4-04 Plans.pdf
PDF 15 MB Posted
- Solicitation number
- 26-04CSP
- Issued by
- Collin County, Texas
About this file
This document is a detailed fire protection engineering set of drawings and plans for the Corporate Hangar 3 project at McKinney National Airport, prepared by Reed Fire Protection Engineering. The project, dated July 16, 2025, involves comprehensive fire protection system modifications, including fire alarm system replacement, high expansion foam system upgrades, and door and window replacements. The scope includes replacing fire doors and windows with 45-minute fire-rated assemblies, installing new fire detection and notification devices across the first and second floors, and updating the existing fire suppression infrastructure.
The project specifically addresses the McKinney Air Center facility, which spans approximately 24,503 square feet and is fully sprinklered. Key modifications include upgrading fire alarm components, replacing duct detectors, installing new notification appliances, and recertifying windows and frames to meet fire safety standards. The plans detail specific technical requirements for mounting devices, power supply connections, and system integration, with careful attention to compliance with NFPA 72 and NFPA 80 standards. The comprehensive approach suggests a thorough modernization of the facility's fire protection systems to enhance safety and meet current regulatory requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCKINNEY NATIONAL AIRPORT
JULY 16, 2025
CORPORATE HANGAR 3
CS1.0
COVER
SHEET
OWNER
MCKINNEY NATIONAL AIRPORT
1508 INDUSTRIAL BLVD.
MCKINNEY, TEXAS 75069
PROJECT ENGINEER
REED FIRE PROTECTION ENGINEERING
4201 SPRING VALLEY ROAD, SUITE 570
DALLAS, TEXAS 75244
Albert W. Reed, PE, Fire Protection Engineer ............. (214) 638 - 7599 ext.103 Darren Roberts, SET, Fire Protection Consultant ........ (214) 638 - 7599 ext.102 Taylor Goetze, CFPS, Fire Protection Consultant ........ (214) 638 - 7599 ext.106
PROJECT NO. #2025026
SYMBOL LEGENDS
SUBSCRIPT
NOTES
FIRE ALARM SYSTEM REPLACEMENT
DRAWINGS
PROJECT SCOPE
FIRE PROTECTION MODIFICATION
AutoCAD SHX Text CODES AND STANDARDS: 1. IBC - INTERNATIONAL BUILDING CODE, 2021 EDITION IBC - INTERNATIONAL BUILDING CODE, 2021 EDITION 2. IFC - INTERNATIONAL FIRE CODE, 2021 EDITION IFC - INTERNATIONAL FIRE CODE, 2021 EDITION 3. IMC - INTERNATIONAL MECHANICAL CODE, 2021 EDITION IMC - INTERNATIONAL MECHANICAL CODE, 2021 EDITION 4. NFPA 409 - STANDARD FOR AIRCRAFT HANGARS, 2022 NFPA 409 - STANDARD FOR AIRCRAFT HANGARS, 2022 5. NFPA 72 - NATIONAL FIRE ALARM CODE, 2025 EDITION NFPA 72 - NATIONAL FIRE ALARM CODE, 2025 EDITION 6. NFPA 70 - NATIONAL ELECTRIC CODE, 2023 EDITION NFPA 70 - NATIONAL ELECTRIC CODE, 2023 EDITION 7. CITY OF MCKINNEY 2021 AMENDED FIRE CODES CITY OF MCKINNEY 2021 AMENDED FIRE CODES OCCUPANCY CLASSIFICATION (STORAGE/BUSINESS): S AND B NFPA 409 HANGAR CLASSIFICATION: GROUP 2 DEMOLITION NOTES: 1. THE NEW FIRE ALARM SYSTEM SHALL BE 100% COMPLETE THE NEW FIRE ALARM SYSTEM SHALL BE 100% COMPLETE WITH END TO END WARRANTY, TESTED, AND APPROVED, BY THE AUTHORITY HAVING JURISDICTION PRIOR TO DEMOLITION OF EXISTING EQUIPMENT. 2. THE CONTRACTOR SHALL FIELD VERIFY AND CAREFULLY THE CONTRACTOR SHALL FIELD VERIFY AND CAREFULLY REMOVE ALL EXISTING FIRE ALARM EQUIPMENT AND WIRING BACK TO THE NEAREST JUNCTION BOXES. 3. THE CONTRACTOR SHALL COORDINATE WITH MCKINNEY THE CONTRACTOR SHALL COORDINATE WITH MCKINNEY NATIONAL AIRPORT (MNA) FOR THE REMOVAL OF THE EXISTING FIRE ALARM SYSTEM EQUIPMENT AND WIRING. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION, SIZE AND QUANTITY OF ALL FIRE PROTECTION EQUIPMENT TO BE REMOVED PRIOR TO BIDDING. 5. CONTRACTOR SHALL FIELD VERIFY AND REMOVE ALL CONTRACTOR SHALL FIELD VERIFY AND REMOVE ALL EXISTING FIRE ALARM DEVICES, EQUIPMENT, WIRE MOLD, AND WIRING. EXISTING EQUIPMENT SHOWN IS APPROXIMATE. ADDITIONAL EQUIPMENT MAY EXIST AND SHALL BE REMOVED. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PAINTING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PAINTING AND PATCHING. COORDINATE WITH MNA FOR APPROVED CEILING TILE, PAINT, PATCHING MATERIALS, COVER PLATES, AND ECT. GENERAL NOTES: 1. THE AUTHORITY HAVING JURISDICTION IS THE CITY OF THE AUTHORITY HAVING JURISDICTION IS THE CITY OF MCKINNEY. 2. REPLACE THE EXISTING FIRE ALARM SYSTEMS THROUGHOUT REPLACE THE EXISTING FIRE ALARM SYSTEMS THROUGHOUT WITH A UL LISTED ANALOG ADDRESSABLE FIRE ALARM SYSTEM IN ACCORDANCE WITH THE CITY OF MCKINNEY ADOPTED CODES AND AMENDMENTS. REMOVE EXISTING AFFF FOAM HAND LINE SYSTEM AND THE EXISTING HIGH EXPANSION FOAM SYSTEM. PROVIDE 1 YEAR WARRANTY FOR ALL FIRE ALARM COMPONENTS. 3. THE FIRE ALARM SYSTEM DRAWINGS AND PERFORMANCE THE FIRE ALARM SYSTEM DRAWINGS AND PERFORMANCE INFORMATION ARE PROVIDED TO COVEY SCOPE INTENT ONLY. EQUIPMENT LOCATIONS INDICATED ARE RECOMMENDATIONS ONLY. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY AND COORDINATE ALL SYSTEM(S) REQUIRED LABOR AND MATERIALS FOR A COMPLETE FULLY COMPLIANT SYSTEM(S). 4. THE PLANS ARE SCHEMATIC IN NATURE. THE DESIGN IS THE PLANS ARE SCHEMATIC IN NATURE. THE DESIGN IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL PROVIDE FULLY CALCULATED AND DESIGNED SYSTEMS. THE DESIGN SHALL BE SEALED, STAMPED AND APPROVED BY A THE CONTRACTORS RESPONSIBLE APS. THE CONTRACTOR PROVIDE ALL SERVICES REQUIRED FOR THE PROJECT SCOPE INCLUDING BY NOT LIMITED TO; DESIGN, CALCULATIONS, REVIEW, PE SEALING OF DESIGN, DRAWINGS, OR DOCUMENTS, CONSTRUCTION ADMINISTRATION, RFI RESOLUTIONS, SITE VISITS, MEETINGS, INSPECTIONS, DOCUMENTATION, TESTING, ETC. 5. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN OPERABLE DURING CONSTRUCTION AND SHALL NOT BE TAKEN OFFLINE UNTIL THE NEW SYSTEM IS COMMISSIONED BY THE AHJ AND ACTIVE. IF THE FIRE ALARM SYSTEM IS REQUIRED TO BE TAKEN OFFLINE FOR CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND PAYING FOR FIRE WATCH THAT IS APPROVED BY THE AHJ. THE FIRE WATCH SHALL BE PROVIDED FOR THE DURATION THAT THE FIRE ALARM OR SPRINKLER SYSTEM IS OFFLINE. 6. THE SYSTEM INSTALLATION SHALL BE PHASED IN THE SYSTEM INSTALLATION SHALL BE PHASED IN ACCORDANCE WITH CLIENT REQUIREMENTS. THE NEW FIRE ALARM SYSTEM SHALL INCLUDE BUT NOT BE LIMITED TO: CONTROL EQUIPMENT, NOTIFICATION POWER EXPANDERS, ADDRESSABLE MODULES, SPOT-TYPE PHOTO SMOKE AND HEAT DETECTION, MANUAL PULL STATIONS, STROBE UNITS, NOTIFICATION APPLIANCES, AND MISCELLANEOUS CONNECTIONS SUCH AS, ALL 120 VOLT ELECTRICAL POWER, WIRE AND CONNECTIONS, AUXILIARY RELAYS, INTERFACE/MONITORING OF RELEASING FIRE CONTROL PANELS, ENERGY MANAGEMENT AND ACCESS CONTROL SYSTEMS, RELEASE OF DOOR LOCKS, ETC. 7. ALL EQUIPMENT AND WIRING SHALL BE NEW. CONTRACTOR ALL EQUIPMENT AND WIRING SHALL BE NEW. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUIT RACEWAY AND/OR WIREMOLD AS REQUIRED IN ALL EXPOSED AREAS AND AS REQUIRED TO COMPLY WITH SURVIVABILITY REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL SYSTEM DESIGN, SUBMITTAL, APPROVAL, PERMITS, AND ANY ADDITIONAL EQUIPMENT REQUIRED DURING THE PROJECT. 8. TO THE EXTENT POSSIBLE, THE NEW FIRE ALARM SYSTEMS TO THE EXTENT POSSIBLE, THE NEW FIRE ALARM SYSTEMS WILL UTILIZE OPEN ARCHITECTURE PROTOCOLS. THE WORK COVERED BY THIS PROJECT CONSISTS OF THE CONTRACTOR FURNISHING ALL DETAILED DESIGN AND DETAILED INSTALLATION DRAWINGS (PLANS AND DETAILS), ALL LAYOUT, SURVEY, PLANT, LABOR, SUPERVISION, QUALITY CONTROL, MATERIALS, EQUIPMENT, MACHINES, TOOLS, APPLIANCES, PROGRAMING, CONDUIT RACEWAY, SERVICES, SUPPLIES, PAINTING/PATCHING, INCIDENTALS, AND OF PERFORMING ALL OPERATIONS IN CONNECTION WITH THE FIRE ALARM SYSTEM REPLACEMENT FOR THE BUILDING. COMPLETE AND IN STRICT ACCORDANCE WITH NFPA STANDARDS, AND THE CITY ADOPTED FIRE CODE. INSTALLATION SHALL BE BY A FACTORY AUTHORIZED AND TRAINED DISTRIBUTOR. THE NETWORK FIRE ALARM SYSTEM(S) SHALL COMMUNICATE VIA TRANSMITTER TO AN OFF-SITE UL CENTRAL STATION. ALL SIGNALS SHALL BE TRANSMITTED “CONTACT I.D.” WITH CONTACT I.D.” WITH WITH BUILDING, LOCATION, AND DEVICE (ADDRESS) DEFINED. IF POSSIBLE ONE MONITORING ACCOUNT SHALL BE USED FOR ALL BUILDINGS. 9. THE BUILDING WILL BE OCCUPIED DURING INSTALLATION OF THE BUILDING WILL BE OCCUPIED DURING INSTALLATION OF NEW FIRE ALARM SYSTEMS. THE EXISTING FIRE ALARM SYSTEMS SHALL REMAIN FULLY OPERATIONAL DURING THE INSTALLATION OF NEW FIRE ALARM SYSTEMS. 10. THE PROJECT CONSISTS OF DESIGN AND INSTALLATION OF THE PROJECT CONSISTS OF DESIGN AND INSTALLATION OF NEW FULLY CODE COMPLIANT FIRE ALARM SYSTEMS USING NEW CABLING, CONNECTIONS, PROGRAMMING, AND REMOVAL OF THE EXISTING FIRE ALARM SYSTEMS UPON COMPLETION IN ACCORDANCE WITH THE CITY. 11. THE PLANS ARE SCHEMATIC IN NATURE. THE CONTRACTOR THE PLANS ARE SCHEMATIC IN NATURE. THE CONTRACTOR SHALL PROVIDE FULLY CALCULATED AND DESIGNED SYSTEMS. THE DESIGN SHALL BE STAMPED AND APPROVED BY A REGISTERED PROFESSIONAL ENGINEER (PE-FIRE PROTECTION) AND/OR A CURRENT APS (ALARM PLANNING SUPERINTENDENT) CERTIFIED BY THE TEXAS STATE FIRE MARSHAL'S OFFICE. 12. THIS PROJECT GENERALLY CONSISTS OF, BUT IS NOT THIS PROJECT GENERALLY CONSISTS OF, BUT IS NOT LIMITED TO; SUBMITTALS AND CALCULATIONS, NEW FIRE ALARM SYSTEM DESIGN AND COMPLETE INSTALLATION PER NFPA 72, WIRING, NETWORK EQUIPMENT, AND CONNECTIONS AS WELL AS TESTING/COMMISSIONING OF THE COMPLETED INSTALLED SYSTEM. UPON COMPLETION OF THE NEW FIRE ALARM SYSTEM; DEMOLITION OF EXISTING FIRE ALARM SYSTEM COMPONENTS AND CONDUIT TO THE NEAREST JUNCTION BOX ABOVE THE CEILING SHALL BE PERFORMED. 13. UPON COMPLETION OF WORK THE CONTRACTOR SHALL UPON COMPLETION OF WORK THE CONTRACTOR SHALL PROVIDE TO THE OWNER'S DESIGN PROFESSIONAL: ONE (1) SET OF RED-LINE AS-BUILT DRAWINGS AND A SET OF CD'S WITH AUTOCAD FILES OF THE CONTRACTOR'S AS-BUILT DRAWINGS, FLOOR PLANS WITH DEVICE LOCATIONS, DEVICE ADDRESSES, WIRE/CONDUIT ROUTING, CALCULATIONS, AND WIRING DIAGRAMS FROM LAST APPROVED SUBMITTALS. 14. THE FIRE ALARM CONTRACTOR SHALL BE AN AUTHORIZED THE FIRE ALARM CONTRACTOR SHALL BE AN AUTHORIZED DISTRIBUTOR AND INSTALLER OF THE FIRE ALARM SYSTEM EQUIPMENT PROPOSED AND INSTALLED. THE FIRE ALARM SYSTEM CONTRACTOR SHALL HAVE COMPLETED EQUIPMENT TRAINING WITH PROOF OF CERTIFICATIONS. 15. PERFORM ALL TESTING AND COMMISSIONING SERVICES PERFORM ALL TESTING AND COMMISSIONING SERVICES UTILIZING AND COMPLETING THE FIRE ALARM SYSTEM ACCEPTANCE TEST PER NFPA 72 AND AHJ. 16. THE CONTRACTOR SHALL PROVIDE FIRESTOPPING AND FIRE THE CONTRACTOR SHALL PROVIDE FIRESTOPPING AND FIRE SAFING THROUGHOUT THE BUILDING AT ALL PENETRATIONS ALL PENETRATIONS PENETRATIONS PERFORMED UNDER THIS CONTRACT. 