4-Addendum No. 1.pdf
PDF 8 MB Posted
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This is Addendum No. 1 to the bidding documents for the Sewer Authority of the Township of Pittston's Pump Station No. 1 Upgrades project, issued September 3, 2026. The project involves removal and replacement of two 5 horsepower duplex submersible sewage pumps rated at 30 gallons per minute at 54 feet of total dynamic head, associated guide rails, brackets, pump control panel, automatic transfer switch, emergency diesel generator, and related electrical and mechanical systems. The contractor is required to supply and install a permanent bypass connection within the existing valve vault to maintain continuous sanitary sewer service during construction, with all bypass pumping costs included in the lump sum bid price. Additional work includes cleaning and coating the interior of the wet well with a high-build, corrosion-resistant epoxy or polyurethane lining system; installing fall protection safety grating at the wet well access hatch; providing a new telemetry system with wet well level instrumentation and alarm devices; and extending the existing generator concrete pad. All bids must be submitted electronically through the PennBid website, and bidders are required to acknowledge receipt of Addendum No. 1 on the bid form.
The addendum provides clarifications and technical specifications regarding the project scope, including responses to contractor questions regarding wet well invert elevations, manhole inverts, lateral connections, equipment retention, generator conductor reuse, and coating material specifications. Acceptable coating manufacturers include PPG, Tnemec, Carboline, Sherwin-Williams, or approved equivalents, with the contractor responsible for submitting the proposed lining system for review and approval. SCH. 80 PVC pressure piping penetrations through the valve vault and wet well shall be sealed with modular mechanical link-type seals, while PVC drain line penetrations shall be sealed watertight with non-shrink grout. No DBE documentation is required with the bid submission. The contractor must provide backup pumping equipment and maintain continuous monitoring of the bypass system through either on-site personnel or automatic alarm and remote notification capability to prevent sanitary sewer overflow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-2024-0968 PITTSTON PLAN SET.pdf | ||
| 1-Contract Specifications.pdf | ||
| 5-Bid Results.pdf | ||
| 2-Bidding Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pump Station 1 Upgrade Addendum No. 1, 9/3/2026
ADDENDUM No. 1
FOR
Sewer Authority of the Township of Pittston
September 3, 2026
A. SCOPE
1. This Addendum No. 1 consists of pages 1 through 7, referenced attachments, and includes information regarding the Bidding Documents.
2. The following revisions, interpretations, and/or supplementations pertaining to the Bidding Documents for the Project are addressed by Addendum No. 1.
B. GENERAL
1. All bids must be submitted electronically through the PennBid website.
2. Bid documents may only be reviewed electronically via the PennBid website.
C. CONTRACTOR QUESTIONS FROM PENNBID
1. If you are requiring DBE documents to be submitted with the bid. can you advise on which forms are required?
DBE documentation is not required to be submitted with the Bid for this project.
2. What are the inverts or the influent pipes at the Wet well? What are the inverts at manholes 552 and 554? How many laterals are connected between manholes 552 and the wet well? How many laterals are connected between MH 554 and the wet well?
Both influent pipes enter the wet well at an invert elevation of 1250.00. MH 552 has an invert elevation of 1263.95, with two laterals located between MH 552 and the wet well. MH 554 has an invert elevation of 1262.09, with one lateral located between MH 554 and the wet well.
3. Is the owner retaining any of the existing equipment?.
The owner is not retaining any of the existing equipment.
4. Please clarify if the newly proposed Generator is to reuse the existing conductors feeding the current Generator. Please clarify if the Overhead Service Size is to remain . (100A)?
The existing generator conductors shall be reused if they are in good condition and properly sized for the new generator. The existing 100A overhead service is to remain.
5. Please provide specification for the coating materials note in sheet C-1.03 note 2.
It appears that Sigma is a product line of coatings. What specific coating are you looking for?
Note 2 on Sheet C-1.03 has been revised to require preparation and repair of the existing concrete surfaces and application of a high-build, corrosion-resistant epoxy, polyurethane, polyurea, or hybrid polymer lining system suitable for municipal wastewater wet well service, including H₂S and MIC exposure.
Acceptable manufacturers include PPG, Tnemec, Carboline, Sherwin-Williams, or approved equal. The CONTRACTOR shall select and submit the proposed lining system for review and approval. The lining system shall be installed in accordance with the manufacturer’s written instructions.
D. CONTRACTOR QUESTIONS FROM PENNBID
1. How will the new PVC drain lines and SCH. 80 PVC pressure piping be connected and sealed at penetrations through the existing valve vault and wet well?
The new PVC drain line penetrations shall be sealed watertight with non-shrink grout. SCH. 80 PVC pressure piping penetrations shall be provided with modular mechanical link-type seals, LINK-SEAL® or approved equal, sized and installed in accordance with the manufacturer’s requirements. The plans have been revised to clarify these requirements.
2. Is the CONTRACTOR to install the bypass connection inside or outside of the valve vault?
E. DRAWING REVISIONS
Sheet C-1.03 - Plan Sections and Details
1. Sheet C-1.03 has been revised to show a proposed permanent bypass connection within the existing valve vault. The permanent bypass connection shall be installed prior to bypass pumping operations and shall be utilized for temporary bypass pumping during the pump station improvements.
F. SPECIFICATION REVISIONS
Section 01511 – Diversion Pumping
1. Revise Paragraphs 1.03.A, 1.04.A, and 3.01.D to require temporary bypass pumping from the existing wet well through the proposed permanent bypass connection in the existing valve vault and into the existing 2-inch force main.
Bidders are required to acknowledge receipt of this Addendum No. 1 on page 2 of the Bid Form.
PUMP STATION NO.1 UPGRADES DIVERSION PUMPING
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON 01511-1
Addendum No. 1
SECTION 01511
DIVERSION PUMPING
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Diversion pumping.
1.02 LUMP SUM PRICE
A. No separate payment will be made for furnishing, installing, operating, maintaining, monitoring, and removing the bypass pumping system. All costs associated with diversion pumping shall be included in the lump sum bid price for Pump Station No. 1 Upgrades.
1.03 DEFINITIONS
A. Bypass pumping is the temporary installation and operation of pumps, suction and discharge piping, hoses, fittings, controls, and appurtenances necessary to maintain continuous sanitary sewer service during the pump station improvements. The bypass pumping system shall convey incoming sewage from the existing pump station wet well through the proposed permanent bypass connection and into the existing force main. The permanent bypass connection shall be installed prior to bypass pumping operations and shall be utilized for temporary bypass pumping during the pump station improvements.
The existing sewage pumps are each rated for 30 GPM at 54 feet T.D.H. The CONTRACTOR shall provide a bypass pumping system of sufficient capacity to accommodate the anticipated maximum incoming flow and prevent surcharge, backup, or sanitary sewer overflow.
1.04 SYSTEM DESCRIPTION
A. Bypass pumping shall provide continuous sanitary sewer service while pump station improvements are in progress. The CONTRACTOR shall temporarily pump incoming sewage from the existing pump station wet well through the proposed permanent bypass connection and into the existing 2-inch force main. The permanent bypass connection shall be installed prior to bypass pumping operations and shall be utilized for temporary bypass pumping during the pump station improvements. The bypass pumping system shall be of sufficient capacity to accommodate anticipated incoming flows and shall continuously maintain sewage flow to prevent surcharge, backup, or overflow onto streets, yards, unpaved areas, buildings, drainage facilities, storm sewers, or waterways.
Discharge of sewage outside the sanitary sewer system is prohibited.
B. The Contractor shall monitor the bypass pumping system while in operation. Monitoring may be accomplished by qualified personnel on site or by an automatic alarm/remote monitoring system capable of notifying designated personnel of high wet well level, pump failure, or other conditions that could result in a sanitary sewer overflow. The Contractor shall provide for prompt response to all alarms and abnormal operating conditions.
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON 01511-2
1.05 SCHEDULING
A. The Contractor shall coordinate bypass pumping operations with the Owner and Engineer prior to taking the existing pump station out of service. Bypass pumping shall be fully installed, tested, and operational prior to disabling the existing pumping equipment.
B. Once initiated, bypass pumping shall be maintained continuously as required to provide uninterrupted sanitary sewer service until the existing pump station or proposed pumping equipment is placed into service and approved for operation.
C. The Contractor shall coordinate shutdown, startup, and removal of the bypass pumping system with the Owner and Engineer. The Contractor shall not discontinue bypass pumping until authorized by the Owner or Engineer.
PART 2 – PRODUCTS
2.01 MATERIALS
A. Provide temporary bypass piping, hoses, joints, fittings, valves, and accessories suitable for sanitary sewage service and capable of withstanding the anticipated operating pressures. Piping, joints, and accessories shall be designed for a working pressure of at least twice the maximum anticipated system pressure or 50 psi, whichever is greater.
B. Bypass pumps shall be self-priming or submersible type, suitable for pumping raw sanitary sewage and capable of passing the solids anticipated in the wastewater. Pumps shall be maintained in good working condition and shall have sufficient capacity to accommodate anticipated incoming flows without surcharge, backup, or sanitary sewer overflow.
C. Where automatic bypass pump operation is utilized, provide controls capable of automatic pump start and stop based on wet well level. Provide a high-water alarm and either on-site monitoring or remote notification capability to alert designated personnel of abnormal operating conditions or bypass system failure.
D. Provide all temporary suction and discharge piping, hoses, valves, fittings, connections, controls, power supplies, and other appurtenances necessary for a complete and operational bypass pumping system.
E. Provide backup pumping equipment or other suitable contingency measures capable of maintaining sanitary sewer service in the event of failure of the primary bypass pumping equipment.
PART 3 - EXECUTION
3.01 FIELD QUALITY CONTROL
A. Prior to taking the existing pump station out of service, the Contractor shall test the
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON 01511-3
complete bypass pumping system and demonstrate satisfactory operation, including pump operation, level controls, and monitoring and/or alarm systems, as applicable.
B. During bypass pumping operations, monitor the bypass pumping system and wet well level by on-site personnel or an automatic alarm/remote monitoring system. The Contractor shall be responsible for promptly responding to alarms, equipment failures, high-water conditions, or other conditions that could result in a sanitary sewer overflow.
C. Maintain all bypass piping, hoses, connections, pumps, controls, and appurtenances in a secure and operational condition for the duration of bypass pumping operations.
D. During bypass pumping, do not allow sewage to leak, discharge, dump, or spill onto any area outside of the sanitary sewer system. All bypassed sewage shall be discharged through the proposed permanent bypass connection into the existing 2-inch force main.
E. In the event of an accidental spill, leak, or sanitary sewer overflow, immediately take necessary measures to stop and contain the discharge, restore sanitary sewer service, and clean and disinfect affected areas. Promptly notify the Owner and Engineer. The Owner shall make required notifications to the Pennsylvania Department of Environmental Protection and other regulatory agencies, unless otherwise directed.
F. The Contractor shall protect all temporary bypass pumps, piping, hoses, and associated equipment from vehicular and pedestrian traffic. Where bypass piping crosses roadways, driveways, or other areas subject to vehicular traffic, provide suitable ramps, protective covers, trenching, or other means necessary to protect the bypass system and maintain safe access. Coordinate temporary traffic control measures with the Owner and Engineer, as required.
3.02 CLEANING
A. When diversion pumping operations are complete, piping shall be drained into the sanitary sewer prior to disassembly.
B. Remove temporary bypass pumps, piping, hoses, controls, connections, and associated equipment after the permanent pump station has been placed into satisfactory operation and removal of the bypass system has been authorized by the Owner or Engineer.
C. Clean and restore areas disturbed by bypass pumping operations to a condition equal to or better than that existing prior to construction.
END OF SECTION
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON 01511-4
THIS PAGE INTENTIONALLY LEFT BLANK
3939 BIRNEY AVENUE
MOOSIC, PA 18507
844-542-4757
MD NY OH PA VA WV
www.jhacompanies.com
LOCATION MAP
2026-08-11
RAY
TJM
MES
FOR BID
2024-0968
AS SHOWN
PUMP STATION #1 UPGRADE
FOR
SEWER AUTHORITY OF THE
TOWNSHIP OF PITTSTON
LOCATED IN
PITTSTON TOWNSHIP
LUZERNE COUNTY PENNSYLVANIA
CALL BEFORE YOU DIG!
COVER SHEET
C-1.00
SITE LOCATION MAP
AVOCA, PA
QUADRANGLE
SCALE: 1" = 2,000'
OWNER:
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON
421 BROAD STREET
PITTSTON, PA 18640
CONTACT: JIM HASTIE
(570) 655-8747
EMAIL: PTSEWER@COMCAST.NET
ENGINEER:
JHA COMPANIES, INC.
ATTN: MAX E. STONER, PE
3705 TRINDLE ROAD
CAMP HILL, PA 17011
PH: (717) 731-1579
FAX: (717) 731-1348
EMAIL: MSTONER@JHACOMPANIES.COM
PUMP STATION #1 UPGRADE
FOR
SEWER AUTHORITY OF THE TOWNSHIP OF PITTSTON
LOCATED IN
PITTSTON TOWNSHIP
LUZERNE COUNTY, PENNSYLVANIA
AUGUST 2026
DRAWING LIST
DRAWING NUMBER DRAWING TITLE
C-1.00 COVER SHEET
C-1.01 OVERALL EXISTING SITE PLAN
C-1.02 PUMPING STATION SITE PLAN
C-1.03 PLAN SECTIONS AND DETAILS
844-542-4757
MD NY OH PA VA WV
www.jhacompanies.com
LOCATION MAP
2026-08-11
RAY
TJM
MES
FOR BID
2024-0968
AS SHOWN
PUMP STATION #1 UPGRADE
FOR
SEWER AUTHORITY OF THE
TOWNSHIP OF PITTSTON
LOCATED IN
PITTSTON TOWNSHIP
LUZERNE COUNTY PENNSYLVANIA
CALL BEFORE YOU DIG!
OVERALL EXISTING SITE PLAN
C-1.01
100'50'
GRAPHIC SCALE: 1" =
50'0
50'
NOTES:
1. THIS PLAN IS REPRODUCED FROM THE ORIGINAL RECORD DESIGN DRAWINGS FOR PUMP STATION NO. 1 AND IS
PROVIDED FOR REFERENCE ONLY. FEATURES IDENTIFIED AS “PROPOSED” ON THE ORIGINAL DRAWINGS SHALL BE CONSIDERED EXISTING FOR PURPOSES OF THIS CONTRACT. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ELEVATIONS, UTILITIES, STRUCTURES, AND EQUIPMENT PRIOR TO COMMENCING THE PROPOSED FACILITY UPGRADES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN THE RECORD DRAWINGS AND ACTUAL FIELD CONDITIONS PRIOR TO PROCEEDING WITH AFFECTED WORK. REFER TO SHEET 1.03 FOR PLAN VIEWS, SECTIONS, DETAILS, AND CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROPOSED
PUMP STATION NO. 1 IMPROVEMENTS.
844-542-4757
MD NY OH PA VA WV
www.jhacompanies.com
LOCATION MAP
2026-08-11
RAY
TJM
MES
FOR BID
2024-0968
AS SHOWN
PUMP STATION #1 UPGRADE
FOR
SEWER AUTHORITY OF THE
TOWNSHIP OF PITTSTON
LOCATED IN
PITTSTON TOWNSHIP
LUZERNE COUNTY PENNSYLVANIA
CALL BEFORE YOU DIG!
PUMPING STATION SITE PLAN
C-1.0210'
GRAPHIC SCALE: 1" =
10'0 20'
10'
NOTES:
1. THIS PLAN IS REPRODUCED FROM THE ORIGINAL RECORD DESIGN DRAWINGS FOR PUMP STATION NO. 1 AND IS
PROVIDED FOR REFERENCE ONLY. FEATURES IDENTIFIED AS “PROPOSED” ON THE ORIGINAL DRAWINGS SHALL BE CONSIDERED EXISTING FOR PURPOSES OF THIS CONTRACT. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ELEVATIONS, UTILITIES, STRUCTURES, AND EQUIPMENT PRIOR TO COMMENCING THE PROPOSED FACILITY UPGRADES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN THE RECORD DRAWINGS AND ACTUAL FIELD CONDITIONS PRIOR TO PROCEEDING WITH AFFECTED WORK. REFER TO SHEET 1.03 FOR PLAN VIEWS, SECTIONS, DETAILS, AND CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROPOSED
PUMP STATION NO. 1 IMPROVEMENTS.
REMOVE AND REPLACE PUMP CONTROL
PANEL
TO REMAIN
AT
REMOVE AND REPLACE
AUTOMATIC TRANSFER
SWITCH IN ACCORDANCE
WITH THE CONTRACT
DOCUMENTS AND
SPECIFICATIONS
REMOVE AND REPLACE
DIESEL GENERATOR IN
ACCORDANCE WITH THE
CONTRACT DOCUMENTS
AND SPECIFICATIONS
3939 BIRNEY AVENUE
MOOSIC, PA 18507
844-542-4757
MD NY OH PA VA WV
www.jhacompanies.com
LOCATION MAP
2026-08-11
RAY
TJM
MES
FOR BID
2024-0968
AS SHOWN
PUMP STATION #1 UPGRADE
FOR
SEWER AUTHORITY OF THE
TOWNSHIP OF PITTSTON
LOCATED IN
PITTSTON TOWNSHIP
LUZERNE COUNTY PENNSYLVANIA
CALL BEFORE YOU DIG!
PLAN SECTIONS AND DETAILS
C-1.03
SCALE: 3/8" = 1'-0"
2'-0"
C FORCE MAIN
ELEV.
L
ALUM. MH.
RUNGS @
1'-0" O.C.CONC. ENCASE
(TYPICAL)
CONC. REACTION BLOCK.
CONSTRUCT TO ALLOW
BOLT REMOVAL FROM
PIPE FLANGES.
1'-0" SQ.. CONC.
PIPE SUPPORT
AT EA. CHECK
VALVE.
6" CRUSHED
AGGREGATE
(TYPICAL)
2" PUMP DISCH.
ALUM. ACCESS DOOR.
EXISTING TO REMAIN
SECTION ALONG CENTER LINE
SERVICE HEAD
4-#2;
2"C.
1/2" DIA. x 8'-0"
LONG COPPER GND.
ROD. (SEE NOTE NO. 2)
#8 GROUND
(SEE NOTE
NO. 2)
4-#2 IN 2"C.
(SEE NOTE NO. 2)
WP, 120V, G.F.I.
DUPLEX RECEPTACLE
100A, 3P, 3 PHASE,
240V; NEMA-3RF DISCONNECT.
FUSED 75A. (SEE NOTE NO. 2)
METER BASE
20"x 20"x 6"
NEMA-3R
JUNCTION BOX
15A, 1P;
NEMA-3R
CIRC. BKR.
EXISTING SERVICE POLE
25'-CLASS 4.5 PC
SET 5'-0"
SUMP
PUMP
CONTROL
FLOATS
NO.1 NO.2
SEWAGE PUMPS
8-#12, 3/4"C.
4-#4, 1 1/2"C.
CONTROL
PANEL
(SEE NOTE
NO. 1)
SEAL FAILURE PANEL
4-#2, 2"C.
(SEE NOTE NO. 2) TELEPHONE, 1"C.
INSTALL UP POLE TO
HEIGHT REQ'D. BY
TELEPHONE COMPANY.
TERMINATED IN AN ``F''
TYPE WEATHERHEAD.
WB-100
3-#12, 1/2"C. S1
SERVICE POLE DETAILS ELECTRICAL RISER DIAGRAM
NO SCALE NO SCALE
WD-100
S1
6"
4"D.I.P. W/4"
FLAP VALVE
2'-0"
8" GRAVITY INFLUENT
INV. EL.
SEALED DISCHARGE
SLIP FLANGE
36" MIN.
IN
FL
UE
NT
IN
VE
RT
EL
EV
AT
IO
N
PU
M
PI
NG
ST
AT
IO
N
NU
M
BE
R
PU
M
PI
NG
ST
AT
IO
N
IN
SI
DE
D
IA
M
ET
ER
ST
AT
IO
N
HE
IG
HT
BO
TT
OM
O
F W
ET
W
EL
L
EL
EV
AT
IO
N
LO
W
W
AT
ER
LE
VE
L
- A
LL
PU
M
PS
O
FF
EL
EV
AT
IO
N
PU
M
P
NU
M
BE
R
ON
EL
EV
AT
IO
N
BO
TH
P
UM
PS
ON
EL
EV
AT
IO
N
HI
GH
W
AT
ER
LE
VE
L
AL
AR
M
FI
NI
SH
ED
G
RA
DE
EL
EV
AT
IO
N
FO
RC
E M
AI
N
C
EL
EV
AT
IO
N
L FO
RC
E M
AI
N
DI
AM
ET
ER
VA
LV
E
PI
T
IN
SI
DE
B
OT
TO
M
EL
EV
AT
IO
N
`A' `B' `C' `D' `E' `F' `G' `H' `J' `K' `L' `M' 1 4'-0" 9'-9" 1247.50 1248.50 1249.00 1249.50 1250.00 1250.00 1251.25 2" 1250.25
TABLE OF DIMENSIONS AND ELEVATIONS
ELECT. CONDUIT FROM
EQUIPMENT ENCLOSURE
SEE SITE PLAN
1258.00 1257.83
WET WELL
VALVE CHAMBER
5'-0"
EXISTING PORTABLE HOIST &
MOUNTING SLEEVE CAPABLE
OF 360° ROTATION TO REMAIN 24" SQ. ALUM.
ACCESS DOOR
AND FRAME.
EXISTING TO REMAIN
REMOVE AND REPLACE
1-1/2" PUMP GUIDE RAILS
REMOVE AND REPLACE
GRINDER PUMPS
TWO (2) EACH.
EXISTING
REMOVE AND REPLACE AS PER SPECS
REMOVE AND REPLACE
REMOVE
& REPLACE
REMOVE 2-KILLARK EMI15B2G
EXPLOSION PROOF WALL
MOUNT WITH 150 WATT
INCANDESCENT LAMP CLEAR.
PATCH HOLES IN CONCRETE.
L
L
CONDUIT.
FOR LEVEL SENSOR
C HOLE IN SLAB
VENT PIPE
FOR 4" PVC
C HOLE IN SLAB
L
& VALVE CHAMBER
C PUMP STATION
LC VALVE CHAMBER
SCALE: 3/8" = 1'-0"
1'-63 4"
EDGE OF OPNG.
IN TOP SLAB
1'-6"
1'-6"
WET WELL
VALVE CHAMBER4' DIA. PRECAST
CONC. MANHOLE
5' DIA. PRECAST
CONC. MANHOLE
C PUMP STATION
& VALVE CHAMBER
L
0'-31 2"
1'-0"
SEE NOTE NO. 1
EDGE OF OPNG.
IN TOP SLAB.
1'-6"
1'-6"
C HOLE IN SLAB FOR
4" VENT PIPE.
L
1'-2 1/2"
0'-5"
0'-8"
2'-0"
4'-0"x 6'-0"x 1'-0" CONCRETE
PAD WITH WWF REINFORCEMENT
ON 12" CRUSHED STONE.
GE
NE
RA
TO
R
10'-6"
CONTROL PANEL
(REMOVE AND REPLACE)
NOTES:
1. G.C. TO REMOVE AND REPLACE EXISTING SEWAGE
PUMPS, BRACKETS, SUPPORTS, GUIDE RAILS,
CONTROLS, PANEL AND LEVEL FLOATS AND
PROBES.
2. G.C. TO CLEAN AND COAT INSIDE OF WET WELL.
PREPARE AND REPAIR EXISTING CONCRETE
SURFACES AND APPLY A HIGH-BUILD,
CORROSION-RESISTANT EPOXY, POLYURETHANE,
POLYUREA, OR HYBRID POLYMER LINING SYSTEM
SPECIFICALLY RECOMMENDED BY THE
MANUFACTURER FOR MUNICIPAL WASTEWATER
WET WELL SERVICE AND RESISTANT TO
CONTINUOUS WASTEWATER EXPOSURE,
HYDROGEN SULFIDE (H₂S), AND
MICROBIOLOGICALLY INFLUENCED CORROSION
(MIC). ACCEPTABLE MANUFACTURERS INCLUDE
PPG, TNEMEC, CARBOLINE, SHERWIN-WILLIAMS,
OR APPROVED EQUAL. PREPARE SURFACES AND
INSTALL THE COMPLETE LINING SYSTEM IN
ACCORDANCE WITH THE MANUFACTURER'S
WRITTEN INSTRUCTIONS.
3. G.C. SHALL PROVIDE AND INSTALL HALLIDAY
PRODUCTS SERIES X RETRO-GRATE™ FALL
PROTECTION SAFETY GRATING, OR APPROVED
EQUAL, AT THE EXISTING WET WELL ACCESS
HATCH. CONTRACTOR SHALL FIELD VERIFY
EXISTING HATCH DIMENSIONS PRIOR TO
FABRICATION AND INSTALLATION. SAFETY
GRATING SHALL BE COMPATIBLE WITH THE
EXISTING HATCH AND INSTALLED IN ACCORDANCE
WITH THE MANUFACTURER'S WRITTEN
INSTRUCTIONS.
4. G.C. SHALL COORDINATE ALL MODIFICATIONS AND
RETROFITTING OF THE EXISTING ELECTRICAL
SERVICE AS REQUIRED FOR THE PROPOSED PUMP
STATION IMPROVEMENTS.
5. G.C. SHALL FURNISH AND INSTALL PERMANENT
BYPASS FITTINGS IN THE EXISTING VALVE VAULT
AS SHOWN ON THE PLANS. PROVIDE ALL PIPING,
VALVES, FITTINGS, FLANGES, CONNECTIONS, AND
APPURTENANCES REQUIRED FOR A COMPLETE
AND OPERATIONAL BYPASS CONNECTION.
COORDINATE INSTALLATION WITH THE OWNER
AND MAINTAIN CONTINUOUS SANITARY SEWER
SERVICE DURING CONSTRUCTION.
6. G.C. TO SUPPLY AND INSTALL A NEW EMERGENCY
GENERATOR ON A NEW EXTENDED CONCRETE
PAD.
7. G.C. TO REMOVE AND REPLACE EXISTING
AUTOMATIC TRANSFER SWITCH WITH NEW
AUTOMATIC TRANSFER SWITCH.
8. G.C. TO CONSTRUCT EXTENSION TO EXISTING
GENERATOR PAD.
9. G.C. SHALL PROVIDE AND INSTALL NEW OMNISITE
XR50 TELEMETRY SYSTEM COMPLETE WITH WET
WELL LEVEL INSTRUMENTATION, ALARM DEVICES,
COMMUNICATION EQUIPMENT, ASSOCIATED
WIRING, AND ALL APPURTENANCES REQUIRED FOR
A COMPLETE AND OPERATIONAL SYSTEM.
COORDINATE PROGRAMMING AND STARTUP WITH
OWNER.
10. G.C. SHALL REMOVE EXISTING PIPING AND VALVES
IN VALVE VAULT. PROVIDE AND INSTALL VALVES,
PIPE, FITTINGS, AND APPURTENANCES AS
SPECIFIED. CLEAN INTERIOR OF VALVE VAULT AND
PROVIDE PIPE SUPPORTS AS REQUIRED.
REMOVE AND REPLACE BOTH LINES.
1. NEW DRAIN LINES – SDR-35 PVC PIPE FROM VALVE CHAMBER TO WET WELL
INTERIOR. CORE DRILL PENETRATIONS AND SEAL ANNULAR SPACE WATERTIGHT WITH
NON-SHRINK GROUT.
2. 2" NEW FORCE MAIN SCH. 80 PVC PIPE PENETRATION THROUGH CONCRETE WALL.
PROVIDE MODULAR MECHANICAL LINK-TYPE SEAL, LINK-SEAL® OR APPROVED EQUAL.
SIZE SEAL AND CORE-DRILLED OPENING IN ACCORDANCE WITH MANUFACTURER'S
REQUIREMENTS.
3. NO CONCRETE ENCASEMENT REQUIRED.
EXTEND EXISTING 4'-0" × 6'-0" CONCRETE PAD
1'-6" TO PROVIDE 4'-0" × 7'-6" FINISHED PAD.
PROVIDE 12" THICK, 4,000 PSI CONCRETE OVER
12" STONE BASE TO MATCH EXISTING PAD.
PROVIDE #4 REINFORCING BARS AT 12" MAX.
O.C. EACH WAY. DOWEL NEW PAD EXTENSION
INTO EXISTING CONCRETE. PROVIDE 3/4"
CHAMFER ALONG EXPOSED TOP EDGES. VERIFY
GENERATOR DIMENSIONS WITH APPROVED
EQUIPMENT SUBMITTAL PRIOR TO
CONSTRUCTION.
REMOVE AND REPLACE
WA-150 ``BENJAMIN''
1SL-070-120 LAMP TYPE -
LU70, 120 VOLT. COMPLETE
W/INTEGRAL PHOTOCELL.
WITH LED AREA LIGHT –
120V, 40–50W, 4,000–6,000
LUMENS, 4000K, POLE/ARM
MOUNTED, COMPLETE WITH
INTEGRAL PHOTOCELL AND
MOUNTING HARDWARE
REMOVE AND REPLACE
S.S. LIFTING CHAIN
WINCH ASSEMBLY. MODEL 9072
BY HYDR-O-MATIC TO REMAIN
SCALE: 3/8" = 1'-0"
L
& VALVE CHAMBER
C PUMP STATION
OUTLINE OF OPNG.
IN SLAB ABOVE
(TYPICAL)
0'-9 1/2"
0'-9 1/2"
C PUMPL
0'-8" C PUMPSL
C VALVE CHAMBERL
10'-6"
CONC. MANHOLE
I.D. PRECAST
WET WELL
CONC. MANHOLE
5'-0" I.D. PRECAST
VALVE CHAMBER
FORCE MAIN.*
* FOR CONTINUATION
SEE ``SITE PLAN''.
WB-100
WB-100-``BENJAMIN''
11W-150-P, LAMP TYPE
100A-19, 120 VOLT
SEWAGE PUMPS
TWO (2) REQ'D.
CAP'Y.:
MOTOR: 5 HP., 1750 RPM.,
230/240V, 3PH., 60 Hz.
MFR.: HYDR-O-MATIC
MODEL: HPGF SERIES
8" GRAVITY INFLUENT SEWER(S)
(SEE NOTE * ON SECTION ALONG
CENTER LINE, THIS SHEET)
FLEXIBLE
COUPLING
30 GPM @ 54 FT. T.D.H.
2" BALL VALVE (TYP.)
REMOVE AND REPLACE BOTH VALVES4"D.I.P.
DRAIN LINE
REMOVE AND
REPLACE
2" CHECK VALVE (TYP.)
REMOVE AND REPLACE
BOTH VALVES
TO BE REMOVED
AND CONCRETE
HOLE PATCHED
REMOVE AND REPLACE
EXISTING 2"GALV.
STEEL FORCE MAIN
PROCESSING PIPING
AND FITTINGS WITH 2"
SCH. 80 PVC
INSTALL HALLIDAY
PRODUCTS SERIES X
RETRO-GRATE FALL
PROTECTION SAFETY
GRATING OR APPROVED
EQUAL4"P.V.C. AIR VENT W/18x14
MESH INSECT SCREEN TO
REMAIN.
2" Quick Coupler W/ End Cap
2" Check Valve 2" Plug ValveREMOVE AND REPLACE
EXISTING ELBOW WITH CROSS
TYPE FITTING.
PROVIDE TWO (2) PERMANENT
BYPASS CONNECTION FITTINGS
AS PER DETAIL AND AS
SPECIFIED.
(SEE DETAIL)
Cross Fitting
Permanent Bypass Connection
| FOR |
| SECTION 01511 - Diversion Pumping-Needs.pdf |
| PART 1 - GENERAL |
| PART 2 – PRODUCTS |
| PART 3 - EXECUTION |
| 2026-09-01-BYPASS ADD-1--2024-0968 PITTSTON.pdf |
| Sheets and Views |
| C-1.00 COVER SHEET |
| C-1.01 OVERALL EXISTING SITE PLAN |
| C-1.02 PUMPING STATION SITE PLAN |
| C-1.03 PLAN SECTIONS AND DETAILS |