will NOT be accepted!
If I/A are not completed as stated prior to shipment, the contractor will be held responsible for returning the material, at their expense, to the above location so that inspection and acceptance can be completed. If inspection and acceptance are not completed as stated, payment will not be processed and theorder/contract may be cancelled or terminated for default.
Contractors can view their orders, contracts and modifications at the Electronic Document Access (EDA) web tool. This web tool is located on the Procurement Integrated Enterprise Environment (PIEE) web site. It is recommended that contractors register for EDA at:
https://cac.piee.eb.mil/. Click on New User and Register.
SHIPPING INSTRUCTIONS. Transportation/shipment instructions are done through SIR (Shipment Instructions Requests) via DCMA e-Tools. Go to www.dcma.mil, go to the Customer tool bar on the top right of the website and choose eTools.
This will allow contractors to register for the tool to assist in printing shipping labels and transportation information for all contracts. This area also offers training on how to access the system. Go to https://www.dcma.mil/WBT/sir/ for more information or contact your local DCMA office if unable to register. This system is the required route for ALL FOB Origin contracts to ensure material is shipped to the proper locations to support the fleet.
UCF SECTION F PRODUCTION FACILITY CHANGES
(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided:
(1) Performance by small business or in labor surplus areas as required by the contract will not be changed;
(2) The change will not cause a delay in delivery or necessitate a change in the purchase description;
(3) The free on board (f.o.b.) point is not changed; and
(4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change.
(b) The Government reserves the right to deny approval even if these four elements are met.
The following website is provided to suppliers to obtain the full text of the DLA Procurement Notes listed below:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
CONTINUED ON NEXT PAGE
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SPRMM1-26-P-MB09 4 31
INTEGRATED PROCUREMENT TECHNOLOGIES
AWARD NOTES:
The following DLA Procurement Notes are applicable to this requirement:
E06 Inspection and Acceptance at Source (JUN 2018)
FMS TAC Code is P11A in lieu of NNW6.
DLA Weapons Support does not utilize the IUID Clause for FMS because these are going straight to the freight forwarder and then overseas.
Provide the following information on your shipping documents for quick identification at the shipping point:
FMS Case number M/F (Mark For) Part Number, and
NSN
This information can be found in the subCLIN of the purchase order.
When shipping, ensure copies of all shipping documents/invoices are attached with the material. Otherwise, delays in payment and/or the return of material may occur.
Attach copies of packing lists with part number, item description, and purchase order number on outside of packages.
POC EMAIL: NICHOLAS.BIRBECK@DLA.MIL
SPRMM1-26-P-MB09
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
WSSTERMBA00
CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code: ( <ZIA3> ) Weapon System LRC: ( <BWN> ) Telephone: ( <445-737-1715> ) E-Mail: ( <Nicholas.Birbeck@dla.mil> )
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CLIN: 0001
NIIN: 012214438 ACTIVITY USE ONLY: TDP VERSION NO.: 015
ITEM NAME: MOTOR,CONTROL
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the MOTOR,CONTROL .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The MOTOR,CONTROL furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no.
<53711 5492310>
3.1.1 <Additional approved sources of supply of 53711 DWG 5492310. 95270 H288-CP489 11384 QTTB-2910-A, Triman, Cage 0ZBE8,is a domesticauthorized distributo r for Kollmorgen
3.2 Marking - This item shall be physically identified in accordance with <MIL-STD-130, REV N, 16 NOV 2012> .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new.
Code 6: Part redesigned - Parts not interchangeable.
WSSTERMCZ05
CONFIGURATION MANAGEMENT - MARITIME
1.0 Configuration Management
1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes. Any approved Class I change may necessitate contract changes by the PCO, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
WSSTERMCZ05 (CONT)
CONFIGURATION MANAGEMENT - MARITIME
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline.
RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance
(RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.
(12-23)
DLATERMC02
C02 MANUFACTURING PHASE-OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURC
ES, AND OBSOLETE MATERIALS OR COMPONENTS (DEC 2016)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
DLATERMC03
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.
(2) Supply Chain Traceability Documentation
(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing source's Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.
(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoi danceProgram/).
(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers's parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and
DLATERMC03 (CONT)
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
DLATERMC14
C14 CORRECTION OF NONCONFORMING PACKAGING OR MARKING (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor's expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government's costs to correct the deficiencies. Upon determining that reimburseis required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
CLIN: 0001
NIIN: 012214438 ACTIVITY USE ONLY: TDP VERSION NO.: 015
ITEM NAME: MOTOR,CONTROL
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
WSSTERMDZ03
PRESERVATION, PACKAGING, PACKING AND MARKING
The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.
1. PRESERVATION REQUIREMENTS
a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to enter the military distribution system for stock in accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Section B, Part I of the Schedule. When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal Regulations (CFR); when HM = N the item is not regulated for transportation.
1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF-22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.
b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within 7 days of receipt) or direct installation, or part numbered item (authority granted to ship without NSN) shall be preserved and packed in accordance with ASTM D3951-18 (2023), "Standard Practice for
WSSTERMDZ03 (CONT)
PRESERVATION, PACKAGING, PACKING AND MARKING
Commercial Packaging", for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.
c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.
2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES
a. When ASTM D3951-18 (2023) is authorized for packaging and the item is considered Electrostatic Discharge sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."
b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.
3. PACKING REQUIREMENTS - The contractor shall pack as follows:
Domestic Shipments (CONUS): Level B
Overseas Shipments (OCONUS) (including Navy ships at sea):
Via air, FPO, APO Level B Via freight forwarder Level B Via surface Level A
Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II.
Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.
4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:
a. ADDITIONAL MARKING FOR SPARES ONLY - Each MIL-STD-129 label shall also include the following:
1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,
2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and
3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).
b. DEPOT LEVEL REPAIRABLE (DLR) LABELS
1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding
6A, 6H and 6X COGs (e.g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.
EXCEPTION: When a DLR item requires use of both a reusable inner unit container and a reusable outer shipping and storage container (excluding wood and fiberboard), only the inner unit container shall be affixed with a DLR label. In these cases only, DLR labels shall NOT be placed on the outer reusable container.
2) Labels are available via the Naval Forms Online website: https://forms.documentservices.dla.mil/order/.
The website will advise the procedures for ordering and establishing an account.
3) NAVSUP WSS authorizes contractors to create and print their own DLR labels. Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.
WSSTERMDZ03 (CONT)
PRESERVATION, PACKAGING, PACKING AND MARKING
NSN DESCRIPTION QUANTITY APPLICATION FORM NUMBER
PER UNIT
PACKAGE
0108LF5055300 DLR Label 100 Unit NAVSUP 1397-1
2in.x3in. Container 0108LF5055000 DLR Label 100 Intermediate NAVSUP 1397
3inx5in. Shipping Container
c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY
1) Certain Program related items are identified by a two-position SMIC, which appears as a suffix to the NSN
(e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two (2) ends as follows:
SMIC MARKINGS COLOR TYPE CONTAINER
L1 LEVEL 1 RED Unit, intermediate and shipping
(size permitting) S1 SURFACE RED Unit, intermediate and shipping
LEVEL 1 (size permitting) D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping
(size permitting) C1* LEVEL 1 SPECIAL Green Unit, intermediate and shipping
CLEAN 02-N2
CP/VG* SPECIAL CLEAN GREEN Unit, intermediate and shipping
02-N2 D0/D6/D8* DSS-SOC Green Unit, intermediate and shipping
SPECIAL CLEAN
O2-N2
VU FBW SFCC VU BLUE Unit, intermediate and shipping
(size permitting) SW FBW SFCC SW BLUE Unit, intermediate and shipping
(size permitting) Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping *denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems."
5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard Practice: Palletized Unit Loads." Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org.
a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No.
MH1/9-02SW4048 or MH1/9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.
b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-07SW4848 pallets.
c. Use of nonstandard commercial pallets is prohibited.
WSSTERMDZ03 (CONT)
PRESERVATION, PACKAGING, PACKING AND MARKING
6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood Packaging Material in International Trade (ISPM 15).
a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards Committee (ALSC) approved mark is applied to every shipment regardless of destination.
b. Failure to comply with the requirements of ISPM 15 may result in refusal of the shipment, destruction or corrective treatment of WPM at the point of receipt and the associated costs charged back to the contractor.
7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non -extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.
8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the "Container NSN" field (e.g . 8145 012622982) requires shipment in a reusable shipping and storage container.
a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of "7E", "7G" and "7H") shall be provided as contractor-furnished material (CFM).
b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of "7R", "6K" or "0R") shall be provided as government-furnished material (GFM). Fast pack containers will not be provided as GFM. To obtain GFM reusable containers, the contractor must request via email usn.philadelphia.navsupwssphil.mbx.navsupcrf@us.navy.mil at least 90 days prior to the anticipated shipping date, 30 days prior for repair contracts. If the Navy's Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.
ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS
Container Container Alternate Packaging Code NSN Part Number (80132) IAW MIL-STD-2073-1 8145 002609548 P069-2 }
8145 002609556 P069-1 } N 001 000 GX 1 00 K3 LT B ED
8145 002609559 P069-3 } UCL = B
8145 002609562 P069-4 } SPMK = 39
8145 010124088 P069-6 } PACK = QFF
8145 010140440 P069-5 } 8145 011644073 P069-7 } 8145 012622982 15450-1 } If MOP/PMT = GX
--------------------------------------} N 001 000 GX 1 00 K3 GH Z ED
8145 012622983 15450-2 } Z= use 1.5" of "GH" cushioning --------------------------------------} between barrier bag and Unit Container
8145 012622984 15450-3 } UCL = B
--------------------------------------} SPMK = 39
8145 012622985 15450-4 } PACK = QFF
8145 012622986 15450-5 } For all other MOPs/PMTs
--------------------------------------} N 001 000 51 1 00 EA GH F ED
8145 012622987 15450-6 } UCL = B
--------------------------------------} SPMK = 03
8145 012622988 15450-7 } PACK = QFF
WSSTERMDZ03 (CONT)
PRESERVATION, PACKAGING, PACKING AND MARKING
c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063
Norfolk, VA-757-445-9099 ext.124 Yokosuka, Japan-011-81-46-816-6304 Cherry point, NC-252-466-2331 Lemoore, CA-559-998-0220 Jacksonville, FL-904-542-1014 Okinawa, JAPAN-011-81-46-816-6304 San Diego, CA-619-545-8360 Iwakuni, JAPAN-011-81-46-816-6304 Puget Sound, WA-360-476-9777 Bahrain-011-318-439-9553
d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military Sales (FMS) customer.
9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM OFFICE (JPO) OR OTHER FOREIGN FORCES
ACQUISITION
a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL (CFM), unless otherwise specified.
b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.
10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.
a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance Oriented Packaging (POP) contained in 49 CFR and the international modal regulations. All performance test requirements shall be supported by test certificates and reports attesting to the date and the results obtained from performance oriented packaging testing. The contractor shall be responsible for assuring that sources providing performance testing services are registered with the U.S. Department of Transportation (DOT). The contractor's signed certification that the packaged configuration meets the applicable modal regulation shall be incorporated on the Wide Area Workflow Receiving Report (WAWF RR), DD Form 250, Material Inspection and Receiving Report, or other related acceptance documents if a WAWF RR, DD Form 250 is not used. The Shipper's Declaration for Dangerous Goods (SDDG) must be included for all air shipments and uploaded to WAWF. All test certificates, reports and training records shall be available for inspection by authorized Government representatives for a period of three years.
b. When a contract/order for hazardous material requires shipment to a military aerial port or through a military container consolidation point including DODAACs SW3225, SW3123, SW3142, N45627, FB4427, FB9150, FB4497, FY8910, FY9125, FB4418, FY4462, FB4484, FY4494, those shipments shall comply with NAVSUP PUB 505/AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipment.
11. SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 "Hazardous Material Identification and Material Safety Data" and DFARS 252.223-7001 "Hazard Warning Labels" the contractor/offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of Safety Data Sheets (SDSs) and Globally Harmonized System (GHS) compliant product label, when applicable, to the NAVSUP WSS or DLA Contracting Officer prior to award. An electronic copy in PDF format of the SDS and GHS product label must also be emailed to NAVSUP WSS Code N242 at NAVSUPWSSMECH.HAZMAT@US.NAVY.MIL. Please include the NSN, CAGE, Part Number, quantity of hazardous material, contract number, and point of contact for hazardous material questions in the body of the email.
12. REPACKAGING TO CORRECT PACKAGING DEFICIENCIES
a. Notwithstanding inspection and acceptance by the Government of items furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the contractor guarantees that the preservation, packaging, packing and marking (PPP&M), and the preparation of, and method of shipment of such items will conform to the requirements of this contract.
b. Items that do not conform to the PPP&M requirements of this contract may have a Supply Discrepancy Report (SDR, SF-364) written against the contractor at the time of receipt.
c. The Government may at the option of the PCO or ACO, correct PPP&M deficiencies, without prior contractor notification, and require an equitable adjustment in the contract price to cover labor and material when corrective actions are warranted, or return the non-conforming material to the contractor for repackaging at the contractor's expense.
WSSTERMDZ03 (CONT)
PRESERVATION, PACKAGING, PACKING AND MARKING
(12-2025)
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
CLIN: 0001
NIIN: 012214438 ACTIVITY USE ONLY: TDP VERSION NO.: 015
ITEM NAME: MOTOR,CONTROL
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.
52.246-2
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
This clause is incorporated by reference with the same force and effect as if it were given in full text.
( < > ) Alternate I (JUL 1985) applies when a fixed-price incentive contract is contemplated.
( < > ) Alternate II (JUL 1985) applies when a fixed-ceiling-price contract with retroactive price redetermination is contemplated.
WSSTERMEZ05
INSPECTION AND ACCEPTANCE OF SUPPLIES
<x> 1. Inspection of Supplies shall be performed at the contractor location shown on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:
<x> Manufacturing Site at <95270> by the Manufacturing Site CAO <S0512A> .
< > Subcontractor's Sites at < > by the Subcontractor Site CAO < > .
< > Packaging Site at < > by the Packaging Site CAO < > .
< > DCMA Naval Special Emphasis Operations < > .
<x> 2. Final Acceptance of Supplies and Packaging shall be performed at the contractor's location on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:
< > Manufacturing Site at < > by the Manufacturing Site CAO < > .
< > Subcontractor's Site at < > by the Subcontractor Site CAO < > .
< > Packaging Site at < > by the Packaging Site CAO < > .
< > DCMA Naval Special Emphasis Operations < > < > Destination.
< > 3. Inspection and Acceptance of Supplies will be performed by the consignee at Destination. (4-15)
DLATERME05
E05 PRODUCT VERIFICATION TESTING (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitlystate this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, "Product Verification Test Samples - Do Not Post to Stock," Contract Number (contractor insert) and Lot/Item Number (contractor insert)" adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy the system of record receiving report as a packing list, in accordance with DFA Appendix F. The contractor shall mark the exterior of the shipping container iaccordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, Uni Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.242-17
GOVERNMENT DELAY OF WORK (APR 1984)
52.247-29
F.O.B. ORIGIN (FEB 2006)
WSSTERMFZ02
TRANSPORTATION ASSISTANCE
To obtain transportation assistance for an upcoming shipment, contractors are to follow the appropriate directions listed below, based on the terms and conditions of the specific contract.
1. For all contracts administered by a Defense Contract Management Agency (DCMA) office (as shown on Page 1 of the contract, or in a subsequent modification), contractors are to contact the Transportation Office at that DCMA.
If the DCMA Transportation Office is unable to provide assistance, contractors may contact transportation customer service at TARPINQ.WSS.fct@navy.mil for transportation arrangements.
2. For FOB Destination contracts, consignment address information is available electronically at the DoD Activity Address Codes (DODAAC) website https://home.daas.dla.mil/daashome/daasinq.asp.
WSSTERMFZ02 (CONT)
TRANSPORTATION ASSISTANCE
For this type of contract, additional information can be found in the clause WSSTERMLZ06 entitled "CONSIGNMENT
INSTRUCTIONS."
(4-23)
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACRN AMOUNT TAC
AA 97-11X824228600007460200659162DPKSE54520400760RDZ $140,722.36 NNW6
252.232-7006
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document Type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .