4-3-3E Drawing Set 17NOV23.pdf
PDF 2 MB Posted
- Attached to
- Fabricate and erect a DVD Platform
- Solicitation number
- PIPII-358159-STE
About this file
This document contains structural drawings and related information for the fabrication and erection of a DVD Platform at the Fermi National Accelerator Laboratory. The drawings provide details on the foundation plan, framing plans, sections, and steel connection details for the platform structure. The drawings indicate the platform is to be constructed to support specific equipment loads, including a Dewar tank and CDS machine loads. The document also includes project notes on construction requirements, shop drawing submittals, and special inspection and testing procedures. This information is related to a federal contract opportunity, PIPII-358159-STE, for the fabrication and erection of the DVD Platform, which is a small business set-aside construction contract subject to Davis-Bacon Act labor standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-3-3E Project Manual 17NOV23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A - 1
F-3
EX
IS
TI
NG
S
OU
TH
BO
OS
TE
R
RO
AD
MASTER SUBSTATION
EXISTING DUCT
BANK (TYP.)
PMH F3
EXISTING FEYNMAN
COMPUTING CENTER
EXISTING WILSON HALL
MAIN RING ROAD
PINE STREET
BOOSTER ROAD
SERVICE
BUILDING 'A-0' SERVICE
BUILDING 'A-1'
SERVICE
BUILDING 'A-2'
SERVICE
BUILDING 'A-3'
TE
M
PO
R
AR
Y
R O
AD
C.U.B.
EXISTING BOOSTER
TOWER SOUTHEAST
EXISTING
RAMSEY AUDITORIUM
EXISTING WILSON HALL
EXISTING TRANSFER GALLERY
A - 0
BIKE PATH
PIP-II CAMPUS ROAD
CRYO
POND
HIGH BAY BUILDING
(4-3-5)
NO
RT
H
EN
TR
AN
CE
R
OAD
EXISTING A-0 MAIN RING POND
PIP-II CAMPUS ROAD
SO
U
TH
BO
O
STER
R O
AD
SO
U
TH
EN
TR
AN
C
E
R O
AD
BEAM TRANSFER LINE
ENCLOSURE
PIP II PROJECT AREA
F - 4
SERVICE
BUILDING 'F-4'
EXISTING
ANTIPROTON
MUON
CAMPUS
CHL
PR
O
JEC
T
N O
R
TH
E
S
W
SCALE: 1" = 250'
VICINITY PLAN
DRAWING LIST
G-1 COVER SHEET
GENERAL DRAWINGS
WILSON ST.
RING RD.
HWY. 56 BUTTERFIELD RD.
TO
IN
TE
RS
TA
TE
I-
FA
RN
SW
O
RT
H
CONSTRUCTION
KAUTZ RD.
ENTRANCE
ROAD B
KI
RK
R D.
(NO TRUCKS)
PINE ST.
ENTRANCE
AREA
MAIN
INJECTOR
MAIN
KA
UT
Z
RD
LEON M. LEDERMAN
CENTER
SCIENCE & EDUCATION
PINE ST. (OUT)
PINE ST. (IN) LABORATORY
AREA
HOLTER RD
CENTRAL
WILSON ST.
ENTRANCE
BURLINGTON NORTHERN R.R.
BATAVIA RD.
RECEIVING
(NO ACCESS)
PINE ST...................6 AM TO 8 PM
KAUTZ RD................6 AM TO 6 PM
WILSON ST...............6 AM TO 6 PM
BATAVIA RD..............6 AM TO 8 PM
ENTRANCE
BATAVIA RD.
(LOAD LIMIT-6 TONS)
EL
G
IN
J
O
LI
ET
E
AS
TE
RN
R .R
CO
M
M O
NW
EA
LT
H
ED
IS
O N
PO
W
ER
L
IN
ES
ROAD
C
BATAVIA RD.
EOLA RD.
ENTRANCE
SWENSON
D-0 FA
RM
R D
FE
LD
O
TT
R D
INDUSTRIAL
AREA
CDF
ROAD D
EO
LA
R D.
TO RT. 59
FERMILAB
VILLAGE
TO HWY 59
TARGET
AREA
FIXED
LOCKED
GATE
RAILYARD
STORAGE
WILSON ST.
HWY 38 ROOSEVELT RD.
NO SCALE
SITE PLAN
TRAFFIC
CONSTRUCTION
MUON
CAMPUS
DISC
OVE
RY R
D.
PROJECT
AREA
PI
P
II
FE
YNMAN
C.C
MSS
CH
L
PROJECT NO. 4-3-3E
PIP-II CRYO PLANT
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
N ov
1,
- 8
:5 9a m Z
:\C lie nt s\
AN
F\
D O
E\ Fe rm i\P
IP
IIc ps \1
2_
LI
N
AC
EX
TC
O N
ST
R
\D es ig n\
St ru c\ M od el
\4 -3
-3 E
C D
S
PL
AT
FO
R M
\4 -3
-3 E_
G -1
.d w g
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering Services Section
4-3-3E G-1
CPB CDS PLATFORM
COVER SHEET
PROJECT
AREA
S-1 STRUCTURAL NOTES
S-2 IBC TESTING AND INSPECTIONS
S-3 ABBREVIATIONS AND SYMBOLS
SC-1 FOUNDATION PLAN
SS-1 LOW PLATFORM FRAMING PLAN
SS-2 PLATFORM FRAMING PLAN
SS-3 SECTIONS
SS-4 SECTIONS
SS-5 STEEL DETAILS
SS-6 STEEL DETAILS
SS-7 STEEL DETAILS
STRUCTURAL DRAWINGS
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text
INDIAN CREEK ROAD
GENERAL NOTES
1. "STRUCTURAL ENGINEER” IN THESE NOTES REFERS TO TYLK GUSTAFSON RECKERS WILSON
ANDREWS, LLC, THE STRUCTURAL ENGINEER OF RECORD.
2. “SPECIALTY ENGINEER” IN THESE NOTES REFERS TO AN ENGINEER LICENSED OR
REGISTERED TO PRACTICE STRUCTURAL ENGINEERING IN THE STATE IN WHICH THE PROJECT
IS LOCATED.
3. STRUCTURAL DRAWINGS ARE TO BE COORDINATED AND USED IN CONJUNCTION WITH THE
ARCHITECTURAL, CIVIL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. SEE
MECHANICAL DRAWINGS FOR EQUIPMENT PADS, BASES, SUPPORTS, AND DUCT
PENETRATIONS.
4. TYLK GUSTAFSON RECKERS WILSON ANDREWS, LLC. SHALL NOT BE RESPONSIBLE FOR, NOR
HAVE CONTROL OR CHARGE OF CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES OR PROCEDURES FOR THE SAFETY PRECAUTIONS AND PROGRAMS IN
CONNECTION WITH THIS PROJECT, AND SHALL NOT BE RESPONSIBLE FOR CONTRACTOR'S
FAILURE TO CARRY OUT HIS WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
5. TYLK GUSTAFSON RECKERS WILSON ANDREWS, LLC. SHALL NOT BE RESPONSIBLE FOR, NOR
HAVE CONTROL OVER, THE ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS,
ANY OF THEIR AGENTS, OR EMPLOYEES, OR ANY OTHER PERSONS PERFORMING ANY OF THE
WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS.
6. THE SUBCONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR ALL TEMPORARY SHORING
AND BRACING REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT. ALL SHORING AND
BRACING MEMBERS AND CONNECTIONS SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT
THE IMPOSED LOADS. TEMPORARY MEMBERS AND CONNECTIONS SHALL NOT BE REMOVED
UNTIL PERMANENT MEMBERS ARE IN PLACE AND FINAL CONNECTIONS ARE MADE.
7. SUBCONTRACTOR SHALL VERIFY IN FIELD ALL DIMENSIONS, ELEVATIONS AND MEMBER SIZES
AS SHOWN ON THE CONTRACT DRAWINGS FOR THE EXISTING CONSTRUCTION, PRIOR TO THE
DETAILING OR FABRICATION OF ANY NEW STRUCTURAL ELEMENT. SUBCONTRACTOR SHALL
DOCUMENT ANY CONSTRUCTION-RELATED DISCREPANCIES. CONTRACTOR SHALL FURNISH
THE ABOVE INFORMATION IN THE FORM OF DETAILED SKETCHES TO THE STRUCTURAL
ENGINEER FOR REVIEW (28) CALENDAR DAYS PRIOR TO THE SCHEDULED START OF ANY
DETAILING OR FABRICATION.
8. THE SUBCONTRACTOR SHALL PROVIDE ALL MEASURES AND PRECAUTIONS NECESSARY TO
PREVENT DAMAGE AND SETTLEMENT OF EXISTING OR NEW CONSTRUCTION INSIDE OR
OUTSIDE THE PROJECT LIMITS DURING EXCAVATION AND FOUNDATION CONSTRUCTION. ANY
DAMAGE TO NEW OR EXISTING CONSTRUCTION INSIDE OR OUTSIDE OF THE PROJECT LIMITS,
CAUSED BY CONSTRUCTION TECHNIQUES IS THE RESPONSIBILITY OF THE SUBCONTRACTOR.
9. NO FIELD MODIFICATIONS TO ANY STRUCTURAL COMPONENTS SHALL BE MADE WITHOUT
PRIOR APPROVAL BY THE STRUCTURAL ENGINEER. THIS INCLUDES, BUT IS NOT LIMITED TO
REVISIONS DUE TO MISLOCATION, MISFIT, OR ANY OTHER CONSTRUCTION ERRORS.
10. NO OPENING SHALL BE PLACED IN ANY STRUCTURAL MEMBER (OTHER THAN AS INDICATED
ON APPROVED SHOP DRAWINGS) UNTIL THE LOCATION HAS BEEN APPROVED BY THE
STRUCTURAL ENGINEER.
11. PROVIDE SLEEVE LAYOUTS FOR ALL PENETRATIONS THROUGH STRUCTURAL MEMBERS (ALL
TRADES ARE INCLUDED). LAYOUTS ARE TO BE SUBMITTED TO THE STRUCTURAL ENGINEER
FOR REVIEW PRIOR TO CONSTRUCTION.
12. SUPPORT ALL ROOF MOUNTED EQUIPMENT OR EQUIPMENT SUSPENDED FROM FLOORS OR
THE ROOF ONLY ON/FROM BEAMS DESIGNATED FOR SUCH PURPOSE. IF NO SUPPORT HAS
BEEN DESIGNATED, OR IF A QUESTION ARISES, NOTIFY STRUCTURAL ENGINEER PRIOR TO
ERECTION OF EQUIPMENT.
13. ALL DETAILS, SECTIONS, AND NOTES ON THE DRAWINGS ARE INTENDED TO BE TYPICAL FOR
SIMILAR SITUATIONS ELSEWHERE, UNLESS OTHERWISE NOTED. FOR DETAILS AND
DIMENSIONS NOT INDICATED ON THE STRUCTURAL DRAWINGS, SEE THE ARCHITECTURAL
DRAWINGS.
14. MATERIALS AND EQUIPMENT SHALL BE STORED AND TRANSPORTED IN A MANNER SO AS NOT
TO EXCEED THE ALLOWABLE FLOOR OR ROOF LOADING INDICATED IN THE "SCHEDULE OF
BUILDING DESIGN LOADS" ON THE CONSTRUCTION DOCUMENTS OR THE ALLOWABLE
CAPACITY OF THE CONSTRUCTED MEMBER, WHICHEVER IS SMALLER.
15. ALL MEMBERS SHOWN ON FRAMING PLANS BETWEEN COLUMN LINES/GRID LINES SHALL BE
EQUALLY SPACED, UNLESS NOTED OTHERWISE.
SHOP DRAWINGS
1. SUBCONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE STRUCTURAL ENGINEER FOR
REVIEW AND APPROVAL.
2. ALL SHOP DRAWING SUBMITTALS SHALL BE AS DESCRIBED IN THE PROJECT SPECIFICATIONS
OR IN THESE NOTES IF THERE IS NO PROJECT SPECIFICATION.
3. SHOP DRAWINGS AND RELATED MATERIALS PREPARED BY SUPPLIERS AND
SUBCONTRACTORS SHALL BE REVIEWED BY THE GENERAL SUBCONTRACTOR PRIOR TO
SUBMITTING TO THE ARCHITECT/STRUCTURAL ENGINEER. THE GENERAL SUBCONTRACTOR
SHALL REVIEW ALL SUBMISSIONS FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS,
MEANS, METHODS, TECHNIQUES, SEQUENCES, AND OPERATION OF CONSTRUCTION,
TECHNICAL CONTENT, COORDINATION OF TRADES, DIMENSIONAL ACCURACY, SAFETY
PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO, ALL OF WHICH ARE THE SOLE
RESPONSIBILITY OF THE GENERAL SUBCONTRACTOR. THE GENERAL SUBCONTRACTOR
SHALL APPROVE AND SO STAMP EACH SUBMISSION BEFORE SUBMITTING TO THE
ARCHITECT/STRUCTURAL ENGINEER.
4. THE STRUCTURAL DRAWINGS SHALL NOT BE USED AS THE BACKGROUNDS FOR THE
PRODUCTION OF ANY SHOP DRAWINGS THAT ARE SUBMITTED FOR REVIEW.
5. ANY DEVIATIONS FROM THE STRUCTURAL DRAWINGS OR SPECIFICATIONS SHALL BE NOTED
AND BUBBLED ON THE SHOP DRAWINGS THAT ARE SUBMITTED FOR APPROVAL.
6. FOR SHOP DRAWINGS TO BE RESUBMITTED TO THE STRUCTURAL ENGINEER FOR A
SUBSEQUENT REVIEW, ALL CHANGES SHALL BE NOTED AND BUBBLED.
EXISTING BUILDING NOTES
1. EXISTING STRUCTURAL FRAMING ELEMENTS SHOWN ARE BASED ON ORIGINAL STRUCTURAL
DRAWINGS PREPARED BY TGRWA, DATED JULY 12, 2019.
2. SUBCONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, ELEVATIONS, AND MEMBER SIZES
AS SHOWN FOR THE EXISTING CONSTRUCTION PRIOR TO THE DETAILING AND FABRICATION
OF ANY NEW STRUCTURAL FRAMING ELEMENT. SUBCONTRACTOR SHALL DOCUMENT ANY
CONSTRUCTION-RELATED DISCREPANCIES AND NOTIFY THE STRUCTURAL ENGINEER AND
ARCHITECT PRIOR TO THE START OF ANY DETAILING OR FABRICATION.
16. REFER TO THE TESTING AND INSPECTION SECTION OF THESE NOTES FOR THE
STRUCTURAL STEEL TESTING AND INSPECTION REQUIREMENTS.
STRUCTURAL LOADING CRITERIA
1. STRUCTURAL BUILDING CODE - INTERNATIONAL BUILDING CODE 2015 (IBC 2015)
2. PLATFORM LOADING:
A. SURFACE LIVE LOAD = 100PSF
B. EQUIPMENT LOAD = SEE PLAN
C. HANDRAIL LOAD - 200 LBS OR 50 LBS/LINEAR FT
3. INTERNAL WIND PRESSURE = 8PSF
4. SEISMIC CRITERIA:
SHORT PERIOD MAPPED SPECTRAL ACCELERATION Ss = 0.157
1-SECOND PERIOD MAPPED SPECTRAL ACCELERATION S1 = 0.166
SHORT PERIOD SITE COEFFICIENT Fa = 1.60 1-SECOND PERIOD SITE COEFFICIENT Fv = 2.40
SHORT PERIOD DESIGNN SPECTRAL RESPONSE ACCELERATION SDS = 0.166
1-SECOND PERIOD DESIGN SPECTRAL RESPONSE ACCELERATION SD1 = 0.104
POST-INSTALLED ANCHORS
1. WHERE EPOXY SYSTEM IS INDICATED ON THE PLANS OR DETAILS, USE HILTI HIT-HY 200 V3
ADHESIVE IN CONCRETE AND SOLID GROUTED MASONRY UNLESS NOTED OTHERWISE.
THE CONTRACTOR MAY SUBMIT SUBSTITUTE EPOXY SYSTEMS FOR APPROVAL PROVIDED
THEY MEET OR EXCEED THE CAPACITY OF HILTI HIT-HY 200 V3 ADHESIVE.
2. DRILL HOLES TO EPOXY MANUFACTURER'S RECOMMENDED SIZE. CLEAN HOLES WITH A
CIRCULAR WIRE OR NYLON BRUSH AND BLOW OUT WITH COMPRESSED AIR.
3. WHERE MECHANICAL EXPANSION ANCHORS ARE INDICATED ON THE PLANS OR DETAILS,
USE HILTI KWIK BOLT TZ2 ANCHORS IN CONCRETE UNLESS NOTED OTHERWISE. THE
SUBCONTRACTOR MAY SUBMIT SUBSTITUTE EXPANSION ANCHOR SYSTEMS FOR
APPROVAL PROVIDED THEY MEET OR EXCEED THE CAPACITY OF HILTI KWIK BOLT TZ2
ANCHORS.
4. POST-INSTALLED ANCHORS MUST BE INSTALLED USING THE SPACING AND EDGE
DISTANCES GIVEN ON THE PLANS OR DETAILS. IF FIELD CONDITIONS DICTATE THAT THE
ANCHOR SPACING OR EDGE DISTANCES BE MODIFIED, THE SUBCONTRACTOR SHALL
SUBMIT A FIELD SKETCH TO THE STRUCTURAL ENGINEER FOR REVIEW PRIOR TO MAKING
ANY MODIFICATIONS.
5. REFER TO THE TESTING AND INSPECTION SECTION OF THESE NOTES FOR THE POST-
INSTALLED ANCHORS TESTING AND INSPECTION REQUIREMENTS.
STRUCTURAL STEEL
1. FURNISH STRUCTURAL STEEL IN ACCORDANCE WITH AISC SPECIFICATIONS FOR THE
DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS AND AISC
CODE OF STANDARD PRACTICE, LATEST EDITIONS.
2. THE STEEL FABRICATOR/ERECTOR SHALL VERIFY IN FIELD ALL DIMENSIONS, ELEVATIONS
AND MEMBER SIZES AS SHOWN ON THE CONTRACT DRAWINGS FOR THE EXISTING
CONSTRUCTION, PRIOR TO THE DETAILING OR FABRICATION OF ANY NEW STRUCTURAL
ELEMENT. THE STEEL FABRICATOR/ERECTOR SHALL DOCUMENT ANY CONSTRUCTION
RELATED DISCREPANCIES. THE STEEL FABRICATOR/ERECTOR SHALL FURNISH THE
ABOVE INFORMATION IN THE FORM OF DETAILED SKETCHES TO THE STRUCTURAL
ENGINEER FOR REVIEW. THERE SHALL BE RESOLUTION TO THE NOTED DISCREPANCIES
PRIOR TO FABRICATION OF ANY NEW STRUCTURAL ELEMENTS.
3. STRUCTURAL STEEL MATERIAL SHALL BE AS INDICATED BELOW UNO:
STRUCTURAL SHAPES ASTM SPECIFICATION
WIDE FLANGES........................................A992
CHANNELS................................................A572/A572M, GRADE 50
ANGLES.....................................................A36
STEEL PIPE...............................................A53, GRADE B
ROUND HSS..............................................A500, GRADE C
SQUARE & RECTANGULAR HSS............A500, GRADE C
PLATES......................................................A36
THREADED RODS.....................................A36
ANCHOR BOLT ASSEMBLIES..................HAS-V-36
4. ALL STRUCTURAL STEEL FRAMEWORK INCLUDED IN THESE DOCUMENTS ARE CLASSIFIED
AS NON-SELF-SUPPORTING. ALL CONNECTIONS SPECIFIED HEREIN ARE BASED ON
LOADING CONDITIONS OF THE FULLY COMPLETED STRUCTURE IN ITS ENTIRETY
INCLUDING THE FUNCTIONS OF THE COLUMN BASE PLATES AND ANCHOR BOLTS.
INSTABILITIES CAN BE EXPECTED DURING THE ERECTION PROCESS DUE TO LACK OF
INSTALLED ROOF, FLOOR, WALL AND SLAB DIAPHRAGMS AS WELL AS STEEL BRACING,
CONNECTION RIGIDITIES AND OTHER SUCH STABILIZING ELEMENTS. THE GENERAL
SUBCONTRACTOR SHALL IDENTIFY THE SEQUENCE AND SCHEDULING OF CONSTRUCTION
ITEMS AND COORDINATE THE ACTIVITIES OF ALL TRADES INCLUDING THE STEEL
FABRICATOR AND ERECTOR. THE ERECTOR SHALL SUBMIT AN ERECTION PLAN AND A
TEMPORARY BRACING SCHEME TO THE CONTRACTOR AND OWNER WHICH IS FOR
RECORD PURPOSES ONLY. THIS SUBMITTAL WILL NOT BE REVIEWED AND IS NOT A
DESIGN FUNCTION OF THE STRUCTURAL ENGINEER.
5. THE FABRICATOR/ERECTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER AND
ARCHITECT FOR REVIEW, ENGINEERED AND CHECKED DRAWINGS SHOWING
FABRICATION DETAILS, FIELD ASSEMBLY DETAILS AND ERECTION DIAGRAMS FOR ALL
STRUCTURAL STEEL ELEMENTS.
6. ALL BEAMS AND JOISTS SHALL BE FABRICATED WITH THE NATURAL CAMBER UP. PROVIDE
FABRICATED CAMBERS AS INDICATED ON THE DRAWINGS.
7. AFTER FABRICATION, ALL STEEL SHALL BE CLEANED OF ALL RUST, LOOSE MILL SCALE,
AND OTHER FOREIGN MATERIALS. STEEL SHALL BE PRIMED AND PAINTED AS OUTLINED IN
THE PROJECT SPECIFICATIONS. STEEL TO RECEIVE SPRAY-ON FIREPROOFING SHALL NOT
BE PRIMED OR PAINTED.
8. WELDING SHALL BE PERFORMED WITH E70XX LOW HYDROGEN ELECTRODES. ALL
WELDING SHALL BE PERFORMED BY CERTIFIED/QUALIFIED WELDERS AND SHALL
CONFORM TO THE AWS D1.1, "STRUCTURAL WELDING CODE - STEEL," LATEST EDITION.
9. MINIMUM FILLET WELD SIZE SHALL COMPLY WITH THE AISC SPECIFICATION
REQUIREMENTS, BUT SHALL NOT BE LESS THAN 3/16 INCH UNLESS NOTED OTHERWISE.
10. ALL BOLTS, NUTS AND WASHERS SHALL CONFORM TO THE REQUIREMENTS OF "AISC
SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS," LATEST
EDITION. ALL BOLT HOLES SHALL BE "SHORT SLOTTED", UNLESS NOTED OTHERWISE.
11. ALL STEEL BEAM AND GIRDER CONNECTIONS SHALL BE SIMPLE SHEAR CONNECTIONS
UTILIZING HIGH STRENGTH BOLTS IN BEARING-TYPE CONNECTIONS WITH THREADS
EXCLUDED FROM THE SHEAR PLANE UNLESS NOTED OTHERWISE. BOLTS ARE TO BE
TIGHTENED TO THE "SNUG TIGHT" CONDITION UNLESS NOTED AS "SLIP CRITICAL". BOLTS
DESIGNATED AS "SLIP CRITICAL" ARE TO BE TIGHTENED PER THE ABOVE MENTIONED
BOLT SPECIFICATION.
12. BOLTED CONNECTIONS SHALL USE A MINIMUM OF (2) 3/4"Ø BOLTS UNLESS NOTED
OTHERWISE.
13. PROVIDE CONNECTIONS AS DETAILED ON THE DESIGN DRAWINGS. ALTERNATE
CONNECTION DESIGNS MAY BE SUBMITTED BY THE SUBCONTRACTOR. THE ALTERNATE
DESIGNS MUST BE PROPERLY ENGINEERED AND SUBMITTED WITH CALCULATIONS
SIGNED AND SEALED BY A SPECIALTY ENGINEER. THE DESIGN BY THE SPECIALTY
ENGINEER AND THE REVIEW BY THE STRUCTURAL ENGINEER OF ANY ALTERNATE
CONNECTIONS WILL BE AT THE SUBCONTRACTOR'S EXPENSE.
14. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK
OF OTHER TRADES WITHOUT THE PRIOR APPROVAL OF THE STRUCTURAL ENGINEER OF
RECORD.
15. STEEL WORK SHALL SLOPE IN ACCORDANCE WITH ELEVATIONS GIVEN ON STRUCTURAL
DRAWINGS.
NOT TO SCALE
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
S-1M WHITE
B. SEIUM STRUCTURAL NOTES11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE:
1PLATFORM 3D VIEW
SCALE:
2PLATFORM 3D VIEW
SPECIAL INSPECTIONS AND TESTS (IBC 2015)
1. THE SUBCONTRACTOR SHALL EMPLOY ONE OR MORE APPROVED AGENCIES TO PROVIDE SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION ON THE TYPES OF WORK SPECIFIED BELOW AND IDENTIFY THE APPROVED AGENCIES TO THE BUILDING OFFICIAL. FRA RESERVES THE RIGHT TO EMPLOY ONE OR MORE APPROVED AGENCIES TO PROVIDE ADDITIONAL SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION.
2. THE APPROVED AGENCIES SHALL PROVIDE WRITTEN DOCUMENTATION TO THE AUTHORITY HAVING JURISDICTION DEMONSTRATING THE COMPETENCE AND RELEVANT EXPERIENCE OR TRAINING OF THE SPECIAL INSPECTORS WHO WILL PERFORM
THE SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION.
3. THE CONSTRUCTION OR WORK FOR WHICH SPECIAL INSPECTION OR TESTING IS REQUIRED SHALL REMAIN ACCESSIBLE AND EXPOSED FOR SPECIAL INSPECTION OR TESTING PURPOSES UNTIL COMPLETION OF THE REQUIRED SPECIAL
INSPECTIONS OR TESTS.
4. APPROVED AGENCIES SHALL KEEP RECORDS OF SPECIAL INSPECTIONS AND TESTS. THE APPROVED AGENCY SHALL SUBMIT REPORTS OF SPECIAL INSPECTIONS AND TESTS TO THE AUTHORITY HAVING JURISDICTION AND TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. REPORTS SHALL INDICATE THAT WORK INSPECTED OR TESTED WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE SUBCONTRACTOR FOR CORRECTION. IF THEY ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE PRIOR TO THE COMPLETION OF THAT PHASE OF WORK. A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSTRUCTIONS AND TESTS, AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS OR TESTS, SHALL BE SUBMITTED AT A POINT IN TIME AGREED UPON PRIOR TO THE START OF WORK BY FERMILAB RESEARCH ALLIANCE OR THE FERMILAB RESEARCH ALLIANCE'S AUTHORIZED AGENT TO THE AUTHORITY HAVING
JURISDICTION.
5. REFER TO 2015 INTERNATIONAL BUILDING CODE FOR DEFINITION OF TERMS.
NOT TO SCALE
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
S-2M WHITE
B. SEIUM IBC TESTING AND INSPECTIONS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
PRIOR TO WELDING (TABLE N5.4-1, AISC 360-10)
STRUCTURAL STEEL (IBC 1705.2.1, 1705.12.1 & 1705.13.1)
1. VERIFY WELDING PROCEDURES (WPS) AND CONSUMABLE CERTIFICATES ☒ CONTINUOUS ☐ PERIODIC
2. MATERIAL IDENTIFICATION ☐ CONTINUOUS ☒ PERIODIC VERIFY TYPE AND GRADE OF MATERIAL
3. WELDER IDENTIFICATION ☐ CONTINUOUS ☒ PERIODIC
A SYSTEM SHALL BE MAINTAINED BY WHICH A WELDER WHO HAS WELDED A JOINT OR
MEMBER CAN BE IDENTIFIED
4. FIT-UP GROOVE WELDS ☐ CONTINUOUS ☒ PERIODIC VERIFY JOINT PREPARATION, DIMENSIONS, CLEANLINESS, TACKING, AND BACKING.
5. ACCESS HOLES ☐ CONTINUOUS ☒ PERIODIC VERIFY CONFIGURATION AND FINISH.
6. FIT-UP OF FILLET WELDS ☐ CONTINUOUS ☒ PERIODIC
VERIFY ALIGNMENT, GAPS AT ROOT, CLEANLINESS OF STEEL SURFACES, AND TACK
WELD QUALITY AND LOCATION.
DURING WELDING (TABLE N5.4-2, AISC 360-10)
1. USE OF QUALIFIED WELDERS ☐ CONTINUOUS ☒ PERIODIC VERIFY THAT WELDERS ARE APPROPRIATELY QUALIFIED.
2. CONTROL AND HANDLING OF WELDING CONSUMABLES ☐ CONTINUOUS ☒ PERIODIC VERIFY PACKAGING AND EXPOSURE CONTROL.
3. CRACKED TACK WELDS ☐ CONTINUOUS ☒ PERIODIC VERIFY THAT WELDING DOES NOT OCCUR OVER CRACKED TACK WELDS.
4. ENVIRONMENTAL CONDITIONS ☐ CONTINUOUS ☒ PERIODIC VERIFY WIND SPEED IS WITHIN LIMITS AS WELL AS PRECIPITATION AND TEMPERATURE.
5. WPS FOLLOWED ☐ CONTINUOUS ☒ PERIODIC
VERIFY ITEMS SUCH AS SETTINGS ON WELDING EQUIPMENT, TRAVEL SPEED, WELDING
MATERIALS, SHIELDING GAS TYPE/FLOW RATE, PREHEAT APPLIED, INTERPASS
TEMPERATURE MAINTAINED, AND PROPER POSITION.
6. WELDING TECHNIQUES ☐ CONTINUOUS ☒ PERIODIC
VERIFY INTERPASS AND FINAL CLEANING, EACH PASS IS WITHIN PROFILE LIMITATIONS,
AND QUALITY OF EACH PASS.
AFTER WELDING (TABLE N5.4-3, AISC 360-10)
1. WELDS CLEANED ☐ CONTINUOUS ☒ PERIODIC VERIFY THAT WELDS HAVE BEEN PROPERLY CLEANED.
2. SIZE, LENGTH, AND LOCATION OF WELDS ☒ CONTINUOUS ☐ PERIODIC
3. WELDS MEET VISUAL ACCEPTANCE CRITERIA ☒ CONTINUOUS ☐ PERIODIC
VERIFY CRACK PROHIBITION, WELD/BASE METAL FUSION, CRATER CROSS SECTION,
WELD PROFILES, WELD SIZE, UNDERCUT, AND POROSITY ARE ALL ACCEPTABLE
4. ARC STRIKES ☒ CONTINUOUS ☐ PERIODIC
5. K-AREA ☒ CONTINUOUS ☐ PERIODIC
6. BACKING & WELD TABS REMOVED ☒ CONTINUOUS ☐ PERIODIC
7. REPAIR ACTIVITIES ☒ CONTINUOUS ☐ PERIODIC
8. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT/MEMBER ☒ CONTINUOUS ☐ PERIODIC
NONDESTRUCTIVE TESTING (SECTION N5.5, AISC 360-10)
1. CJP WELDS (RISK CAT. II) ☐ CONTINUOUS ☒ PERIODIC
ULTRASONIC TESTING SHALL BE PERFORMED ON 10% OF CJP GROOVE WELDS IN
BUTT, T- AND CORNER JOINTS SUBJECT TO TRANSVERSELY APPLIED TENSION
LOADING IN MATERIALS 5/16 INCH THICK OR GREATER. TESTING RATE MUST BE
INCREASED IF > 5% OF WELDS TESTED HAVE UNACCEPTABLE DEFECTS PER SECTION
N5.5F.
2. CJP WELDS (RISK CAT. III OR IV) ☒ CONTINUOUS ☐ PERIODIC
ULTRASONIC TESTING SHALL BE PERFORMED ON ALL CJP GROOVE WELDS IN BUTT, T-
AND CORNER JOINTS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN
MATERIALS 5/16 INCH THICK OR GREATER. A REDUCTION IN THE RATE OF ULTRASONIC
TESTING IS ALLOWED PER SECTION N5.5E.
3. ACCESS HOLES (FLANGE > 2") ☒ CONTINUOUS ☐ PERIODIC
MAGNETIC PARTICLE TESTING OR PENETRANT TESTING SHALL BE PERFORMED. ANY
CRACK SHALL BE DEEMED UNACCEPTABLE
4. WELDED JOINTS SUBJECT TO FATIGUE ☒ CONTINUOUS ☐ PERIODIC REFER TO APPENDIX 3, TABLE A-3.1.
NOT REQUIRED IF ONLY SNUG-TIGHT JOINTS ARE SPECIFIED [ PER SECTION N5.6(1) OF AISC 360-10].
PRIOR TO BOLTING (TABLE N5.6-1. AISC 360-10)
1. CERTIFICATIONS OF FASTENERS ☒ CONTINUOUS ☐ PERIODIC
2. FASTENERS MARKED ☐ CONTINUOUS ☒ PERIODIC
VERIFY THAT FASTENERS HAVE BEEN MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS.
3. PROPER FASTENERS FOR JOINT ☐ CONTINUOUS ☒ PERIODIC
VERIFY GRADE, TYPE, AND BOLT LENGTH IF THREADS ARE EXCLUDED FROM THE
SHEAR PLANE.
4. PROPER BOLTING PROCEDURE ☐ CONTINUOUS ☒ PERIODIC VERIFY PROPER PROCEDURE IS USED FOR THE JOINT DETAIL.
5. CONNECTING ELEMENTS ☐ CONTINUOUS ☒ PERIODIC
VERIFY APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, IF
SPECIFIED, MEET REQUIREMENTS.
6. PRE-INSTALLATION VERIFICATION TESTING ☐ CONTINUOUS ☒ PERIODIC
OBSERVE AND DOCUMENT VERIFICATION TESTING BY INSTALLATION PERSONNEL FOR
FASTENER ASSEMBLIES AND METHODS USED. COMPONENTS.
7. PROPER STORAGE ☐ CONTINUOUS ☒ PERIODIC
VERIFY PROPER STORAGE OF BOLTS, NUTS, WASHERS, AND OTHER FASTENER
COMPONENTS.
OR TWIST-OFF TYPE TENSION CONTROL METHOD [ PER SECTION N5.6(2) OF AISC 360-10]
NOT REQUIRED FOR PRETENSIONED JOINTS USING TURN-OF-THE-NUT METHOD WITH MATCH-MARKING, DIRECT-TENSION-INDICATORS, NOT REQUIRED IF ONLY SNUG-TIGHT JOINTS ARE SPECIFIED [ PER SECTION N5.6(1) OF AISC 360-10].
DURING BOLTING (TABLE N5.6-2, AISC 360-10)
STRUCTURAL STEEL (CONT) (IBC 1705.2.1, 1705.12.1 & 1705.13.1)
1. FASTENER ASSEMBLIES ☐ CONTINUOUS ☒ PERIODIC
VERIFY THAT FASTENER ASSEMBLIES ARE OF SUITABLE CONDITION, PLACED IN ALL
HOLES, AND WASHERS ARE POSITIONED AS REQUIRED.
2. SNUG-TIGHT PRIOR TO PRETENSIONING
' ☐ CONTINUOUS ☒ PERIODIC
VERIFY THAT JOINTS ARE BROUGHT TO SNUG-TIGHT CONDITION PRIOR TO
PRETENSIONING OPERATION.
3. FASTENER COMPONENT ☐ CONTINUOUS ☒ PERIODIC
VERIFY THAT FASTENER COMPONENT IS NOT TURNED BY WRENCH PREVENTED FROM
ROTATING.
4. PRETENSIONED FASTENERS ☐ CONTINUOUS ☒ PERIODIC
VERIFY THAT FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH RCSC
SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT
TOWARD THE FREE EDGES.
AFTER BOLTING (TABLE N5.6-3, AISC 360-10)
1. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS ☒ CONTINUOUS ☐ PERIODIC
OTHER STEEL INSPECTIONS (SECTION N5.7, AISC 360-10; TABLES J8-1 & J10-1, AISC 341-10)
1. STRUCTURAL STEEL DETAILS ☐ CONTINUOUS ☒ PERIODIC
ALL FABRICATED STEEL OR STEEL FRAMES SHALL BE INSPECTED TO VERIFY
COMPLIANCE WITH THE DETAILS SHOWN IN THE CONSTRUCTION DOCUMENTS, SUCH
AS BRACES, STIFFENERS, MEMBER LOCATIONS, AND PROPER APPLICATION OF JOINT
DETAILS AT EACH CONNECTION.
2. ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL ☐ CONTINUOUS ☒ PERIODIC
SHALL BE ON THE PREMISES DURING THE PLACEMENT OF ANCHOR RODS AND OTHER
EMBEDMENTS SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH
CONSTRUCTION DOCUMENTS. VERIFY THE DIAMETER, GRADE, TYPE, AND LENGTH OF
THE ANCHOR ROD OR EMBEDDED ITEM, AND THE EXTENT OR DEPTH OF EMBEDMENT
PRIOR TO PLACEMENT OF CONCRETE.
3. REDUCED BEAM SECTIONS (RBS) ☒ CONTINUOUS ☐ PERIODIC
VERIFY CONTOUR AND FINISH AS WELL AS DIMENSIONAL TOLERANCES (SEE TABLE
J8-1 OF AISC 341-10).
4. PROTECTED ZONES ☒ CONTINUOUS ☐ PERIODIC
VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS ARE MADE WITHIN THE
PROTECTED ZONE (SEE TABLE J8-1 OF AISC 341-10).
5. H-PILES ☒ CONTINUOUS ☐ PERIODIC
VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS OCCUR WITHIN THE
PROTECTED ZONES OF PILING (SEE TABLE J10-1 OF AISC 341-10).
STEEL ELEMENTS OF COMPOSITE CONSTRUCTION (TABLE N6.1, AISC 360-10; TABLES J9-1 THRU J9-3, AISC 341-10)
1. PLACEMENT AND INSTALLATION OF STEEL DECK ☒ CONTINUOUS ☐ PERIODIC
2. PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS ☒ CONTINUOUS ☐ PERIODIC
3. DOCUMENT ACCEPTANCE OR REJECTION OF STEEL ELEMENTS ☒ CONTINUOUS ☐ PERIODIC
4. REINFORCING STEEL ☐ CONTINUOUS ☒ PERIODIC
VERIFY APPROPRIATE REINFORCEMENT SIZE, SPACING, AND ORIENTATION; THAT IT
HAS NOT BEEN RE-BENT IN FIELD; THAT IT IS CORRECTLY TIED AND SUPPORTED; AND
THAT REQUIRED STEEL CLEARANCES HAVE BEEN PROVIDED.
5. COMPOSITE MEMBER SIZE ☐ CONTINUOUS ☒ PERIODIC VERIFY THAT COMPOSITE MEMBER IS THE REQUIRED SIZE.
POST-INSTALLED ANCHORS
CONCRETE CONSTRUCTION (IBC 1705.3 AND IBC CHAPTER 19)
1. CAST-IN ANCHORS & EMBEDS ☐ CONTINUOUS ☒ PERIODIC COMPLY WITH SECTIONS 1.9 & 17.8.2 OF ACI 318-14.
2. POST-INSTALLED ANCHORS (ADHESIVE) ☒ CONTINUOUS ☐ PERIODIC
ALL POST-INSTALLED ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS
REQUIRED BY THE APPROVED ICC-ES REPORT, AND SHALL COMPLY WITH SECTIONS
17.8.2, 26.7.2, AND 26.13.3.2&3 OF ACI 318-14.
3. POST-INSTALLED ANCHORS (NON-ADHESIVE) ☐ CONTINUOUS ☒ PERIODIC
ALL POST-INSTALLED ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS
REQUIRED BY THE APPROVED ICC-ES REPORT, AND SHALL COMPLY WITH SECTIONS
17.8.2, 26.7.2, AND 26.13.3.2&3 OF ACI 318-14.
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
S-3M WHITE
B. SEIUM ABBREVIATIONS AND SYMBOLS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
ABBREVIATIONS
SPAN DIRECTION OF TWO WAY
SLAB
SPAN DIRECTION OF ONE WAY
SLAB OR METAL ROOF DECK
RAMP SLOPE DOWN
RAMP SLOPE UP
SLAB STEP
ELEVATION TARGET
NORTH ARROW
REVISION CLOUD
REVISION
GENERAL SYMBOLS
P R
O
JE
C T
N O
R T H
E S
W
X
ADDL ADDITIONAL
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASSY ASSEMBLY
B/ BOTTOM OF
BLDG BUILDING
BM BEAM
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BW BOTH WAYS
C/C CENTER TO CENTER
CCD CHICAGO CITY DATUM
CIP CAST IN PLACE
CJ CONSTRUCTION JOINT, CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
COORD COORDINATE, COORDINATION
CTR CENTER
CU FT CUBIC FOOT
CU YD CUBIC YARD
DEG DEGREE
DEMO DEMOLISH
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DWG DRAWING
DWGS DRAWINGS
(E) EXISTING
EA EACH
EF EACH FACE
EL ELEVATION
ELEC ELECTRICAL
EMBED EMBEDDED
ENGR ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL, EQUIVALENT
EQUIP EQUIPMENT
EW EACH WAY
EXIST EXISTING
EXP JT EXPANSION JOINT
EXT EXTERIOR
FF FINISHED FLOOR
FIN FINISH
FLR FLOOR
FDN FOUNDATION
FS FAR SIDE
FT FOOT, FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GC GENERAL CONTRACTOR
GYP GYPSUM
GYP BD GYPSUM BOARD
HORIZ HORIZONTAL
ID INSIDE DIAMETER
IN INCH(ES)
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JST JOIST
JT JOINT
K KIPS
KSI KIPS PER SQUARE INCH
LAT LATERAL
LB POUND
LFH LONG FACE HORIZONTAL
LFV LONG FACE VERTICAL
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LSL LONG SLOT
LVL LAMINATED VENEER LUMBER
LW LIGHT WEIGHT
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MEP MECHANICAL ELECTRICAL PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MK MARK
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NW NORMAL WEIGHT
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPP HD OPPOSITE HAND
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERIM PERIMETER
PREP PERPENDICULAR
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLUMB PLUMBING
PLYWD PLYWOOD
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT POST TENSIONED
QTY QUANTITY
RAD RADIUS
REBAR REINFORCING BAR
REF REFER, REFERENCE
REINF REINFORCE, REINFORCEMENT
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
SC SLIP CRITICAL
SCHED SCHEDULE
SE STRUCTURAL ENGINEER
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPECS SPECIFICATIONS
SQ SQUARE
SQ YD SQUARE YARD
SS STAINLESS STEEL
SSL SHORT SLOT
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SYM SYMMETRICAL
T&B TOP & BOTTOM
T/ TOP OF
TEMP TEMPORARY
THRU THROUGH
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WF WIDE FLANGE
WP WORK POINT
WWF WELDED WIRE FABRIC
MARK DESIGNATIONS
Bx INDICATES BEAM TYPE. REFER TO BEAM SCHEDULE AND
DETAILS FOR ADDITIONAL INFORMATION.
BFx INDICATES BRACED FRAME TYPE. REFER TO BRACED FRAME
ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION.
Cx INDICATES COLUMN TYPE. REFER TO COLUMN SCHEDULE
AND DETAILS FOR ADDITIONAL INFORMATION.
CCx INDICATES CAISSON CAP TYPE. REFER TO CAISSON CAP
SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
CSx INDICATES CAISSON TYPE. REFER TO CAISSON SCHEDULE
AND DETAILS FOR ADDITIONAL INFORMATION.
DPx INDICATES DRIVEN / DRIVEN / DRILLED PILE TYPE. REFER TO
DRILLED PILE SCHEDULE AND DETAILS FOR ADDITIONAL
INFORMATION.
Fx INDICATES SPREAD FOOTING TYPE. REFER TO FOOTING
SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
GBx INDICATES GRADE BEAM TYPE. REFER TO GRADE BEAM
SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
Jx INDICATES JOIST TYPE. REFER TO CONCRETE JOIST
SCHEDULE AND DETAILS FOR ADDITIONAL INFORMATION.
Lx INDICATES LINTEL TYPE. REFER TO LINTEL SCHEDULE AND
DETAILS FOR ADDITIONAL INFORMATION
Px INDICATES PIER TYPE. REFER TO PIER DETAILS FOR
ADDITIONAL INFORMATION.
PCx INDICATES PILE CAP TYPE. REFER TO PILE CAP DETAILS FOR
ADDITIONAL INFORMATION.
PCBx INDICATES PRECAST BEAM TYPE BY PRECAST
MANUFACTURER.
PCPx INDICATES PRECAST PLANK TYPE BY PRECAST
MANUFACTURER.
PTBx INDICATES POST TENSIONED BEAM TYPE. REFER TO POST
TENSIONED BEAM SCHEDULE AND DETAILS FOR ADDITIONAL
INFORMATION.
SWx INDICATES SHEAR WALL TYPE. REFER TO SHEAR WALL
ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION.
SWBx INDICATES SHEAR WALL BEAM TYPE. REFER TO SHEAR WALL
BEAM SCHEDULE AND DETAILS FOR ADDITIONAL
INFORMATION.
PRECAST
GEOFOAM
CONCRETE MASONRY (ELEVATION)
CONCRETE MASONRY (PLAN)
WOOD
STEEL
CONCRETE
GROUT / SAND
GRAVEL
EARTH / NATIVE SOIL
HATCH PATTERNS
SPAN DIRECTION OF TWO WAY
SLAB
SPAN DIRECTION OF ONE WAY
SLAB OR METAL ROOF DECK
RAMP SLOPE DOWN
RAMP SLOPE UP
SLAB STEP
ELEVATION TARGET
NORTH ARROW
REVISION CLOUD
REVISION
GENERAL SYMBOLS
P R
O
JE
R T H
E S
W
X
ROOFTOP UNIT DESIGNATION
ROOF FALL ARREST
ROOF TIEBACK
ROOF DAVIT
COLUMN ABOVE
COLUMN SPLICE
STAIR CONNECTION
BEAM OPENING. REFER TO BEAM OPENING
SCHEDULE FOR ADDITIONAL INFORMATION.
SLIDE BEARING CONNECTION
SLIP CRITICAL CONNECTION
DRAG STRUT CONNECTION
MOMENT CONNECTION
STEEL FRAMING SYMBOLS
X
RTU#
XXX LBS
B
B'
A.9
SS-3
SS-4
PL1PL2
PLB
PLA
(E) 18" CONC SLAB
T/SLAB EL = 0' - 0"
6.
in
248.90 in
C1
C1C1
C1
C2
SS-4
SS-3
NOTES:
1. T/(E) SLAB-ON-GRADE EL = 0'-0" = 749.00 NAVD88
2. REFER TO SS-5 FOR COLUMN AND BASE PLATE SCHEDULE.
3. VERIFY ALL COLUMN LOCATIONS WITH FRA PRIOR TO
FABRICATION.
3'
3"
1'
3"
3'
1/
2"
9'
1/ 2"
3' - 5" 1' - 6" 10' - 6 3/4" 14' - 5 1/4"
25' - 0"
SS-5
TYP,
UNO
SS-5
5'
3" 2'
7"
1'
1/
2"
4 3/4"
PLATFORM ALIGNED WITH (E)
COLD BOX CDS INTERFACE
PER DRAWING F10209024.
STAIR LANDING SUPPORT POST
C4
(E) CMU WALL
(E) CONC FTG (TYP)
(E) WF COL (TYP)
(E) BRACE FRAME)
(E) PRECAST WALL
SS-5
3/8" = 1'-0"
1 5 7
SCALE FEET
30 2 4 6
P R
O J E
R
T H
E
S
W
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
3/8" = 1'-0"
SC-1M WHITE
B. SEIUM FOUNDATION PLAN11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: 3/8" = 1'-0"
LEVEL 01 PLAN AT PLATFORM
B
B'
A.9
SS-3
SS-4
PL1PL2
PLB
PLA
SS-4
SS-3
6.
in
248.90 in
3'
3"
1'
3"
3'
1/
2"
9'
1/ 2"
1' - 6" 10' - 6 3/4" 14' - 5 1/4"
25' - 0"
NOTES:
1. G1 - INDICATES 1 1/2"x1/4" 19W4 HOT DIP GALVANIZED BAR GRATING.
2. T/GRATING EL = 11'-8"
3. T/STEEL EL= 11'-6 1/2", UNO
4. VERIFY LOCATION OF ALL FRAMING SUPPORTING FERMILAB EQUIPMENT WITH
FRA PRIOR TO FABRICATION.
W14x34 [T/EL=8' - 7"]
W x3
[T /E
L= 8'
7"
W14x34 [T/EL=8' - 7"]
W x3
[T /E
L= 8'
7"
W12x22
G
W12x22
W14x48
W x3
W14x48
W x3
W14x34
4' - 4" 1' - 10 1/2"
3'
1/
2"
5'
3"
2'
7"
W12x22 W x3
W x2
W14x48
3' - 5" 11' - 8" 4 3/4"
PLATFORM ALIGNED WITH (E)
COLD BOX CDS INTERFACE
PER DRAWING F10209024.
2'
1/
2"
1 5/8"
5/
8"
1 1/2"1 1/2"
2' - 1 1/2"
2'
9" 3'
1/ 2"
1/
2"
7" 3' - 5"
(2)L5x5x3/8 VERTICAL BRACING
(TYP)
DEWAR CAN LOAD
= 1200LB
TEMPORARY GRATING
TO BE CUT AND
REMOVED PRIOR TO
EQUIPMENT
INSTALLATION
W12x22 - COORDINATE
LOCATION WITH FRA
SS-7 TYP @ 1 1/2"
GAURDRAIL
LADDER
1 1/2" METAL
GAURDRAIL (TYP)
SS-5 TYP
(E) WF COL (TYP)
(E) CMU WALL
SS-5
SS-5
3/8" = 1'-0"
1 5 7
SCALE FEET
30 2 4 6
P R
O J E
R
T H
E
S
W
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
3/8" = 1'-0"
SS-1M WHITE
B. SEIUM LOW PLATFORM FRAMING PLAN11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: 3/8" = 1'-0"
LOW PLATFORM FRAMING PLAN
B
B'
A.9
SS-3
SS-4
PL1PL2
PLB
PLA
6.
in
248.90 in
3'
3"
1'
3"
3'
1/
2"
9'
1/ 2"
1' - 6" 10' - 6 3/4" 14' - 5 1/4"
25' - 0"
3'
1/
2"
/2
1'
1/ 2"
5'
3"
C3
W24x104
W x1
W33x130 W/ PL WELDED
W x1
W x5
[T /E
L=
6"
W x5
[T /E
L=
6"
W x3
W x3
G1
SS-4
G1
G1
W33x130
W x3
W 8x
W 8x
HSS6x6x3/8
[T/EL=23' - 7"]
HSS6x6x3/8 [T/EL=23' - 7"]
W 8x
W 8x
2' - 5 1/2" 11 1/2" 12' - 0 3/4"
7'
2"
W8x18
W8x18
W8x18 W8x18
W8x18
W8x18
1' - 3"1' - 3"
W8x18
NOTES:
A. G1 - INDICATES 1 1/2"x1/4" 19W4 HOT DIP GALVANIZED BAR GRATING.
B. T/GRATING EL = 15'-0", UNO
C. T/STEEL EL= 14'-10 1/2", UNO
D. COORDINATE L4x4 ANGLE LOCATIONS AT CDS1 AND CDS2 WITH FRA.
E. SEE DETAILS FOR CHANNEL ORIENTATION.
1'
4" 1'
1/ 2"
1' - 5 1/2" 2' - 10 1/2" 5' - 9" 3' - 5 1/4"
L4x4x1/4 HORIZONTAL
BRACING (TYP)
3/ 4"
1 5/8"
3/
8"
DOUBLE ANGLE VERTICAL
BRACING (TYP)
PLATFORM ALIGNED
WITH (E) COLD BOX
CDS INTERFACE PER
DRAWING F10209024.
W8x18
W8x18
W8x18
CDS1
CDS2
CDS1 - INDICATES CDS MACHINE LOAD PER EACH ANCHOR PLATE OF
A. CASE 1:
Fx = -12.4K Fz = -7.9K My = -83.2K-FT
B. CASE 2:
Fx = 12.4K Fz = -3.6K My = 72.8K-FT
CDS2 - INDICATES CDS MACHINE LOAD PER EACH ANCHOR PLATE OF
A. CASE 1:
Fz = -4.2K My = 8.3K-FT
B. CASE 2:
Fz = -6.5K My = 18.3K-FT
(x DIRECTION - PROJECT EAST DIRECTION) (y DIRECTION - PROJECT NORTH DIRECTION) (z DIRECTION - UPWARD VERTICAL)
600 LB HANGING
LOAD
600 LB HANGING
LOAD
T/GRATING EL = 11' - 8"
/4
HSS COL BELOW
C x2 0.
C x2 0.
TEMPORARY GRATING TO BE
CUT AND REMOVED PRIOR TO
EQUIPMENT INSTALLATION
SS-6
TYP
SS-5
SS-6
SS-6
SS-7 TYP @ 1 1/2"
GAURDRAIL
LADDER
HSS8x8x1/2 [T/EL=11' - 6 1/2"]
SS-7 TYP @ 2 1/2"
GAURDRAIL
1 1/2" METAL GAURDRAIL
(TYP)
2 1/2" METAL GAURDRAIL
(TYP)
L6x4x3/8L6x4x3/8
L4x4x1/4 L4x4x1/4
L4x4x1/4
L4x4x1/4
L6x4x3/8
L6x4x3/8
SS-5
C8x11.5 [T/EL=11' - 6 1/2"]
1/2"
SWING GATE
SS-6
5/
8"
SS-6
2' - 2"
C12x20.7 [T/EL=11' - 10"]
(E) WF COL
(E) BRACE FRAME
W24x104
SS-5
SCALE: 3/8" = 1'-0"
PLATFORM FRAMING PLAN
3/8" = 1'-0"
1 5 7
SCALE FEET
30 2 4 6
P R
O J E
R
T H
E
S
W
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
3/8" = 1'-0"
SS-2M WHITE
B. SEIUM PLATFORM FRAMING PLAN11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23 y x z
LEVEL 01
0"
T/STEEL @ PLATFORM
14' - 10 1/2"
SS-4
T/STEEL @ LOW PLATFORM
11' - 6 1/2"
T/STEEL
13' - 6"
T/LOW STEEL
8' - 7"
PL1PL2
SS-4
EQUIPMENT
ANCHORAGE BY FRA
DVB TANK BY FRA
WF BEAM (TYP)
CUT TOP FLANGE AND WEB
TO PROVIDE RECESS FOR
EQUIPMENT
PROVIDE PL WELDED TO
WEB OF BEAM, SEE
METAL GRATING
(TYP)
WF COL (TYP)
HSS POST
HSS BEAM
METAL GUARD RAIL
(TYP)
7'
5"
EQUIPMENT
ANCHORAGE BY FRA
LADDER
SS-6
SS-7
SS-7
OPP HD
TYP
SWING GATE
2' - 6"
2' - 0" 5' - 3 1/2" 2' - 0"
/10 SS-6
LEVEL 01
0"
LOWER HOOK LIMIT
1' - 0"
T/STEEL @ PLATFORM
14' - 10 1/2"
SS-4
T/STEEL @ LOW PLATFORM
11' - 6 1/2"
T/STEEL
13' - 6"
T/LOW STEEL
8' - 7"
PL1PL2
SS-4
WF BEAM (TYP)
METAL GRATING
(TYP) EQUIPMENT
ANCHORAGE BY FRA
DVB TANK BY FRAMETAL GUARD RAIL
(TYP)
7'
5"
SS-7
OPP
HD
SS-7
TYP
3/8" = 1'-0"
1 5 7
SCALE FEET
30 2 4 6
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
3/8" = 1'-0"
SS-3M WHITE
B. SEIUM SECTIONS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: 3/8" = 1'-0" SC-1
2SECTION AT PLATFORM
SCALE: 3/8" = 1'-0" SC-1
1SECTION AT PLATFORM
SS-1, SS-2 SS-1, SS-2
LEVEL 01
0"
CB'
TOP OF CRANE RUNWAY
27' - 0"
T/STEEL @ PLATFORM
14' - 10 1/2"
SS-3
T/STEEL
13' - 6"
T/LOW STEEL
8' - 7"
PLBPLA
SS-3
EQUIPMENT
ANCHORAGE BY FRA
DVB TANK BY FRA
WF BEAM (TYP)
CUT TOP FLANGE AND WEB
TO PROVIDE RECESS FOR
EQUIPMENT
PROVIDE WELDED TO WEB
OF BEAM, SEE
METAL GRATING
(TYP)
KICKER ANGLE
7'
5"
METAL GUARD
RAIL
SS-6
SS-7
/10 SS-6
LEVEL 01
0"
CB'
TOP OF CRANE RUNWAY
27' - 0"
T/STEEL @ PLATFORM
14' - 10 1/2"
SS-3
T/STEEL @ LOW PLATFORM
11' - 6 1/2"
T/STEEL
13' - 6"
T/LOW STEEL
8' - 7"
PLBPLA
SS-3
WF BEAM
(TYP)
METAL GRATING
(TYP)
WF COL (TYP)
DOUBLE ANGLE
BRACE (TYP)
METAL GUARD
RAIL (TYP)
STAIR LANDING
SUPPORT POST
SS-6
SS-6
SS-7
1 4" MAX
SCALE: 3/8" = 1'-0" SC-1
2SECTION AT PLATFORM
SCALE: 3/8" = 1'-0" SC-1
1SECTION AT PLATFORM
3/8" = 1'-0"
1 5 7
SCALE FEET
30 2 4 6
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
3/8" = 1'-0"
SS-4M WHITE
B. SEIUM SECTIONS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SS-1, SS-2 SS-1, SS-2
COL
HIGH STRENGTH BOLTS IN
BEARING TYPE CONNECTION.
REFER TO SHEAR PLATE
CONNECTION SCHEDULE
FOR SIZE AND NUMBER.
WF BEAM (TYP)
WF COLUMN
NOTES:
1. SEE SHEAR PLATE CONNECTION SCHEDULE
FOR ADDITIONAL INFORMATION.
SHEAR PLATE
CONNECTION (TYP)
1/4
1/4
TYP
GIRDER
SHEAR PLATE
CONNECTION (TYP)
HIGH STRENGTH BOLTS IN
BEARING TYPE CONNECTION.
REFER TO SHEAR PLATE
CONNECTION SCHEDULE FOR
SIZE AND NUMBER.
WF BEAM (TYP)
1/4
1/4
TYP
NOTES:
1. SEE SHEAR PLATE CONNECTION SCHEDULE FOR
ADDITIONAL INFORMATION.
NOTES:
1. SEE SHEAR PLATE CONNECTION SCHEDULE
FOR ADDITIONAL INFORMATION.
COL
SHEAR PLATE
CONNECTION (TYP)
HIGH STRENGTH BOLTS IN
BEARING TYPE CONNECTION.
REFER TO SHEAR PLATE
CONNECTION SCHEDULE FOR
SIZE AND NUMBER
WF BEAM (TYP)
WF COLUMN
CJP (TYP)
1/4
1/4
TYP
CONTINUITY PLATE
THICKNESS TO MATCH
THICKNESS OF THICKER
BEAM FLANGE + 1/8" (TYP)
1/4
1/4 3-SIDES
TYP
WF COL
/4
N
O N
-S H
R
IN
K G
R O
U T
B A
S E
P L
/4
S
E T
T
IN
G P
L A
T E
(4) HAS GR36 THREADED ROD
W/ HILTI-HY200 ADHESIVE
L
W
E M
B E
D M
E N
T
1/4
TYP
2"
CL COL & BASE PL
(4) WASHER
PLATES
HSS COL
/4
N
O N
-S H
R
IN
K G
R O
U T
B A
S E
P L
/4
S
E T
T
IN
G P
L A
T E
(4) HAS THREADED ROD
W/ HILTI-HY200 ADHESIVE
E M
B E
D M
E N
T
1/4
TYP
2"
CL COL & BASE PL
W
L
(4) WASHER
PLATES
L3 1/2x2 1/2x3/8
(TYP)
WF BEAM (TYP)
(6) 3/4" DIA A325-X HIGH
STRENGTH BOLTS IN BEARING
TYPE CONNECTION
GIRDER
CJP (TYP)
HSS COL
GRATING
WF BEAM (TYP)
(4) A325-X BOLTS
1/4
W
L
B A
S E
P L
WF BEAM (TYP)
SHEAR PL
CONNECTION
PER
WF BEAM (TYP)
HIGH STRENGTH BOLTS IN
BEARING TYPE CONNECTION.
REFER TO SHEAR PLATE
CONNECTION SCHEDULE FOR
SIZE AND NUMBER
GIRDER
CJP (TYP)
/4 SS-5
HSS COL
WF BEAM
3/4" Ø A325-X BOLTS IN
SHORT SLOTTED HOLES
3/8" SHEAR
PLATE
1/4
1/4
NOTES:
1. SEE DETAIL 4/SS-5 FOR REQUIRED NUMBER OF BOLTS.
2. PROVIDE 3/8" CAP PLATE AT ROOF LOCATION UNLESS NOTED
OTHERWISE.
NOT TO SCALE
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
SS-5M WHITE
B. SEIUM STEEL DETAILS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: NTS SS-2
SHEAR PLATE BEAM
TO GIRDER
CONNECTION
SCALE: NTS
SHEAR PLATE BEAM
TO COLUMN FLANGE
CONNECTION
SCALE: NTS SS-1
SHEAR PLATE BEAM
TO COLUMN
WEB MOMENT
CONNECTION
SHEAR PLATE CONNECTION SCHEDULE
BEAM SIZE SHEAR PLATE SIZE SHEAR PLATE LENGTH BOLTS # OF BOLTS
W8, W10 3/8x3 1/2 6" 3/4" Ø A325-X 2
W12, W14 3/8x3 1/2 9" 3/4" Ø A325-X 3
W16, W18 3/8x3 1/2 12" 3/4" Ø A325-X 4
W21 3/8x3 1/2 15" 3/4" Ø A325-X 5
W24 3/8x3 1/2 18" 3/4" Ø A325-X 6
W27 3/8x3 1/2 21" 3/4" Ø A325-X 7
W30 3/8x3 1/2 24" 3/4" Ø A325-X 8
W33 3/8x3 1/2 27" 3/4" Ø A325-X 9
W36 3/8x3 1/2 30" 3/4" Ø A325-X 10
STEEL COLUMN SCHEDULE
MARK SIZE
BASE PLATE
(txWxL)
ANCHORS/BOLTS EMBED DETAIL
C1 W10x60 3/4x12x1'-6 1" DIA 9" 1/SS-5
C2 HSS6x6x3/8 3/4x14x1'-2 3/4" DIA 9" 2/SS-5
C3 HSS6x6x3/8 3/4x12x1'-2 3/4" DIA - 3/SS-5
C4 HSS8x8x3/8 3/4x16x1'-4 3/4" DIA 9" 2/SS-5
SCALE: NTS SC-1
WF COLUMN BASE
PLATE
SCALE: NTS SC-1
HSS COLUMN BASE
PLATE
SCALE: NTS SS-2
HSS COLUMN BASE
PLATE
SCALE: NTS SS-2
DOUBLE ANGLE
CONNECTION AT
CANTILEVERED BEAM
SCALE: NTS SS-1
BEAM TO BEAM
MOMENT
CONNECTION
SCALE: NTS SS-1
BEAM TO HSS
COLUMN SHEAR
PLATE CONNECTION
DETAIL
SS-6
SHEAR PL CONN
PER
BEAM
BRACE
BRACE
BEAM
WF BEAM
WF BEAM
HORIZ BRACE
(TYP)
/4 SS-5
SS-6
1" M
A X
BEAM
1/4
1/4
TYPWF BEAM
BRACE ANGLE (TYP)
PL 3/8x5x0'-5 (TYP) SHEAR PL CONN
PER /4 SS-5
1"
(2) 3/4" DIA A325-X @ 3" OC
(TYP)
WF BEAM (TYP)
KICKER ANGLE
PL 3/8x4x4 (TYP)
1/4
TYP
1/4
TYP
T/STEEL
EL = SEE PLAN
T/STEEL
EL = SEE PLAN
SHEAR PL CONN
PER (TYP)/4 SS-5
GRATING
(2)L4x4x3/8 W/ A325-SC
BOLTS, SEE
FOR BOLT QTY
/4 SS-5
WF BEAM (TYP)
EQUIPMENT
ANCHORAGE BY FRA
DVB TANK BY FRA
TEMPORARY GRATING TO BE
CUT AND REMOVED PRIOR TO
EQUIPMENT INSTALLATION
G
CJP
HSS BEAM
HSS COL
3/8" CAP PL
(3/16)
COL
2' - 6 "
PLA
WF COL
WF BEAM (TYP)
SHEAR PL CONN
PER /4 SS-5
GRATING
DOUBLE ANGLE BRACE
SHEAR PL CONN
PER /5 SS-5
1/4
1/4
1/4
TY
P
1/ 2"
C
LR
PL 3/8 (TYP)
METAL GAURD RAIL (TYP)
(2) 3/4" DIA A325-X
BOLT (TYP)
PL1x12x1'-6 W/
(4) 3/4" DIA
A325X BOLTS
1/4
WP 1/4
1 1/2" DIA METAL GAURD RAIL (TYP)
GRATING
PLB
WF COL
WF BEAM
(TYP)
C12 STAIR STRINGER
SHEAR PL CONN
PER (TYP)/4 SS-5
HSS BEAM
HSS COL
(2) 3/4" DIA A325-X
BOLTS ON EA SIDE
OF HSS COL
1/2x4x12 FACE PL
W/ 1/2 STIFFENER
1/4
1/4
TYP
SS-6
L3 1/2x3 1/2x3/8 W/ (3) 3/4" DIA
A325-X BOLTS (TYP)
PL1x12x1'-6 W/
(4) 3/4" DIA
A325X BOLTS
1/4
2"
TYP
9 1/2"
TY
P
5/
8"
1/4
(5/16)
TYP
CHANNEL (TYP)
1'
7" 1'
3'
6"
1 1/2" METAL HAND RAIL (TYP)
2'
(2)PL1x12x1'-2
PL3/8 (TYP)
1/4
3 SIDES 2' - 4"
SS-7
(TYP)
STEEL BAR GRATING
STAIR TREAD
STAIR STRINGER (TYP)
BAR GRATING SUPPORT
FRAMING PER BAR GRATING
STAIR TREAD MFR
STEEL BAR GRATING
STAIR LANDING
ADJACENT PLATFORM
AND STRUCTURE BY
FERMILAB
CHANNEL
PLATE
CJP
3/8 SHEAR PL W/ (2) 3/4"
DIA A325-X BOLTS
1/4
1/4
T/STEEL
EL = SEE PLAN
T/STEEL
EL = SEE PLAN
WF BEAM
PL3/4x6 (TYP)
WF BEAM TO
BE CUT
(3/8) 3-12
TYP
NOT TO SCALE
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
SS-6M WHITE
B. SEIUM STEEL DETAILS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: NTS SS-2
HORIZONTAL
BRACING
CONNECTION
SCALE: NTS SS-6
HORIZONTAL
BRACING
CONNECTION
SCALE: NTS SS-2
BRACE CONNECTION
DETAIL
SCALE: NTS SS-2
ANCHOR PLATE
SECTION
SCALE: NTS SS-2
HSS OUTRIGGER
CONNECTION
SCALE: NTS SS-4
VERTICAL BRACING
CONNECTION
SCALE: NTS SS-4
8STAIR STRINGER
SCALE: NTS SS-6
9STAIR TREAD DETAIL
SCALE: NTS SS-2
STAIR LANDING
DETAIL
SCALE: NTS SS-6
10BEAM REINF DETAIL
1/
2" 1'
6"
1'
6"
1 1/2" DIA GUARDRAIL POST
GRATING
WF BEAM
1 1/2" DIA HORIZONTAL RAIL (TYP)
3/16
TYP
SLEEVE
3'
1/
2"
9" 1'
1/ 2"
1'
0" 6"
1'
0" 1'
0"
6"
1'
9"
2 1/2" DIA GUARDRAIL POST
GRATING
WF BEAM
2 1/2" DIA HORIZONTAL
RAIL (TYP)
3/16
TYP
SLEEVE
8'
1/
2"
METAL GAURDRAIL POST W/ SLEEVE BASE,
PROVIDE 3 1/2" DIA SLEEVE FOR 2 1/2" POST
AND 2 1/2" DIA SLEEVE FOR 1 1/2" POST
WF BEAM
3"
1/4
SS-7
6"
GUARDRAIL POST
GRATING
WF BEAM
MOUNTING SLEEVE
W/ LOCKING PIN
3"
1 1/2" DIA GUARDRAIL POST
GRATING
STAIR STRINGER
1 1/2" DIA HORIZONTAL RAIL (TYP)
3/16
TYP
3'
6"
3/16
TYP
1 1/2" DIA HANDRAIL
3"
2'
NOT TO SCALE
4-3-3E
CPB CDS PLATFORM
REVISIONS
DATEREV. DESCRIPTIONS
DRAWING NO. REV.
SCALE:
CHECKED
DRAWN
DESIGNED
Fermilab Managed by Fermi Research Alliance for the U.S. Department of Energy Office of Science
Facilities Engineering
Services Section
SS-7M WHITE
B. SEIUM STEEL DETAILS11/17/23
/1
/2
C HENRICHS 11/17/23
11/17/23
SCALE: NTS SS-1
2GUARDRAIL DETAIL
SCALE: NTS SS-2
1GUARDRAIL DETAIL
SCALE: NTS
GUARDRAIL BASE
DETAIL
SCALE: NTS SS-7
GUARDRAIL BASE
DETAIL
SCALE: NTS SS-6
STAIR RAILING
DETAIL
| 4-3-3E_G-1-Layout1 |
| S-1 - STRUCTURAL NOTES |
| S-2 - IBC TESTING AND INSPECTIONS |
| S-3 - ABBREVIATIONS AND SYMBOLS |
| SC-1 - FOUNDATION PLAN |
| SS-1 - LOW PLATFORM FRAMING PLAN |
| SS-2 - PLATFORM FRAMING PLAN |
| SS-3 - SECTIONS |
| SS-4 - SECTIONS |
| SS-5 - STEEL DETAILS |
| SS-6 - STEEL DETAILS |
| SS-7 - STEEL DETAILS |
File details come from the government source that posted it. Updated .