4-5 SCOPE OF WORK.pdf

PDF 149 KB Posted

Attached to
Electrical Services 570-25-07
Solicitation number
US.199163
Issued by
Pennsylvania

About this file

This Scope of Work/Specifications document is for Electrical Services issued by the North Wales Water Authority in the Commonwealth of Pennsylvania. The contract is for an on-call electrical contractor to perform routine maintenance repairs and emergency electrical services at the Authority's facilities, with no guaranteed minimum work volume. The services will be performed by a licensed, trained electrical mechanic during general work hours of 8:00 am to 4:00 pm, Monday through Friday, with the understanding that the water authority operates 24/7 and may require electrical services with no advance notice outside standard work hours.

The contractor will be responsible for supplying all necessary tools and maintaining an adequate inventory of parts to minimize equipment downtime. They must perform all work in compliance with the National Electrical Code and all state and local regulations. The contractor will offer a firm markup on parts and equipment over the supplier's invoice, with copies of supplier invoices required for payment. All work is guaranteed for one year, including parts, materials, and labor, and any contractor-caused damage to parts or equipment must be repaired or replaced at no cost to the Authority.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK/ SPECIFICATIONS

ELECTRICAL SERVICES (On-Call Services): Performed as needed; no guaranteed minimum.

A. GENERAL

1. This specification provides for an electrical contractor, licensed in the Commonwealth of

Pennsylvania, to perform routine maintenance repairs and emergency services on the various electrical facilities belonging to the North Wales Water Authority.

2. All work must be performed by a trained, competent mechanic regularly employed by the contractor.

3. The contractor shall maintain or have access to an adequate inventory of parts and supplies to minimize downtime of vital equipment.

4. All work performed shall be in conformance with the National Electrical Code, all state and local codes, regulations and ordinances. All work shall be guaranteed by the contractor for one (1) year including parts, material and labor in addition to any standard manufacturer's warranties.

5. Parts or equipment damaged by the contractor shall be repaired or replaced at no cost to the

Authority.

B. HOURS OF WORK

l. General work shall be performed between the hours of 8:00 am and 4:00pm. Monday through

Friday and will be scheduled a day in advance.

2. North Wales Water Authority is a 24-hour, 7-day operation. Occasionally, there is a need for electrical services with no advance notice within or outside of general work hours.

C. PARTS AND EQUIPMENT

1. The contractor shall supply all necessary tools to perform the required work.

2. The contractor shall offer a firm markup for all parts/equipment required during the contract period over supplier's invoice. Copies of the supplier's invoices shall accompany the invoice for payment.

File details come from the government source that posted it. Updated .