17. FIRE ALARM CONTRACTOR SHALL FIELD VERIFY, PROVIDE, FIRE ALARM CONTRACTOR SHALL FIELD VERIFY, PROVIDE, AND INSTALL ALL REQUIRED DUCT DETECTION IN ACCORDANCE WITH NFPA 90A AND THE INTERNATIONAL CODES. CONTRACTOR SHALL FIELD VERIFY AND MAKE ALL REQUIRED CONNECTIONS TO MECHANICAL EQUIPMENT OR SYSTEMS FOR A COMPLETE AND APPROVED SYSTEM. ALL DUCT DETECTION SHALL INITIATE A SUPERVISORY SIGNAL. DUCT DETECTION MAY NOT BE SHOWN AS COMPLETE ON THIS PLAN. CONTRACTOR IS RESPONSIBLE FOR FIELD SURVEY, LOCATING, INSTALLATION, AND PROGRAMING OF ALL DUCT DETECTION. INCLUDE ADD/DELETE PRICING IN BID. 18. FLUSH MOUNT ALL EQUIPMENT WHERE POSSIBLE. FLUSH MOUNT ALL EQUIPMENT WHERE POSSIBLE. CONTRACTOR SHALL PROVIDE AND INSTALL BACK BOXES THAT MATCH THE EXACT SIZE OF SURFACE MOUNTED NOTIFICATION APPLIANCES AND INITIATING DEVICES. EQUIPMENT SHALL NOT HANG OVER ELECTRICAL BOXES. PANELS/EQUIPMENT THAT IS NOT FLUSH MOUNT SHALL COMPLY WITH ALL ADA REQUIREMENTS. 19. ISOLATION MODULES SHALL BE IN ACCORDANCE WITH ISOLATION MODULES SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND SHALL BE INSTALLED TO ISOLATE THE SLC CIRCUIT AND TO PREVENT CIRCUIT LOSS. 20. MANUAL PULL STATIONS SHALL BE INSTALLED IN MANUAL PULL STATIONS SHALL BE INSTALLED IN ACCORDANCE TO NFPA 72. MOUNT THE OPERABLE PART OF MANUAL PULL STATIONS AT 48" A.F.F. 21. RACEWAY SYSTEM SHALL BE ESTHETICALLY PLEASING IN RACEWAY SYSTEM SHALL BE ESTHETICALLY PLEASING IN EXPOSED CEILING AREAS. RACEWAY SHALL BE PAINTED TO MATCH SURROUNDINGS. UFP SHALL PRE-APPROVE ALL CONDUIT OR WIREMOLD PRIOR TO INSTALLATION. 22. LABEL POWER SUPPLY DISCONNECT SWITCH RED AND LABEL POWER SUPPLY DISCONNECT SWITCH RED AND LABEL "FIRE ALARM". FIRE ALARM CONTROL PANEL 120VAC POWER SHALL BE DEDICATED. DEDICATED POWER CIRCUITS SHALL BE EQUIPPED WITH BREAKER LOCK (NON-SWEEPING STYLE). 23. FIRE ALARM CONTRACTOR SHALL PROVIDE ALL POWER FIRE ALARM CONTRACTOR SHALL PROVIDE ALL POWER LIMITED AND NON-POWER LIMITED CIRCUITS. 24. COORDINATE WITH CLIENT FOR APPROVED POWER SUPPLY COORDINATE WITH CLIENT FOR APPROVED POWER SUPPLY LOCATIONS. POWER SUPPLIES SHALL BE LOCATED IN AN ENVIRONMENTALLY CONDITIONED SPACE. LOCATE ALL POWER SUPPLIES IN EASY TO REACH LOCATIONS NO HIGHER THAN 6'-0 A.F.F. 25. DO NOT LOCATE DETECTORS INDIRECT AIR OR CLOSER DO NOT LOCATE DETECTORS INDIRECT AIR OR CLOSER THAN THREE (3) FEET FROM AIR SUPPLY OR RETURN DIFFUSER. 26. PROVIDE 16AWG MINIMUM SIGNALING LINE CIRCUITS (CLASS PROVIDE 16AWG MINIMUM SIGNALING LINE CIRCUITS (CLASS A). 27. PROVIDE 14AWG MINIMUM NOTIFICATION APPLIANCE CIRCUITS PROVIDE 14AWG MINIMUM NOTIFICATION APPLIANCE CIRCUITS (CLASS B). 28. PROVIDE CLASS A OR CLASS X SIGNALING LINE CIRCUITS PROVIDE CLASS A OR CLASS X SIGNALING LINE CIRCUITS WITH FOUR (4) FEET SEPARATION. 29. PROVIDE CLASS B, NOTIFICATION APPLIANCE CIRCUITS. PROVIDE CLASS B, NOTIFICATION APPLIANCE CIRCUITS. 30. COORDINATE NOTIFICATION APPLIANCES WITH WHITE FACE COORDINATE NOTIFICATION APPLIANCES WITH WHITE FACE PLATES THROUGHOUT THE BUILDING. 31. PROVIDE DEDICATED 120VAC POWER TO ALL CONTROL PROVIDE DEDICATED 120VAC POWER TO ALL CONTROL PANELS. THE CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CODES, DETERMINE CIRCUIT REQUIREMENTS AND INSTALL ALL WIRING, EQUIPMENT, CONDUIT RACEWAY AND CONNECTIONS FOR A COMPLETE SYSTEM. 32. NEW FIRE ALARM SYSTEM SHALL BE ANALOG ADDRESSABLE. NEW FIRE ALARM SYSTEM SHALL BE ANALOG ADDRESSABLE. THE CONTRACTOR SHALL CONFIRM LOCATION ONSITE AND PROVIDE ALL CABLE AND CONNECTIONS REQUIRED FOR A COMPLETE APPROVED SYSTEM. 33. CONTRACTOR SHALL PROVIDE FIRE ALARM NOTIFICATION CONTRACTOR SHALL PROVIDE FIRE ALARM NOTIFICATION APPLIANCE POWER SUPPLIES AS REQUIRED. SMOKE DETECTION SHALL BE PROVIDED FOR PROTECTION OF CONTROL EQUIPMENT IN ACCORDANCE WITH NFPA 72. 34. THE CONTRACTOR SHALL VERIFY AND PROVIDE ALL THE CONTRACTOR SHALL VERIFY AND PROVIDE ALL REQUIRED SMOKE AND CARBON MONOXIDE DETECTION IN ACCORDANCE WITH NFPA 720, NFPA 72, NFPA 70 AND 2021 INTERNATIONAL BUILDING CODES AS AMENDED BY THE CITY OF MCKINNEY. SMOKE AND CO DETECTION SHOWN ON THE DRAWINGS IS SCHEMATIC ONLY AND DOES NOT DEPICT ALL REQUIRED EQUIPMENT. 35. FIRE ALARM CONTRACTOR SHALL PROVIDE AND INSTALL FIRE ALARM CONTRACTOR SHALL PROVIDE AND INSTALL ADDRESSABLE MODULES AS REQUIRED FOR CONNECTION TO SUPPRESSION SYSTEMS TO INCLUDE BUT NOT BE LIMITED TO SPRINKLER SYSTEMS, FIRE PUMPS, AND OTHER AUXILIARY SYSTEMS. 36. PROVIDE SURGE PROTECTION IN ACCORDANCE WITH NFPA PROVIDE SURGE PROTECTION IN ACCORDANCE WITH NFPA 70 AND NFPA 72. 37. WIRING METHODS SHALL COMPLY WITH NFPA 72. CONDUIT WIRING METHODS SHALL COMPLY WITH NFPA 72. CONDUIT AND CI CABLE SHALL BE INSTALL WHERE REQUIRED. 38. CONTRACTOR SHALL VERIFY INTELLIGIBILITY DBA LEVELS CONTRACTOR SHALL VERIFY INTELLIGIBILITY DBA LEVELS MEET CODE REQUIREMENTS BY MEASUREMENT AFTER INSTALLATION PER NFPA 72. 39. ALL HORN STROBES AND HORN APPLIANCES SHALL ALL HORN STROBES AND HORN APPLIANCES SHALL PRODUCE AN AUDIBLE TONE 15 dBA OVER AVERAGE AMBIENT NOISE LEVELS FOR ITS TARGET AREA. CONTRACTOR SHALL FIELD VERIFY AUDIBILITY. 40. ALL WORK SHALL BE PERFORMED IN A NEAT AND ALL WORK SHALL BE PERFORMED IN A NEAT AND WORKMANLIKE MANNER AND IN ACCORDANCE WITH ALL APPLICABLE NATIONAL, STATE, AND LOCAL CODES. 41. CONTRACTOR'S SUBMITTAL OF AN OFFER REPRESENTS THAT CONTRACTOR'S SUBMITTAL OF AN OFFER REPRESENTS THAT THEY HAVE VISITED THE SITE AND ARE FAMILIAR WITH EXISTING CONDITIONS THAT MAY AFFECT ANY PORTION OF THE WORK. 42. THE PLANS AND SPECIFICATIONS CONTAINED HEREIN THE PLANS AND SPECIFICATIONS CONTAINED HEREIN REPRESENT THE SCOPE OF WORK TO BE PROVIDED. CONTRACTOR SHALL PROVIDE ALL WORK SHOWN ON THESE DOCUMENTS AND ALL WORK THAT CAN BE REASONABLY INFERRED TO BE INCLUDED. ENGINEER SHALL BE THE SOLE INTERPRETER OF THE INTENT OF THE PLANS AND SPECIFICATIONS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AND SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THAT PORTION OF THE WORK. 43. IN ALL CASES, CARE SHALL BE TAKEN TO CREATE AS IN ALL CASES, CARE SHALL BE TAKEN TO CREATE AS LITTLE NUISANCE AS POSSIBLE. CORRIDORS SHALL BE KEPT FREE OF HAZARDOUS EXTENSION CORDS, EQUIPMENT, TRASH, AND OTHER SITUATIONS THAT COULD RESULT IN INJURY TO VISITORS OR EMPLOYEES OF THE CONTRACTOR. 44. PRIOR TO SUBMITTING AN OFFER, THE CONTRACTOR SHALL PRIOR TO SUBMITTING AN OFFER, THE CONTRACTOR SHALL CHECK ON THE AVAILABILITY OF ALL MATERIALS SPECIFIED AND QUALIFY IN WRITING AT THE TIME OF BIDDING IF ANY MATERIALS SHOULD REQUIRE A LONG LEAD TIME OR ARE NOT AVAILABLE WITHIN A REASONABLE TIME FRAME. 45. UPON SELECTION OF THE CONTRACTOR, HE SHALL SUBMIT UPON SELECTION OF THE CONTRACTOR, HE SHALL SUBMIT A SCHEDULE OF WORK LISTING THE AREAS TO RECEIVE NEW WORK, THE STARTING DATES OF EACH PHASE OF WORK IN EACH AREA, THE LENGTH OF TIME TO COMPLETION, WORK TO BE PERFORMED AFTER HOURS AND A SCHEDULE OF VALUES FOR EACH PHASE OF WORK. 46. CONTRACTOR SHALL ACQUIRE AND PAY FOR ANY AND ALL CONTRACTOR SHALL ACQUIRE AND PAY FOR ANY AND ALL PERMITS OR FEES THAT MAY BE REQUIRED FOR THIS PROJECT. 47. CONTRACTOR SHALL INCLUDE ALL HAULING OF DEMOLISHED CONTRACTOR SHALL INCLUDE ALL HAULING OF DEMOLISHED MATERIALS OR TRASH GENERATED BY THIS PROJECT. TRASH SHALL BE REMOVED DAILY FROM THE AREAS BEING IMPROVED AND SHALL NOT BE ALLOWED TO ACCUMULATE. 48. UPON COMPLETION OF WORK, CONTRACTOR SHALL UPON COMPLETION OF WORK, CONTRACTOR SHALL THOROUGHLY CLEAN ALL AREAS WHERE WORK OCCURRED, AS WELL AS ANY "PATHS" THAT MAY HAVE BEEN ESTABLISHED DURING CONSTRUCTION. AREAS DESIGNATED BY THE MNA FOR STORAGE OF THE CONTRACTORS EQUIPMENT AND MATERIALS SHALL ALSO BE LEFT CLEAN, FREE OF DEBRIS OR EXCESS MATERIALS. 49. CONTRACTOR SHALL THOROUGHLY PROTECT ALL EXISTING CONTRACTOR SHALL THOROUGHLY PROTECT ALL EXISTING SURFACES DURING DEMOLITION AND CONSTRUCTION. ANY MATERIAL OR SURFACE THAT IS DAMAGED SHALL BE REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE. 50. THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND ACCURACY OF HIS WORK, CONFIRMING QUANTITIES, FOR SELECTING FABRICATION AND CONSTRUCTION PROCESSES, FOR TECHNIQUES OF ASSEMBLY, FOR PERFORMING HIS WORK IN A SAFE MANNER AND FOR ADHERING TO ALL APPLICABLE CODES. 51. AREAS TO RECEIVE NEW PAINT SHALL HAVE OLD PAINT AREAS TO RECEIVE NEW PAINT SHALL HAVE OLD PAINT REMOVED AND ANY REPAIRS MADE TO THE SUBSTRATE THAT MAY BE REQUIRED TO PROVIDE PROPER INSTALLATION OF PAINT MATERIALS, ADJACENT METAL, BRICK, AND GLASS SURFACES ARE TO BE PROTECTED AS REQUIRED FROM APPLICATION OVERSPRAY OR OTHER DAMAGE. 52. TO MINIMIZE DISRUPTION, ADDITIONAL PHASING OF WORK, TO MINIMIZE DISRUPTION, ADDITIONAL PHASING OF WORK, EVENING OR WEEKEND SCHEDULES OR OTHER MEASURES MAY BE REQUIRED TO COMPLETE PORTIONS OF THE PROJECT. 53. CONTRACTOR SHALL COORDINATE ACCESS TO CAMPUS CONTRACTOR SHALL COORDINATE ACCESS TO CAMPUS PRIOR TO INSTALLATION. 54. 907.5.2.3.4 NOTIFICATION ALARM CONTINUATION. FIRE 907.5.2.3.4 NOTIFICATION ALARM CONTINUATION. FIRE ALARM SYSTEMS SHALL BE PROGRAMMED NON-SILENCABLE FOR ALL EXTINGUISHING AND SUPPRESSION SYSTEMS. VISIBLE NOTIFICATION APPLIANCES SHALL CONTINUE TO OPERATE UNTIL THE FIRE ALARM SYSTEM HAS BEEN CLEARED AND RESET. 55. CONTRACTOR SHALL CONCEAL ALL FIRE ALARM SYSTEM CONTRACTOR SHALL CONCEAL ALL FIRE ALARM SYSTEM WIRING ABOVE ACCESSIBLE CEILINGS, IN ATTIC SPACES. ALL SPLICES SHALL BE MADE IN APPROVED JUNCTION BOXES. CONTRACTOR SHALL COMPLY WITH NFPA AND NATIONAL ELECTRICAL CODE REQUIREMENTS. 56. THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR THE ENTIRE PROJECT INCLUDING BUT NOT LIMITED TO NEW FIRE ALARM SYSTEM, CONDUITS, POWER, WIRING, AND DEMO. 57. THE CONTRACTORS SHALL COORDINATE ALL WORK WITH THE CONTRACTORS SHALL COORDINATE ALL WORK WITH BUILDING MANAGEMENT. 58. CONTRACTOR SHALL REFER TO EXISTING FIRE ALARM CONTRACTOR SHALL REFER TO EXISTING FIRE ALARM INSPECTION REPORTS, FIELD VERIFY QUANTITY AND LOCATION OF ALL SPRINKLER MONITORING EQUIPMENT. PROVIDE ALL EQUIPMENT AND MATERIALS REQUIRED FOR CONNECTION TO NEW, COMPLETE, CODE COMPLIANT, ANALOG ADDRESSABLE FIRE ALARM SYSTEM. 59. SEE FIRE ALARM SPECIFICATIONS 28 31 76 FOR SEE FIRE ALARM SPECIFICATIONS 28 31 76 FOR ADDITIONAL REQUIREMENTS. 60. FIRE ALARM DESIGN SURVEY WAS PERFORMED ON FIRE ALARM DESIGN SURVEY WAS PERFORMED ON 4-15-25. CHANGES TO BUILDING CONSTRUCTION, USE, INCLUDING FURNITURE CONFIGURATIONS, AND OCCUPANCY BEYOND THIS DATE WILL REQUIRE ADDITIONAL SURVEY AND REVISIONS TO THE FIRE ALARM SYSTEM. CONTRACTOR SHALL PERFORM A COMPLETE SURVEY OF THE BUILDING AND MAKE NOTE OF ALL CHANGES AND PROVIDE ALL REQUIRED EQUIPMENT PRIOR TO BEGINNING WORK. 61. ALL FIRE ALARM EQUIPMENT SHALL BE RATED/UL LISTED ALL FIRE ALARM EQUIPMENT SHALL BE RATED/UL LISTED FOR THE ENVIRONMENTAL CONDITIONS THEY ARE INSTALLED IN. PROVIDE WEATHERPROOF EQUIPMENT WHERE REQUIRED.
AutoCAD SHX Text
WEATHERPROOF APPLIANCE
AutoCAD SHX Text
WP
AutoCAD SHX Text
CEILING MOUNT APPLIANCE
AutoCAD SHX Text C
AutoCAD SHX Text
STROBE CANDELLA SETTING
AutoCAD SHX Text 75cd
AutoCAD SHX Text
FACP
AutoCAD SHX Text
AS BUILT CABINETS
AutoCAD SHX Text
DBX
AutoCAD SHX Text
FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
FIRE ALARM COMMUNICATOR
AutoCAD SHX Text
TRAN
AutoCAD SHX Text
FIRE ALARM ANNUNCIATOR PANEL
AutoCAD SHX Text
ANN
AutoCAD SHX Text
ADDRESSABLE PULL STATION (DOUBLE ACTION TYPE)
AutoCAD SHX Text F
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
HEAT DETECTOR
AutoCAD SHX Text
ADDRESSABLE MONITOR MODULE
AutoCAD SHX Text
AM
AutoCAD SHX Text
FIRE ALARM STROBE
AutoCAD SHX Text
FIRE ALARM HORN STROBE
AutoCAD SHX Text
FIRE ALARM HORN
AutoCAD SHX Text
FOAM SYSTEM MANUAL RELEASING STATION
AutoCAD SHX Text
FO
AutoCAD SHX Text
FO
AutoCAD SHX Text
FOAM SYSTEM ABORT/STOP SWITCH (DEAD-MAN STYLE)
AutoCAD SHX Text
LOW TEMP SWITCH
AutoCAD SHX Text
LT
AutoCAD SHX Text
SPRINKLER TAMPER SWITCH
AutoCAD SHX Text
SPRINKLER WATERFLOW SWITCH
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
WATERFLOW ALARM PRESSURE SWITCH
AutoCAD SHX Text SHEET LIST: CS1.0 - COVER SHEET FA-1 - 1ST FLOOR FIRE ALARM FA-2 - 2ND FLOOR FIRE ALARM FA-3 - ROOF FIRE ALARM FA-4 - DETAILS FA-5 - DIAGRAMS FP-1 - AFFF HAND LINE DEMOLITION FP-2 - HIGH EXPANSION FOAM SYSTEM DEMOLITION F-1 - HANGAR BAY DOOR REPLACEMENT F-2 - HANGAR BAY WINDOW REPLACEMENT OR RE-CERTIFY F-3 - DOOR AND WINDOW SCHEDULE
AutoCAD SHX Text PROJECT SCOPE THE PROJECT SCOPE ENCOMPASSES, BUT IS NOT LIMITED TO: ALL WORK SHALL BE PERFORMED BY THE CONTRACTOR IN STRICT COMPLIANCE WITH THE 2025 EDITION OF NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, THE 2021 INTERNATIONAL FIRE CODE (IFC) AS ADOPTED AND AMENDED BY THE CITY OF MCKINNEY, TEXAS, AND ALL OTHER APPLICABLE CITY OF MCKINNEY CODES, ORDINANCES, AND ADMINISTRATIVE RULINGS. FOR WORK COMMENCING ON OR AFTER OCTOBER 1, 2025, COMPLIANCE SHALL TRANSITION TO THE 2024 INTERNATIONAL FIRE CODE (IFC) AS ADOPTED AND AMENDED BY THE CITY OF MCKINNEY, TEXAS. 1. INSTALLATION OF A NEW NFPA 72-COMPLIANT ANALOG INSTALLATION OF A NEW NFPA 72-COMPLIANT ANALOG ADDRESSABLE FIRE ALARM SYSTEM THROUGHOUT THE FACILITY. THIS INCLUDES ALL CONTROL PANELS, NOTIFICATION APPLIANCES, INITIATING DEVICES, AND ASSOCIATED WIRING AND PROGRAMMING FOR FULL BUILDING COVERAGE AND INTEGRATION. 2. PERFORM AND PROVIDE A RADIO SURVEY FOR EMERGENCY PERFORM AND PROVIDE A RADIO SURVEY FOR EMERGENCY RESPONDER RADIO COVERAGE. IF DEEMED NECESSARY PER RADIO SURVEY PROVIDE THE REQUIRED EMERGENCY RESPONDER TWO-WAY RADIO SYSTEM. PROVIDE CONNECTION TO FIRE ALARM SYSTEM AS REQUIRED. 3. DECOMMISSIONING AND DEMOLITION OF ALL EXISTING FIRE DECOMMISSIONING AND DEMOLITION OF ALL EXISTING FIRE ALARM SYSTEM COMPONENTS, INCLUDING BUT NOT LIMITED TO, CONTROL PANELS, WIRING, SENSORS, AND NOTIFICATION DEVICES. 4. DECOMMISSIONING, REMOVAL, AND DISPOSAL OF THE DECOMMISSIONING, REMOVAL, AND DISPOSAL OF THE EXISTING FIRE PUMP, INCLUDING THE FIRE PUMP UNIT, CONTROLLER, DEDICATED POWER SUPPLY, ALL ASSOCIATED HYDRAULIC PIPING, VALVES, AND ANCILLARY EQUIPMENT. 5. DECOMMISSIONING, REMOVAL, AND CERTIFIED DISPOSAL OF DECOMMISSIONING, REMOVAL, AND CERTIFIED DISPOSAL OF THE EXISTING AQUEOUS FILM-FORMING FOAM (AFFF) SUPPRESSION SYSTEM, INCLUDING THE BLADDER TANK, FOAM CONCENTRATE, ASSOCIATED PIPING NETWORK, RISER ASSEMBLIES, HAND LINES, AND DISCHARGE NOZZLES. DISPOSAL SHALL ADHERE TO ALL APPLICABLE ENVIRONMENTAL REGULATIONS AND HAZARDOUS WASTE PROTOCOLS. 6. DECOMMISSIONING, REMOVAL, AND CERTIFIED DISPOSAL OF DECOMMISSIONING, REMOVAL, AND CERTIFIED DISPOSAL OF THE EXISTING HIGH EXPANSION FOAM (HEF) SUPPRESSION SYSTEM, INCLUDING THE BLADDER TANK, FOAM CONCENTRATE, ASSOCIATED PIPING NETWORK, RISER ASSEMBLIES, HAND LINES, AND DISCHARGE NOZZLES. DISPOSAL SHALL ADHERE TO ALL APPLICABLE ENVIRONMENTAL REGULATIONS AND HAZARDOUS WASTE PROTOCOLS. 7. MANAGEMENT OF ALL LOGISTICS AND COSTS ASSOCIATED MANAGEMENT OF ALL LOGISTICS AND COSTS ASSOCIATED WITH THE TRANSPORTATION AND CERTIFIED DISPOSAL OF AFFF AND HIGH EXPANSION FOAM CONCENTRATES IN ACCORDANCE WITH ALL APPLICABLE ENVIRONMENTAL REGULATIONS AND HAZARDOUS WASTE PROTOCOLS. 8. RESTORATION OF IMPACTED ARCHITECTURAL SURFACES RESTORATION OF IMPACTED ARCHITECTURAL SURFACES POST-EQUIPMENT REMOVAL, INCLUDING PATCHING AND PAINTING. ALL WALLS, INCLUDING WALLS FORMING THE FIRE BARRIER BETWEEN THE HANGAR AND OTHER OCCUPANCY SPACES SHALL BE RESTORED TO MAINTAIN THEIR ORIGINAL 1-HOUR FIRE RESISTANCE RATING, IN COMPLIANCE WITH BUILDING CODES AND THE PRINCIPLES OF NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, REGARDING THE INTEGRITY OF FIRE BARRIERS. 9. COMPREHENSIVE SYSTEM TESTING AND CERTIFICATION FOR COMPREHENSIVE SYSTEM TESTING AND CERTIFICATION FOR ALL NEWLY INSTALLED SYSTEMS, COMPLIANT WITH RELEVANT NFPA STANDARDS (E.G., NFPA 72, NFPA 13 AS APPLICABLE) AND CITY OF MCKINNEY INSPECTION PROTOCOLS. THIS INCLUDES UL CENTRAL STATION MONITORING SERVICE ACTIVATION AND A 1-YEAR PARTS AND LABOR WARRANTY FOR THE COMPLETE FIRE ALARM SYSTEM. ALL NECESSARY PERMITS AND ELECTRONIC REPORTING THROUGH THE CITY'S ONLINE PLATFORM (E.G., IROL) SHALL BE COMPLETED BY THE SERVICE PROVIDER. 10. REPLACEMENT AND RECERTIFICATION OF EXISTING REPLACEMENT AND RECERTIFICATION OF EXISTING FIRE-RATED DOORS AND WINDOWS LOCATED WITHIN DESIGNATED 1-HOUR FIRE BARRIER ASSEMBLIES. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, ENSURING PROPER INSTALLATION, LABELING, HARDWARE, AND OPERATIONAL FUNCTIONALITY FOR THE SPECIFIED FIRE RESISTANCE RATING. THIS INCLUDES VERIFICATION OF CLEARANCES, SELF-CLOSING/AUTOMATIC-CLOSING DEVICES, AND POSITIVE LATCHING. ALL ASSOCIATED PERMITS AND INSPECTIONS REQUIRED BY THE CITY OF MCKINNEY FIRE MARSHAL'S OFFICE SHALL BE OBTAINED. 11. INSPECTION AND RECERTIFICATION OF THE EXISTING INSPECTION AND RECERTIFICATION OF THE EXISTING OVERHEAD WET PIPE SPRINKLER SYSTEM, IN FULL COMPLIANCE WITH NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS, AND ALL APPLICABLE CITY OF MCKINNEY CODES AND AMENDMENTS.
UP
OFFICE
OFFICE
OFFICE
BREAK
ROOM
OFFICE
BREAK
ROOM
CONFERENCE
ROOM
CONFERENCE
ROOM
MULTI
OFFICE
REST
ROOM
REST
ROOM
STORAGE
LASER
LAB
LASER
LAB
MULTI
OFFICE
STORAGE
RISER LEAD
IN
STORAGE
ENTRY/CORRIDOR
ENTRY/SHOW
ROOM
ELEVATOR
STAIR
ELECTRICAL
ROOM
ENTRY/CORRIDOR
HANGAR
POPULATION
LAB
CLASSROOM/LAB
SIMULATOR
ROOM
MULTI
OFFICE
CLASSROOM LIFT
ROOM
STORAGE
STORAGE
CORRIDOR
CORRIDOR
ELECTRICAL
UP
KEYNOTE LEGEND
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
IN
G
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R O
AD
D
AL
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
AR
SU
IT
E
STE. 570
FIRE ALARM
PLAN
FA-1
1ST FLOOR1
FA-1
NORTH
FIRE ALARM PLAN SCALE: 1/8" = 1'-0"
EXISTING SPRINKLER RISER TO
REMAIN 2
FA-1
AutoCAD SHX Text
FACP
AutoCAD SHX Text F
AutoCAD SHX Text
DBX
AutoCAD SHX Text
TRAN
AutoCAD SHX Text
SS
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 115cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 115cd
AutoCAD SHX Text C
AutoCAD SHX Text 115cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 115cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text 184cd
AutoCAD SHX Text 184cd
AutoCAD SHX Text 185cd
AutoCAD SHX Text 185cd
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text
ANN
AutoCAD SHX Text
ANN
AutoCAD SHX Text
FIRE RISER MONITORING
AutoCAD SHX Text
AM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AM
AutoCAD SHX Text
AutoCAD SHX Text
1. IN LOCATIONS HAVING A 99.6% DRY BULB TEMPERATURE LESS THAN 40ºF PER ENGINEERING WEATHER DATA, PROVIDE LISTED/APPROVED FIXED TEMPERATURE SENSORS SET AT 40ºF. INITIATE LOW-TEMPERATURE CONDITIONS AT THE FACP AS A SUPERVISORY CONDITION. 2. LOCATE TEMPERATURE SENSORS AT THE SAME LEVEL AS THE ADJACENT SPRINKLER HEAD BRANCHLINE. PROVIDE CENTER TO CENTER SPACING NOT EXCEEDING 200 FT. (61.0 M), OR SPACING FROM THE WALL NOT EXCEEDING 100 FT.
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text 177cd
AutoCAD SHX Text
WP
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text THE CONTRACTOR SHALL VERIFY THAT SPRINKLERS ARE LOCATED AT THE TOP AND BOTTOM OF THE EXISTING ELEVATOR HOISTWAY. IF SPRINKLERS ARE PRESENT COMPLY WITH NFPA 2025 SECTION 21.3.7. SEE A.21.3.7 FOR ADDITIONAL CODE DETAILS. ALL INITIATING DEVICES INSTALLED IN THE HOISTWAY AND PIT SHALL BE ACCESSIBLE FOR SERVICE, TESTING, AND MAINTENANCE FROM OUTSIDE THE ELEVATOR HOISTWAY.
AutoCAD SHX Text
AutoCAD SHX Text 75cd
AutoCAD SHX Text
WP
AutoCAD SHX Text 185cd
AutoCAD SHX Text
WP
AutoCAD SHX Text F
AutoCAD SHX Text 30cd
AutoCAD SHX Text 30cd
AutoCAD SHX Text
DEMO FIRE PUMP AND ASSOCIATED EQUIPMENT
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DNDN
ENTRY/CORRIDOR
MULTI
OFFICE
MAIL/OFFICE
OFFICE
OFFICEOFFICE COPY
REST
ROOM
REST
ROOM
JAN/OFFICE
ELEVATOR
MACH.KITCHEN
OPEN
OFFICE
STORAGE
OPEN
OFFICE
OPEN
OFFICE
SIM
ROOM
OFFICE
OFFICEOFFICE
OFFICEOFFICE
OFFICEOFFICE
OFFICE
REST
ROOM
REST
ROOM
OFFICEOFFICE
OFFICE
OFFICE OFFICE
OFFICE
JAN/OFFICE
ENTRY/CORRIDOR
ENGINEERING
CONFERENCE
CORRIDOR
CORRIDOR
CORRIDOR
CONFERENCE
KEYNOTE LEGEND
OFFICE
ELEC
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
FIRE ALARM
PLAN
2ND FLOOR
FA-2
FA-2
NORTH
FIRE ALARM PLAN SCALE: 1/8" = 1'-0"
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 75cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
AM
AutoCAD SHX Text
AM
AutoCAD SHX Text
AM
AutoCAD SHX Text
AM
AutoCAD SHX Text
AutoCAD SHX Text THE CONTRACTOR SHALL VERIFY THAT SPRINKLERS ARE LOCATED AT THE TOP AND BOTTOM OF THE EXISTING ELEVATOR HOISTWAY. IF SPRINKLERS ARE PRESENT COMPLY WITH NFPA 2025 SECTION 21.3.7. SEE A.21.3.7 FOR ADDITIONAL CODE DETAILS. ALL INITIATING DEVICES INSTALLED IN THE HOISTWAY AND PIT SHALL BE ACCESSIBLE FOR SERVICE, TESTING, AND MAINTENANCE FROM OUTSIDE THE ELEVATOR HOISTWAY.
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text
WALL DOES NOT EXTEND TO LAY IN CEILING
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 30cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text C
AutoCAD SHX Text 15cd
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROOF PEAK
ROOF
ROOF
AHU 1
AHU 2
AHU 3 AHU 4 AHU 5
AHU 6
AHU 8
AHU 7
AHU 9
AHU 10
AHU 11
AHU 12
NOTE - DUCT DETECTOR LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD
VERIFY REQUIRED QUANTITIES. WHERE POSSIBLE, INSTALL DUCT DETECTION ON DUCT
INSIDE THE BUILDING IN LIEU OF ON ROOF. ALL DETECTION SHALL BE INSTALLED PER
NFPA 72 AND MANUFACTURERS REQUIREMENTS.
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
FIRE ALARM
PLAN
ROOF
FA-3
FA-3
NORTH
FIRE ALARM PLAN SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
FA-4
DETAILS
MOUNTING DETAIL
FIRE ALARM PLAN SCALE: N.T.S
ELEVATION DETAIL
FIRE ALARM PLAN SCALE: N.T.S
FA-4
FA-4
MOUNTING DETAIL
FIRE ALARM PLAN SCALE: N.T.S
FA-4
MOUNTING DETAIL
FIRE ALARM PLAN SCALE: N.T.S
FA-4
FCPS FACP
KEYNOTE LEGEND
TRANS
DOCUMENT
BOX
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
FA-5
DETAILS
FA-5
FA-5
AutoCAD SHX Text
DISPLAY ALARM DEVICE
AutoCAD SHX Text
ACTUATE COMMON ALARM SIGNAL INDICATOR AND AUDIBLE
AutoCAD SHX Text
ACTUATE SUPERVISORY INDICATOR AND AUDIBLE
AutoCAD SHX Text A
AutoCAD SHX Text
CONTROL PANEL RETURNS TO NORMAL (AUDIBLES AND VISUALS STOP)
AutoCAD SHX Text
ACTUATE AUDIO VISUAL/FIRE ALARM
AutoCAD SHX Text
TRANSMIT FIRE ALARM SIGNAL TO BASE FIRE DEPARTMENT
AutoCAD SHX Text
DISPLAY TROUBLE CONDITION
AutoCAD SHX Text
DISPLAY SUPERVISORY CONDITION
AutoCAD SHX Text
ACTUATE COMMON TROUBLE SIGNAL INDICATOR AND AUDIBLE
AutoCAD SHX Text
SILENCE PANEL AND FACILITY AUDIBLES ( VISUALS CONTINUE)
AutoCAD SHX Text
CONTROL UNIT
AutoCAD SHX Text
ANNUNCIATION
AutoCAD SHX Text
SYSTEM OUTPUTS
AutoCAD SHX Text
NOTIFICATION
AutoCAD SHX Text
GROUND FAULT
AutoCAD SHX Text
OPEN CIRCUIT
AutoCAD SHX Text
FIRE ALARM AC POWER FAILURE
AutoCAD SHX Text
FIRE ALARM SYSTEM LOW BATTERY
AutoCAD SHX Text
SYSTEM FUNCTIONS
AutoCAD SHX Text
MANUAL PULL STATION
AutoCAD SHX Text
AutoCAD SHX Text
SYSTEM INPUT
AutoCAD SHX Text
FIRE ALARM DEVICES
AutoCAD SHX Text
NOTIFICATION APPLIANCE CIRCUIT SHORT
AutoCAD SHX Text
INITIATION DEVICE FAILURE / MALFUNCTION
AutoCAD SHX Text
TRANSMIT TROUBLE SIGNAL TO BASE FIRE DEPARTMENT
AutoCAD SHX Text
TRANSMIT SUPERVISORY SIGNAL TO BASE FIRE DEPARTMENT
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text Q
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text V
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text Q
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text V
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text Y
AutoCAD SHX Text Z
AutoCAD SHX Text X
AutoCAD SHX Text Y
AutoCAD SHX Text Z
AutoCAD SHX Text
AutoCAD SHX Text
SYSTEM SILENCE BUTTON
AutoCAD SHX Text
SYSTEM RESET BUTTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FACP FUNCTION
AutoCAD SHX Text
AutoCAD SHX Text **NOTE: COORDINATE ALL ALARM SEQUENCES AND FLOOR TO FLOOR OCCUPANT NOTIFICATION IN ACCORDANCE WITH CITY OF DALLAS AMENDED FIRE CODES.
AutoCAD SHX Text
AutoCAD SHX Text
1ST FLOOR ELEVATOR LOBBY SMOKE DETECTOR
AutoCAD SHX Text
ELEVATOR MACHINE ROOM/HOIST WAY SMOKE DETECTION
AutoCAD SHX Text
ELEVATOR MACHINE ROOM/HOIST WAY HEAT DETECTOR
AutoCAD SHX Text
SPRINKLER WATER FLOW SWITCH
AutoCAD SHX Text
SPRINKLER TAMPER SWITCH
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
RECALL ELEVATOR CAB TO ALT FLOOR
AutoCAD SHX Text
ACTIVATE ELEVATOR LED FIRE MAN HAT WARNING INDICATOR
AutoCAD SHX Text
SHUNT MAIN LINE POWER TO ELEVATOR
AutoCAD SHX Text
SHUT DOWN ASSOCIATED AHU UNIT
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
CONTACT ID
AutoCAD SHX Text
TO OFF-SITE MONITORING SERVICE
AutoCAD SHX Text
SURGE PROTECTOR 120-HW
AutoCAD SHX Text
DEDICATED 120VAC
AutoCAD SHX Text
24VDC
AutoCAD SHX Text
1. DRAWING IS DIAGRAMMATIC ONLY AND DOES NOT INDICATE ALL REQUIRED
AutoCAD SHX Text
2. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR DEDICATED 120VAC
AutoCAD SHX Text
EQUIPMENT QUANTITIES OR CIRCUITS.
AutoCAD SHX Text
POWER PANEL AND BREAKER INFORMATION.
AutoCAD SHX Text
RISER DIAGRAM NOTES:
AutoCAD SHX Text
3. CONTRACTOR SHALL PROVIDE A COMPLETE RISER DIAGRAM BASED ON SPECIFIC
AutoCAD SHX Text
EQUIPMENT REQUIREMENTS.
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
24VDC
AutoCAD SHX Text
(SLC CKT - TYP)
AutoCAD SHX Text
MM
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
(SLC CKT - CLASS A RETURN)
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
(STROBE CKT - TYP)
AutoCAD SHX Text
SURGE PROTECTOR 120-HW
AutoCAD SHX Text
DEDICATED 120VAC
AutoCAD SHX Text
MM
AutoCAD SHX Text
AutoCAD SHX Text
EOLR
AutoCAD SHX Text C
AutoCAD SHX Text CONTRACTOR SHALL FIELD LOCATE AND PROVIDE FIRE ALARM MONITORING FOR ALL SPRINKLER SYSTEMS.
AutoCAD SHX Text
FIRE ALARM MATRIX
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
FIRE ALARM RISER DIAGRAM
SCALE: NTS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
DEMO
PLAN
DEMO PLAN AFFF HAND LINE SYSTEM
FP-1
FP-1
NORTH
FIRE PROTECTION PLAN SCALE: NTS
DEMO AFFF HAND LINE TANK WATER SUPPLY PIPING2
FP-1 NORTHFIRE PROTECTION PLAN SCALE: NTS
AFFF HAND LINE FOAM CONCENTRATE SUPPLY PIPING3
FP-1 NORTHFIRE PROTECTION PLAN SCALE: NTS
FIRE PUMP AND AFFF DEMO4
FP-1 FIRE PROTECTION PLAN SCALE: NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RED DASHED LINES AND RED HATCHED AREAS INDICATE SCOPE OF WORK FOR AFFF HAND LINE SYSTEM DEMOLITION. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL AFFF CONCENTRATE, FIRE PUMP, RISER, PIPING, HAND LINES, AND ASSOCIATED EQUIPMENT. ALL AREAS WHERE EQUIPMENT IS REMOVED OR ADDED AND PENETRATES A RATED ASSEMBLY SUCH AS A FIRE WALL OR FIRE BARRIER SHALL BE PATCHED, PAINTED AND FIRE STOPPED IN ACCORDANCE WITH AN APPROVED UL LISTING. UL LISTING SHALL BE SUBMITTED FOR REVIEW PRIOR TO INSTALL.
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
SUPRESSION
PLAN
DEMO PLAN HIGH EXPANSION FOAM SYSTEM
FP-2
FP-2
NORTH
FIRE ALARM PLAN SCALE: NTS
HIGH EXPANSION FOAM TANK WATER SUPPLY PIPING2
FP-2 NORTHFIRE PROTECTION PLAN SCALE: NTS
HIGH EXPANSION FOAM CONCENTRATE SUPPLY PIPING3
FP-2 NORTHFIRE PROTECTION PLAN SCALE: NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RED DASHED LINES AND RED HATCHED AREAS INDICATE SCOPE OF WORK FOR HIGH EXPANSION FOAM SYSTEM DEMOLITION. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL HIGH EXPANSION FOAM CONCENTRATE, FIRE PUMP, RISER, PIPING, AND ASSOCIATED EQUIPMENT. ALL AREAS WHERE EQUIPMENT IS REMOVED OR ADDED AND PENETRATES A RATED ASSEMBLY SUCH AS A FIRE WALL OR FIRE BARRIER SHALL BE PATCHED, PAINTED AND FIRE STOPPED IN ACCORDANCE WITH AN APPROVED UL LISTING. UL LISTING SHALL BE SUBMITTED FOR REVIEW PRIOR TO INSTALL.
UP
OFFICE
OFFICE
OFFICE
BREAK
ROOM
OFFICE
BREAK
ROOM
CONFERENCE
ROOM
CONFERENCE
ROOM
MULTI
OFFICE
REST
ROOM
REST
ROOM
STORAGE
LASER
LAB
LASER
LAB
MULTI
OFFICE
STORAGE
FIRE PUMPRISER LEAD
IN
STORAGE ENTRY/CORRIDOR
ENTRY/SHOW
ROOM
ELEVATOR
STAIR
ELECTRICAL
ROOM
ENTRY/CORRIDOR
HANGAR
POPULATION
LAB
CLASSROOM/LAB
SIMULATOR
ROOM
MULTI
OFFICE
CLASSROOM LIFT
ROOM
STORAGE
STORAGE
CORRIDOR
CORRIDOR
ELECTRICAL
UP
DEMO AND
REPLACE DOORS
AND FRAME WITH
45-MIN FIRE RATED
ASSEMBLY.
1 HOUR DOUBLE UL FIRE DOOR AND FRAME ASSEMBLY COUNT: 7
SCOPE: REPLACE ALL DOORS, FRAMES, AND WINDOWS WITH 45 MINUTE RATED UL
ASSEMBLES ON NORTH AND EAST WALLS WITH COMMON ADJOINING SPACES TO THE
HANGAR BAY. COMPLY WITH NFPA 80
FIRE PUMP
AND RISER
ROOM
1 HOUR SINGLE UL FIRE DOOR AND FRAME ASSEMBLY COUNT: 8
GENERAL NOTES DOORS
STORAGE
3'X3' WINDOW
LOCATED ON FIRST
FLOOR IN
MULTI-OFFICE.
REVISIONS
DESCRIPTIONNO. DATE
T.
(2
) 6
F.
(2
) 6 w w w .re ed fir e.
co m
R
EE
D F
IR
E
PR
O
TE
C
TI
O
N E
N G
IN
EE
R
PROPERTY OF REED FIRE PROTECTION ENGINEERING. THIS
DOCUMENT AND THE INFORMATION CONTAINED HEREIN MAY
NOT BE REPRODUCED OR EXCERPTED FROM, WITHOUT
EXPRESS WRITTEN PERMISSION OF THE ENGINEERING OFFICES
OF REED FIRE PROTECTION ENGINEERING. UNAUTHORIZED
DISCLOSURE OR CONSTRUCTION USE ARE PROHIBITED BY
COPYRIGHT LAW.
S
PR
IN
G
V
AL
LE
Y
R
LA
S, T
EX
AS
M C
KI
N
N
EY
N
AT
IO
N
AL
A
IR
PO
R T
IN
D
U
ST
R
IA
L
BL
VD
M C
KI
N
N
EY
, T X
T.
(9
) 9
-1 w w w
.fl yt ki .c om
DALLAS, TX 75254
214.638.7599
4201 SPRING VALLEY RD.
www.reedfire.com
FIRE PROTECTION
ENGINEERING
REED
C O
R
PO
R
AT
E H
AN
G
E
STE. 570
F-1
DOOR AND
WINDOW RR
1ST FLOOR DOOR REPLACEMENT 1
F-1
NORTH
DOOR AND WINDOW REPLACEMENT PLAN SCALE: 1/8" = 1'-0"
DOOR STYLE 12
F-3 DOOR AND WINDOW REPLACEMENT PLAN
DOOR STYLE 23
F-3 DOOR AND WINDOW REPLACEMENT PLAN
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
ONE-HOUR FIRE RATED BARRIER
AutoCAD SHX Text 1.1
AutoCAD SHX Text 1.2
AutoCAD SHX Text 1.3
AutoCAD SHX Text 1.4
AutoCAD SHX Text 1.5
AutoCAD SHX Text 1.6
AutoCAD SHX Text 1.7
AutoCAD SHX Text 1.8
AutoCAD SHX Text 1.9
AutoCAD SHX Text 1.10
AutoCAD SHX Text 1.11
AutoCAD SHX Text 1.12
AutoCAD SHX Text 1.13
AutoCAD SHX Text 1.14
AutoCAD SHX Text 1.15
AutoCAD SHX Text
1. ALL DOORS SHALL COMPLY WITH NFPA 80. ALL DOORS SHALL COMPLY WITH NFPA 80. 2. ALL WORK TO COMPLY WITH NFPA 409. SEE SECTION ALL WORK TO COMPLY WITH NFPA 409. SEE SECTION 7.3.4: WHERE A STORAGE AND SERVICING AREA HAS AN ATTACHED, ADJOINING, OR CONTIGUOUS STRUCTURE, SUCH AS A LEAN-TO, SHOP, OFFICE, OR PARTS STORAGE AREA, THE WALL COMMON TO BOTH AREAS SHALL HAVE AT LEAST A 1-HOUR FIRE RESISTANCE RATING, WITH OPENINGS PROTECTED BY LISTED FIRE DOORS HAVING A MINIMUM FIRE RESISTANCE RATING OF 1 HOUR AND ACTUATED FROM BOTH SIDES OF THE WALL. 3. DO NOT PAINT OVER UL/FIRE RATED DOOR, FRAME, OR DO NOT PAINT OVER UL/FIRE RATED DOOR, FRAME, OR WINDOW TAGS. ALL DOOR, FRAME, AND WINDOW TAGS SHALL BE TAPPED OFF PRIOR TO PAINT TO PROTECT FROM DAMAGE. 4. CONTRACTOR SHALL SUBMIT A COMPLETE HARDWARE CONTRACTOR SHALL SUBMIT A COMPLETE HARDWARE SCHEDULE WITH HARDWARE CUT SHEETS PREPARED BY A QUALIFIED HARDWARE CONSULTANT FOR OWNER AND ENGINEERS AND APPROVAL. 5. CONTRACTOR TO PRODUCE AND COORDINATE USE OF A CONTRACTOR TO PRODUCE AND COORDINATE USE OF A MASTER KEYING SYSTEM DEVELOPED WITH AND APPROVED BY THE BUILDING OWNER AND TENANT. 6. CONTRACTOR TO VERIFY THAT ALL NEW AND EXISTING CONTRACTOR TO VERIFY THAT ALL NEW AND EXISTING TO REMAIN DOORS AND DOOR HARDWARE COMPLY WITH REQUIREMENTS OF GOVERNING CODES & STANDARDS. NOTIFY THE OWNER AND ENGINEER IMMEDIATELY OF ANY NON-COMPLIANCE. 7. MATCH BUILDING STANDARD DOORS AND HARDWARE MATCH BUILDING STANDARD DOORS AND HARDWARE WHERE APPLICABLE AND IN COMPLIANCE WITH ACCESSIBILITY CODE REQUIREMENTS. 8. THE CONTRACTOR SHALL REPORT TO THE OWNER AND THE CONTRACTOR SHALL REPORT TO THE OWNER AND ENGINEER FOR REVIEW AND RESOLUTION ANY DISCREPANCIES OR CONFLICTS FOUND BETWEEN THE CONSTRUCTION DOCUMENTS AND BUILDING STANDARDS FOR DOORS, SIDELITES, DOOR AND SIDELITE FRAMES AND HARDWARE. 9. FIELD MEASURE ALL DOORS AND/OR DOOR OPENINGS FIELD MEASURE ALL DOORS AND/OR DOOR OPENINGS AS REQUIRED PRIOR TO FABRICATION. 10. CONTRACTOR IS RESPONSIBLE TO COORDINATE & CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY THE REQUIRED THROAT DEPTH FOR EACH DOOR FRAME PRIOR TO FABRICATION. 11. FIRE RATED DOORS AND FRAMES SHALL SHALL BEAR A FIRE RATED DOORS AND FRAMES SHALL SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWING THE SPECIFIC RATINGS IN COMPLIANCE WITH REQUIREMENTS OF GOVERNING CODES & STANDARDS. 12. ALL FIRE RATED DOORS TO HAVE A LATCH AND SELF ALL FIRE RATED DOORS TO HAVE A LATCH AND SELF CLOSER. 13. ALL SWINGING DOOR HANDLES TO BE LEVER-TYPE IN ALL SWINGING DOOR HANDLES TO BE LEVER-TYPE IN COMPLIANCE WITH GOVERNING CODES & ACCESSIBILITY STANDARDS. 14. DOOR HANDLES OR PULLS AND ALL OTHER OPERABLE DOOR HANDLES OR PULLS AND ALL OTHER OPERABLE PARTS OF DOOR HARDWARE (SUCH AS DEADBOLTS, KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34" AND 44" ABOVE FINISH FLOOR. 15. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT.EXCEPT AT A MAIN ENTRANCE WHERE A SIGN WITH CONTRASTING LETTERS 1 INCH OR MORE HIGH IS PROVIDED STATING "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED.” 16.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .