4.0 26QS064 PWS SO25-012 Cargo Reefer and Brine Pump Repair_Redacted.pdf
PDF 197 KB Posted
- Solicitation number
- N0040626QS064
About this file
This Service Order (SO-25-012) is a Category "A" contract for Cargo Refer Plant Repair for the Military Sealift Command (MSC)/ATH. The document requires a contractor to provide qualified personnel to perform comprehensive troubleshooting and repair services on Cargo Reefer Systems and Brine Pumps. Key work requirements include conducting systematic inspections of reefer machinery components, testing electrical systems and safety circuits, verifying sensor accuracy, checking refrigerant levels, and inspecting brine pump systems.
The contractor must provide a detailed Diagnostic Findings Report that includes a summary of tests performed, identified root causes of system failures, and a recommended Repair Plan of Action with an itemized list of required parts and tools. Additional obligations include executing repairs in coordination with MSCREP and the Ship's Chief Engineer, performing a full operational run-test under simulated load conditions, and ensuring system continuous operation for a minimum of 12 hours without generating alarms. The work must be completed to the satisfaction of the MSCREP and Chief Engineer, with specific attention to safety protocols, especially regarding high-voltage electrical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.0 26QS064 SOL_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACHINERY, AUXILIARY SYSTEMS SERVICE ORDER
SO-25-012 Category “A” MSC/ATH
Cargo Refer Plant Repair
SO-25-012 - 1
1.0 ABSTRACT:
1.1 This item describes the requirement to provide
qualified and authorized personnel to perform troubleshooting and repairs on Cargo Reefer System and Brine pumps.
2.0 REFERENCES/ENCLOSURES:
2.1 References:
2.1.1 Technical Manual T9516-A8-MMC-010, Refrigeration Plant, Cargo.
2.1.2 Technical Manual T9515-A8-MMC-010, Refrigeration Plant, Cargo For USNS T-AKE Class Installation, Operation And Maintenance Manual
2.2 Enclsoure: None.
3.0 ITEM LOCATION/QUANTITY/DESCRIPTION:(Contractor Furnished
Material).
- All Circuit cards and cooling fans for Cargo Reefers.
Please make sure Circuit cards are pre-programmed.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item.
In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 23, and 29.
5.2 This ship contains High Voltage (HV) electrical
systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.
5.3 Contractor shall provide labor necessary to complete
work as discribed in this Work Item and help Ships
SO-25-012 - 2
Force clear all faults with the Cargo Refreigeraton Plants.
5.4 Contractor shall perform inspections, tests, and
trials to demonstrate a SAT operational test of the Cargo Refrigeration Plant.
5.5 Contractor shall provide distance support (if
Required) until faults have been cleared.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 All work performed and services provided shall be to
the satisfaction of the MSCREP and Chief Engineer.
7.0 STATEMENT OF WORK REQUIRED
7.1 Cargo Reefer System
7.1.1 Conduct a systematic inspection of all
reefer machinery, including compressors, condensers, evaporators, and expansion valves.
7.1.2 Test all associated electrical components, control circuits, and safety cut-outs.
7.1.3 Verify the accuracy of all temperature and
pressure sensors.
7.1.4 Check refrigerant levels and test for system
leaks.
7.2 Brine System Pump
7.2.1 Inspect brine pump #2 & #3 and its
associated motor, bearings, and seals for mechanical failure or wear.
7.2.2 Test all electrical connections, motor
starter, and control panel circuitry.
7.2.3 Verify flow rates and pressures within the
brine loop.
7.2.4 Assess the condition of the brine and check
for contaminants
7.3 The contractor shall provide a detailed Diagnostic
Findings Report. This report must include:
SO-25-012 - 3
7.3.1 A summary of all tests performed.
7.3.2 The identified root cause(s) of failure for
each system.
7.3.3 A recommended Repair Plan of Action and an
itemized list of all required parts, materials, and specialized tools
7.4 Execute all repairs, replacements, and servicing as
outlined in the approved plan with MSCREP AND SHIPS
CHIEF ENGINEER.
7.5 Perform a full operational run-test of the Cargo
Reefer and Brine Pump systems under simulated load conditions.
7.6 Ensure the systems can operate continuously for a
minimum of 12 hours without generating alarms or exhibiting anomalie
7.7 RESERVED
8.0 GENERAL REQUIREMENTS: None additional.
File details come from the government source that posted it. Updated .